Beruflich Dokumente
Kultur Dokumente
IRJ
www.railjournal.com | @railjournal
Innovations Showcase
International Railway Journal
IRJ
www.railjournal.com | @railjournal
Innovations Showcase
International Railway Journal
Our new antiviral air filter captures airborne particles which may contain viruses
such as COVID -19 and then eliminates 99.9% of the virus , making rail travel safer
than ever before. And the best part ? Our filter is immediately available, and can
even be retrofitted to existing fleets . T
To
ogether we move – safely
w w w. bombardier.com
Contact us
Contents
September 2020 Volume 60 issue 9
News
Editorial offices
Post 46 Killigrew Street
Falmouth 4 This month
Cornwall, TR11 3PP, UK 6 News extra
Tel +44 1326 313945
8 News headlines
16
Web www.railjournal.com
16 Transit news
Editor-in-Chief
18 Financial news
Kevin Smith
ks@railjournal.co.uk
22 World market analysis
Consulting Editor/
Associate Publisher
David Briginshaw
db@railjournal.co.uk
Germany
News & Features Writer
26 Pandemic pushes operators to the brink
David Burroughs Kevin Smith reports on the challenges ahead
32 FlixTrain returns to the rails
26
dburroughs@railjournal.co.uk
News & Features Writer Private operator still plans to expand business
Oliver Cuenca
36 Iconic Stuttgart 21 makes progress
ocuenca@railjournal.co.uk
Production Manager Complex project will finally be completed in 2025
Sue Morant 38 Learning the lessons of Rastatt
sm@railjournal.co.uk Guidelines put into practice following Auggen accident
IRJ Pro Account Manager
Chloe Pickering
cp@railjournal.co.uk
IRJ Insights
IRJ Pro Market Analyst
32
Oscar Sinclair
os@railjournal.co.uk
Cybersecurity
Advertising sales office 40 Responding to the digital threat
Post 88 Pine Street, 23rd Floor
As rail becomes more digitalised, it must protect itself
New York, NY 10005
United States against increasingly sophisticated threats
Tel +1 732 887 5563
Business development manager
Jerome Marullo jmarullo@sbpub.com
Tel +1 732 887 5562
IRJ 2020 Innovations Showcase
Pushing the boundaries
Subscriptions hotline
36
Tel (US only) +1 800 553 8878
(Canada/International) +1 319 46 The latest industry innovations revealed
364 6167 Fax +1 402 346 4740 Suppliers continue to push the limits despite the
International Railway Journal (Print ISSN 2161-7376,
Digital ISSN 2161-7368), is published monthly by
coronavirus pandemic
Simmons-Boardman Publishing Corp, 88 Pine Street,
23rd floor, New York, NY 10005, USA. Printed in
Great Britain by Buxton Press and distributed in the
USA by Mail Right International, 1637 Stelton Road
Front cover
paid at Piscataway, NJ and additional mailing offices.
COPYRIGHT © Simmons-Boardman Publishing Cor-
27/08/2020 00:18 Page 1
52 Rendezvous
poration 2020. All rights reserved. Contents may
September 2020 | Volume 60 Issue 9
IRJ
www.railjournal.com | @railjournal
not be reproduced without permission. For reprint Plasser & Theurer’s versatile
53 Full contact list E³ hybrid drive technology
information please contact Editor-in-Chief. For sub-
Innovations Showcase
International Railway Journal
run railway?
year while the railway’s debt to return to pre-crisis levels
ceiling has been increased from before 2023, predicting a 35%
É25bn to É30bn. decline this year.
B
Mofair says its members are Both Mr Christian Schreyer,
again at a disadvantage. It says CEO of Transdev North and
RITAIN’s Office for National says that without government private competitors cannot Central Europe, and Ms Anne
Statistics declared that Train subsidies it would have reported expect their shareholders to Mathieu, CEO of Keolis
Operating Companies (TOCs) a loss of É1.078bn in the first pour in cash because unlike Germany, report that traffic on
were in state control on July 31. half of 2020. It is engaging in the German government, DB’s their regional services has
The government’s Emergency cost cutting measures worth sole shareholder, they expect a recovered to around 60% of
Measures Arrangement É1.4bn, including cutting up return on their investment. pre-crisis levels but no further.
(EMA), introduced in response to 2300 jobs, or 11.5% of its Similar arguments surround They both say the next few
to the coronavirus pandemic, workforce, to return to a the apparent preferential weeks are critical as schools
replaced the franchise operators, financially healthy position by treatment by national and universities return after
which are running the system 2025. However, five regional governments of state operators the summer break and if more
at no risk under a central contract. operators have launched legal hoping to revitalise Europe’s people decide to return to the
The franchising system was proceedings against the award night train network. Austrian office. At 60% of previous
already on its last legs before to NS of a 15-year direct Federal Railways (ÖBB) is traffic and revenues, in a low
the crisis. However, the goal award concession to operate seeking and securing direct margin business, Schreyer says
posts have moved, and the ‘core network’ passenger award subsidies for operating net contracts are simply not
long-awaited Williams Review services - the heart of NS’ overnight trains in certain sustainable. Local public
might not now ever see the service - from the start of the territories. However, private transport authorities are also
light of day. The EMAs are set December 2024 timetable. competitors, including Sweden’s under pressure to continue to
to expire this month and support public service
“
whether the government obligation contracts with very
been made.
This is still an opportunity worst possible scenario - a
to right the wrongs of the second comprehensive
recent past. The effective mix lockdown. The economic
of market competition on The Netherlands Federation Snälltåget, do not have access consequences of this for the
profitable commuter and inter- of Mobility Companies (FNM) to the same support. railway as well as the wider
city services with a public is pushing for greater competition Reinforcing the incumbent is economy are unfathomable -
service obligation network that in the awarding of passenger an understandable government the public funds which have
offers a viable and sustainable concessions. Meanwhile across response to Covid-19. Doing propped up the sector so far
alternative to road transport the border, Belgian National so to back rail as a sustainable might not be available second
can offer Britain’s railway a Railways’ (SNCB) is requesting transport mode is a policy we time around. We all hold our
sustainable footing. It might a 10-year direct award contract have been encouraging for years. breath.
also encourage the private for the whole network, which However, not offering the same
companies that have turned would prevent any tendering level of support to other operators
away to come back. of services for the foreseeable threatens to unravel much of
ks@railjournal.co.uk
However, with usage still future. the progress that has been
low - around 20% of pre-crisis German Rail (DB) also made and damage the financial
levels with the government reported equally depressing viability of the sector. With less
only just rolling back its financial results, going from a competition, costs will go up.
dangerous message to avoid É757m profit in the first half of The European Commission
public transport - the fear is 2019, to a É1.8bn operating loss is the check and the balance in
that the railway may not be in the first half of this year. Yet this process. It is up to the
seen to justify further support the decision to award Siemens commission to approve bailout
and miss out on the radical a É1bn contract for new high- funds proposed by member
overhaul it so badly needs. speed trains on July 15 has left states and ensure they are
Britain took a different path prospective competitors distributed fairly. While the
from its European neighbours incensed for reinforcing DB’s Fourth Railway Package’s
when introducing privatisation. long-distance monpoly (p26). market pillar is not legally
There the state incumbent Mofair has accused DB and binding until 2024, if the EC
railways remain. But with the government of trying to wants a truly competitive rail
these railways struggling with “kill” the prospects for long- market to survive the crisis it
similarly dramatic drops in distance competition. There must act quickly.
traffic and only partial recoveries, are also concerns over the extent The great caveat in all
some government decisions in to which DB Regio will benefit of this is whether
recent weeks to offer a crutch from a federal-state É5bn passengers return.
to the embattled incumbents compensation package after DB In its bi-annual
have been criticised by their received its own separate report of the global
would-be competitors which É5bn capital injection from the rail market (p20), SCI
are equally feeling the pinch. German government. Another Verkehr says it does
Netherlands Railways (NS) É3.6bn is planned for next not expect patronage
4
News | extra
Photo: SNCF
The ONS says it reached the
T
conclusion after reviewing the
classification against
international statistical
HE European Commission before putting the proposal to Borghini, executive director of guidelines. Under the EMAs,
(EC) is inviting expressions the European Council to establish S2R, told IRJ. This would enable the normal franchise
of interest by October 1 from the new rail partnership under the new partnership to be arrangements have been
private and public organisations the EU’s new Horizon Europe established in the second half amended with almost all
to become founding members research programme. of 2021. revenue and cost risk
of a new European rail research The core membership will “We want to build on the transferring to the government
partnership to succeed Shift2Rail comprise around 20 organisations results already achieved and while the TOCs have had
(S2R). representing infrastructure go to the next level of a system- restrictions imposed on their
The EC says the new managers, passenger and integrated approach,” Borghini ability to borrow money. The
European Partnership on Rail freight operators, suppliers, says. “This will include new operators also cannot make
Research and Innovation will and rail research centres. methods of operation based on significant changes to fares or
have a long-term commitment Members will be expected to digitalisation, a strong focus on staffing levels by more than
from the European Union and contribute about É30m each, of freight, opportunities for high- 5% without government
its members “to deliver system- which 5% will go towards speed to compete with regional agreement.
focused solutions ready to running costs. The partnership flights, and better urban “The TOCs’ net borrowing
enter industrialisation, will also be able to access connections.” and debt will be included in
deployment and operation.” various European programmes = S2R will provide up to É75.4m the relevant ONS public sector
“This partnership will focus on such as the Connecting Europe in funding for 19 projects worth finances series and their
accelerating research, development Facility, European Regional a total of É147.7m under the 2020 workforces will be included in
and demonstrations of innovative Development Fund and the call for proposals for research the public sector employment
technologies and operational Cohesion Fund for funding. and innovation (R&I) activities. totals as soon as possible,” the
solutions to make rail more “A possible schedule could be S2R members will undertake ONS says.
attractive, enabled by that the proposal will be eight projects worth É127.7m, The assessment notes that
digitalisation and automation,” examined at the European with S2R providing É55.4m in the main reason why train
the EC says. Council meeting at the end of funding. An additional 11 open services continue to operate is
The EC will consult with the November, followed by around call projects worth É22m have to follow government policy to
European Parliament and the six months of negotiations with been approved, of which up to maintain the services. Some of
Economic and Social Committee member states,” Mr Carlo É20m will be funded by S2R. the open-access operators not
I
The Ministry of Transport has
NDIA is increasing the Haldibari line will allow lines have since reopened, announced that infrastructure
number of cross-border links freight and passenger services including Gede - Darsana and access charges will be cut to
with neighbouring Bangladesh to operate from Bangladesh via Petrapole - Benapole, which support rail freight flows
in a bid to balance China’s Siliguri to Darjeeling in India. carry both passengers and which are suffering as a result
efforts to increase rail This will provide a route from freight, and the Singhbad - of the Covid-19 pandemic. The
connectivity with its southeast India’s landlocked northeastern Rohanpur and Radhikapur - measure needs to be approved
Asian neighbours. states and Bhutan and Nepal Birol freight lines. by the European Commission,
Work is underway on three to the Port of Mongla near Indian-funded rail bridges which is preparing a legislative
new rail links comprising Khulna, the second busiest have been completed over the initiative on the matter.
Azerbaijan
Haldibari - Chilahati, seaport in Bangladesh. Titas and Bhoirab rivers and a
Mahishashan - Shahbazar and There used to be seven new rail link from Rajshahi,
Agartala - Akhoura. regular rail connections Bangladesh, to Kolkata, India, Alstom has launched
Reopening the Chilahati - between the countries. Four is planned. validation tests for the Prima
U
on the Baku - Kars freight
corridor in Azerbaijan, which
was recently converted from
NITED States national Amtrak says calculations for Mr Bill Flynn, Amtrak’s CEO, 3kV dc to 25kV ac. The first T8
passenger rail operator future demand and for its 2021 on May 25 to support the locomotive was delivered on
Amtrak has released criteria financial plan will account for operation of services across its December 19 2018, from a
for the restoration of regular reduced availability of spaces network. However, no É288m order for 50 units
long-distance services due to both reduced ridership, additional funding has been awarded to EKZ, a joint
following an announcement caps on ticket sales and other forthcoming. venture of Alstom and
that most daily services would coronavirus-related social The long-distance service Transmashholding (TMH).
Britain
be cut to three times a week distancing measures. reductions are scheduled to be
from October due to the If all criteria are met by a introduced in October and
coronavirus pandemic. given route, services could be Amtrak released its new The government has allocated
Amtrak has confirmed that restored to daily by May 2021. timetable on August 13. £598m for electrification of the
the return to daily services Amtrak hopes that full Mr Roger Harris, Amtrak’s Trans-Pennine main line
along its routes will be restoration of all services will executive vice-president and linking Manchester,
determined by three metrics, be achieved by the end of June chief marketing and revenue Huddersfield and Leeds. The
with assessments according to 2021 but warns that it officer, says that the cost- most congested section of the
these benchmarks scheduled currently lacks sufficient data cutting measures are part of a route will be doubled from
to begin from February 15 2021: to confirm this. pledge to Congress to reduce two to four tracks. Most of the
= Covid-19-related The operator also notes that costs by $US 500m. The line will be electrified, with
hospitalisation rates in areas plans to restore services reductions should save $US full electrification, digital
served by the long-distance depend on sufficient federal 150m during the 2021 fiscal signalling and more multi-
trains must be stable or falling government support. It year. Amtrak services made a tracking under consideration.
= the number of available seat estimates it will require $US $US 500m annual loss before = HS2 Ltd has signed an
and room-miles booked in 3.5bn in government funding the pandemic. agreement with the UK Rail
February for operating for the 2021 fiscal year Amtrak reported an 81% fall Research and Innovation
services in June 2021 must be assuming a 50% network-wide in demand for long distance Network (UKRRIN) to access
comparable with at least 90% ridership level. services in April and May technologies produced by the
of tickets booked for those Amtrak has so far received alone, reflecting a network- group’s research facilities.
China
services in June 2020, taking $US 1.02bn of government wide 95% drop in ridership
into account the currently support under the compared with 2019.
reduced timetable, and Coronavirus Aid, Relief and Amtrak also attempted to Technical studies for the 77km
= projected network ridership
Photo: Stephen C Host
Economic Security (Cares) Act. address concerns that the Ningbo - Zhoushan high-
for autumn 2021 must be at This support is currently service reductions could be speed line have been
least 90% of figures estimated scheduled to expire at the end permanent by affirming its completed following two years
in Amtrak’s 2021 financial year of September. An additional commitment to its long- of development. The line will
operating plan. $US 1.48bn was requested by distance trains. reduce Ningbo - Zhoushan
travel times from 1h 30min by
road to 30 minutes by rail.
Construction is expected to
start later this year.
Egypt
Egyptian National Railways
(ENR) has begun operation
with new passenger coaches
supplied by Transmashholding
under a É1bn contract from
2018. The trains will operate
on the Cairo - Alexandria and
Cairo - Asyut - Sohag lines.
Photo: RAIB
people onboard when it hit the
landslip at around 09.40. All
coaches subsequently derailed,
killing two crew members and northbound track at Carmont and second coaches came to of rail accidents. “However,
one passenger. The remaining and travelled approximately rest on their roofs, with the landslips and other earthworks
six survivors were later taken 2.25km north towards Aberdeen first lying perpendicular to the failures remain a risk to trains
to hospital. before hitting a separate landslip, track and the second lying on that needs to be constantly
After departing Stonehaven, 6.4km southwest of Stonehaven. top of it. The fourth coach also managed, and this is becoming
RAIB found that 1T08 was The train subsequently derailed, lay on the first coach but even more challenging for the
instructed to stop by the and as the line curved to the remained upright and attached rail industry due to the increasing
signaller at Carmont where the right, the train continued in to the rear power car, which incidence of extreme weather
signaller instructed the driver roughly a straight line for 91m was derailed but also upright. events.”
to return to Aberdeen following until it struck part of a bridge RAIB says it is collecting Network Rail says it will
reports from the driver of a parapet. evidence to identify the cause now carry out an inspection of
northbound train of a landslip The leading power car and consequences of the accident. high-risk trackside slopes
between Carmont and continued over the bridge and “Fatal derailments are a rare following a government
Laurencekirk, which had fell from the railway down a occurrence on Britain’s national request to review its resilience
obstructed its progress. wooded embankment along network,” says Mr Simon to and management of extreme
vossloh.com
News | headlines In brief
T
The Association of German
HE Czech Ministry of 84bn,” says transport minister, preparation underway for Transport Companies (VDV)
Transport, together with Mr Karel Havlícek. “We expect several other sections. and Allianz pro Schiene have
infrastructure manager SZ, has a budget of about Koruna 23bn Havlícek confirmed that proposed reopening up to 238
announced an investment of over 10 years to equip all rolling from January 1 2025, trains not disused or freight-only lines to
around Koruna 100bn ($US stock, around two billion a year.” equipped with ETCS will not passenger services, covering
4.5bn) to install ETCS on the ETCS is currently installed be allowed on selected up to 4016km of infrastructure.
national network and fleets on about 225km of line, with corridors. Around three million people
over the next 20 years. another 206km between In February, the European in 291 towns could benefit.
“In total, we are ready to Breclav and Petrovice u Commission (EC) approved = The European Commission
invest Koruna 5bn a year by Karviné being tested. The É134m to support the has approved a É500m
2040 to secure all railway lines 108km section between Prerov installation of ERTMS on scheme to support research,
in the Czech Republic, at an and Ceská Trebová is due to be Czech rolling stock. The development and innovation
based ERTMS
direct grants of É25,000-É30m
I
available.
Ireland
Ersat EAV integrates ERTMS
with GPS and the Galileo
satellite navigation and The governments of Ireland
C
geolocation system and public and Britain are launching a
telecommunications networks. feasibility study into a high-
The technology locates trains RRC Zhuzhou has unveiled the first of its Shen 24 28.8MW speed line on the Belfast -
via satellite and interfaces six-section electric locomotives at a ceremony attended by Dublin - Cork/Limerick TEN-
with ERTMS. By using satellite Chinese government officials and academics from the Chinese T corridor. The study is due to
location and public networks, Academy of Engineering. commence by November and
the system is intended to bring The 106m-long, 24-axle locomotive is part of an order of eight will develop high-level design
and operational proposals.
Italy
the benefits of ERTMS to lower for mining company China Shenhua Energy.
traffic regional lines with reduced The locomotives will haul 10,000-tonne coal trains along the
installation and operating costs 266km Shenmu - Shuozhou railway. The locomotives are capable
than conventional ERTMS. of top speeds of 120km/h and can manage gradients of up to Tunnelling has resumed on the
RFI says the agreement will 1.2% at capacity. Genoa Node element of Italy’s
enable the creation, validation The locomotive is based on the China Railways HXD1 two- É6.9bn Terzo Valico rail
and certification of the Ersat section freight locomotive, but is designed to be safer and more project following a two-year
suspension of work.
Mongolia
system, to speed up the environmentally friendly.
commissioning process. The company is reported to be planning a further order of 12
ERTMS Level 2 is currently Shen 24 locomotives.
S
KL-Singapore HS agreement expected
being installed on the Novara - Ulaanbaatar Railway (UBTZ)
Rho line. The pilot system will has completed construction of
initially use GPS to determine the first 58.5km of the 414.6km
INGAPORE and Malaysia hope to come to an agreement on Tughrik 750bn ($US 263m)
train position, with this later
the future of the Kuala Lumpur - Singapore high-speed Talvin Tolgoi - Zumbayan
replaced with the Galileo system.
project by the end of the year, Singapore prime minister, Mr Lee 1520mm-gauge railway. The
Ersat promises to reduce the
Hsien Loong, says. new railway will connect with
installation and maintenance
“The Malaysian side has given us certain proposals on the the UBTZ’s central line and
costs of ERTMS by using a
changes, which we are studying carefully and we’ll discuss will transport coking coal from
satellite link to create ‘virtual
further with them,” Lee told reporters following a ceremony to Tavan-Tolgoi in southern
balises’ every 50m to allow
mark the official resumption of work on the 4km Johor Baru - Mongolia. The line is expected
signallers to track the position
Singapore Rapid Transit System (RTS) Link. to carry its first train in December.
Switzerland
of trains. Base stations are
Lee said the basic need for the line, to increase business and
needed every 7km rather than
improve ties between the two cities, were still important, Uif
balises every 1.3km or less
Tusbju!Ujnft reported. The 15.4km Ceneri Base
under conventional ERTMS.
Malaysia’s former prime minister, Mr Mahathir Mohamad, had Tunnel under the Swiss Alps is
The agreement follows
threatened to scrap the high-speed project, which was a flagship due to be handed over to
testing and experimentation
scheme of his predecessor, Mr Najib Razak. In September 2018 Swiss Federal Railways (SBB)
with the satellite technologies.
the governments agreed to suspend the project until May 2020 to on September 4, 14 years after
RFI completed initial testing of
allow time for a cost review. In June, the governments agreed to construction started, with
the Ersat system in Sardinia in
a further extension until December 31. operation due to begin by the
February 2017.
Photo: Shutterstock
LORIDA-based private
operator Brightline, which
has operated as Virgin Trains
USA since 2019, says it will
revert to its former name and
end its partnership with Virgin
Enterprises, following a
termination notice delivered
on July 29.
The operator, which has
suspended its Miami - West
Palm Beach service due to the
coronavirus pandemic, stated
that it will “change its name to
Brightline Trains LLC
following the expiration of the
applicable notice period for
P
name changes under the
senior loan agreement.”
Brightline adds that Virgin
AKISTAN’s Executive for freight. Capacity will also 2026 at a cost of $US 2.7bn. The has no remaining equity
Committee of the National increase from 34 to 171 trains third package, between ownership or affiliation with
Economic Council (ECNEC) in each direction per day. Hyderabad and Karachi, is the company. Virgin plans to
has approved a $US 6.8bn The project will be divided expected to cost $US 1.7bn. dispute the notice.
project to upgrade 2655km of into three packages. Work on China is expected to finance The rebranding was part of
railway infrastructure on the the first package covering the 90% of the project. Separate a 20-year licencing agreement
Peshawar - Lahore - Karachi Peshawar - Rawalpindi - Lahore financial agreements will be with Virgin agreed in
corridor and establish a dry section is due to commence in reached for each stage, with November 2018. The deal was
port at Havelian. January 2021 and will conclude the Hyderabad - Karachi made in advance of a planned
The Mainline-1 (ML-1) project in December 2024 at a cost of section expected to be delivered initial public offering intended
involves upgrading and track- $US 2.4bn. The second package, as a public-private partnership. to finance a 273km extension
doubling the corridor, helping which involves upgrading the The government has to Orlando. The IPO was
to increase line speeds from Lahore - Hyderabad section, announced the formation of scrapped in February 2019
110km/h to 165km/h for will start in January 2022 and the Mainline-1 Authority to following approval to raise
B
strategy to retain private
Israel announces
control of the company.
The coal was mined at Minergy’s Masama
I
coal consignment by rail from the Masama coal mine, Botswana’s first privately-operated
coal mine following a launch ceremony on July 17. coal mine, which began production in February
The 2650-tonne coal shipment was initially last year.
BR plans to begin construction of the 56km SRAEL’s Minister of
transported 60km by road from the mine in
Mmamabula - Lephalale 1067mm-gauge freight Transport and Road Safety,
Mmamabula to the Tshele Hills rail siding in
line in the second half of 2021. The line will Mrs Miri Regev, has
Kgatleng, southern Botswana, which was
provide a more direct route between the coal announced plans to construct
upgraded to support the loading of coal onto
field and Lephalale in Limpopo Province, South new rail and light rail
freight trains.
Africa, where it will connect with the existing connections to a planned
The train consisted of 50 high-sided BHS
rail network. Planning for a 367km cross-border military intelligence campus in
wagons, each carrying around 53 tonnes. It is
Mosetse - Kazungula - Livingstone freight line Likit, northeast of Be’er Sheva,
the first of three consignments ultimately
between Botswana and Zambia is also Negev.
destined for delivery to a South African cement
The main line would
C
network at Goral junction
north of Be’er Sheva and run
HINA National Railways speed network. The country’s more than one million residents. eastwards to Likit. The light
(CR) says it wants to extend network of eight vertical and CR says rail is a strategic, rail connection will link Be’er
the rail network to 200,000km, eight horizontal corridors will critical infrastructure and Sheva city centre with Likit.
including around 70,000km of be further enhanced. forms the main artery of the The campus will open in
high-speed lines, by 2035. China has invested around Chinese economy. CR says the 2026, with thousands of
All cities with more than Yuan 800bn ($US 115bn) a year plan will produce a high-level, military personnel expected to
200,000 residents will be in rail since 2016, with the modern railway by 2050. commute daily from central
connected to the conventional network reaching 141,000km at China invested Yuan 325.8bn Israel. The new lines would
network, while cities with the end of July. The high-speed in the network in the first half provide journey times of
more than 500,000 residents network is now 36,000km long, of 2020, up Yuan 3.8bn (1.2%) around 1h 10min between
will be served by the high- connecting 94.7% of cities with on the same period last year. central Israel and the facility.
China approves $US 68bn inter-city plan for Pearl River Delta
C
end of the year. The tunnel is
the final section of the Zürich -
HINA’s National by 2025, expanding to 5700km railway networks as well as Milan New Alpine Rail Link
Development and Reform by 2035. transit services at major hubs (Neat) corridor project.
Commission (NRDC) has Work on seven new line centred on Guangzhou, = The Lötschberg Base Tunnel
approved a Yuan 474.1bn ($US projects will start before 2022. Shenzhen and Zhuhai, on the will undergo a SFr 15m ($US
67.91bn) plan to develop inter- Construction on a project to border with Macau, along with 16m) emergency renovation by
city railway connections in the add a fifth and sixth track Zhaoqing East and Pearl River BLS, starting this month,
Guangdong-Hong Kong- between Guangzhou East and Delta Airport stations. The goal following unexpected water
Macau Greater Bay area of Xintang (29km, Yuan 5.8bn) is to offer journey times of one ingress earlier this year. Work
southern China. and to redevelop Guangzhou hour between the major cities is expected to be completed by
The plan comprises 13 new East station (Yuan 2.5bn) will in the Greater Bay Area and in mid-December.
Taiwan
line projects, which will add a also start before 2022. Guangdong province, and
total of 775km to the railway A further seven new line three hours to other provincial
network, two track expansion projects, one track expansion capitals. Hyundai Rotem has competed
projects, and the redevelopment scheme and the redevelopment Guangdong province will the assembly of the first two
of Guangzhou and Guangzhou of Guangzhou station (Yuan organise and implement the class 900 EMUs from a contract
East stations. 18.3bn) are planned but with projects. The Guangdong- for 52 for Taiwan Railways
The plan envisages that the no confirmed start date. Hong Kong-Macau Greater Administration (TRA), which
region will have 4700km of NRDC says the new projects Bay Area covers 56,000km²and are expected to enter service in
railway infrastructure in will improve integration with has a population of 72.65 January. The first batch was
P
month, but has since been
delayed until October.
Thailand
ASSENGER Rail Agency of board launched legal proceedings with Prasa, discovered that the
South Africa (Prasa) has to challenge the procurement Afro 4000 locomotives were
presented a business case to process on the grounds of too high to operate safely under State Railway of Thailand
parliament to acquire the collusion during the tendering the country’s 3kV electrified (SRT) has begun a feasibility
remaining Afro 4000 and Afro process. network with a minimum roof study for the 190km Baht
Dual locomotives built by Prasa, which is desperately clearance of just 10mm below 101.7bn ($US 3.2bn) Rayong -
Vossloh Spain (now Stadler short of reliable power to haul the contact wire. Chanthaburi - Trat eastern
Rail Valencia), which were its Shosholoza Meyl long- The country’s rail safety Phase II section of its high-
ordered but never delivered distance passenger trains, is regulator banned the locomotives speed rail project. Work on the
after it was discovered they now lobbying to acquire 22 from operating on the 3kV study is expected to be
exceeded the loading gauge on locomotives from Stadler. network, pending an completed this month and will
part of the network. Under the proposal Stadler, investigation. Prasa mothballed be submitted to the Thai
The controversial Rand 2.5bn which was paid Rand 1.8bn by the locomotives in 2015 when cabinet next year. The study
($US 147m) deal, under which Swifambo, would supply the court proceedings began, will advise SRT in planning of
Swifambo Rail contracted Vossloh seven Afro 4000 and five and the contract was set aside a public-private investment
in 2013 to supply 20 Afro 4000 AfroDual locomotives that in 2017. plan due to launch in 2022
diesel-electric and 50 AfroDual were built but are still in Spain. To cut its losses, Prasa, before tendering for
Stadler would build another which is now under construction begins in 2024.
UAE
electro-diesel locomotives,
ground to a halt in South four AfroDual locomotives and administration, elected to sell
Africa’s courts in November help Prasa recommission six of 13 Afro 4000s at auction, with
2015 following allegations of the Afro 4000 locomotives that private operator Traxtion Etihad Rail has awarded a
corruption. have been idle since 2015. purchasing seven of them. An contract for the manufacture,
Only 13 Afro 4000 locomotives The original deal drew auction for the remaining six supply and commissioning of
- a 1067mm-gauge version of national media attention when locomotives was halted 842 new freight wagons to
the Euro 4000 - were delivered engineers from freight operator pending the outcome of the CRRC Yangtze. The new
to South Africa before Prasa’s Transnet, which shares track proposal before parliament. wagons will more than triple
Trafikverket completes ‘wasp’s
Etihad Rail’s fleet to more than
United States
Stockholm Central and Stockholm
Södra, one of the Swedish network’s
busiest sections. Work included The Nevada State Board of
replacing bridges over the Finance has approved up to
Söderström River, connecting $US 200m in state bonds for
Södermalm with Riddarholmen Brightline’s privately-funded
last summer, and between $US 4.8bn high-speed line
Riddarholmen and Tegelbacken between Las Vegas and
this summer. The project also Southern California. The
involved rebuilding the Älvsjö funding will allow Brightline
freight railway and Stockholm to issue bonds worth up to
South station and the completion $US 800m, which can be used
of the City Line 6km tunnel to design, develop and build
beneath central Stockholm in 2017. facilities for the line. IRJ
Austin city council approves $US 7bn Rheinbahn halts acceptance of LRVs
productivity in the completion sites. opportunity.” is scheduled to open in 2027.
I
before 2025.
Porto
Cairo Metro inaugurated the
7km Phase 4B section of Line 3
NDIA’s continuing border on August 17, extending Line
Development Authority Porto has awarded two
hostilities with China have 3 east on an elevated line from
(MMRDA). “As for the contracts worth a combined
El-Shams Club to Adly Mansour.
É288m for the construction of
Copenhagen
led to uncertainty about the Chinese involvement in other
future of several metro projects lines, we will abide by the two new light rail lines to a
involving Chinese companies. instructions of IR, which we consortium of Ferrovial
A new metro line has been
Six Chinese companies are are awaiting.” Construction and Alberto
proposed to serve a planned
involved in Mumbai projects A review of other projects Couto Alves. The projects
artificial island in Copenhagen
to build 337km of metro lines. could be tricky. For example,
harbour and provide extra comprise a 3.15km É106m
Of these, Shanghai Tunnel four tunnel boring machines double-track light rail
services through the centre of
Engineering, China Rail Tunnel ordered from China for extension to the existing Line
the city. Lynetteholmen Island
Group and Continental Bangalore’s Namma Metro D (Yellow Line) and a new
will have space for 35,000 new
Engineering are participating have already arrived, while
homes and construction of the 3.1km É181m underground
in Line 3, while China Harbour CRCC Nanjing Puzhen is Line G (Pink Line). Work will
island will begin in 2022.
Gold Coast
Engineering is building part of shipping 204 metro cars begin later this year.
Seoul
Line 4 in a joint venture with required for Phase II.
Tata Projects. At the same time, officials of The government of the
“Two Chinese firms had the Bangalore Metro Rail Australian state of Queensland The first phase of the 4.7km
been interested to supply rakes Corporation (BMRCL) and Gold Coast city council eastern extension of Line 5
[coaches] for the Jacob - Circle expressed apprehension that a will equally co-fund a $A 7m opened on August 7,
- Wadala - Chembur monorail $US 335m loan for Phase II, ($US 5m) business case for a connecting Hanam in
project, but we have scrapped signed last year by BMRCL 13km extension to the Gold Gyeonggi Province to the
the bidding process,” says Mr and the Beijing-based Asian Coast Light Rail line (G:link). metro network for the first
B G Pawar, spokesman for Infrastructure Investment Bank time.
Shenzhen
The extension, known as Stage
Mumbai Metro Rail (AIIB), might not go through. 4, will extend the light rail line
from Burleigh Heads to Gold
Coast Airport at Tugun, at the Shenzhen Metro opened two
southern tip of the Gold Coast. new lines with a total length of
Kunming
78km on August 18, bringing
the network’s length to 373km.
CRRC Zhuzhou Electric The 49km Line 6 runs
Locomotive has rolled out its northwest from the city centre
first super capacitor-powered to Songgang. The 29.3km
LRV, which is also designed north-south Line 10 opened on
for automatic operation. The the same day. Shenzhen city
LRV will operate on a line government has awarded
serving Kunming Changshui MTR Consulting and the
International Airport, and is China Railway Electrification
designed to run for up to 5km Bureau (EEB) a public-private
partnership (PPP) contract to
First Tokyo Metro series 17000 train unveiled: Tokyo Metro
on a single charge. The seven-
section bi-directional vehicle construct, finance and operate
presented the first of its new series 17000 trains on August 11. will be able to accommodate a the 22.4km Line 13 project.
Singapore
The first 10-car train will enter service on the Yurakucho and maximum of 500 passengers.
Ludwigsburg
Fukutoshin lines in February 2021. Tokyo Metro plans to have
the rest of the fleet, comprising six 10-car trains and 15 eight-car SMRT, Singapore, and
trains, in service by 2022. The new trains will replace series 7000 Ludwigsburg in the state of Malaysian public transport
B
established a special purpose signed a joint venture
organisation to design and agreement to form RTS
RITISH Columbia, Canada, VCC-Clark to a new station at build a new ƒ250m 28km light Operations, which will operate
rail network, which will use the cross-border Johor Bahru -
has selected the Acciona- the intersection of Broadway
8km of disused railway. Singapore light metro system
Ghella joint venture as the and Arbutus, offering a
Detailed planning will begin when it opens at the end of
preferred bidder for a $C 2.8bn journey time of 11 minutes.
in 2021 with a target opening 2026.
Xiamen
($US 2bn) contract to design The extension will interchange
date of 2030.
New York
and construct a 5.7km with the Canada Line at
underground westward Broadway City Hall.
The first of a fleet of 10 trains
extension to the Millennium The Transportation
Metropolitan Transportation powered by permanent
Line of the SkyTrain metro. Investment Corporation (TI
Authority (MTA) has awarded magnet synchronous traction
The contract includes the Corp) will lead the design-
a $US 233m contract to Wabtec motors has entered service on
construction of 5.2m internal build-finance project. The BC
for 25 MotivePower R255 Xiamen Metro’s 41.6km Line 2.
diameter twin tunnels and six government will provide
hybrid battery-diesel The trains are manufactured
new stations. Construction is funding of $C 1.82bn, with $C
locomotives for use on NYC by CRRC Tangshan, while the
planned to start this year, with 888.4m provided by the
Transit (NYCT) work trains, permanent magnet synchronous
the line scheduled to open in Canadian federal government,
with an option for up to 45 traction system is produced by
2025. and $C 99.8m from Vancouver
additional units. The CRRC Times Electric. IRJ
The new line will connect City Council.
Strikes and pandemic plunge SNCF into €2.4bn first half net loss
F RENCH National Railways
(SNCF) reported a 2020
first-half net loss of É2.4bn,
compared with a 2019 first-half
net profit of É20m, due to
strikes and the coronavirus
pandemic.
First-half revenue plunged
by 21% to É14.1bn resulting
from strikes against pension
reforms which cost É275m,
and government-imposed
travel restrictions to combat
Covid-19, which started on
March 17, and cost É3.9bn in
lost revenue.
Following the January
strikes, SNCF achieved a 4%
increase in TER regional
passenger traffic and 6%
growth in TGV patronage.
However, growth came to an
abrupt end in March with the As of June 30, Transilien was April. At the end of June, this É4.3bn in 2019 to É3.7bn in
start of the national lockdown. running 98% of timetabled plan had already cut costs by 2020.
In April, SNCF cut rail services, TER 87%, and TGV É350m, reduced investment by “It is still difficult to judge
capacity to 7% of normal for 70%, while rail freight was É130m, and saved É600m the long-term financial impact
TGV services, 34% for Paris running nearly 85% of normal from activating cash flow of the Covid-19 pandemic with
Transilien commuter services, services. levers. “The plan’s impact will any degree of precision, given
and 16% for TER, while only SNCF will launch a continue into H2 2020, the high level of uncertainty
8% of Eurostar and Thalys passenger traffic recovery plan improving liquidity by É1.8bn about how and when the crisis
trains ran. Around 70% of this month, focussing on over the full year,” SNCF says. will end, and what the
freight trains continued to adapting fares and digital tools “This unprecedented effort will economic fallout will be,”
operate. to reflect new passenger have no impact on jobs in the SNCF says.
Passenger services started to behaviour patterns such as rail sector proper, nor will it SNCF says it hopes to reach
resume in May, but with lower working from home. affect essential investment in an agreement with the
train occupancy levels. SNCF To limit the fallout from the the network or in rail government before the end of
introduced promotions in June pandemic, SNCF expanded its operations.” As a result, first the year to define a financial
to stimulate passenger traffic. cost cutting action plan in half investment fell from support package.
Plan to save Latvian Railways’ rail freight business launched $US 1bn ADB
The second concession, services to under one hour. three concessions must also the new operators to mobilise.
L ATVIAN Railways (LDz) has drawn up a foresees an expansion into freight forwarding, loan for Delhi -
Meerut project
I
new business model in a bid to halt a including by sea and road transport, and
continuing steep decline in freight traffic and to warehousing services, coupled with a drive to
modernise passenger stations and lines. increase efficiency, reduce operating costs, and
NDIA’s National Capital
LDz says rail freight traffic dropped to the improve productivity.
Region Transport Corporation
lowest level for decades in 2019, “substantially “By expanding into new markets and
(NCRTC) has been awarded a
reducing the company’s income, affecting the developing new competitive services with high
$US 1bn loan by the Asian
company’s financial situation and posing a added value, it is possible to partly and
Development Bank (ADB) to
significant threat to the company’s overall gradually replace the declining transit flows of
support construction of the
stability.” The downward trend is continuing in fossil fuels through Latvia with other types of
82km Delhi - Meerut Regional
the first half of 2020. freight, even though we are aware that the new
Rapid Transit System (RRTS).
“Given the current geopolitical trends and the types of freight will not restore freight transport
The Delhi - Meerut line,
declining demand for fossil fuels in Europe, the volumes to the former amounts,” says LDz
which is projected to cost $US
volumes of the most frequently shipped goods - chairman, Mr Maris Kleinbergs.
3.94bn, will reduce journey
coal and oil products - are not likely to recover In addition, LDz has revised its investment
times to less than 60 minutes
in the coming years,” LDz says. plans to include the construction and
and carry an estimated
The new business model will expand the modernisation of 48 stations, and the complete
ridership of around 800,000
company’s range of freight services substantially upgrade of infrastructure on four electrified
passengers per day when it
and see LDz become a full-scale provider of lines radiating from the capital of Riga to
opens in 2025.
P
combined with $US 1.89bn of
funding from the Indian
HILIPPINES National 53km Clark Phase 2 section includes the operations control government and $US 1bn from
Railway (PNR) has between Mabalacat, Pampanga centre (OCC), stabling points, co-financiers.
awarded the first two and an underground station workshops, training centre and Construction of the project
engineering and construction serving Clark International other buildings. will be carried out by Heavy
contracts for Clark Phase 2 of Airport. The following contracts have Civil Infrastructure, a
its North-South Commuter Package 4 covers the not yet been awarded although subsidiary of L&T Construction,
Railway Project (NSCR), engineering and construction bids have been submitted by under two contracts awarded
following a virtual signing of approximately 6.3km of 11 local and international in April.
ceremony on August 1. main line and 1.6km of depot companies: A further contract worth Rs
Contract Package 4 was access line, as well as the = package 1 covering work on 25.77bn ($US 344.4m) for 40
awarded to a partnership of construction of the Clark 17km of railway including trains for the line was awarded
EEI and Acciona Construction Airport station. Calumpit and Apalit stations by NCRTC to Bombardier in
Philippines, and Contract Package 5 covers the = package 2 covering work on May, comprising 30 six-car
Package 5 was awarded to engineering and construction 16km including San Fernando regional commuter trains and
Posco, Korea. The two of the NSCR Clark Depot in station, and 10 three-car intra-city trains
contracts cover infrastructure Mabalacat, which will cover = package 3 covering 12km together with 15 years of
on the final 8km stretch of the approximately 33 hectares, and including Angeles station. maintenance.
Bangladesh
KTZ. minimum of 26 trains consisting
Union Cohesion Fund grant.
France
The tender comes after a of around 18 coaches each to
joint venture between Talgo KTZ between 2022 and 2029.
Bangladesh Railways has
and KTZ to manufacture 420 The maintenance aspect of
signed a Taka 6.58bn ($US Paris Transport Authority
coaches at Tulpar ended in 2019. the contract includes providing
77.7m) contract with a joint (RATP) has reported an Ebit of
É57m in the first six months of
The competition is being technical support, maintenance,
venture of Korean companies
the year, declining by É190m
facilitated by DB Engineering repairs, spare parts and overhauls
Sung Shin Rolling Stock
and Consulting, under its for 20 years, with an option for
Technology and Posco (77%) year-on-year. Overall
group net income fell by É214m
long-term cooperation with another 20 years.
International for the procurement
KTZ to introduce international KTZ plans to conclude the
of 150 metre-gauge passenger to -É88m, a 170.1% fall year-on-
standards across the company, contract for the sale of Tulpar
coaches. year caused by the coronavirus
Britain
particularly in the passenger and the order for the coaches
pandemic and strikes in
division. in April 2021, with the
December and January.
Italy
KTZ will sign a strategic maintenance contract expected
Hitachi has announced the
agreement with the winning to be finalised by December
purchase of technology firm
Alstom-Bombardier
CAGR in %)
German-based locomotive
plant. For the first time, CRRC
now has a production facility
With the recently approved in Central Europe. The pandemic, together SCI Verkehr expects a
takeover of Bombardier Due to the Covid-19 pandemic, with the deteriorating negative market development
Transportation by Alstom (p6), all manufacturers are under economic situation and the in Africa/Middle East and the
the competitive landscape in increasing pressure to reduce supply of raw materials, is Commonwealth of Independent
Europe, but also worldwide, their fixed and one-off costs having a particular influence on States (CIS) during the next
will change massively. and to leverage optimisation the development of regional five years.
The merger creates the world’s potential through synergies. railway technology markets. South America, with its lead
market Brazil which is
0 10 20 30 40 particularly affected by Covid-
19, is growing at 1.3% which is
a lower rate than for the
China worldwide market. However,
South America already had to
United States accept a significant reduction
in market volume in 2019 due
Russia to a low number of deliveries
and reduced investment in
Germany infrastructure.
The strongest growth is
India expected in Australia/Pacific,
Western Europe, Asia and
France Eastern Europe.
In total, the top five largest
Britain railway markets accounted for
53% of the worldwide market
Japan volume for railway technology
in 2019. Newly included in the
top five of the largest rail
Italy
markets is India, which has
ousted France from fifth position
Canada and will grow significantly in
Figure 6: Top-10 worldwide railway markets for OEM and after-sales in 2019 (€ billion)
the long term despite current
Covid-19 crisis. IRJ
O
24 IRJ September 2020
Improve your rail
engine‘s performance
& efficiency.
We are your dependable partner for holistic,
advanced and inspiring air-management
systems for freight and passenger trains.
↗ More information:
air-management@pbst.eu
www.pbst.eu
Pandemic pushes German
Germany | Covid-19
Germany’s Covid-19 lockdown resulted in passenger rail use falling to around 10% of normal levels in much of
S
March and April, causing economic devastation to the sector. As operators embark on their respective
recoveries, Kevin Smith analyses the impact of the crisis and its implications for the future of the market.
TANDING proudly, and roughly expansion and consistent modernisation competitor, FlixTrain, was forced to
1.5m apart, Germany’s federal of the railways, we are jointly creating suspend all services on March 20 until
minister for transport and the the conditions for a substantial shift to July 23 (p32).
heads of German Rail (DB) and climate-friendly rail transport,” said DB There have been mixed messages
Siemens, enthusiastically announced a CEO, Dr Richard Lutz. about the rationale for this policy - DB
É1bn order for 30 high-speed ICE trains Although the tender was announced said it was following government
on July 15. in October 2019, critics have questioned instructions to maintain the service to
The minister for transport and digital the timing of the contract award. An prevent overcrowding, something the
infrastructure, Mr Andreas Scheuer, equivalent private company, they say, government has consistently denied.
praised the investment for providing a simply would not make such a huge While they might continue to agree to
“turbo boost” to the German economy investment in assets at the height of the disagree, this is one certainty: the
during the era of coronavirus. He said largest crisis in living memory. damage done to DB’s finances is
the order reinforces the German Indeed, DB, along with all public unprecedented.
government’s longer-term commitment transport operators, suffered a crash in “Covid has pushed us into the red -
to sustainable transport. The new trains traffic after the coronavirus lockdown from an operating profit of É757m in
will offer 25,000 additional seats and was instituted across Germany on the first half of 2019 to an operating loss
support a 30-minute service frequency March 22. DB introduced only minor of É1.8bn in the first half of 2020,” DB’s
between major cities as DB expands its adjustments to the long-distance CFO, Dr Levin Holle, said on July 30.
ICE fleet to 411 trains by 2026. domestic timetable, operating 70-90% of “Our rail business is fixed-cost heavy,
“With investments in our entire fleet its usual services while it was carrying so when people stop travelling and
of É12bn by 2026, of which É8.5bn is in less than 10% of normal passengers. In revenues fall, that has an almost direct
long-distance traffic alone, with massive contrast, its largest long-distance impact on our bottom line. Our group
Germany’s transport minister, Andreas Scheur (left) and DB CEO, Richard Lutz (right), say
government support for DB will encourage a shift to “climate friendly” rail transport.
Transdev operates 23 contracts in Germany. However, CEO for Northern and Central Europe, Christian Schreyer, fears for their future viability.
losses, which is set to be followed by up is so arrogant and has made us really consequence of the pandemic but an
to É3.6bn next year. The company’s furious. It shows the mindset of DB overall trend in the market.
debt ceiling has also been increased to currently.” “The parent companies of both the
É30bn from É25bn previously. Dipl-Pol Oliver Mietzsch, executive private and the state-owned operators
Mofair believes that using taxpayers’ director of Greater Leipzig Transport like Abellio are in difficulty because
money in such a way could have serious Authority (ZVNL), shares the concern they do not make too much money in
implications for future competition by that the capital injection could potentially the German regional rail market,”
providing DB with an unfair competitive distort future competition. He says Mietzsch says. “For 5-6% margins, they
advantage. They argue that covering ZVNL has appointed the consultancy are asking themselves whether they
losses incurred by DB Long Distance is KZV, which has a good handle on DB’s need to do all of this work? There is an
the equivalent of a direct award and finances, to monitor how the É5bn will argument that we have gained all of the
that FlixTrain or other competitors be redistributed throughout the possible gains in the competition
should have had the opportunity to fill company, although it is too early to say process - we the authorities but also the
this gap. what the outcome will be. companies, so there is not much left to
For commuter and regional services, Stoffregen says the European get any more money out of it.”
the government argues that the cash Commission is also closely engaged in This view is shared by Prechtl and
injection is equivalent to a private the process and could yet rule against it Gründler. They believe that several firms
company increasing capital into its if it is deemed to offer an unfair advantage could withdraw from the market
business. However, Mofair does not feel to DB. “The federal government must altogether. Takeovers and mergers of
that DB should be able to benefit twice. not do the capital increase before the smaller players are also likely as operators
“It is a little bit strange when the CFO commission has allowed it,” he says. seek synergies between contracts to
of DB says that we are steering through “That is forbidden by European law.” drive efficiency improvements.
the crisis while talking about the new Another area where Mofair feels that
Reforms
trains for DB Long Distance and not DB is distorting the market is the use of
adding where the money came from,” its recently-established low-cost carrier,
says Dr Matthias Stoffregen, Mofair’s Regional Transport Start Germany, to They also believe that several reforms
managing director. “It comes directly compete in tenders where it is looking are possible, which could support
from the state, which is state aid that to regain market share, already winning participants which do not have the
other competitors do not get. It is a back one contract from Transdev in backing of the state, potentially
really huge problem that questions the Saxony. reinvigorating the market.
principle of competition in German rail In addition, it has been common in For example, in Bavaria the state
generally.” recent tenders for three, two, or sometimes currently guarantees the finance of new
“They are using taxpayer’s money only one bidder to come forward trains, providing an equal opportunity
but are saying to the private operators compared with five or six for previous to all bidders. This is a unique
to ask their shareholders for the same contracts. arrangement, but other states have
capital increase, where their shareholder Mietzsch says Start was founded to similar initiatives - Baden Württemberg
is not a taxpayer and doesn’t have help DB compete more effectively for example owns the trains which are
unlimited funds,” Schreyer says. “All because it discounts overheads that its rented to the operator. Similar
normal shareholders expect a return competitors don’t have, such as the guarantees could be offered in other
one day on their investment. The large blue-collar workforce. However, areas where operators take on risk or
taxpayer does not have the same he says the reduction in bidders are exposed to large costs, such as train
expectation. This is why this comment competing for contracts is not a maintenance. Many of the operators are
“
buying your ticket with a card and
making this a contactless payment will
FlixTrain rein
Flixtrain, Germany largest open-access long-distance passenger operator, started to reintroduce train services
on July 23 following a four-month shutdown due to the coronavirus pandemic. As FlixTrain’s managing
F
director, Fabian Stenger, explains to David Briginshaw, passengers are returning, and the company intends to
resume its expansion plans next year.
LIXTRAIN, in common with Stenger, FlixTrain’s managing director throughout, before and after each
Europe’s other open-access long- told IRJ. Stenger says he is “happy with journey
distance train operators, was the restart” and that FlixTrain is currently = providing every passenger with an
forced to suspend operations when the performing above the market average in assigned seat, meaning passengers can
coronavirus pandemic struck earlier this terms of load factor. board the train through the correct door
year. The company shut down its three- Stenger says adapting to the new and nobody needs to stand in the aisles
line network in Germany on March 19, normal during Covid-19 has been a = contactless check-in
but it was not until July that it felt tough challenge for all modes of = continuous supply of fresh air, and
confident enough to start running trains transport in Germany. “There is close = load indicators for each train on its
again. contact with the government on how to website.
Two routes, Cologne - Berlin and operate safely and the same measures Passengers are given the current
Cologne - Hamburg, restarted on July have been agreed for all carriers in safety instructions together with their
23, but at a lower frequency than before. Germany,” Stenger says. booking confirmation. Train crew also
“We were cautious in the beginning, but For FlixTrain, these measures include: inform passengers of all hygiene
after a couple of weeks we decided to = mandatory face masks for all measures when boarding.
increase capacity and almost doubled passengers and staff Stenger says these measures have
the number of journeys,” Mr Fabian = cleaning and disinfecting trains enabled FlixTrain to maintain capacity
ROLIFT SYSTEM
Mobile Exchange System
on its trains. “Compared with German share of the long-distance rail market in
Rail (DB), we can’t overbook a train Germany, an even greater advantage
because every passenger is assigned a over private operators.
seat so we can carry the same number FlixBus founder and CEO, Mr André
of passengers as before,” Stenger told IRJ. Schwämmlein, wrote to the European www.robel.com
“It is hard to say what the additional commissioner for competition, Ms
cost is, but it is an investment from our Margrethe Vestager, on July 7 calling for Plasser UK
side, and we are happy to start up again.” measures to balance competition in the Contact: ROBEL’s UK Agent
German operators have benefited German rail market. Schwämmlein is Plasser UK Ltd.
from a positive attitude to the use of particularly concerned about the É11bn Manor Road, West Ealing, London
public transport, partly due to a much in state aid which DB was promised last Tel: Main Office +44 (0) 208998 4781
E-mail: robel@plasser.co.uk
lower incidence of Covid-19 in Germany autumn as part of Germany’s climate
than in other European countries. Indeed, package and an increase in its debt
while most of Europe’s incumbent ceiling from É25bn to É30bn.
national rail operators cut back services “DB seems to be incessantly using
drastically during national lockdowns, crisis situations to strengthen its
DB continued virtually as normal. competitive advantage,” Schwämmlein
However, FlixMobility, FlixTrain’s says. “Such a pattern could set a
parent company, is unhappy with the dangerous precedent in the EU, turning
German government’s planned state- back the clock on decades-long efforts
aid package to DB to offset the effects of and preventing other private rail
the coronavirus pandemic which it services to launch competitive offers
believes will give DB, which has a 99% across Europe in the foreseeable future.”
IRJ September 2020
Germany | FlixTrain
In order to maintain fair competition “There are anti-trust authorities we was expanded to two round trips a day.
in the German rail market, FlixMobility can appeal to in Germany, but in the A third route, linking Berlin with
would like to see non-discriminatory end it is a political decision. We want to Cologne and running six days per week,
access to DB’s distribution channels maintain fair competition in the German was launched in May 2019. FlixTrain
such as the DB Navigator app and train market. We are talking to a lot of added seven new destinations to its
website. German politicians, but DB is a state- nationwide long-distance rail network
“Consumers are still being misled, owned company.” with the start of the new timetable on
thinking this is a comprehensive While FlixTrain ramped up services December 15 2019, and the journey time
overview of journeys, but there is not on its two reopened routes in Germany for Hamburg - Cologne services was cut
always full transparency and consumers in August, Stenger says the company is from a minimum of 4h 8min to just over
are not able to buy FlixTrain tickets planning to reopen the third route 3h 30min.
directly via bahn.de,” Stenger says. linking Berlin with Stuttgart, but it does FlixTrain planned to launch a new
FlixMobility also wants a reduction in not have a set timing on when to do so. Hamburg - Stuttgart service this spring
train access charges for commercial “It’s a tricky question - I don’t have a with up to three departures per day by
operators, fair access to train paths, crystal ball,” he says. “We are more on the summer. However, expansion plans
maintenance and train stabling facilities, the conservative side at the moment and came to an abrupt halt with the spread
and a ban on aggressive price dumping looking at how to proceed for 2021.” of coronavirus forcing the company to
by DB. Nevertheless, Stenger says FlixTrain is suspend all services on March 19.
“It is a tough time for everyone, and “looking for expansion in 2021.” Up to that point, Stenger says traffic
we are not against some kind of state was building up well. “We carried more
Expansion
aid for the incumbent,” Stenger told IRJ. than 1 million passengers during our
“DB received huge financial support first year of operation,” he says. “We were
last year, and with Covid-19 another FlixTrain’s growth has been rapid very happy with the numbers which
package is coming to the table. We are since it entered the German long-distance were exceeding our expectations. We
talking about billions of euros, but there rail market in March 2018 when it took are the first private long-distance
is no transparency on how DB will use over the operation of the former Hamburg- passenger rail network in Germany
the money. Cologne Express (HKX) service linking competing with DB. We are aware that
“State aid should not endanger fair the two cities. The following month, the it is an up-hill task and a long-term
competition. There is far more competition company launched its second route investment.”
in air transport than rail, but the linking Berlin to Stuttgart with Leo Last year, the company decided to
German government placed a lot more Express, Czech Republic, as the operator. upgrade its rolling stock. FlixTrain’s
conditions on Lufthansa than it has on This revived the short-lived crowd-funded financial partner, Railpool, acquired
DB. We are a private company and we Locomore service between the two cities. used compartment coaches which are
had to cease our operation whereas DB FlixTrain added a second round trip on being converted to high-capacity vehicles
continued with virtually the same the Berlin - Stuttgart route and stepped by Talbot Services in Aachen. Talbot
capacity, so it is somewhat unfair when up the frequency from five times per will also maintain the vehicles under
the incumbent gets government support week to daily in June 2018. The following Railpool’s 15-year lease agreement with
and we do not. month, the Cologne - Hamburg service FlixTrain.
The work involves more than 100 owns FlixBus, has similar partnership
coaches and includes removing the agreements with both train and bus
traditional compartments and converting operators. “We may need additional Make room m
the coaches to open-plan saloons, fitting partners for specific routes, and we will
new seats and modernising the toilets. discuss this over the next couple of for your ideas
Power sockets and Wi-Fi have been months about how we grow and
installed as well as an onboard expand next year,” Stenger says.
entertainment system. The refurbishment FlixTrain was planning to become the
should extend the life of the coaches by first open-access long-distance train
15-20 years. operator in France with services
Train services are only being resumed radiating from Paris to Bordeaux,
using the refurbished coaches. “We Toulouse, Lyon, Nice (an overnight
have refurbished more coaches than we train) and across the border to Brussels.
currently have in service,” Stenger says. However, FlixTrain decided in April not
“We are always looking at options to to proceed with plans to enter the
add more coaches to the fleet, but the French market. DVC 1000 -P series
number of second-hand vehicles is Stenger says one of the obstacles is
limited, so we have also been looking at the “enormous” cost of track access Based on isolating amplifier technology, LEM
Operators
DVC 1000 -P offers significant savings in terms
Sweden. “With fees at the current levels, of space compared to a typicala sensor.
it is very challenging to offer customers
It delivers great overall accurac
cy, of +/- 1 % at
The restoration of services also coincided an affordable product similar to that mperature leading
+25°C, with high stability in temper
with a switch in train operators following which FlixTrain successfully provides in to an overall accuracy of +/- 1.5% from - 40°C
the ending of agreements with Germany,” the company told IRJ at the to +85°C as operating temperaturature range.
FlixTrain’s two launch operators, time. “If French decision makers can It is ideally situated in industrial
al applications
but can also be used in traction on as it is fully
BahnTouristikExpress, in partnership demonstrate a willingness to align with compliant with the International al Railway
with Railroad Development other European markets and conditions Industry Standards ( IRIS).
Corporation (RDC), and Leo Express. improve, FlixTrain is open to
• 1000 V nominal voltage
“The current situation is a great reconsidering a French expansion.”
• PCB mounting
challenge for the entire mobility FlixTrain announced plans last
• Small dimensions & light weight (22g)
industry, which includes our partner September to launch services in Sweden • - 40 to +85°C operation
companies,” Stenger explains. “Both from Stockholm to Gothenburg and • Fast response time of 10μs
0μs
FlixTrain and RDC decided to terminate Malmö this year. Despite the pandemic,
their cooperation. Leo Express has FlixTrain still plans to enter the Swedish www.lem.com
recently made entrepreneurial decisions rail market due to the “excellent
that have affected their cooperation situation for private operators.”
with FlixTrain and the re-start of “Rail is a long-term investment for
operations. Economically, we did not us,” Stenger says. “We have slowed
come to an agreement and therefore we down a little, but we still want to
had to decide to terminate our expand. The question is what impact
cooperation. We regret that Leo Express Covid-19 will have on demand in the
will not continue to be our partner.” future. We still expect to open new
The two routes are now operated by routes in Germany and to start business
SVG and IGE. FlixMobility, which also in Sweden next year.” IRJ
IRJ September 2020
Iconic project makes progress
Germany | Stuttgart 21
T
project is now making steady progress. As David Briginshaw and Anitra Green report, the project will
radically alter the rail network in the Stuttgart area when it is finally completed in 2025.
HE ambitious project to replace round the building sites and a multimedia which was set up in 2013. In total, DB
Stuttgart’s terminus station with exhibition in the station’s iconic square is building five new stations, 120km of
an underground through station tower. tunnels and 81 bridges. The new
and build a new direct line to the city’s Even so, costs continued to rise, with through main station in Stuttgart will
airport and exhibition centre was the total cost officially estimated at É6.5bn also mean that there are many new
originally launched in 1994. However, in March 2013. On January 26 2018, direct links for regional traffic, which
Stuttgart 21 has been dogged by DB’s Supervisory Board approved will take the pressure off Stuttgart’s S-
controversy since the outset due to a financing framework of É8.2bn for Bahn network, already operating at its
disagreements over funding and Stuttgart 21, which includes a É495m limit.
mounting opposition from politicians risk buffer. Stuttgart 21 is being The core of the Stuttgart 21 project is
and local residents who questioned the financed by DB, the German federal the new eight-track underground
project’s value for money in the face of government, the European Union, the station for through trains. The new
rising costs and the destruction of state of Baden-Württemberg, the City of station will run along the side of the
landmark buildings in the city centre. Stuttgart, Stuttgart Airport and VVS. existing main station building, at an
The cost of the project was originally Construction is also taking far longer angle of 90o°to the existing terminus
estimated at around É2.5bn, but by than expected. Stuttgart 21 should have station. The historic station building
2009 this had risen to É4.5bn with completed by last year. However, the with its tower is being retained, and
funding split between the state of completion date was first extended to DB is investing É200m in the É250m
Baden-Württemberg, Stuttgart city 2022, and subsequently slipped to 2025. renovation scheme. Supports have
council, Stuttgart Transport Association Stuttgart 21 will be linked to a new been inserted beneath the building to
(VVS), Stuttgart Airport and German high-speed line being built from allow the new station platforms and
Rail (DB). However, costs continued to Wendlingen, to the east of the city, to track to be constructed.
mount with DB blaming a building Ulm, which will effectively extend the Meanwhile work is in progress on
boom for higher-than-expected prices Mannheim - Stuttgart high-speed line to constructing new lines forming a circle
from contractors. Ulm en route to Munich when it opens around the city centre,
Nevertheless, DB was determined to in 2022. DB expects more than 10 million mostly in tunnels,
push ahead and started work in 2010. long-distance passengers a year to and including
This only enflamed opposition further benefit from the Stuttgart - Ulm project. the new
leading to violent protests. It was only The cost of the Wendlingen - Ulm line Mitternacht
after a referendum in 2011, which section is budgeted at É3.7bn as of S-Bahn
backed the project, that work could December 2017, with DB funding É141m, station. On
finally get going properly. Baden-Württemberg É950m and the July 20 the
There are still some German government and the EU the project
protests, but they are far remaining É2.6bn. partners
less serious than before Both projects are being
thanks to a public managed by DB Project
relations campaign Stuttgart-Ulm,
that includes
guided tours
Construction up!Vmn!boe!
Nvojdi
Stuttgart 21 is underway at eight
construction sites. To the north, tunnels Airport/Exhibition Centre Wendlingen
are being built to provide better Filderstadt
connections to Feuerbach and Bad
Cannstatt. To the south, the Filder tunnel up!Vmn!
will provide a direct line to Stuttgart Kirkheim boe!
IRJ Nvojdi
airport and the exhibition centre, as
well as a better connection with the part of the S-Bahn network will be 750m, which means a climb of almost
Gäubahn line to Boblingen. From the equipped with ETCS, digital signalboxes 500m on the 16km uphill section from
airport, a new line is being constructed and highly automated operation. Wendlingen towards Ulm. This is too
parallel to the existing highway to The first phase will involve equipping steep for heavy freight trains, so the
Wendlingen am Neckar as part of the the lines radiating from Stuttgart to new line will be restricted to trains
new Stuttgart - Ulm high-speed line. Feuerbach, Bad Cannstatt, and Sommerrain weighing a maximum of 1500 tonnes.
Since travelling times to the airport to the north, Untertürkheim to the east, According to DB, the shell of the new
will be considerably shorter for both Filderstadt-Bernhausen near the airport, Wendlingen - Ulm line is 90% complete.
long-distance and regional passengers, and Goldberg to the southwest. The More than 60km of tunnel bores have
a substantial shift from road to rail is entire S-Bahn network will follow by been completed. Equipping the line is
expected, especially for travellers from 2030, including lines also used by long- also making good progress with 37km
other regions. For example, a trip by distance, regional and freight trains. of track already laid and 800 catenary
rail from Stuttgart main station to the The 60km Wendlingen - Ulm line is masts erected.
airport will take only 8 minutes instead designed for 250km/h operation and is Completion of the two projects will
of 27 minutes today, from Ulm 30 minutes being built in seven sections. Half of the have many benefits. The high-speed
instead of 1h 35min, from Rottweil 59 route consists of nine tunnels, otherwise line will open in 2022 and will be used
minutes instead of 2h 2min, and from it runs parallel to the A8 highway. The by two or three high-speed passenger
Tübingen 35 minutes instead of 65. new line takes a more direct route than trains per hour. The non-stop trip from
The Stuttgart 21 partners have also the existing Stuttgart - Ulm main line, Stuttgart to Ulm will take 30 minutes,
agreed on a pilot project to introduce a crossing the Swabian Jura hills further compared with 58 minutes today. The
digital signalling and train control to the south. line will also be used by regional trains
system, which would make Stuttgart Around 40 rail and road bridges are which will stop at a new station being
the first city in Germany to introduce being built. One of the two major built at Merklingen, though this is not
such a system. By 2025, all lines in the bridges crosses the Neckar river at actually part of the main project and
Stuttgart 21
Stuttgart 21 project as well as the greater Wendlingen, and is 136m long at an was planned and financed separately.
altitude of 271m above sea level. The Regional trains will take 41 minutes to
other, the 458m-long Fils Valley bridge complete the journey.
Total route length: 57km between Mühlhausen im Täle and Stuttgart’s main station can currently
High-speed lines: 20km Wiesensteig is an even more imposing handle a maximum of 35 trains per
Tunnels: 33km structure. At an altitude of 485m, it is hour today, but with the start of the
Bridges: 44 one of the highest railway bridges in new timetable in December 2025, the
Passenger stations: 3 Germany. The bridge connects the new through station will have capacity
Park and ride station: 1 Boßler tunnel with the Steinbühl tunnel for 42 long-distance and regional trains
Planned commissioning: December 2025
Stuttgart - Ulm
directly. “This rare combination of between 07.00 and 08.00.
tunnel-bridge-tunnel is architecturally The new lines leading to the new
Total route length: 59.6km
and technically demanding,” says DB. main station will also permit much
Tunnels: 30.4km
The existing railway bridge over the higher speeds, with a maximum of
Maximum speed: 250km/h
River Danube in Ulm has already been 160km/h. In future it will be possible to
Railway overpasses: 17
widened to accommodate four tracks approach the station at speeds of up to
Road bridges: 20
under a joint project called Neu-Ulm 21, 100km/h, whereas trains today are
Planned commissioning: December 2022
and was completed in 2007. restricted to 20km/h, which will help to
The highest point of the new line is at reduce journey times. IRJ
IRJ September 2020 37
Learning the lessons of Rastatt
Germany | incident management
Developed following the Rastatt incident in 2017, the ICM Handbook is designed to improve responses to
disruptions along the Rail Freight Corridor network. Christiane Warnecke and Alessandro Fattorini from the
T
Rhine-Alpine Rail Freight Corridor talk with David Burroughs about how guidelines from the handbook and
other lessons learned from the Rastatt incident were put into practice following an accident at Auggen in April.
HE Rastatt tunnel collapse in August Managers in Europe (Prime) in June is currently underway into how the
2017 caused one of the biggest 2018. It was also confirmed and supported concrete block came to be on the track.
disruptions to rail traffic in Europe’s by the transport ministries of Rail Fattorini was notified of the accident
recent history, halting services along the Freight Corridor (RFC) Rhine-Alpine by BLS around 21.30, and immediately
route for seven weeks before the line and RFC North Sea-Mediterranean in contacted the German traffic control
was repaired and reopened in October May 2018. The ICM was first used by centre to clarify whether the ICM
2017. A study carried out by Hanseatic corridors RFC Mediterranean in France process would be triggered. Following
Transport Consultancy (HTC) on behalf and RFC Scandinavian-Mediterranean the technical specifications and analysis
of the European Rail Freight Association in Denmark in 2019, with the handbook conducted by German IM DB Networks, it
(Erfa), Network of European Railways also used during an incident in was announced around 01.30 on April 3
(NEE), and the International Union for northern Germany in August. that the incident was an international
Road-Rail Combined Transport (UIRR), The first test of whether the RFC Rhine- disruption under the ICM, triggering
calculated that the total losses stemming Alpine and the related infrastructure the ICM international contingency
directly from the incident reached managers (IMs) had learned the lessons process on RFC Rhine-Alpine for the
É2.048bn. of Rastatt came at 19.50 on April 2, when first time.
Following the disaster, DB Networks, a BLS Cargo locomotive hauling an SBB “This is triggered when the leading
SBB Infrastructure and RFC Rhine-Alpine Cargo International rolling-road service IM figures that it will take longer than
launched a series of workshops to derailed after colliding with a 140-tonne three days to resolve an incident,” says
develop a blueprint covering the future concrete bridge section at Auggen on corridor managing director, Ms Christiane
response to similar incidents and to the Karlsruhe - Basle main line, about Warnecke. “Another condition is that
identify options for strengthening the 20km north of Basle. The locomotive traffic is seriously affected. It could be
existing disaster management process. driver was killed, with several lorry that only one track is affected and most
This led to the development of the drivers travelling on the train also injured. traffic could still run, and then the ICM
Handbook for International Contingency The road bridge was scheduled to be process would not be initiated. In this
Management (ICM), which was demolished as part of the project to case DB Networks found it would take
accepted by the Rail Net Europe (RNE) expand the line to four tracks, says longer than three days and traffic
general assembly in May 2018 and by Rhine-Alpine corridor manager, Mr would be strongly affected, so they
the Platform of Rail Infrastructure Alessandro Fattorini, and an investigation started the ICM processes.”
T
what else is required to protect suppliers, operators and customers in this digital era.
HE railway industry is no stranger German Rail’s (DB) passenger information game - or catch up with threats it has
to managing security in the physical displays as part of a larger attack that fallen behind.
sense, but as trains increasingly spread around the world in May 2017 An alert issued on July 23 by the
become digital hubs, communication also highlights how rail can be caught United States’ National Security Agency
systems become ever more sophisticated up in wider indiscriminate attacks. (NSA) and Cybersecurity and
and corporate secrets are increasingly Technology supplier Ensco Rail says it Infrastructure Security Agency (CISA)
stored on web-connected servers, the has received numerous questions from emphasised the growing risks, warning
dangers posed by a lack of digital security both freight and passenger operators that operational technology (OT)
are growing exponentially. over the past 18 months asking it to infrastructure was becoming an
Cybersecurity is a subject that has confirm that its products comply with attractive target.
only recently become a major topic of various cybersecurity standards, “Legacy OT assets that were not
conversation among operators, highlighting how this has become a designed to defend against malicious
manufacturers and suppliers. But recent major topic of concern. This is echoed cyber activities, combined with readily
incidents such as the data breaches at by cybersecurity analysts RazorSecure available information that identifies OT
Stadler and Spanish infrastructure which says it has been involved in more assets connected via the internet, are
manager Adif have highlighted the risks conversations about cybersecurity over creating a ‘perfect storm’ of easy access
to the industry, while other incidents the past 12 months than was previously to unsecured assets; use of common,
such as the 2015 Ukraine power grid the norm. open-source information about devices;
cyberattack show the damaging impact But this awareness and discussion and an extensive list of exploits
attacks can have on critical infrastructure. must be translated into concrete action deployable via common exploit
The WannaCry attack that brought down if the industry is to remain ahead of the frameworks,” the alert warned. “It is
40
important to note that while the behaviour “The infrastructure has not been
may not be technically advanced, it is affected at any time, and the correct
still a serious threat because the potential functioning of all its services has been EN 45545 CERTIFIED
impact to critical assets is so high.” guaranteed,” the company says. “Adif,
The state of cybersecurity in the rail aware of being the manager of a critical
industry, and its ability to respond to infrastructure such as the exploitation of
these threats, is very much a mixed bag the railway network, considers
says RazorSecure CEO and founder, Mr cybersecurity as one of the pillars of
Alex Cowan. comprehensive security.”
“There are some companies that are These are not isolated incidents, with
much further along the path, they’ve the 2020 IBM Dptu!pg!b!Ebub!Csfbdi
been doing it for four or five years and Sfqpsu finding that the average data
have quite a strong view on what good breach in the transport industry cost
cybersecurity looks like,” Cowan says. $US 3.58m, up from $US 2.9m in 2015.
“And there are others that are really The average time to identify and contain
very much further behind and are a breach in the industry was 275 days.
starting to take the first steps, but Mr Brett Callow, a Canadian-based
maybe lack some of the maturity that threat analyst with New Zealand
the others have developed through cybersecurity firm Emsisoft, says it is a
starting a bit earlier.” common misconception that ransomware
Data
attacks are instantaneous. “People think
you open an email attachment and your
files immediately start being encrypted
The risks of not taking data protection but that’s not how it works,” he says.
seriously include loss of intellectual “The deployment of the ransomware
property, the theft of sensitive data, and and the encryption of the files is very
damage to high value systems and much the last stage in an attack. They
infrastructure. will have had access to the network for
When it announced the attack on days, weeks or possibly even months
May 7, Stadler said it had immediately prior to starting to encrypt the files and
initiated the required security measures, they’ll have used that time to spread
involved the responsible authorities and laterally through the network to collect
launched a detailed investigation. credentials and steal data.”
“Stadler’s internal surveillance services Callow says there has been an increase ible
found out that the company’s IT in hackers stealing data from companies
Flex tion
network has been attacked by malware instead of just encrypting it. This comes Solu
which has most likely led to a data despite the increased risks, as there is a
leak,” the company said at the time. greater chance that a company may
Later that month, internal documents notice the unusual activity and stop it INSTA LL SA FE T Y
stolen during the cyber-attack were before the hackers have the opportunity
published online after the manufacturer to encrypt the data, leaving them ®
refused to give in to a $US 6m ransom
demand, to be paid in Bitcoin. “Stadler
empty handed.
Callow says there are things companies
ArmaFlex Rail
is not and was at no time willing to can do to protect their data in order to The world‘s first flexible,
make payments to the blackmailers and stop most attacks, or at least limit their closed-cell insulation to
has not entered into the negotiations,” scope: meet EN 455 45 fire pro-
the company told IRJ after 4GB of = use multi-factor authentication
information was published, along with everywhere it can be used, including on
tection requ
uirrements.
a list of files the hackers had accessed internal administration accounts
and could potentially have extracted. = limit admin rights
The attack on Adif appears to have = disable remote desktop protocol (RDP)
followed a similar pattern, with hackers if not needed and lock it down if it is,
claiming to have taken 800GB of data and secure other remote access solutions w w w.arm
macell.com
including correspondence and contracts. = segment networks
In a message posted to a leak site = patch in a timely manner
related to REvil ransomware, they = disable PowerShell, a cross-platform
threatened to publish the data if Adif task automation and configuration
did not make contact. management framework, when not
“Simultaneously with the publication, needed
the third attack will follow,” the message = continuously conduct security
read. “We will continue to download awareness training, and
your data until you contact us.” = assume that perimeters will be
Adif confirmed to IRJ that a cyberattack breached and ensure the tools and
using ransomware software had been processes are in place to monitor for
controlled by its internal security services. indications of compromise.
Image: Shutterstock/SkillUp
ArmaFlexx®
IRJ Insights | cybersecurity
W
Keeping operational technology secure
“If you understand what typical activity
looks like on your internal network you
can spot things that may be abnormal,”
ITH critical infrastructure such as firmware, software, service contracts,
Callow says. “Companies need to have
as rail coming under increased product licenses, product keys and
the tools and processes in place to
pressure, the United States’ configuration information, and verify
enable them to do that.”
National Security Agency (NSA) and that all gold copy resources are stored
Staff play a critical role in ensuring
Cybersecurity and Infrastructure off-network and store at least one copy
these tools and processes are followed.
Security Agency (CISA) recommends in a locked tamperproof environment
This was highlighted by a recent incident
developing an OT resilience plan that such as a locked safe, and
at Twitter, where multiple major accounts
allows organisations to: = test and validate data backups and
including those of Barack Obama and
= immediately disconnect systems processes in the event of data loss due
Elon Musk were compromised and
from the internet that do not need to malicious cyber activity.
used to promote a bitcoin scam.
internet connectivity for safe and Before an incident, organisations
The attack was made possible after
reliable operations, and ensure that should develop a well-exercised
the alleged United States-based hacker,
compensating controls are in place incident response plan:
17-year-old Graham Ivan Clark, phoned
where connectivity cannot be removed = conduct a table top exercise,
an information technology employee at
= plan for continued manual operation including executive personnel, to test
Twitter and convinced him that he was a
should the Industrial Control Systems the existing incident response plan
colleague who needed login credentials
(ICS) become unavailable or need to be = include public affairs and legal teams
to access the company’s customer
deactivated due to hostile takeover in the exercise in addition to IT, OT,
support platform. Clark now faces 30
= remove additional functionality that and executive management
felonies for the attack.
could induce risk and attack surface area = discuss key decision points in the
Operational Technology
= identify system and operational response plan and identify who has the
dependencies authority to make key decisions under
= restore OT devices and services in a what circumstances, and
As OT and IT systems become ever
timely manner, and assign roles and = partner with third parties for support,
more closely connected, the threat of
responsibilities for OT network and and review service contracts and
cyberattacks being used against this
device restoration government services for emergency
infrastructure continue to grow. Innovative
= back-up “gold copy” resources such incident response and recovery support.
solutions such as autonomous controls
for safety critical systems, Internet of is when you listen to train manufacturers While GSM-R is a 2G-based system,
Things (IoT)-connected sensors and and operators, and they openly admit FRMCS is an IP-based system that will
real-time communication services have that a lot of operators don’t know what is use 5G. “We all know that IP is a good
all introduced additional attack vectors installed on their train,” says RazorSecure entry door for cyberattacks, unfortunately,”
that can expand an attacker’s footprint executive chairman, Mr Robert Brown. says Mr Jean-Michel Evanghelou, head
and increase vulnerability. “They might know 90% of it, but 10% of telecoms at the International Union
These new capabilities often require they don’t know. With cybersecurity, of Railways (UIC), which is leading the
integration into dated architectures and unless you know what assets you’re FRMCS project.
are often reliant upon legacy support trying to protect, how do you protect The most likely threat against
systems which can be inherently less them? I think that is really quite a FRMCS is a Denial-of-Service (DoS)
secure. Trains are also much more glaring example of how the industry attack, Evanghelou says. A DoS is
digitalised today than even a few years needs to catch up.” designed to shut down a machine or
ago, with more than 100 Internet Protocol The way this can pose added risks are network, making it inaccessible to its
(IP) connected systems and up to 10- varied and numerous. RazorSecure has intended users. This is usually achieved
times as many processors onboard as seen multiple instances where devices by flooding the target with traffic, or
previous models. lack basic passwords or encryption, and sending it information that triggers a
“Part of the challenge [operators and there have also been instances where crash. While this is not likely to affect
manufacturers] run into is that this protected devices have been openly the safety of the railway due to the
adds a lot of additional risk,” Cowan available for sale on Ebay. This can pose failsafe systems in place, it would more
says. “It means that you have an onboard a major security risk as hackers can use than likely result in a lack of service.
network that itself needs to be secured, these to decompile the inbuilt software In order to protect against this, the
you have lots of different systems that will allow them to discover UIC is looking to bake countermeasures
running a lot of different software on vulnerabilities or loopholes to enable into FRMCS. As part of the technological
board as well. But there are a lot of future attacks. jump from 2G to 5G, a new Telecom
existing suppliers that haven’t really On-Board Architecture (Toba) is being
FRMCS
considered how they will maintain and developed to manage telecommunication
manage that software over the whole between the train and the network. “In
life of an asset. That’s probably the One of the most important digital the design of Toba, particularly speaking
biggest gap I see in the industry today.” systems currently under development of FRMCS, we will have some level of
This complexity can pose real challenges across the railway industry is the Future cybersecurity protection,” Evanghelou
to operators trying to protect their fleets, Railway Mobile Communication System says. “And we are starting to decide
especially if they’re not aware of just (FRMCS), a successor to GSM-R that what kind of protection level we will
how extensively connected they are and will provide wireless train radio voice put into the system.
what systems need protecting. applications and ETCS data communication “What we are looking at is having a
“The thing that I find quite extraordinary between the train and the network. double layer of protection, not only
42
protection at the communication layer, the existing GSM-R network. What we through the supply chain was highlighted
which is very important, but also are being pushed to look at for the by a collection of vulnerabilities called
additional protection at the application future for FRMCS has also pushed us to Ripple20. The 19 hackable bugs were
layer, the objective being that when we increase the level of protection of GSM-R.” identified by Israeli security firm JSOF
start to put the first FRMCS products in A number of suppliers across the in code sold by a small Ohio-based
place that these products are embedded industry are working with the UIC on company called Treck, which provides
with these levels of protection.” the development of FRMCS, including software used in IoT devices. JSOF
the cybersecurity development. For this, found that a piece of code carrying the
Critical time
Cyber Supply Chain Risk Management bug, which was designed to handle the
(C-SCRM) is critical, especially for those ubiquitous TCP-IP protocol that connects
Evanghelou explains that it is always suppliers providing technology that is the device to networks and the internet,
more difficult to add protection to an safety critical in nature or involves was installed in devices from more than
existing system than to design one with proprietary information. 10 different manufacturers, including
protection embedded from the start, “Managing the risks associated with HP, Intel, Caterpillar and Schneider
which is why the development of the the supply chain requires suppliers to Electric.
FRMCS standard has come at a critical adhere to standards and best practices and Rail is exposed because the affected
time. participate in vulnerability testing with devices range from power supply systems
This is not to say that GSM-R is not proof of successful defence mechanisms in data centres to the programmable
secure, despite cybersecurity not being including attack sensing and warning,” logic controllers used in power grids
a major topic of concern when it was says Mr Ruben Peña, director, and manufacturing.
developed around 2000. In fact, the government surface transportation at JSOF began contacting the affected
system’s core basic design means it is Ensco Rail. manufacturers in February. Schneider
less impregnable than newer IP-based “Appropriate incident response Electric put out a security bulletin on
systems with the biggest vulnerability measures must be in place throughout June 16, followed by a security notification
coming from the IP-based networks it the supply chain to contain the on June 23 and a subsequent patch for
connects with. problem, communicate effectively with some of the vulnerabilities.
“There is always a weakness point when internal and external customers, “Customers should immediately ensure
you introduce GSM-R into the IP network conduct the necessary forensics, and they have implemented cybersecurity
of a company,” Evanghelou says. “The ultimately determine the root cause and best practices across their operations to
good thing now is that the work we are preventative action.” protect themselves from possible
doing with FRMCS will be applied to The way a security flaw can propagate exploitation of these vulnerabilities,”
voith.com
IRJ Insights | cybersecurity
the security notification says. “Where summit in London, a group of says meeting these standards will soon
appropriate, this includes locating their cybersecurity experts demonstrated become a requirement, meaning
industrial systems and remotely how they were able to expose the suppliers should look to conform now.
accessible devices behind firewalls; vulnerabilities of a control system of a Malo, who was previously CISO at
installing physical controls to prevent train that had recently been delivered. the FBI, says there are two ways a hacker
unauthorised access; preventing “They were able to gain access to the can use the supply chain to compromise
mission-critical systems and devices Train Control and Management System a railway. The first is through intentional
from being accessed from outside (TCMS) and essentially had full privileged interference in the supply chain, in
networks; and following remediation access, including to the braking system,” order to compromise products and
and general security recommendations.” Cowan says. The hackers were also able embed sleeper malware than can be
to demonstrate how they could use the activated once these components have
Risks
access to one train to then gain access to been installed. The second is through
another train’s TCMS. “There is potentially exploiting simple weaknesses that have
With the risk of not taking cybersecurity a very serious event that could occur as not been identified and fixed.
seriously seemingly so obvious and a result,” Cowan continues. “They’re “The result is the same for us, and
costly, it would appear logical to embed not saying that people are in that that is compromise,” Malo says. “I’m
the highest level of protection possible system today, but they demonstrated worried about customer safety, I’m
into systems and fleets. But Brown says that it could be done on a live train that worried about our customer’s personal
it comes down to a simple calculation: is out running around Britain today.” information and their credit card
money. Standards to protect against this have information, and obviously reputation.
With existing fleets, the operator may already been introduced for some The conversation I have within our
not have the funding available to install sectors of the industry, including the organisation is what happens the day
a new cybersecurity system across its United States’ National Institute of after a cyberattack, what happens to our
trains while with new orders, it depends Standards and Technology (NIST) SP ridership levels, what does that mean to
on whether the company placing the 800-171 as well as accreditation with the our revenue.”
order has included it as a condition International Organisation for This also has major follow-on
when writing the specifications. Building Standardisation/International implications for a supplier if their
cybersecurity into the fleet may increase Electrotechnical Commission (ISO/IEC) products are found to be the source of
the attractiveness of a bid, but it could 27001 standard. Other standards such the breach.
also add in major new costs that could as the Cenelec TS50701 Cyber Security “If I’m going to follow a NIST
result in a lower cost competitor Technical Specification for the EU rail framework and I have to certify that in
providing less security if it is not industry will be published in June 2021. order to get hundreds of millions of
specified specifically by the tender. This will help to standardise dollars in federal funding, I can tell you
Brown also points out that there is cybersecurity requirements for rolling that things like the supply chain and
currently a gap between the tenders stock, signalling and infrastructure, and how we secure the technology we’re
and specifications being written now, is designed to become an EN standard buying is not just something we like to
which generally include cybersecurity, that will be used globally. do, it’s now something that we have to
and new trains being delivered that Washington Metropolitan Area Transit do,” Malo says.
may have been tendered five years ago Authority’s (WMATA) senior director of
Partnerships
when cybersecurity was less of a cybersecurity and chief information
concern. During a recent cybersecurity security officer (CISO), Mr Kyle Malo,
Rail is not alone in its fight against
cyberattacks, and it is one area where it
can look to build partnerships with
both the private and public sectors to
share information, learn from previous
attacks and gain an early understanding
of how it could be at risk from future
attacks.
Looking at the state of the industry
and the wide range of risks posed, the
task of protecting the entire rail sector
might seem daunting and unachievable.
Cowan disagrees.“I don’t think it’s too
big, and I don’t think it can be too big,”
he says. “There’s a long way to go, and
there’s a mix of challenges. In terms of
actually delivering and securing the
entire rail industry, there are still many
years of work ahead. But I don’t think
it’s an impossible task. I think it just
requires a lot more effort and
dedication in order to get there. I think
New trains are increasingly becoming digital hubs, but each new technology introduced poses the industry will get there, it’s just a
another challenge to digital security. Photo: Transport for London question of timing and money.” IRJ
44
Unmatched fleet VISIBILITY
Actionable INTELLIGENCE
Predictive ANALYTICS
TR ACK SMARTER
The End-to-End Platform for Global Fleet Visibility
amsteddigital.com
IRJ 2020 Innovations showcase
management
its Autorail à Grande Capacité
I
(AGC) multiple-unit trains, as
part of an effort to improve the
environmental impact of the
vehicles. VU Traffic Technologies will
The project aims to convert include integrated train path
at least 50 dual-mode electro- management in its IVU.rail
diesel AGCs to electric as part software in the near future,
of a complementary service using the upcoming European
included as part of the trains’ TAF/TAP TSI standard.
necessary mid-life overhaul. The software will allow
The trains’ existing diesel packs planners to import the latest
will be replaced by four battery train path planned and
units, as well as a high-power published by the network
charger to transfer energy operator into IVU.rail’s
between the battery, traction planning environment, and
incorporation of regenerative The initiative is currently
equipment and pantograph. incorporate it into timetable
braking, offering 15% higher developing a model capable of
The batteries will complement planning and vehicle
peak power. controlling three locomotives
scheduling.
weak catenary power supply = A Bombardier-led Shift2Rail in a 700m-long mixed train.
during acceleration and It also enables planners to
initiative, for the development Later versions will include
improve operational robustness, analyse train path changes
of the technology to operate radio technologies such as 5G
and prevent the unnecessary before transferring them to the
multiple traction units and FRMCS.
replacement of existing rolling scheduled trains.
simultaneously via LTE radio The initiative is part of the
stock fleets while reducing In addition, integrated
communication will enable the EU-funded FFL4E project,
their environmental impact in conflict management makes
operation of up to 1500m long which previously
line with plans to eliminate all planners aware of technical
freight trains, doubling the demonstrated the technology
diesel trains by 2035. The conflicts between a train and a
capacity of European freight with a 500m, 3500-tonne train
conversion to electric also scheduled train path, such as
trains and significantly in push-pull configuration
reduces energy costs in AGCs formation restrictions,
improving the productivity with 39 fully-loaded Fal-
compared with diesel-fuelled maximum weight and other
and competitiveness of rail wagons controlled through
T
TSI standard and integrating it
with the actual planning
HE new SAB RailLine 560 halogen-free flexible flame protection and is non-toxic, as well as process, IVU.rail will ensure
cable is capable of withstanding heavy weather resistant to oil, fuel, UV and ozone. consistent planning
conditions and is resistant to mechanical stress. The RailLine 560 is available as control cable information, from journeys
It is ideal for use in door control systems, with a nominal voltage of 300/500V, as a and vehicle schedules to
bogies or as jumper cables or sensor cables for screened version or as paired data cable, or disruption management and
the wheelset. In addition, the cable has high designed for a nominal voltage of 0.6/1kV. day-to-day operation.
Z
antenna provides greater narrow bandwidth, supporting
transparency of movement on the very high frequency PTC
tracks, enabling improvements band of 220MHz. Operators
to operational planning on busy can select a standalone PTC F has developed a range of ZF’s EcoWorld is a compact,
lines, as well as significantly antenna or have the option of products for rail vehicles powerful and cost-efficient
improving the viability of an embedded multi-band including EcoMet, a modular DMU system which offers a
automated operation. GNSS receiving antenna to gearbox for metro trains which drive power maximum of
The antenna’s robust design support upper GNSS bands on allows easy adaptation to the 600kW and an input torque of
meets the stringent EN 50155 GPS, Galileo, DeiDou and needs of individual clients. 2500Nm. It features a revised
H
times and manufacturing costs directly integrated into the
while still benefitting from transmission. Thanks to a new
ITACHI ABB Power Grids 24/7 traction power to depots, high performance. The gearbox drive system that can be
is developing a new providing a cost-effective can operate variable centre combined with a range of axle
system in partnership with alternative power supply distance of 350mm to 370mm, ratios, the transmission is
energy storage operator which will remain accessible and ratios within a single, suitable for both slow-speed
Zenobe Energy which will at times when power is noise-optimised housing. It is and fast long-distance
enable the powering of 25kV normally unavailable. designed for a maximum load operation. Equipped with an
ac overhead lines through In addition, the technology of 17 tonnes and a top speed of optional advanced coasting
energy stored in batteries. could also be used in future to 120km/h at a maximum function, the transmission
The technology, which provide power to sections of engine speed of about allows additional fuel savings
couples Zenobe’s batteries track where electrification is 6000rpm. In addition, the of 5% depending on route,
with Hitachi’s Static Frequency currently undergoing gearbox is easily adaptable to engine type and load
Converter (SFC) system, will maintenance and upgrading, incorporate digital condition. EcoWorld can be
be used on the British rail providing significantly functionality, including fitted in existing trains to
network in its first application decreased disruption, greater comprehensive monitoring prolong the vehicle’s service
in the country. The first planned efficiency and enabling longer systems such as the ZF life and significantly reduce
applications will be to provide work times. connect@rail system. operating costs.
S
continuous performance
monitoring and energy
optimisation of HVAC IEMENS Mobility is currently developing a and have low maintenance costs. The new
systems. modular hydrogen fuel cell drive for its Mireo hydrogen fuel cell has a triple service life, 50%
iCom is part of a portfolio Plus H regional train platform, which will higher power density and 5% better efficiency.
which includes optimisation subsequently be integrated into other platforms. The hydrogen-powered Plus H trains will be
algorithms for energy-efficient The É12m project, in partnership with Canadian used on existing diesel routes and in regions
driving styles, assistance systems fuel cell producer Ballard Power Systems and where hydrogen is cheaply available through
with obstacle detection and the Rhine-Westphalian Technical University in wind power and the chemicals industry.
collision avoidance, Aachen (RWTH), plans to produce a usable fuel The project is being funded by the German
reproducible braking distance cell drive by 2021, with a planned range of federal Ministry for Transport and Digital
functionalities and ATO 600km-900km in two or three-car trains. Infrastructure (BMVI) as part of its National
systems for freight train The fuel cell trains should perform to the Innovation Programme for Hydrogen and Fuel
operation. same level as electric trains, emitting no CO2 Cell Technology.
T
wireless networking standards. contract in December 2019 for
DAC allows for on-site data the implementation of 5G ATO
HE Oelcheck sample data Oelcheck, with no need for management and processing to systems for the Hamburg S-
entry app provides a user- handwritten forms. The app also support real-time applications Bahn.
friendly interface to monitor offers encrypted communication for remote operations, Nokia 5G SA will also
the quality of locomotives’ and storage. predictive maintenance and feature Ultra-Reliable Low-
operating fluid and lubricant, The latest 4.0 update also smart manufacturing. Latency Communication
ensuring higher levels of safety allows for easy retrieval of lab The services offer low (URLLC), Time-Sensitive
and guaranteeing reliability. reports, as well as the ability to latency, strong security and Networking (TSN) in future
The app allows users to record send sample photos and enter dependable QoS management, 5G 3GPP releases (R16-18),
sample data in three steps: scan data offline, meaning that and offer flexibility for allowing for low latency and
the QR code for the machine and users no longer have to worry customers including full ultra-high reliability on
select the component, scan the about poor internet connections. control of multi-local networks mission-critical applications
barcode of the sample, and the The app is available on iOS and easy scalability to suit all such as ATO and intelligent
app sends the sample data to and Android. operation sizes, with further power management.
T
without expensive increases in teams and trains inside
battery capacity, enabling cost- tunnels, either in a defined
effective monitoring of assets zone or at specific points.
once deemed too expensive to Zone-based positioning is ELTRONIC’s new RTP-800 voice and data, Tetra voice
track. With GPS now in use in intended to optimise rescue is a radio system which plus LTE data, or LTE MCPTT
most management centres, action in the event of integrates single rack Tetra, and VoIP services for voice and
implementation is easy and emergencies. Continuous LTE and Wi-Fi for voice and broadband data services.
inexpensive. location tracking, which data communications. Additionally, the RTP-800
The Syntony SubWave GPS enables tracking of down to The hardware allows for full provides massive data
Coverage Extension allows for 2m of error, is designed for dedication to broadband transmission for signalling
the monitoring of assets in improvements to management communications and comes applications including ETCS,
with an independent interface CBTC and PTC, as well as
R
that allows the transmission of onboard video and voice
data without interfering with services which work without
mission critical functions, and downtime. The equipment can
OLLON launched a project raceways, solidity and sturdiness without additional equipment. be integrated with other
in June to revamp its entire guaranteed by the steel slider. The new onboard equipment is subsystems such as the Train
product range starting with The new Plus version also configured as a single hardware Control Management System
Compact Rail, Elm and Robot provides better performance, platform that supports (TCMS) and public address
P
All these products have been raceways which guarantee
technologically and aesthetically greater rigidity with increased
renewed to increase performance load capacities up to +170% in LATFORM Basket’s new The platform is designed for
and opportunities for industrial the axial direction and +65% in RR9/200 aerial work use on both rail and road, and
designers as well as offer the radial direction. The entire platform is designed to be light, is equipped with hydraulic
pleasant looking products that Compact Rail range now offers compact and transportable on rotational tracks which allow
can be integrated into the new steel sliders equipped road trailers with a maximum for ease of transition between
factory design. with self-centering raceway weight of 3.5 tonnes. the two without the need for
Compact Rail is a system of cleaners, integrated lubrication The platform is equipped special alignment manoeuvres.
rails with bearings in cold systems for the raceway cleaners with a two person basket and The platform is equipped
drawn steel with induction with a slow-release felt pad is capable of lifting a 200kg with a 10.5kW diesel
hardened and ground raceways for automatic lubrication, lateral payload up to 9.5m, with a reach endothermic engine, but can
to manage misalignment. The seals to protect the internal of 4.7m. It is ideal for light also be equipped with lithium-
new version is reliable in dirty components and a cover on maintenance work on signalling, ion batteries for fully electric
environments, resistant to top to prevent accidental lighting and power lines, as operation for use in tunnels,
corrosion and has a long life alterations or tampering with well as the maintenance of stations and other interior
due to induction hardened the radial ball bearing rollers. station infrastructure. environments.
Soniq uses both augmented reality (AR) and artificial intelligence (AI) to find
V
and display rail defects.
OSSLOH’s Soniq Rail images document the rail’s
Explorer is a rail tester that condition at the time of the
offers high-performance inspection. Integration with
inspection capabilities Microsoft HoloLens enhances
enhanced with augmented the inspection data and shows
reality (AR) and artificial the operator a spatially
intelligence (AI) technologies. accurate virtual overlay
Developed in collaboration superimposed on the real rail.
with the Fraunhofer Research The intelligent integration of
Institute, Soniq employs AI to proven ultrasound technology
analyse serious rail defects and with existing infrastructure
AR to display results clearly enables easier interpretation
for operators. As well as and classification of the data.
detecting any irregularities The learned algorithms option
T
The data is permanently Findings can be
saved for later analysis and incorporated into the
HE modular RailCare rCE The Powerpack’s adapter sent to the office via a SIM- company’s digitalised process
Powerpack is a power frame fits on a 20-foot card module, thus assisting chains to serve as evidence if
supply system for freight container’s spigot positions, asset management and problems occur. Long-term
wagons, which provides cost- and doesn’t require maintenance optimisation to access to ultrasound data also
effective temperature controls complicated modifications to increase track availability. produces knowledge about
for containers. be made to the wagon’s Raw data collected during damage progression allowing
The system, developed by structure. The system also rail inspections and displayed for optimised rail maintenance
T
users access 24/7 to sensors, which allow customers
contractual information and to track the status of all
RANSMASHHOLDING located in the air ducts of a allowing them to call up the transport data including
(TMH) has developed a new vehicle, which blocks acoustic data of wagons on hire in real container temperature, shock
air-conditioning unit which radiation produced by the fans time. Recent features include detection and positioning
includes a built-in air sanitiser while maintaining an estimated time of arrival through GPS/QZSS, Glonass,
capable of reliably purifying unobstructed flow of air. services and the ability for Galileo, BeiDou and GSM
the air of bacteria and viruses During tests, noise levels customers to check brake block systems.
such as Covid-19 as it regulates were found to have reduced by conversion status. VTG plans to expand its
onboard temperatures. around 10dBA compared with VTG’s FastTrack service range of ports in future. In
The system, developed in previous versions of the product. enables customers to book addition, VTG will provide
collaboration with Andreyev The new system will be short-term, flexible freight traction in-house through its
Acoustics Institute, is equipped installed on the new metro train hire via Traigo, enabling subsidiary VTG Retrack.
with UV lamps which vehicles, locomotives, EMUs,
eliminate pathogens before and other rolling stock
returning the air to coaches. produced by TMH, and has
The system also significantly been validated for safety and
reduces the noise emitted efficiency by the Russian
during operation by harnessing a Scientific Research Institute of
G
algorithm in which data is
of the wires. Wire Scan uses analysed under the eyes of
advanced scanning technology maintenance experts. Smart
to automatically and accurately algorithms analyse and ANSER, the developer of enables highly accurate
measure the position and interpret the data and report the first Common Rail multiple injections, while the
condition of overhead catenary, on the root causes of failures. Systems (CRS) for passenger WDD dampens the
reducing the need for manual, The latest data is available vehicles and large diesel propagation of pressure
physical inspections. Data is online via the PossOnline engines, offers two state-of- fluctuations. This offers 5-10%
then displayed via a GIS digital platform, allowing the-art injector components: fuel savings across the whole
interface. The system also enables operators to optimise the the patented Poppet Valve and duty cycle as well reductions
customised algorithms for maintenance process and the Wave Dynamics and of 50-90% of black smoke, 60-
specific monitoring thresholds. enable maintenance work to be Dampening device (WDD), 90% of CO2 and 20-50% of
In addition, Strukton’s Poss carried out accurately and which have been field-tested NOx.
data monitoring and analysis efficiently. The predictive on V16 GE 7FDL and Alco In micro pilot injectors for
system uses non-intrusive strength of Poss means that locomotive engines. dual-fuel locomotives, 98-
sensors and data loggers to users only receive information The results of these trials 99.5% fuel substitution rates
track the condition of a broad that they need, when they confirmed an injected quantity are also enabled by the poppet
range of infrastructure assets need it. Technicians deviation of less than 1%, and valve’s accurate switching
such as points and track circuits. immediately know where they a return fuel quantity below even at the smallest injection
The system allows for the need to be, what the problem 10%, combined with zero static quantities. The WDD and
collection and analysis of data is and how to solve it, and leakage and a minimal dynamic injector-integrated
on a broad range of parameters asset managers immediately leakage. This results in reduced accumulators allow jumper
including temperature, current, obtain full insight into the parasitic losses and an efficient lines to be used instead of rails
impact, movement, humidity performance and condition of usage of the pressurised fuel. to connect the injectors thereby
and hydraulic pressure, their assets. The poppet valve’s robustness saving space. IRJ
October 2020
21—Britain
Northern Transport and asia-pacific-rail
1-3—Karlsruhe, Germany
5-7—Dubai, UAE Infrastructure Development
16-18—Amsterdam, Netherlands IT Trans International Conference
Virtual Conference
8 Waterfront, London, Britain.
UITP/MENA Transport Congress World Rail Festival & Exhibition
and Exhibition 8 Terrapinn, London, Britain. 8 UITP, Brussels, Belgium.
8 UITP, Brussels, Belgium. https://bit.ly/3cUahbh
www.terrapinn.com/conference/ www.it-trans.org/en
https://mena.uitp.org/uitp-mena rail-festival
-congress-exhibition 27-28—Sydney, Australia 9-10—Valenciennes, France
RISSB Safety Conference
8 RISSB, Melbourne, Australia.
25—London, Britain Rail Industry Meetings
12-15—Changsha, China Rolling Stock Procurement Forum 8 ABE, Paris, France.
Maglev International Conference www.rissb.com.au/events/rissb-
8 Waterfront, London, Britain. www.railindustrymeetings.com
8 Hunan Maglev Research, rail-safety-conference-2020 https://bit.ly/3g9cdPh
Changsha, China. 14-15—London, Britain
www.maglev2020.com 28-30—Singapore 25-26—Bangkok, Thailand ERTMS & ETCS – The Future of
SITCE 2020 Railway Signalling Conference
8 UITP, Brussels, Belgium. 8 Waterfront, London, Britain.
Rail Asia Expo
14—Britain 8 AES, Bangkok, Thailand.
Rail Freight Group Virtual www.uitp.org/events/sitce-2020 www.railasiaexpo.com https://bit.ly/2vtYWhS
Regional editors
spokesman responsible for the communication service
before becoming general manager, corporate and
Chile Ian Thomson Newman ian.thomson.newman@gmail.com
public affairs. He replaces interim CEO Ms Ann
Germany Keith Fender kdfender@hotmail.com
Billiau, who announced her departure in June.
Italy Marco Chiandoni mchiandoni@gmail.com
Japan Yoshihiko Sato Tel +81 3 5721 6616 y-sato@sato-rail.co.jp
New Zealand Richard Worrall rworrall@themainreport.co.nz Ms Lilia Krutonog has been appointed general director
Spain Ferran Torga ferran.torga@gmail.com of RZD Logistics subsidiary Far East Land Bridge
Switzerland Anitra Green Tel +41 61 461 4536 (FELB). Krutonog worked for 12 years at Austrian
USA/Canada William C Vantuono Tel +1 212 620 7240 Federal Railways (ÖBB) subsidiary Rail Cargo Group.
wvantuono@sbpub.com From 2018 to 2020, she was the general director for the
Correspondents
eastern division of CD Cargo.
Argentina Jorge Waddell India Srinand Jha
Australia Tony Duboudin Israel Jeremaya Goldberg Norfolk Southern (NS) has appointed Ms Cindy Sanborn
Austria Erwin Reidinger Korea Andy Tebay
Brazil Renata Passos Netherlands Quintus Vosman
as executive vice-president and chief operating officer,
Denmark Denis Bowers Pakistan Naeem Qureshi/Rashid Ali
effective September 1. Sanborn succeeds Mr Michael
France David Haydock Poland Mykola Zasiadko
Wheeler, who will retire on October 1. Sanborn joins NS
Hungary Ferenc Joo Ukraine Alexander Kava
from Union Pacific, where she most recently served as
vice president, network planning and formerly
Executive offices
oversaw all activities in the northern region.
Michael Peter, CEO of Siemens Mobility, sets out a five-point plan to make rail a more attractive option
than the private car for people travelling door-to-door.
H OW do I get from A to B?
At first glance, it’s quite a
simple question. But if you ask
of ATO over ETCS for example
will guide the way to make
this a standard in the future.
yourself, ‘how do I get from A
ATO benefits
to B efficiently?’ it becomes
more complex and people tend
to stick to what they know: But what is the real benefit of
their own vehicle. ATO? Saving a train driver’s
In the broader context of salary? Definitely not if you
optimising passenger flows in compare it with the rest of a
transport networks, rail naturally train’s running costs. Better
outperforms the use of private breaking and acceleration will
cars as it requires less space save energy, but the major
while providing more relative benefits are flexibility and
capacity. But for many people, punctuality: reacting to changing
using their own vehicle seems passenger demand more solve the first and last mile to complete existing proof of
to be more convenient. quickly and dispatching trains problem, they must be certified concept projects to demonstrate
So how do we break this reliably regardless of schedules and able to run safely under the applicability of these
habit? The alternative must be and staff availability. Ultimately, real traffic conditions without a innovations under real
significantly better: more this results in higher train driver, while vehicle utilisation conditions.
comfortable, faster, cheaper, frequencies, less waiting at must be maximised to achieve Achieving these solid reference
and with fewer headaches. To stations, fewer packed trains a solid business case. points for complex solutions
change people’s mindset, and a better travel experience: What will make these like ATO over ETCS or fully
political decision makers, autonomous buses will open
MG31
Thee fastest rail milling
train in the world
SF06-FFS Plus
Developed for
o
maxximum per for
o mance
SF03-FFS
Unniversal application,
equippeed for all challenges
SF02T-FS
Featuring low
axle loads
SF02-TR
T UCK
Maximum flexibility
and mobility
MG11
Desig
gned especially for
o
small structure gauges
Beforre After
Aft
UNM A T C HE D
R AIL MAINTENANCE
P R O D U C T I V I T Y.
W W W. L I N S I N G E R . C O M
MOBILITY WITH VISION
Together with you, Goldschmidt masters all challenges
of modern, railbound mobility – for safe, sustainable and
long-lasting railways of premium quality.
www.goldschmidt.com