Table contents
1. Introduction …………………………………………….......... 3
5. Limitations ………………………………………………........... 7
6. Methodology ……………………………………………………. 8
6.1 Feasibility Study ……………………………………………. 8
6.2 Requirement Analysis and Specification …………………… 8
6.3 Design and Specification …………………………………….. 8
6.4 Coding and Module Testing …………………………………... 8
6.5 Integration and System Testing ……………………………….. 8
6.6 Delivery and Maintenance ……………………………........... 8
7. Significance and Beneficiaries……………………………………… 9
7.1, Benefits of customer …………………………………………., 9
7.2, Benefits of Hotel …………………………………………….. 9
8. Task breakdown and Feasibility analysis ………………………….. 10
2
8.1, Over view of existing system ………………………………. 10
8.2, Over view of proposed system ………………………………. 10
8.3, Functional requirement ……………………………………… 11
8.3, Non-Functional requirement ……………………………….. 11
9.Project time line ………………………………………………….. 13
1. Introduction
With the advancement of technology, application areas of computer are rising day by day. Every
sector desires its solving problem for fast accurate and easy operations. Therefore different
program are developed to meet the requirement of various types of users i.e. related to any field.
This program entitled “Hotel Management System” is a small software package which is
helpful in the areas of Kenenisa Hotel and also others hotels. This program package includes
all the activities(can you) in which the Kenenisa hotel is managed. The activities like customer
room reservation, the user management, the inventory processing, the data summary, also the
new idea may be exchange the money from Ethiopian birr in to dollar etc are included.
This project is database oriented program because it is developed using DBMS like MYSQL or
SQL. We have used SQL for Database programming in this project. The programming language
used for developing this software is Visual Basic or Java-Ide.
Users can simply add record, delete them, update them, create Backups of the Database, and
many more using this software. User need not have to think about where the data should be
saved or from where they can respond it. All the data are saved automatically in the defined
place and are retrieve from there directly by using this software. No computer trainings or
experts are needed to handle this software.
In terms of security this software is totally secure as it doesn't give access to unauthorized user as
the username and password facility is provided.
3
2, statement of the Problem (write in proper way)
Even through we have tried our best effort in making the system error free but some errors may
have crept into it. As this is our first project or system development in visual basic we have tried
our best to make it free from limitations, and if we are successful. The limitation on the project is
the lesson for us to improve it. During our system development on this project we have faced
many problems in testing, coding, debugging and implementing some rules and regulation.
The current status of kenenisa hotel management systems did not have exchanging Ethiopian birr
in to dollar this is also one of the major problem faced in testing ,coding , & implementing.
The developing system is similar to that of databases before the widespread acceptance of the
relational model and SQL.
The current worked kenenisa hotel management systems incorporate in the design very
reliable exclusive interpretations of the world that make practically impossible to do different
systems.
Statement of the Problem comment ( first start the big picture about
the Hotel where is it location of kenenissa hotel, short history about
the hotel, how currently run the hotel, how many workers does it
support now, etc what problem it safer by using the manual process,
what benefit you can give for it, how do you seen the existing
problem. You have to put big picture about the hotel that you select)
4
3. General and specific Objectives
The main objective behind preparing this project is that to give hotel a complete facility that a
hotel managerial team wants. It even helps the user to handle the managing system of the hotel
properly. And it also gives the customer an easier way to have booking and other related
activities in the hotel. Besides this there are many objectives like:
- If the visitor is satisfied with the room location, then confirm the booking.
5
4, scope the project
There are different activities that we plan to perform in the system. Such as providing the
complete hotel information about the kenenisa hotel such as how it is online transactions
,customer data record, online room reservation ,payment exchange, web page, announcement
about different events that will be conducted by the hotel time to time and provide information
about hotel services. Generally the scope of our project designing hotel management system for
kenenisa hotel.
6
5, Limitations
Each and every system has some limitations that can restrict then to work on a particular
environment. Through our system is provided high amount of accuracy and quick data
generation there is still some limitations that led us to in greater deficiency to work on that
system. Some of the limitation that is we observed during all the process is mentioned below
Unable to meet the manager of the organization at the time that we want
We are entitled for many courses due to this reason we had not enough time to fully
concentrated on the project
Unable to get full information resource about the organization.
Lack of resource for instance personal computer.
We spent many times in data collection about the organization because employees do not
present at their office every time.
Lack of financial resource for transportation
7
6, Methodology
The waterfall model is implemented while developing the system. The main system is divided
into many sub programs and modules. But they all are focused to one goal one aim i.e. the
smooth running of the program. This methodology implemented here implies that the system's
control is from top to bottom.
The different phases that we underwent during implementation of this model are:
6.1 Feasibility Study
The purpose of this phase is to produce the feasibility study documents that evaluate the cost and
benefits of the proposed application. It also provides:
a) The definition of the problem.
b) The alternative solution and their benefits.
c) Required resources cost and delivery dates.
6.2 Requirement Analysis and Specification
After the feasibility analysis this phase performs the identification and documents the exact
requirement for the system. This phase produce user manuals and plans for the system test that is
performed before the system is delivered.
6.3 Design and Specification
This phase involves how to solve the problem. We have divided in two phase i.e.:
a) Architectural or high level design.
b) Detailed design.
6.4 Coding and Module Testing
The actual code are produced that will be delivered to the user as a running system. Individual
modules developed in this phase are tested before going to the next phase.
6.5 Integration and System Testing
The modules that have been developed and tested are put together and are tested as a whole
system.
6.6 Delivery and Maintenance
When the system is passed through all the tests, it is delivered to user and the maintenance phase
is started. If any modifications are to be made to the system then it is done in this phase.
8
7, significance and beneficiaries
The system we are going to build will provide solution for the problem current Hotel
management system facing. The primary benefits are the customer and the Hotel.
7.1, Benefits of customer
It is online-based system so Users use it anywhere and anytime.
It reduce the cost of the customer
It saves customer time and effort
9
8, Task breakdown and feasibility analysis
System analysis is the process of gathering and interpreting facts, diagnosing problems and the
information to recommended improvements on the system. System analysis is a problem solving
activity that requires intensive communication between the system users and system developers.
System analysis or study is an important phase of any system development process. The system
is studied to the minutest detail and analyzed. The system analysis includes different activities
such as gathering data, identifying system requirement, prioritize system requirement and
recommendation and evaluation of the system.
A detailed study of the process must be by various techniques like interviews, questionnaires,
and observation to gather the information on the system, therefore we used observation
(reviewing) to gather information.
10
8.3, Functional requirement
It deals with the functionalities required from the system which are as follows:
The system enables customer to login through id and password and gain access
information about the Hotel.
Administrator will be responsible for updating the system.
The system enables events or advertising of the Hotel.
The system enables online reservation
The system enables transactions
The system provide complete information about customer
11
4) Maintainability
The system has been designed in a way that the components can be changed. This makes it
easy to maintain and use.
12
9, Project time line
Project time line ( start and end day is not specified, detail activities
were not included, use the chart if you miss other project
management software )
13
10, References
www.scribd.com
software engineering
hotel management & operation system 4th edition Denney,
G.Ruthford
www.kenenisahotel.com
14