JOB HAZARD ANALYSIS [JHA] WORKSHEET

JHA NO. PTW NO WORK PERMIT TYPE HOT/ COLD

FACILITY RDPA PLATFORM LOCATION RESAK FIELD, TERENGGANU SPECIFIC WORKSTATION SEA DECK

EQUIPMENT NO. WORK DESCRIPTION Setting Up Air Compressor & UHPWJ Machine
NOTE
1. JHA shall be applicable for all work activities which requires PTW.
2. The pre-prepared JHA and JHA prompters will be used as a reference/guide during the development of JHA.
3. Personnel carrying out the work shall be fully familiar with the written Work/Operating Procedures developed for the job. The Work/Operating Procedures shall describe, in step-by-step instructions, the correct method of executing the specified work.
4. Prior to commencement of work (after PTW has been approved), the task-specific JHA shall be discussed amongst all personnel involved in the execution; and requirements contained therein shall be fully understood and agreed by all involved
personnel.

JOB ACTION PARTY ACTION PARTY


DESCRIPTION OF JOB STEP POTENTIAL HAZARD POTENTIAL CONSEQUENCES CONTROL BARRIERS RECOVERY BARRIERS
STEP

 OPERATION
1. Use Proper PPE (Hand Gloves) 1. Stop work  SAFETY
1. Hand and Finger Injuries 2. Secure/ identify sharp edges and pinch point  RSB SUPV /WL 2. First aid OFFICER
Sharp Edges
2. Cuts 3. Display proper Warning Signage  RSB CREWS 3. Report to Operation  RSB SUPV/WL
And Points 4. Secure incident location
3. Puncture wounds 4. Protect or wrap any sharp edges or pinch SAFETY OFFICER  RSB CREWS
points with Cotton rag with barricade  RSB FIRST
AIDER
 OPERATION
 SAFETY
 RSB SUPV /WL
Pinch point 1. Wear safety gloves OFFICER
1. Finger injury  RSB CREWS 1. First aid
2. Correct hand placement  RSB SUPV/WL
 RSB SSS
 RSB CREWS
RSB FIRST AIDER
 OPERATION
1. Apply correct manual handling of hand tools  SAFETY
2. Apply “Buddy System” at work, 2 person if the
1. Musculoskeletal disorders  RSB SUPV/WL 1. Stop work OFFICER
object is heavy
1 Assembling hoses Ergonomic Hazard 2. Back Pain 3. Observe surroundings before and while  RSB CREWS 2. First aid  RSB SUPV/WL
3. Back Injuries carrying the objects  SAFETY OFFICER 3. Report to Operation  RSB CREWS
 RSB FIRST
AIDER
 OPERATION
1. Stop work  SAFETY
1. puncture wound 1. Wear proper and suitable PPE when  RSB SUPV/WL OFFICER
2. First aid
performing tasks
Corroded connectors 2. personnel injury  RSB CREWS 3. Report to Operation  RSB SUPV/WL
2. Use WD-40 to clear corrosion
 SAFETY OFFICER 4. Secure incident location  RSB CREWS
3. Use correct tools when performing task
with barricade  RSB FIRST
AIDER
 OPERATION
1. Extra cautious of worksite hazardous 1. Stop work  SAFETY
surrounding  RSB SUPV/WL 2. First aid
Uneven/ 1. Personnel injury OFFICER
2. Awareness of worksite  RSB CREWS 3. Report to Operation
Slippery surface 2. Trip and fall injury  RSB SUPV/WL
3. Wear correct PPE (non-slip safety  SAFETY OFFICER 4. Secure incident location
boots/shoes) with barricade  RSB CREWS
RSB FIRST AIDER
Page 1
JOB ACTION PARTY ACTION PARTY
DESCRIPTION OF JOB STEP POTENTIAL HAZARD POTENTIAL CONSEQUENCES CONTROL BARRIERS RECOVERY BARRIERS
STEP

 OPERATION
1. Use Proper PPE (Hand Gloves) 1. Stop work  SAFETY
1. Hand and Finger Injuries 2. Secure/ identify sharp edges and pinch point  RSB SUPV /WL 2. First aid OFFICER
Sharp Edges
2. Cuts 3. Display proper Warning Signage  RSB CREWS 3. Report to Operation  RSB SUPV/WL
And Points 4. Secure incident location
3. Puncture wounds 4. Protect or wrap any sharp edges or pinch SAFETY OFFICER  RSB CREWS
points with Cotton rag with barricade  RSB FIRST
AIDER
 OPERATION
 SAFETY
Inspection of air compressor &  RSB SUPV /WL
2. Pinch point 1. Wear safety gloves OFFICER
UHPWJ machine 1. Finger injury  RSB CREWS 1. First aid
1. Correct hand placement  RSB SUPV/WL
 RSB SSS
 RSB CREWS
RSB FIRST AIDER
 OPERATION
1. Extra cautious of worksite hazardous 1. Stop work  SAFETY
surrounding  RSB SUPV/WL 2. First aid
Uneven/ 1. Personnel injury OFFICER
2. Awareness of worksite  RSB CREWS 3. Report to Operation
Slippery surface 2. Trip and fall injury  RSB SUPV/WL
3. Wear correct PPE (non-slip safety  SAFETY OFFICER 4. Secure incident location
boots/shoes) with barricade  RSB CREWS
RSB FIRST AIDER
1. Close monitoring of diesel tank gauge while
filling/ topping up.  OPERATION
1. Inhaling hazardous diesel fumes 2. Use proper equipment to topping the diesel.
1. Stop work  SAFETY
into respiratory system 3. Use drip pan underneath the tank to collect  RSB SUPV/WL 2. First aid OFFICER
Chemical hazard 2. Skin irritation and inflammation dripping oil.
 RSB CREWS 3. Report to Operation  RSB SUPV/WL
3. Handling of flammable diesel 4. Barricade work area.
5. Use mandatory PPE.  SAFETY OFFICER 4. Secure incident location  RSB CREWS
fuel with barricade
6. Use rubber gloves.  RSB FIRST
4. Fire incident
7. Diesel filling to be done only when engine is AIDER
3. Topping up diesel fuel
shut off and cold.
 OPERATION
1. Apply correct manual handling of hand tools  SAFETY
2. Apply “Buddy System” at work, 2 person if the
1. Musculoskeletal disorders  RSB SUPV/WL 1. Stop work OFFICER
object is heavy
Ergonomic Hazard 2. Back Pain 3. Observe surroundings before and while  RSB CREWS 2. First aid  RSB SUPV/WL
3. Back Injuries carrying the objects  SAFETY OFFICER 3. Report to Operation  RSB CREWS
 RSB FIRST
AIDER
4. Check battery status (sign of  OPERATION
leakage/ cable) 1. Conduct full check of the battery prior to start  SAFETY
Battery Leak up.  RSB SUPV/WL 1. Stop work
1. Electrocution OFFICER
2. Ensure the battery in good condition.  RSB CREWS 2. First aid
2. Personnel injury  RSB SUPV/WL
3. Competent personnel.  SAFETY OFFICER 3. Report to Operation
4. Use mandatory PPE.  RSB CREWS
RSB FIRST AIDER
Battery cable wear & tear 1. Electrocution 1. Conduct full check of the battery prior to start  RSB SUPV/WL 1. Stop work  OPERATION
2. Personnel injury up.  RSB CREWS 2. First aid  SAFETY
2. Ensure the battery in good condition.  SAFETY OFFICER 3. Report to Operation OFFICER
3. Competent personnel.
 RSB SUPV/WL
5. Use mandatory PPE.
 RSB CREWS
JOB ACTION PARTY ACTION PARTY
DESCRIPTION OF JOB STEP POTENTIAL HAZARD POTENTIAL CONSEQUENCES CONTROL BARRIERS RECOVERY BARRIERS
STEP

RSB FIRST AIDER


5. Test run air compressor and Static electricity
UHPWJ machines for blasting and
painting activities.  OPERATION
1. Conduct full check of the machine prior to
1. Stop work  SAFETY
1. Electrocutions start up.  RSB SUPV/WL OFFICER
2. First aid
2. Ensure the machine is properly grounded.
2. Fire incident  RSB CREWS 3. Report to Operation  RSB SUPV/WL
3. Competent personnel.
3. Personnel injury  SAFETY OFFICER 4. Secure incident location  RSB CREWS
4. Use mandatory PPE.
with barricade  RSB FIRST
5. Use hand gloves.
AIDER

Generation of spark at  OPERATION


engine exhaust system. 1. Conduct full check of the machine prior to  SAFETY
1. Stop work
start up.  RSB SUPV/WL OFFICER
2. First aid
1. Fire incident 2. Ensure the machine is properly grounded.
 RSB CREWS 3. Report to Operation  RSB SUPV/WL
2. Personnel injury 3. Competent personnel.
 SAFETY OFFICER 4. Secure incident location  RSB CREWS
4. Use mandatory PPE.
with barricade  RSB FIRST
5. Use hand gloves.
AIDER
High engine noise  OPERATION
1. Stop work  SAFETY
1. Display warning signage.  RSB SUPV/WL OFFICER
2. First aid
1. Temporary hearing impairment 2. Barricade at work area.
 RSB CREWS 3. Report to Operation  RSB SUPV/WL
2. loss of hearing sense 3. Use mandatory PPE.
 SAFETY OFFICER 4. Secure incident location  RSB CREWS
4. Use ear protection.
with barricade  RSB FIRST
AIDER
 OPERATION
1. Stop work  SAFETY
1. Personnel burned by the hot 1. Barricade equipment area.  RSB SUPV/WL 2. First aid OFFICER
Hot engine surface surface 2. Use mandatory PPE.  RSB CREWS 3. Report to Operation  RSB SUPV/WL
2. Personnel injury 3. Use hand gloves.  SAFETY OFFICER 4. Secure incident location  RSB CREWS
with barricade  RSB FIRST
AIDER
 OPERATION
1. Stop work  SAFETY
1. Inhaling hazardous diesel fumes 1. Always stay upwind.  RSB SUPV/WL 2. First aid OFFICER
Presence of exhaust fumes into respiratory system 2. Barricade equipment area.  RSB CREWS 3. Report to Operation  RSB SUPV/WL
2. Skin irritation and inflammation 3. Use 3M dusk mask (if necessary)  SAFETY OFFICER 4. Secure incident location  RSB CREWS
with barricade  RSB FIRST
AIDER
Machine Failure 1. Personnel injury 1. Ensure all safety features of the equipment  RSB SUPV/WL 1. Stop work  OPERATION
2. Property damage are functioning.  RSB CREWS 2. First aid  SAFETY
2. Only qualified personnel to operate machine.  SAFETY OFFICER 3. Report to Operation OFFICER
3. Vigilant monitoring of the equipment. 4. Secure incident location
 RSB SUPV/WL
4. Shall conduct daily inspection on UHPWJ with barricade
machine. Shutdown machine whenever  RSB CREWS
JOB ACTION PARTY ACTION PARTY
DESCRIPTION OF JOB STEP POTENTIAL HAZARD POTENTIAL CONSEQUENCES CONTROL BARRIERS RECOVERY BARRIERS
STEP

needed especially when not in use. Change


parts if needed. Refill/renew oil when
necessary.
5. No hydro blasting conducted until machine
breakdown is settled and safe to be use.
6. Radio communications between RSB MT, RSB  RSB FIRST
RAT III, RSB SPV must be carried along this AIDER
work activity
7. Barricade and signage machine area.
8. Secure hose connection by tightening of bolts,
couplings being pin and connected hoses
being whip checked.
 OPERATION
 SAFETY
 RSB SUPV /WL
Pinch point 1. Wear safety gloves OFFICER
1. Finger injury  RSB CREWS 1. First aid
2. Correct hand placement  RSB SUPV/WL
 RSB SSS
 RSB CREWS
RSB FIRST AIDER
 OPERATION
1. Use Proper PPE (Hand Gloves) 1. Stop work  SAFETY
1. Hand and Finger Injuries 2. Secure/ identify sharp edges and pinch point  RSB SUPV /WL 2. First aid OFFICER
Sharp Edges
2. Cuts 3. Display proper Warning Signage  RSB CREWS 3. Report to Operation  RSB SUPV/WL
6. Housekeeping And Points 4. Secure incident location
3. Puncture wounds 4. Protect or wrap any sharp edges or pinch SAFETY OFFICER  RSB CREWS
points with Cotton rag with barricade  RSB FIRST
AIDER
 OPERATION
1. Use Proper PPE (Hand Gloves)  SAFETY
2. Secure/ identify sharp edges and pinch point • RSB SUPV/WL
Underlying Tools and 1. Slip, Trip and Fall 1. Stop work OFFICER
3. Display proper Warning Signage • RSB CREWS
Equipment 2. Foot injury 2. First aid  RSB SUPV/WL
4. Protect or wrap any sharp edges or pinch • SAFETY
3. Hand and Finger Injuries points with Cotton rag
3. Report to Operation  RSB CREWS
OFFICER
 RSB FIRST
AIDER
JHA APPROVAL DURING PTW APPLICATION

REVIEWED BY APPROVED BY
NAME NAME

DESIGNATION WORK LEADER DESIGNATION PRODUCTION SUPERVISOR / MAINTENANCE SUPERVISOR

SIGNATURE SIGNATURE

DATE DATE

AFTER PTW HAS BEEN APPROVED


WORK TEAM (CONFIRMATION THAT JHA HAS BEEN COMMUNICATED TO WORK TEAM AS PART OF PRE-JOB/TOOLBOX MEETING - AFTER PTW HAS BEEN APPROVED)
Name(s) Designation Signature Name(s) Designation Signature