Infrastructure Department II
Construction Division IV
DESIGN CALCULATION
The sorting plant will consist of several parts calculated based on the amount of waste entering the sorting plant.
Some assumptions used :
- The density of mixed solids entering is 169.4 kg/m3
- The weight of waste entering is 35 tons
- Trash capacity for 2 days
- The maximum height of waste is 2.5 m
- The weight of residual waste is 30.5 tons
Design Calculation :
a. The reception room is calculated as follows :
Waste height (t) = 2.5 m
wieight of waste 35 t
Waste volume = = = 206.612 m3
density of mix waste 0.1694 t/m3
The design of the collection building will be adjusted to the capacity of incoming solid waste and the density of mixed solid waste entering is 169.4 kg/m3
With leachete channel collected at one point like a collector. So we get an area of Anorganic Reception Area of 168 m2
b.
The length of the conveyor belt is in accordance with the total workforce of 14 persons (divided by 2 left and right), a container with volume of 4 m3 is placed
between the sorters, so that it takes 14 containers. In addition to storage buildings in the form of 10 m3 containers of 8 in accordance with the types of stalls.
e.
There is sufficient access in and out of incoming garbage trucks. The access is in a location close to the landfill entrance and Sorting residues are
placed separately to facilitate routine disposal by using dump truck. Residual placement in 2 containers according to calculations.
We use 26 x 72 = 1,872.00 m2