CHECK LIST FOR TESTING OF ELCTRICAL INSTALLATIONS BG/QA/CL-308/14 Rev: 00
Project: Date:

Acceptable Unacceptable State C1 Improvement State Not Not


OUTCOMES OK NV NA
Condition Condition or C2 Recommeded C3 verified applicable
OUTCOME (Use codes above. Provide Further investigation
SN DESCRIPTION
additional comment where applicable) required (Y/N)
A Main Switchboard (MV Panel) & MV Room
1 Adequacy working space and safe switch room.
Entrance /exit to switch room and/or electrical facilities are free of
2
obstruction.
Suitable lighting provision provided for switch room and /or electrical
3
facilities.
Suitable ventilation/air conditioning provision provided for switch room
4
and /or electrical facilities.

A warning notice ‘DANGER — ELECTRICITY, UNAUTHORISED


5
ENTRY PROHIBITED’ and ‘provided at every entrance of switch room.

Updated schematic diagrams and instructions are correctly and


6
adequately provided.
All switchgears, circuits, fuses are provided with a legible and durable
7
identification label.
8 No visible damage to impair safety.

9 The rating of all ACBs/MCCBs/CTs comply with Kahramaa regulations.

10 Suitable cable terminations provided.


11 Cable conductors of correct phases connected.
12 Wiring inside the MV Room shall be by MICC.
13 Operation of circuit breakers and main switches checked.

14 All the meters and selector switches are to be checked to ensure that
correct selection and ratings (where appropriate).
B Sub Main Board/ Distribution Board/ Electrical Room
Entrance /exit to electrical room and/or electrical facilities are free of
1
obstruction.
Suitable lighting provision provided for switch room and /or electrical
2
facilities.
Suitable ventilation/air conditioning provision provided for switch room
3
and /or electrical facilities.
Danger/warning notices, updated schematic diagrams and instructions are
4
correctly and adequately provided.
Sub Main Boards/Distribution boards mounted as per Kahramaa
5
regulations.
The rating of all MCCBs/MCBs/RCBOs comply with Kahramaa
6
regulations.
Circuits connected to MCCBs/MCBs or RCBOs in accordance with the
7
schematic diagram.
Earthing of components and other related connections are to be verified
8
and ensured.
9 All the metallic components are properly earthed / bonded.
The installation of the cable to be checked to ensure the correct laying,
10 proper glanding/termination, adequate supports, labelling, identification
etc.
The earth fault loop impedance of all circuits has been found satisfactory
11 for operation of the protective devices. Measurement results shall be
recorded in Annex I.
Hand operation on protective devices such as miniature circuit breakers,
12 moulded case circuit breakers, air circuit breakers, fused switches,
isolators etc. are satisfactory.

13 All the meters and selector switches are to be checked to ensure that
correct selection and ratings (where appropriate).

Checked by: Name Signature Date


Testing Engineer
Page 1 of 3
Noted by:
Project Manager
Doc.Name: DOC. NO :
CHECK LIST FOR TESTING OF ELCTRICAL INSTALLATIONS BG/QA/CL-308/14 Rev: 00
Project: Date:

Acceptable Unacceptable State C1 Improvement State Not Not


OUTCOMES OK NV NA
Condition Condition or C2 Recommeded C3 verified applicable
OUTCOME (Use codes above. Provide Further investigation
SN DESCRIPTION
additional comment where applicable) required (Y/N)
All lighting circuits shall be energised and checked to ensure that they are
14
operational.
C Conductors, Cables and Wirings
1 No visible damage to impair safety.
All conductors and their methods of insulation, in relation to design
2 currents of circuits and to the operating currents of the protective devices,
are properly selected and erected.
3 All conductors are correctly identified.
Armoured cables properly terminated to metal casing or trunking by
4
proper cable glands.
5 Non-sheathed cables protected by conduit, trunking or ducting.
6 Cables and ductings adequately supported.
7 Cables are terminated with suitable cable lugs.
8 All exposed metal parts including the armour effectively earthed.
D Conductor Continuity/Polarity
All circuit conductors have been tested for continuity and the same is
1
recorded in Annex I.
The insulation resistance between phase to earth is NOT less than 1 mega
2
ohm.

3 The insulation resistance between phases is NOT less than 1 mega ohm.

4 Insulation resistance test results recorded in Annexure-I.


5 Polarity check results recorded in Annexure-I.
E Final Circuits
No socket outlet installed close to water tap, gas tap or cooker so as to
1
avoid danger.
Radial final circuits are installed in compliance with Kahramaa
2
regulations.
Ring circuits using socket outlets in compliance with Kahramaa
3
regulations.
Residual current device having a rated residual operating current not
4
exceeding 30mA provided for all socket outlets.

5 All circuits & switches ratings in compliance with Kahramaa regulations.

Luminaires, switches, sockets and plugs, cable couplers installed outdoor,


6
being weatherproof type.
F Functional Test of System/Equipment
All circuits including lighting and power circuits have been verified
1 through switching operation that they are installed in accordance with the
designated circuits.

Checked by: Name Signature Date


Testing Engineer
Page 2 of 3
Noted by:
Project Manager
ANNEXURE - I
Project Name: Detais of circuits and/or installaed equipement vulnerable to damage when
testing Details of test instruments used (state serial and/or asset numbers)

Continuity
Reference No. Insulation resistance
Location Earth fault loop impedance
Zs at Incomer (Ω) RCD
Correct supply polarity confirmed Test results
Phase sequence confirmed (where approriate)
Continuity
Circuit details Ring final circuit RCD Remarks
(Ω) (R1+R2) Insulation Resistance (MΩ)
Conductor continuity (Ω) (ms) (continue on a separet sheet if necessary)
Overcurrent device or R2
details

Breaking capacity (kA)


Circuit Number

Polarity
Zs
(Ω)

functionality
Rating (A)

Live(mm²)

Rn (neutral)

(R1+R2)*
cpc(mm²)
Circuit Description

R1(line)

R₂(cpc)

@5I∆n

Test Button/
@I∆n
Type

Y-N
Y-B
R-Y

R-N

B-N
B-R

N-E
R₂

Tested By: Noted By:

Name of Engineer: Name of Project Manager:

Signature & Date: Signature & Date:


* Where there are no spurs connected to a ring final circuits, this value is also t