ASSIGNMENT

Draw the developed winding diagram of the armature of the dc machine with the
following data.Number of poles is 4,Number of slots is 12.Type of winding is simplex
wave

WINDING DIAGRAM

17 19 21 1 2 3 4 5 6 7 8 9 10 111213 141516 171819 20 2122 2 4 6

N S N S

DUMMY
COIL
18 20 22 1 3 5

1 2 3 4 5 6 7 8 9
-VE +VE
+VE

SEQUENCE DIAGRAM -VE

1 8 1320 3 101522 5 12 17 2 7 1419 4 9 16 21 6 1118 1

+VE -VE SIDDESH S


1JB18EE429
Draw the single line diagram of Generating Station with following equipments C)Transformers: 15MVA,110/66KV,3phase,Y/Δ Two
A)Incoming lines:110KV,50HZ,Two 10MVA,110/11KV,3phase,Y/Y One
B)Outgoing lines:110KV,50HZ,One 3MVA,11KV/440v,3phase,Y/Y One
66KV,50HZ,One D) BUSBARS: 110KV,Two
11KV,50HZ,One 66KV,One
Show the positions of CT,PT,Isloating Switches , Lightning Arrestors,Circuit breakers 11KV,One
440V,One SIDDESH S
1B18EE429

110KV Original Busbar


110/66kv 15MVA 3PHASE

110KV Original Busbar2


66KV Original Busbar

110KV Duplicate Busbar


Step Down Transformer 1
LT OCB
PT
OCB CT
LT
LA OCB I 66KV OUTGOING FEEDER
110KV INCOMING WT I
OCB
FEEDER 1 110/66kv 15MVA 3PHASE CT
I Step Down Transformer 2
LA
CT LT OCB
CC I
ES PT
LA OCB CT
I LA
CT CT
BC BC OCB
110KV OUTGOING FEEDER
I I
CT PT 11KV/440V
440V BUSBAR
3MVA
LA OCB
110KV INCOMING WT I OCB Step Down Transformer 440V OUTGOING FEEDER
OCB LT OCB
FEEDER 2
I 110/11KV 10MVA 3PHASE PT CT PT
Step Down Transformer CT
CT
CC I LT OCB LA
ES LA
LA PT
OCB CT OCB
I 11KV OUTGOING FEEDER
LA
CT PT

LA
I I
BC
11KV Original Busbar
Draw the single line diagram of SubStation with following equipments C)Transformers: 5MVA,110/11KV,3phase,Δ-Δ Two
A)Incoming lines:110KV,50HZ,Two 15MVA,110/220KV,3phase,Δ-Δ One
B)Outgoing lines:110KV,50HZ,One 500KVA,11KV/440v,3phase,Δ/Y One,Auxiliary station
11KV,50HZ,Eight transformer
D) The station is connected to another substation through 15MVA transformer of
110/220KV
Show the positions of CT,PT,Isloating Switches , Lightning Arrestors,Circuit breakers

LT

110KV Original Busbar 1


OCB I 11KV OUTGOING FEEDER 1

11KV Original Busbar


CT PT

110KV Duplicate Busbar

110KV Original Busbar 2


220KV OUTGOING FEEDER TO LA
ANOTHER SUBSTATION
LT
110/220KV 3phase OCB I 11KV OUTGOING FEEDER 2
15MVA Δ/Δ
PT
110KV INCOMING I OCB Step Up Transformer CT
WT OCB LT OCB
FEEDER 1 LA
I CT PT
LT
CT 11KV OUTGOING FEEDER 3
CC I LA OCB I
ES
LA
PT
OCB CT
I
110KV OUTGOING FEEDER
CT CT LA
CT PT
LT
BC BC 11KV OUTGOING FEEDER 4
OCB I
LA
I I
PT
CT

110KV INCOMING I 110/11KV 5MVA 3PHASE Δ/Δ LA


WT OCB
FEEDER 2 Step Down Transformer 1 LT
LT OCB OCB I 11KV OUTGOING FEEDER 5
I
CT PT
CC OCB CT CT PT
ES I
LA LA
LA
I
110/11KV 5MVA 3PHASE Δ/Δ
Step Down Transformer 2 LT
110KV Original Busbar 3

LT OCB OCB I 11KV OUTGOING FEEDER 6

I I PT PT
BC OCB CT CT

11KV/440V LA LA
3MVA Δ/Y LT
Step Down Auxiliary Station OCB I 11KV OUTGOING FEEDER 7
OCB Transformer
LT OCB
SIDDESH S PT
CT
1B18EE429 CT PT
Auxiliary Station Supply LA
LA
LT
OCB I 11KV OUTGOING FEEDER 8

PT
CT
LA
Draw the single line diagram of SubStation having the following equipments C)Transformers: 15MVA,110/13.2KV,3phase,Δ/Y One
A)Incoming lines:110KV,50HZ,one 10MVA,110/11KV,3phase,Δ/Y One
B)Outgoing lines:13.2KV,50HZ,Three D)BusBars: 110KV,One
11KV,50HZ,four 13.2KV,One
11KV,One
Show the positions of CT,PT,Isloating Switches , Lightning Arrestors,Circuit breakers
LT
I

13.2KV Original Busbar


OCB
13.2KV OUTGOING FEEDER 1
PT
CT
SIDDESH S LT LA
1B18EE429 OCB I
110/13.2KV 15MVA 3PHASE Y/Δ 13.2KV OUTGOING FEEDER 2
PT
CT
Step Down Transformer 1
LT OCB LA

110KV Original Busbar


PT
OCB CT LT
OCB I
LA
13.2KV OUTGOING FEEDER 3
PT
CT
LA

LT
110KV INCOMING WT OCB OCB I
FEEDER 1 I
11KV OUTGOING FEEDER 1
PT
CT
CT

11KV Original Busbar


CC
ES LT LA
LA I
OCB
11KV OUTGOING FEEDER 2
PT
CT
LA
110/11KV 8MVA 3PHASE Y/Δ
Step Down Transformer 1 LT
LT OCB OCB I
11KV OUTGOING FEEDER 3
PT PT
OCB CT CT
LA LT LA
OCB I
11KV OUTGOING FEEDER 4
PT
CT
LA

OCB CT
LT OCB
Auxiliary Station Supply
PT
11KV/440V3MVA
Δ/Y Step Down
Auxiliary Station LA
Transformer
Draw the single line diagram of SubStation with following equipments C)Transformers: 5MVA,110/11KV,3phase,Δ-Δ Two
A)Incoming lines:110KV,50HZ,Two 15MVA,110/220KV,3phase,Δ-Δ One
B)Outgoing lines:110KV,50HZ,One 500KVA,11KV/440v,3phase,Δ/Y One,Auxiliary station
11KV,50HZ,Eight transformer
D) The station is connected to another substation through 15MVA transformer of
110/220KV
Show the positions of CT,PT,Isloating Switches , Lightning Arrestors,Circuit breakers

LT

110KV Original Busbar 1


OCB I 11KV OUTGOING FEEDER 1

11KV Original Busbar


CT PT

110KV Duplicate Busbar

110KV Original Busbar 2


220KV OUTGOING FEEDER TO LA
ANOTHER SUBSTATION
LT
110/220KV 3phase OCB I 11KV OUTGOING FEEDER 2
15MVA Δ/Δ
PT
110KV INCOMING I OCB Step Up Transformer CT
WT OCB LT OCB
FEEDER 1 LA
I CT PT
LT
CT 11KV OUTGOING FEEDER 3
CC I LA OCB I
ES
LA
PT
OCB CT
I
110KV OUTGOING FEEDER
CT CT LA
CT PT
LT
BC BC 11KV OUTGOING FEEDER 4
OCB I
LA
I I
PT
CT

110KV INCOMING I 110/11KV 5MVA 3PHASE Δ/Δ LA


WT OCB
FEEDER 2 Step Down Transformer 1 LT
LT OCB OCB I 11KV OUTGOING FEEDER 5
I
CT PT
CC OCB CT CT PT
ES I
LA LA
LA
I
110/11KV 5MVA 3PHASE Δ/Δ
Step Down Transformer 2 LT
110KV Original Busbar 3

LT OCB OCB I 11KV OUTGOING FEEDER 6

I I PT PT
BC OCB CT CT

11KV/440V LA LA
3MVA Δ/Y LT
Step Down Auxiliary Station OCB I 11KV OUTGOING FEEDER 7
OCB Transformer
LT OCB
SIDDESH S PT
CT
1B18EE429 CT PT
Auxiliary Station Supply LA
LA
LT
OCB I 11KV OUTGOING FEEDER 8

PT
CT
LA
Draw the single line diagram of Generating Station with following equipments C)Transformers: 11/33KV,3phase,Y/Δ Two
A)Incoming lines:11KV,50HZ,Two D) BUSBARS: 110KV,One
B)Outgoing lines:33KV,50HZ,Four 33KV,Two
Show the positions of CT,PT,Isloating Switches , Lightning Arrestors,Circuit breakers

11KV Original Busbar


SIDDESH S

11KV Duplicate Busbar


1B18EE429

11KV INCOMING I OCB


WT OCB 33KV OUTGOING FEEDER 1
FEEDER 1

33KV BUSBAR 2
I 11/33KV 3PHASE Y/Δ PT
CT
CT Step Up Transformer 1
CC I LT OCB LA
ES
LA PT
OCB CT OCB
I 33KV OUTGOING FEEDER 2
LA
CT CT PT
CT
BC BC
LA
I I

11KV INCOMING I OCB


WT OCB 33KV OUTGOING FEEDER 3
FEEDER 2

33KV BUSBAR 1
I 11/33KV 3PHASE Y/Δ CT PT
CT Step Up Transformer 2
CC I LT OCB LA
ES
LA PT
OCB CT OCB
I 33KV OUTGOING FEEDER 4
LA
CT PT

LA
I I
BC
Draw the single line diagram(SLD) of Generating Station having the following D)LT busbar in 2 sections
details E)Auxiliary Transformers:500KVA,11KV/400V,1.
A)Generators:50 MVA,11KV,3phase,2. F)Outgoing lines:132KV,3phase,4
B)Transformers: 50MVA,11/132KV,3phase,Δ/Y 2
C)HT busbar in 2 sections
Indicate the positions of CT,PT,Isloating Switches , Lightning Arrestors,Circuit breakers

132KV Duplicate Busbar


132KV Original Busbar 1
11KV Original Busbar 1
11/132KV 50MVA 3PHASE
I
Step Up Transformer 1
LT OCB LT
I OCB I

11KV Duplicate Busbar


PT

11KV Original Busbar2


OCB CT 132KV OUTGOING FEEDER 1
I PT
CT
LA
I LT LA

132KV Original Busbar 2


OCB I
11KV INCOMING WT I CT CT 132KV OUTGOING FEEDER 2
OCB PT
FEEDER 1 CT
BC BC
I
CT I I LA
CC I
ES LT
LA
50MVA 11KV 3Phase 11/132KV 50MVA 3PHASE OCB I
I
Generator 1 I Step Up Transformer 2 132KV OUTGOING FEEDER 3
LT OCB PT
CT CT CT
I
PT
BC BC OCB CT LT LA
I OCB I
I I LA 132KV OUTGOING FEEDER 4
I PT
CT

11KV INCOMING WT I LA
OCB
FEEDER 2
I 11KV/440V
I I
CT 500KVA CT BC
CC I
ES Step Down Auxiliary Station
LA
50MVA 11KV 3Phase OCB Transformer
Generator 2 I LT OCB 440V Station Auxiliary Supply SIDDESH S
PT 1B18EE429
CT
LA
I I
BC
Draw the single line diagram of Generating Station with following equipments C)Transformers: 11/33KV,3phase,Y/Δ Two
A)Incoming lines:11KV,50HZ,Two D) BUSBARS: 110KV,One
B)Outgoing lines:33KV,50HZ,Four 33KV,Two
Show the positions of CT,PT,Isloating Switches , Lightning Arrestors,Circuit breakers

11KV Original Busbar


SIDDESH S

11KV Duplicate Busbar


1B18EE429

11KV INCOMING I OCB


WT OCB 33KV OUTGOING FEEDER 1
FEEDER 1

33KV BUSBAR 2
I 11/33KV 3PHASE Y/Δ PT
CT
CT Step Up Transformer 1
CC I LT OCB LA
ES
LA PT
OCB CT OCB
I 33KV OUTGOING FEEDER 2
LA
CT CT PT
CT
BC BC
LA
I I

11KV INCOMING I OCB


WT OCB 33KV OUTGOING FEEDER 3
FEEDER 2

33KV BUSBAR 1
I 11/33KV 3PHASE Y/Δ CT PT
CT Step Up Transformer 2
CC I LT OCB LA
ES
LA PT
OCB CT OCB
I 33KV OUTGOING FEEDER 4
LA
CT PT

LA
I I
BC
Draw the single line diagram of SubStation with following equipments C)Transformers: 5MVA,110/11KV,3phase,Δ-Δ Two
A)Incoming lines:110KV,50HZ,Two 15MVA,110/220KV,3phase,Δ-Δ One
B)Outgoing lines:110KV,50HZ,One 500MVA,11KV/440v,3phase,Δ/Y One,Auxiliary station
11KV,50HZ,Three transformer
D) The station is connected to another substation through 15MVA transformer of
110/220KV
Show the positions of CT,PT,Isloating Switches , Lightning Arrestors,Circuit breakers

110KV Original Busbar 1

110KV Duplicate Busbar

110KV Original Busbar 2


110/220KV 3phase
15MVA Δ/Δ
220KV OUTGOING FEEDER TO
110KV INCOMING I OCB Step Up Transformer ANOTHER SUBSTATION
WT OCB LT OCB
FEEDER 1
I CT PT
CT
CC I LA
ES
LA
I OCB
110KV OUTGOING FEEDER
CT CT
CT PT
BC BC LT
LA OCB I 11KV OUTGOING FEEDER 1
I I
PT
CT

11KV Original Busbar


110KV INCOMING I 110/11KV 5MVA 3PHASE Δ/Δ
WT OCB LA
FEEDER 2 Step Down Transformer 1
LT OCB LT
I I 11KV OUTGOING FEEDER 2
PT OCB
CT OCB CT
CC I
ES PT
LA LA CT
I LA
110/11KV 5MVA 3PHASE Δ/Δ
Step Down Transformer 2 LT
11KV OUTGOING FEEDER 3
110KV Original Busbar 3

LT OCB OCB I

I I PT PT
BC OCB CT CT

11KV/440V LA LA
3phase 500MVA Δ/Y
Step Down Auxiliary Station LT
OCB Transformer I 400V OUTGOING FEEDER
LT OCB OCB
SIDDESH S
1B18EE429 PT PT
CT CT
Auxiliary Station Supply
LA LA
Draw the single line diagram of a typical substation: 66KV amd 11KV buses are double bus with a bus coupler
Transformers:2,5MVA,66/11KV,delta/delta,3phase,50hz coupling condenser,wave trap,earthing switches are to
Auxiliary transformer: 1,11KV/400V,delta/star,3phase,50hz positioned at the incoming lines
Incoming lines:2,66KV
Outgoing lines: 1,66Kv & 5,11KV
Indicate the positions of CT,PT,Isloating Switches , Lightning Arrestors,Circuit breakers

11KV Duplicate Busbar


11KV Original Busbar 1
LT

66KV Original Busbar 1


66/11KV 5MVA 3PHASE Δ/Δ OCB I
I 11KV OUTGOING FEEDER 1
Step Down Transformer 1
LT OCB PT
CT
I

66KV Duplicate Busbar

66KV Original Busbar2


PT
OCB CT LT LA
I OCB I
LA 11KV OUTGOING FEEDER 2
CT PT
I

11KV Original Busbar 2


66KV INCOMING WT I CT CT LA
OCB LT
FEEDER 1
BC BC OCB I
I 11KV OUTGOING FEEDER 3
CT I I PT
CC I CT
ES
LA
66/11KV 5MVA 3PHASE Δ/Δ LA
I LT
I Step Down Transformer 2
LT OCB OCB I
CT CT I 11KV OUTGOING FEEDER 4
PT PT
BC BC OCB CT CT
I
I I LA LA
LT
I OCB I
11KV OUTGOING FEEDER 5
66KV INCOMING WT I LT 66KV OUTGOING FEEDER PT
OCB OCB I CT
FEEDER 2
I PT LA
CT I I
CT BC
CC I
ES LA
LA
I 11KV/440V SIDDESH S
Δ/Y 3phase 1B18EE429
Step Down Auxiliary Station
OCB Transformer 440V Station Auxiliary Supply
LT OCB
I I PT
BC CT
LA
Draw the single line diagram of a typical substation with data of the equipment D)Bus couplers on the high tension side only.
given below: E)Feeders of 11KV at low tension side total no.=6
A)Two Incoming lines 110KV Inappropriate positions of CT,PT,Isloating Switches ,
B)Two Transformer of 110/11KV Lightning Arrestors,Circuit breakers,earthing switches
C)Double bus bars for high tension and low tension sides have to indicated wave traps and coupling condensers at incoming and
LT
station auxiliary transformers of 11KV/415V I 11KV OUTGOING FEEDER 1
OCB

11KV Original Busbar


PT
CT
LA

110KV Duplicate Busbar


110KV Original Busbar
LT
OCB I 11KV OUTGOING FEEDER 2

11KV Duplicate Busbar


11KV Original Busbar
PT
CT

110KV INCOMING I LA
WT OCB
FEEDER 1 LT
I 110/11KV 3PHASE I OCB I 11KV OUTGOING FEEDER 3
CT Step Down Transformer 1
CC I LT OCB PT
ES I CT
LA PT
OCB CT LA
I I
LA LT
CT CT 11KV OUTGOING FEEDER 4
I OCB I
BC BC
CT PT
I I CT
BC BC
LA
I I LT
110KV INCOMING WT I OCB I 11KV OUTGOING FEEDER 5
OCB
FEEDER 2
I 110/11KV 3PHASE I PT
CT
CT Step Down Transformer 2
CC I LT OCB LA
ES I
LA PT
OCB CT
I I LT
LA OCB I 11KV OUTGOING FEEDER 6
I
PT
CT
SIDDESH S I
BC I
LA
1JB18EE429 11KV/415V
3phase
Step Down Auxiliary Station
OCB Transformer 440V Station Auxiliary Supply
LT OCB

CT PT

LA
Draw a SLD of connections of hydroelectric station having the following equipment
a.Alternators:12MVA,3Ø,50Hz,11KV,Y-connected,Five.
b.Steo-up transformers:5000KVA,3Ø,50Hz,11/110KV,Δ/Y-connected,Five
c.Bus:110KV double bus bar with bus coupler
d.Outgoing transmission lines:110KV,two
e.Station Auxiliary transformer:750KVA,3pahse,50Hz,11KV, Δ/Y,Two
f.Also indicate positions of CT,PT,Isolating Switches,Lightning Arrestors,Circuit breakers
11KV/440V 3phase 50Hz
750KVA Δ/Y
Step Down Auxiliary Station
OCB Transformer 1 Auxiliary Station Supply
LT OCB
PT
CT
Auxiliary Station Supply
LA

11KV/440V 3phase 50Hz


750KVA Δ/Y
11KV Original Busbar 1

Step Down Auxiliary Station


OCB Transformer 2 Auxiliary Station Supply
LT OCB
11KV Duplicate Busbar

CT PT

LA

110KV Duplicate Busbar


11KV INCOMING WT I
OCB

110KV Original Busbar


FEEDER 1
I 11/110KV 5000KVA 3Ø 50Hz I
CT Δ/Y Step Up Transformer 1
CC I OCB
ES I
12MVA 11KV 3Phase LA PT
OCB CT
Y-connected Alternator1 I I
LA
CT CT
I
BC BC
I I

I
11KV INCOMING WT I
OCB
FEEDER 1
I 11/110KV 5000KVA 3Ø 50Hz I
CT Δ/Y Step Up Transformer 2
CC I OCB
ES I
12MVA 11KV 3Phase LA PT
OCB CT
Y-connected Alternator2 I I
LA
CT CT
I
BC BC
CT
I I
BC

I I
11KV INCOMING WT OCB
FEEDER 1
I 11/110KV 5000KVA 3Ø 50Hz I OCB
CT Δ/Y Step Up Transformer 3 110KV OUTGOING FEEDER 1
CC I OCB
ES I PT
LA CT
33KV BUSBAR 1

12MVA 11KV 3Phase PT


OCB CT
Y-connected Alternator3 I I LA
LA
CT CT
I OCB
BC BC 110KV OUTGOING FEEDER 2
CT CT
I I CT PT
BC BC
11KV INCOMING WT I I I LA
OCB
FEEDER 1
I 11/110KV 5000KVA 3Ø 50Hz I
CT Δ/Y Step Up Transformer 4
CC I OCB
ES I
12MVA 11KV 3Phase LA PT
OCB CT
Y-connected Alternator4 I I
LA
CT CT
I
BC BC
CT CT SIDDESH S
I I
BC BC 1B18EE429
I I
11KV INCOMING WT I
OCB
FEEDER 2
I 11/110KV 5000KVA 3Ø 50Hz I
CT Δ/Y Step Up Transformer 5
CC I OCB
ES I
12MVA 11KV 3Phase LA PT
OCB CT
Y-connected Alternator5 I I
LA
I

I I
BC

I I
BC
Draw a SLD of connections of hydroelectric station having the following equipment
a.Alternators:12MVA,3Ø,50Hz,11KV,Y-connected,Five.
b.Steo-up transformers:5000KVA,3Ø,50Hz,11/110KV,Δ/Y-connected,Five
c.Bus:110KV double bus bar with bus coupler
d.Outgoing transmission lines:110KV,two
e.Station Auxiliary transformer:750KVA,3pahse,50Hz,11KV, Δ/Y,Two
f.Also indicate positions of CT,PT,Isolating Switches,Lightning Arrestors,Circuit breakers
11KV/440V 3phase 50Hz
750KVA Δ/Y
Step Down Auxiliary Station
OCB Transformer 1 Auxiliary Station Supply
LT OCB
PT
CT
Auxiliary Station Supply
LA

11KV/440V 3phase 50Hz


750KVA Δ/Y
11KV Original Busbar 1

Step Down Auxiliary Station


OCB Transformer 2 Auxiliary Station Supply
LT OCB
11KV Duplicate Busbar

CT PT

LA

110KV Duplicate Busbar


11KV INCOMING WT I
OCB

110KV Original Busbar


FEEDER 1
I 11/110KV 5000KVA 3Ø 50Hz I
CT Δ/Y Step Up Transformer 1
CC I OCB
ES I
12MVA 11KV 3Phase LA PT
OCB CT
Y-connected Alternator1 I I
LA
CT CT
I
BC BC
I I

I
11KV INCOMING WT I
OCB
FEEDER 1
I 11/110KV 5000KVA 3Ø 50Hz I
CT Δ/Y Step Up Transformer 2
CC I OCB
ES I
12MVA 11KV 3Phase LA PT
OCB CT
Y-connected Alternator2 I I
LA
CT CT
I
BC BC
CT
I I
BC

I I
11KV INCOMING WT OCB
FEEDER 1
I 11/110KV 5000KVA 3Ø 50Hz I OCB
CT Δ/Y Step Up Transformer 3 110KV OUTGOING FEEDER 1
CC I OCB
ES I PT
LA CT
33KV BUSBAR 1

12MVA 11KV 3Phase PT


OCB CT
Y-connected Alternator3 I I LA
LA
CT CT
I OCB
BC BC 110KV OUTGOING FEEDER 2
CT CT
I I CT PT
BC BC
11KV INCOMING WT I I I LA
OCB
FEEDER 1
I 11/110KV 5000KVA 3Ø 50Hz I
CT Δ/Y Step Up Transformer 4
CC I OCB
ES I
12MVA 11KV 3Phase LA PT
OCB CT
Y-connected Alternator4 I I
LA
CT CT
I
BC BC
CT CT SIDDESH S
I I
BC BC 1B18EE429
I I
11KV INCOMING WT I
OCB
FEEDER 2
I 11/110KV 5000KVA 3Ø 50Hz I
CT Δ/Y Step Up Transformer 5
CC I OCB
ES I
12MVA 11KV 3Phase LA PT
OCB CT
Y-connected Alternator5 I I
LA
I

I I
BC

I I
BC
Draw a single line diagram of a 66KV MUSS with the following details.
a.66KV incoming lines,2 nos e.bus couplers for HT side only
b.Step down transformer 66/11KV,2 f.Feeders,11KV radiating from L.T bus bars,4
c.OCB's for transformer bank on L.T side,2 g.L.T circuit breakers for feeders,4
d.Duplicate bus bars for H.T and L.T side to provided
h.Positions of lightning arrestors,CT's and PT's are to be indicated
SIDDESH S

66KV Duplicate Busbar


66KV Original Busbar
1JB18EE429

11KV Duplicate Busbar


11KV Original Busbar
66KV INCOMING WT I
OCB
FEEDER 1

11V BUSBAR
I 66/11KV 3PHASE Y/Δ I
Step Down Transformer 1 LT OCB 11KV OUTGOING FEEDER 1
CT
CC I OCB
ES I CT PT
LA PT
OCB CT
I I LA
LA
CT CT
I LT OCB 11KV OUTGOING FEEDER 2
BC BC
CT CT PT
I I CT
BC BC
LA
I I
66KV INCOMING WT I
OCB
FEEDER 2
I 66/11KV 3PHASE Y/Δ I
Step Down Transformer 2 LT OCB 11KV OUTGOING FEEDER 3
CT
CC I OCB
ES I CT PT
LA PT
OCB CT
I I LA
LA
I LT OCB 11KV OUTGOING FEEDER 4
I I CT PT
BC
LA
I I
BC
Following deatils ofa KVA single phase , 6600/400Vtransformer
Draw the frontelevation right half of right limb in section and right half
sectional plan
PLAN RIGHT HALF IN SECTION

END PLATE

CORE

12 LV INSULATION
LV WINDING
330
HV 1st LAYER
HV 2nd LAYER

175 BOLT

280
SIDDESH S
1JB18EE429 337.5

383

3 490
3 UPPER YOKE
250
WOOD

HV WINDING

HV INSULATION

LV WINDING
LV INSULATION
G
430 TAPPIN

250 LOWER YOKE

ELEVATION RIGHT HALF OF A RIGHT LIMB IN SECTION


DRAW THE FRONT ELEVATION LEFT HALF IN SECTION AND SECTIONAL PLAN OF A 15KVA,
50HZ DISTRIBUTION TRANSFORMER WITH THE FOLLOWING DATA

LV INSULATION
HV INSULATION
HV COIL
LV COIL
63

SIDDESH S
1JB18EE429

63
91.6 114.5

YOKE
63.5

TAPPING

298.5

63.5
YOKE
The following are the details of three phase core type transformer draw to
suitable scale
1.Elevation of Transformer assemble showing one limb in section
2.Plan of transformer assemble showing one limb in section
PLAN SHOWING ONE LIMB IN SECTION

220
231 SIDDESH S
13.3
340 1JB18EE429

250

480
427

250

ELEVATION SHOWING ONE LIMB IN SECTION


DRAW THE SECTIONAL VIEW OF THE CASING OF A
CONVENTIONAL 4 POLE DC MACHINE
150.0000

160.000 Ø745.0000 INTER POLE


40X150
Ø845.0000

Ø425.0000

845.0000

450.0000

SIDDESH S, 1JB18EE429