13. Ensure the BOM for part drawing nos. are mentioned correctly.
14. Ensure the vendor drawings for connection between equipment to piping
Check the vendor drawing for pipe connection matting flange and
15. fasteners are released, if not released. Ensure these items are released
in this drawing.
Valves and instruments shall be installed in such a way it shall be
16.
operated either from platform, ground or conveniently from operating floor
Check whether the valve bodies or their hand wheels are fouling with
17
adjacent structures or pipe lines.
18.. Check the material specification for fittings with concern person.
1
Format No.
Common Checklist for Piping
APIL-NCR-PP-CHKL-006
(For Site run Pipe Routing)
REV.00
Ensure elevation and pipe routing dose not affect the free movement of
19.
operating personal
Ensure continuous dimensions are mentioned for piping from reference
20.
point.
Consider 10% extra length for pipe, in addition to total length of pipe as
21.
per layout
Provide extra quantity for elbows and support clamps for easy to pipe
22.
routing at site.
Provide supports for straight pipe every 3 meters and provide the
23
supports at bend location.
24. Ensure the typical support details are given in drawing.
For unequal tee socket weld fitting is not available, proceed with butt weld
25.
unequal tee fitting
Check and ensure that all the weld symbols along with the details are
26.
given correctly
Provide the pipe length and support clamps for drain pipe based on
27
trench or pit location.
d. Extra quantity are given for item nos. xx, xx & xx.
Checked by Approved by
Signature with date : Signature with date :
Name : Name :