Type Double acting cylinder Description Hydraulic cylinder

Item
Description Actions to be Taken Observation
No.

AC RW RE
Cleaning, DPT, repairing, testing and painting
1 Received condition
to be done

w w w . s u n p o w e r. a e
Form Ref: 10 1148 Rev-00 Dated: 11-04-2019
Page 1 of 5
Report No. :
INITIAL INSPECTION REPORT Date :
Job Card No :

Item
Description Actions to be Taken Observation
No.

AC RW RE
Found lines inside the tube, need to replace
2 Cylinder tube
with new one.

Item
Description Actions to be Taken Observation
No.

AC RW RE
Found dent lines on the rod, need to carry out
3 Piston rod
chroming.

w w w . s u n p o w e r. a e
Form Ref: 10 1148 Rev-00 Dated: 11-04-2019
Page 2 of 5
Report No. :
INITIAL INSPECTION REPORT Date :
Job Card No :

Item
Description Actions to be Taken Observation
No.

AC RW RE
4 Gland Manual polishing required

Item
Description Actions to be Taken Observation
No.

AC RW RE
5 Piston Manual polishing required

w w w . s u n p o w e r. a e
Form Ref: 10 1148 Rev-00 Dated: 11-04-2019
Page 3 of 5
Report No. :
INITIAL INSPECTION REPORT Date :
Job Card No :

Item
Description Actions to be Taken Observation
No.

AC RW RE
6 Spherical bearing Need to replace with new one

Item
Description Actions to be Taken Observation
No.

AC RW RE
7 Seal kit Need to replace with new one

w w w . s u n p o w e r. a e
Form Ref: 10 1148 Rev-00 Dated: 11-04-2019
Page 4 of 5
Report No. :
INITIAL INSPECTION REPORT Date :
Job Card No :

Remarks (SPG- 2339)

Cylinder details:-
1. Cylinder tube: ID- 2” (50.80mm), OD- 2 ½”(63.50mm), Honing length- 180mm, Inner length- 222mm, Total
length- 235mm, Raw stock length- 275mm.
2. Piston rod: OD- 32(31.95) mm, Chrome length- 190mm, Total length- 284mm.
3. Gland: OD- 63.50mm, length- 54mm.
4. Piston: OD- 50mm, length- 35mm.
5. Spherical bearing no: SBB12.

SUMMARY (SPG- 2339)

Sl no Description Status
1 Received condition - Cleaning, DPT, repairing, testing and painting to be done
2 Cylinder tube - Need to replace with new one
3 Piston rod - chroming required
4 Gland - Manual Polishing required
5 Piston - Manual Polishing required
6 Spherical bearing - Need to replace with new one
7 Complete seal kit - Need to replace with new one

Name Designation Date

Inspected By: Jayaprakash Supervisor

Prepared By: Rajmohan Tr.Engineer

Approved By: Samuel Manager

Legends: AC – Accepted, RW – Rework; RE- Replace