The scope of work document outlines 6 areas of data measurement for the Pusat Rehabilitasi Perkeso Melaka building project site. These include: 1) measuring the chilled water system parameters over 7 days, 2) logging main electrical data over 14 days, 3) taking instant electrical and air measurements of AHUs, 4) measuring the electrical distribution board power, 5) logging room temperature, humidity, CO2 and light levels, and 6) monitoring the electrical power of air compressors and motors. The goal is to collect voltage, current, power usage and other system parameters to assess building equipment and system performance over time.
The scope of work document outlines 6 areas of data measurement for the Pusat Rehabilitasi Perkeso Melaka building project site. These include: 1) measuring the chilled water system parameters over 7 days, 2) logging main electrical data over 14 days, 3) taking instant electrical and air measurements of AHUs, 4) measuring the electrical distribution board power, 5) logging room temperature, humidity, CO2 and light levels, and 6) monitoring the electrical power of air compressors and motors. The goal is to collect voltage, current, power usage and other system parameters to assess building equipment and system performance over time.
The scope of work document outlines 6 areas of data measurement for the Pusat Rehabilitasi Perkeso Melaka building project site. These include: 1) measuring the chilled water system parameters over 7 days, 2) logging main electrical data over 14 days, 3) taking instant electrical and air measurements of AHUs, 4) measuring the electrical distribution board power, 5) logging room temperature, humidity, CO2 and light levels, and 6) monitoring the electrical power of air compressors and motors. The goal is to collect voltage, current, power usage and other system parameters to assess building equipment and system performance over time.
PROJECT SITE: PUSAT REHABILITASI PERKESO MELAKA, 75450 BEMBAN,
MALACCA
N Scope of Work Description
o 1 Building Chilled Water Data measurement covers: Main Distribution Board - Secondary Pump Electrical Panel a) Data logging for 7 days with at least 5-minute interval data. The parameters to be collected are: i) Voltage (V) ii) Current (A) iii) Active Power (kW) iv) Power factor
Secondary Chilled Water Pipeline
a) Data Logging for 7 days with at least 15-minute interval data. The parameters to be collected are: i) Chilled water supply flow rate ii) Chilled water supply temperature iii) Chilled water return temperature
2 Main Incoming Electrical Data measurement covers:
Data Logging (LV) a) Data logging for 14 days with at least 15-minute interval data. The parameters to be collected are: i) Voltage (V) ii) Current (A) iii) Active Power (kW) iv) Power factor
3 Air Handling Unit (AHU) Data measurement covers:
Data Measurement a. Instantaneous measurement of AHU electrical data. Among parameters will be measured are: i) Voltage (V) ii) Current (A) iii) Active Power (kW) iv) Power factor
b. Instantaneous measurement of AHU air side data. Among parameters will
be measured are:
Return Air Duct
i) Cross section area ii) Return air flowrate/velocity iii) Return air temperature iv) Return air relative humidity v) Return air CO2
Mixed Air Duct
i) Cross section area ii) Mixed air flowrate/velocity iii) Mixed air temperature iv) Mixed air relative humidity
Outside Air Duct
i) Cross section area ii) Outside air flowrate/velocity iii) Outside air temperature iv) Outside air relative humidity
Supply Air Duct
i) Supply air temperature ii) Supply air relative humidity 4 Electrical Distribution Data measurement covers: Board Power a. Instantaneous electrical measurement of Electrical Distribution Board. Measurement Among parameters will be measured are: i) Voltage (V) ii) Current (A) iii) Active Power (kW) iv) IV. Power factor 5 Room Data Data measurement covers: Measurement a. Instantaneous measurement of Room Data. Among parameters will be measured are: i) Room Temperature (°C) ii) Room Relative Humidity (RH %) iii) CO2 Level (ppm) iv) IV. Lux Level 6 Air Compressor/Motor Data measurement covers: a. Instantaneous electrical measurement of Electrical Distribution Board. Among parameters will be measured are: i) Voltage (V) ii) Current (A) iii) Active Power (kW) iv) IV. Power factor