EDUCATION
COMPETENCY SUMMARY
Period 1
Employer:
Position:
Supervisor:
Location:
Date
Major Responsibilities and Projects:
Employer:
Position:
Supervisor:
Location:
Date
Period 3
Employer:
Position:
Supervisor:
Location:
Date
1.1 Regulations, Codes & Standards: Demonstrate knowledge of regulations, codes, standards, and safety - this includes local engineering procedures and
practices as applicable.
Situation
The situation was faced related to plumbing works which there was the requirement of following the defined regulations, codes and standards.
Action
There was the water supply which had higher particles concentration with the negative consequences and it affected the plumbing components. I evaluated the pumping issues into
lower supply pressure and sediment accumulation was the associated cause. But, the sediment deposits removal was the solution proposed if the poor water quality was not addressed.
There was sediment built up again over time. There was excess water pressure resulted to cause plumbing leaks and the seals were designed for it. I obtained the higher pressure which
enhanced with the mechanical load on piping and it caused damage supports and unions over time. There was the plumbing fixtures which suffered a service life reduction when these
were constantly subjected to excessive pressure.
Outcome
I achieved the work objectives with the consistent implementation of the regulations, codes and standards. The significant implementation of the work activities were conducted with
the regulation of the defined mechanical engineering standards.
1.2 Project & Design Constraints: Demonstrate knowledge of materials, or operations as appropriate, project and design constraints, design to best fit the purpose or
service intended and address inter-disciplinary impacts.
Situation
The design activities were carried out under my duties of mechanical engineering. The technical situation was faced in which HVAC system design constraints were obtained.
Action
For evaluating the design constraints, there were determination of the room-by-room loads and air-flows calculated utilizing defined calculations processes. I prepared the duct system
layout on floor plan which was for setting the fire-walls, joists, and other potential obstructions. I determined register types, duct lengths and connections needed for producing layout
given construction constraints. I did duct system sizing based on the standard manual processes. I obtained the HVAC equipment sizing based on load with installation of equipment
and ducts according to design specifications. I charged the system approximately and verified charge with the evaporator superheat technique.
Outcome
All the work outputs were obtained with the utilization of mechanical engineering concepts and work outputs were achieved within the set timeframe.
Applicant: 3
1.3 Risk Identification & Mitigation: Analyze technical risks and offer solutions to mitigate the risks.
Situation
The situation was faced in the project which I undertook related to HVAC and plumbing system in which there was a slight risk involved related to equipment installation and handling.
Action
I worked on checking the proper furnace burner operation with fire-box drafting and tested the system for ensuring that it performed from properly determination of the system. I
checked for proper furnace burner operation along with system testing for ensuring that it determined from the properly sized system. There was no leakage in the system with the
proper air-handler fan flow which was supported with the proper plenum static pressure.
Outcome
The project outcome turned out to be positive and risks associated typically overcame with the expertise applied in the domain of mechanical engineering.
Applicant: 3
Situation
The scenario was faced in which there was the implementation of the engineering knowledge required to design the system.
Action
I evaluated the steam power plants which provided around 37% of the specified pressure and temperatures values. The steam boilers efficiency was assumed to be 90 and the system
overall efficiency was 33%. I analyzed the reciprocating engines which worked with around 70% of the produced heat in burning fossil fuels and it was being transferred to the
atmosphere. I obtained an alarming amount when various quantities were considered.
I supervised all routine preventive maintenance to ensure that machines continue to run smoothly, building systems operate efficiently, and the physical condition of properties does not
deteriorate. There was the was responsible for the management, co-ordination and implementation of maintenance operation procedures and maintenance service contract. All the
associated work results were accomplished with the defined timeline.
Applicant: 4
1.5 Solution Techniques: Be able to understand solution techniques and independently verify the results.
Situation
The situation was faced in which the requirement was raised for implementing and analyzing the plumbing system using mechanical engineering knowledge. There was also
other technical objectives which were needed to execute using the technical skills.
Action
I used handy-dandy plunger for cleaning some of the blockages. I along with team members ran the drain cleaner in which there were chemicals and these were added with other dilute
liquids utilized for avoiding the damaging of pipes and affecting the water. I proposed the safer and environmentally-friendly option and with the problem existed, there were various
drain and sewer cleaning options opted for obtaining the solutions.
Outcome
All the work outputs were achieved with the appropriate implementation of the technical skills in the mechanical engineering domain.
Applicant: 3
1.6 Safety Awareness: Safety awareness: be aware of safety risks inherent in the design; and Demonstrate Safety Awareness - on-site and possible safety
authorization/certificate as appropriate.
Situation
While executing the mechanical works at site, there was the safety considerations made of each design activity for obtaining the work results.
Action
During the project activities, I along with all team members always made sure to avoid unnecessary hazards. There was the debris which was cleaned up and kept clear of all walkways.
I recommended that the hoses were elevated above workers with the crossover plank and all spills were promptly cleaned. I also defined the emergency exits along with fire alarms
access which were cleared throughout the conducted activities.
Outcome
The desired work results were achieved within the specified project timeframe and with the consistent implementation of the technical skills while meeting the safety standards.
1.6 Competency Level
Applicant: 4
Situation
During the installation of the HVAC system, there were various components required to install and test .
Action
I worked on the heat exchanger, combustion chamber, condenser coil and evaporator coil. I specified each component in the HVAC system which brought refrigerant to the small
nozzles series and the valves were for spraying the liquid refrigerant which evaporated from liquid to the gas in a faster manner. It resulted in absorbing heat and lowering the
temperature as required.
Outcome
I configured, installed and tested each component appropriately using the technical skills in the mechanical engineering domain.
Applicant: 3
1.8 Project & Process Lifecycle: Exposure to all stages of the process/project life cycle from concept and feasibility analysis through implementation.
Situation
During the implementation of complete project, there were various stages defined which were needed to execute within the specified timeline.
Outcome
All the assigned tasks were accomplished with the implementation of each specified objective and it successfully led towards timely work completion.
Applicant: 3
1.9 Quality Control: Understand the concept of quality control during design and construction including independent design check and independent reviews of design,
field checks and reviews.
Situation
I faced the situation in which the overall HVAC system design was required to evaluate and monitor from the monitoring team set by the client.
The project main requirement was evaluating each assigned task and implemented it using technical expertise. There was the quality control department associated which consistently
monitored the work activities and provided the list of changes which were required to be done for obtaining the defined project results within the set work timeline.
Outcome
All the project activities regarding the HVAC system design was consistently monitored and work results were accomplished within the set work timeframe.
Applicant: 2
1.10 Engineering Documentation: Transfer design intentions to drawings and sketches; Understand transmittal of design information to design documents.
Situation
When implementing the HVAC system design, there was the requirement faced related to implementing the drawing and documented it accordingly.
Action
I worked on the drawings and prepared the documents while continuously coordinating with the team members. There was an understanding obtained regarding the information design
transmission and it was done using the appropriate technical skills with documenting each step in the prepared project report.
The final prepared file was presented to the project manager as well as to the project director and obtained the final approval.
Applicant: 3
2.1
Situation
While implementing the HVAC and plumbing works, there was the adequate requirement followed and weekly discussions were carried out for achieving the desired work results.
Action
There was the decent communication topology followed throughout my project tenure. I carried out an evaluation of the defined work activities and outputs were achieved within the
set work timeframe. I maintained the communication with the project manager throughout the project and obtained the work results accordingly.
Outcome
I conducted an evaluation of each project factor with the in-depth research being made and discussion was conducted with the team members using adequate communication skills.
Position
Employer Validator Date Canadian Environment?
Situation
I prepared the project plan and it included implementing drawings using the SolidWorks software.
Action
I adequately prepared the project drawings with the usage of software skills and I reported everything to the project manager in written format. There was even the presentation
prepared for the stakeholders in which I presented my facts and achieved the results accordingly.
Outcome
The project results were accomplished with the consistent utilization of my technical skills and results were reported using the technical writing skills.
Applicant: 3
Situation
There was the situation faced regarding the new HVAC system design and I was required to execute my duties as a MEP Engineer in the project.
Action
APEGS Test: Competency Report
I took appropriate measures in the project with the considerations made on the associated project factors. I applied the adequate reading measures which were based on getting the
desired work results within the specified project timeline.
Outcome
I obtained the work results with the implementation of the in-depth research made on various work factors. I even analyzed the project principles and achieved the results using my
appropriate research skills in it
2.3 Competency Level
Applicant: 3
Situation
There was the situation faced related to the implementation of the project management principles and these were required to sort for getting the best results.
Action
I defined the project management principles at an initial work stage which underlying fundamental concepts. I researched on the principles which included following adequate project
management plan for the timely work completion. I did inclusion of all the principles and the most appropriate were preparing project management structure, engaging with
stakeholders, defining the project goals and outcomes, documented responsibilities and roles, adequate change management plan, delivery capabilities, risk management, performance
management baseline and the solid communication plan.
Outcome
The work outcome turned out to be positive within the defined work timeline and with the complete utilization of the project management principles in it.
Applicant: 3
Situation
The situation was faced in which I took the assigned responsibilities from the Project Manager.
Action
I prepared the action plan in which my responsibilities were clearly highlighted. I always coordinated with the project manager and discussed various aspects for getting the desired
work results. I even prepared the mitigation plan which was when addressing the technical glitches and obtaining the solutions.
Outcome
I always accomplished the defined work tasks and adhered to the duties assigned from the project manager which ultimately turned out to be a positive work experience.
Applicant: 3
During the execution of the MEP services, there was the requirement from the project manager to implement the activity within the stipulated timeframe and budget.
Action
I evaluated the project resources and discussed the work aspects with the team. There was even discussions made with the project manager to evaluate the proper functioning of the
work activities and I always worked on meeting the project’s expectations which were within the specified project timeline.
Outcome
The project outputs were accomplished within the set work timeline and with consistent technical discussions made with the team members as well as with the project manager for
meeting the expectations of the client.
Applicant: 3
I faced the situation in which the project resources were limited and finances were required to maintain for effectively executing the work objectives.
Action
At the beginning stage of the project, I prepared the budgeting and financial plan based on the requirements obtained from the client. I obtained the approval of the prepared project
budget from the project manager and used the effective yet economical components in the project.
Outcome
I carried out my duties in the project with the implementation of project budgeting plan and obtained the results with continuous consultations obtained from the project manager.
Applicant: 3
Situation
Throughout the project, there were various activities executed in which I obtained the feedback from the project manager and it was required to address.
Action
I addressed the feedback obtained from the project manager and always responded with patience. I then worked on evaluating the project factors and obtained the results within the
project specified tenure. There was the research conducted on the project factors which had direct influence on the response obtained from project manager and achieved the work
results within the defined work timeline.
Applicant: 3
Situation
I faced the technical scenario in which I evaluated the work objectives and these were specifically dependent on getting the desired work objectives.
Action
I analyzed each work aspect and coordinated with the team members throughout the project. It was dependent on analyzing the work concepts and obtaining the results accordingly with
the consistent technical expertise applied in the project.
Outcome
I achieved the work objectives and obtained the results with the implementation of the project duties for getting the effective work results within the specified project tenure.
Applicant: 4
Situation
I evaluated the technical scenario and sorted the work activities which was based on resolving differences among the team members.
Action
The differences were created specifically when implementing the HVAC design as there were various ways of executing the design and it was necessary to reach to a single point. I
analyzed the provided design from each team member and selected the most effective one with taking all the team members in confidence.
Outcome
The work results were accomplished within the set work timeline and outputs were achieved accordingly using mechanical engineering skills.
Applicant: 3
Situation
I was required to implement the work activities while maintaining the ethical attitude in the project.
Action
Being a professional mechanical engineer, it was my duty to fulfil the technical objectives in an ethical manner and with complete coordination made with team members. There were
technical hurdles faced in the project which were sorted with the consistent technical skills applied in the project while maintaining the technical activities in the project.
There were scenarios analyzed and evaluated throughout my work tenure and ethical responsibilities were defined from the initial stage which assisted well in getting the targeted work
results.
Applicant: 3
Situation
I analyzed and evaluated the proper plumbing activities which were needed to execute in the project.
Action
There were various work limitations obtained when implementing the design and it was required to analyze and execute each work activity for successfully getting the targeted project
results. I made execution of the design activities and obtained the work results within the specified project tenure.
Outcome
The project outcomes were successfully accomplished with the complete utilization of the technical expertise and there were limitations analyzed and evaluated in a decent manner
throughout the project tenure.
5.2 Competency Level
Applicant: 3
Position
Employer Validator Date Canadian Environment?
Laureate Vocational Saudi
Arabia Mechanical Engineer No
Situation
With the technical scenarios analyzed and evaluated in the work tenure, there were various hurdles faced which were required to remove using the professional technical skills.
Action
I approached and sorted the conflict of interest which were from two varied models. One was dependent on the presumption against the relationship which could present a
conflict. This was termed as prohibition model and the prohibition can overcome with the sufficient social benefit demonstration. The other was based on the presumption for the
relationship with provision for review and disclosure. This model was termed as peer review and disclosure.
Outcome
I sorted each activity in a professional manner and achieved the work results using the full mechanical engineering expertise in the project.
Applicant: 3
Situation
The technical scenarios faced in the work which were required to execute with the implementation of the technical activities and I was responsible for fulfilling the technical glitches in
the project.
Action
I was responsible for fulfilling the project responsibilities and all the liabilities were required to execute. I designed the HVAC system and overcame the technical glitches with the
expert technical skills applied in the project. I even evaluated the errors and omissions when performing the professional services and achieved the desired work results.
Applicant: 3
Situation
I faced the technical scenario in which there was the requirement raised for stamping and signing of the documents.
Action
I implemented the work activities appropriately with the usage of appropriate stamp and seal from the project manager. There were various factors evaluated in the work and proper
documentation was done in the project for obtaining the desired work results.
Outcome
All the documents were approved and submitted with proper stamping and sealed from the mechanical engineer (myself) and project manager.
Applicant: 3
Situation
There were the work activities executed in the project in which strengths and weaknesses were required to point out appropriately in the project.
Action
I investigated equipment failures and difficulties to diagnose faulty operation, and to make recommendations to maintenance crew. I established and coordinated the maintenance and
safety procedures, service schedule, and supply of materials required to maintain machines and equipment in the prescribed condition. I ensured that a building complies with health and
safety regulations, especially after an inspection that required changes. I worked on analyzing existing systems and operations and developing preventative maintenance strategies. I
provided work direction and supervision to staff involved in maintenance and repair work of facilities and equipment.
Outcome
All the work objectives were achieved within the specified project timeframe and I overcame the weaknesses which I faced in the project and achieved the work results
accordingly with the consistent technical expertise applied in the project.
Applicant: 3
Competency Category 6: Social, Economic, Environmental and Sustainability Required Average Level: 2
The work was done on the HVAC design in the office building at site for the client and it was required to implement the design while maintaining the public safeguards.
Action
I worked on reading and analyzing contracts, drawings, and specifications in order to conduct data collection activities to determine acceptability of product to appropriate
standards, guidelines and conformance criteria. I ordered the materials based upon the site requirement. I verified the quality of the delivered material. I inspected buildings or
building designs to determine fire protection system requirements and potential problems. I maintained the public impacts and safeguards while making offers for everything related to fire-fighting
systems. I regularly attended all levels of technical meetings with project managers and consultant/client representative. I prepared hydraulic calculation, shop drawings and
technical material submittals for consultant’s approval.
Outcome
All the work outputs were accomplished while consistently maintaining the public impacts and safeguards.
Applicant: 2
Situation
The situation was faced regarding the HVAC design in which there was the requirement of following the engineering and the public.
Action
I worked on safety, health, and welfare of the public along with performing services in competence areas. I issued public statements in a truthful and objective manner. I acted for each
employer as faithful agents. Also, I worked on avoiding deceptive acts and conducted honorable, responsible, ethical, and lawful act for enhancing the overall working operation of the
profession.
Outcome
The outcomes were accomplished within the specified work tenure and the engineering & public standards were maintained throughout the project.
APEGS Test: Competency Report
6.2 Competency Level
Applicant: 3
Situation
The working on the HVAC design was conducted with maintaining the regulatory acts which were monitored from the regulatory bodies.
Action
I followed the provided guidelines received from the regulatory bodies and the campaign process was initiated mainly for ensuring that the regulations placed in an earlier period were
complied with the direct access time. It was distributed according to the said rules and the technicalities were impartial and met the needed standards which resulted in adhering to the
agreed practice. Also, the regulatory body defined the lookout approach for the specified interference with the media freedom for covering the campaign freely. The requirement was
followed related to convey information regarding the interference to the appropriate governmental authorities.
Outcome
All the associated work objectives were achieved within the specified project timeframe.
Applicant: 3
Situation
I faced the situation in which there was the requirement of following the sustainable guidelines.
Action
I analyzed existing systems and operations and developing preventative maintenance strategies. I provided work direction and supervision to staff involved in maintenance and repair
work of facilities and equipment. I looked over work request to decide problem and resolution, and delegate assignments to technicians. I prepared the list of scheduled tasks and
distribute them to all facility management technicians-in coordination with the Operations Managers. I supervised all routine preventive maintenance to ensure that machines continue
to run smoothly, building systems operate efficiently, and the physical condition of properties does not deteriorate. I was responsible for the management, co-ordination and
implementation of maintenance operation procedures and maintenance service contract. I checked the progress and ensure that all maintenance work conform to established work
standards & statutory requirements and are also in line with company procedures.
Outcome
The sustainable guidelines were followed and achieved the desired results within the provided work timeline.
Applicant: 4
Situation
The work activities were done with the consideration and requirement raised related to the sustainable acts promotion.
Action
I promoted the sustainable operation when attended meetings with the management, co-ordination and implementation of maintenance operation procedures and maintenance service
contract. I checked the progress and ensure that all maintenance work conform to established work standards & statutory requirements and are also in line with company procedures. I
improved existing operation systems, maintenance policies, and procedures in support of management visions and company objectives. Furthermore, I assisted the site teams in
carrying out the root cause analysis of the problems and provide solutions. Also, I provided performance-related feedback and formal evaluations for technicians, and interview new
technicians.
APEGS Test: Competency Report
Outcome
All the project outputs were achieved with the mechanical engineering expertise applied appropriately for obtaining the defined work results.
Applicant: 4
No
Global Business Executive
Company Ltd. Mechanical Engineer
Situation
With the implementation of the mechanical works at site, there was the requirement of executing the professional development activities.
Action
I carried out the detailed mechanical design work and design verification testing, as required. I worked on agreeing the mechanical design approach with the Engineering Manager and
Senior Mechanical Design Engineers. Also, I arranged and forecast the manpower, material, tools & machinery as per project requirements. I performed design calculations as
applicable to design field such as HVAC, Firefighting and plumbing. Furthermore, I followed quality assurance procedures for review and inspection of installations throughout the
project period. I prepared submittals for mechanical systems, materials, equipment for approval from consultant and client. I assisted in the review of shop drawings to ensure that they
are in accordance with the design and that they are coordinated. I prepared quotations, invoices, variations, substantiation and running bills of concerned projects. I prepared the bills of
quantity of materials for mechanical work, and order the material. Moreover, I attended coordination meetings with project managers and consultant/client representative and anticipate
potential problem areas and solve them before they occur. I coordinated closely with all engineers of various trades/disciplines as to the needs and requirements of the project, and
ensure project site execution and completion as per agreed budget.
Outcome
All the associated project objectives were accomplished within the specified project deadline and evaluated the outcomes within the set timeline.
Applicant: 3
Situation
There was the requirement of identifying the work objectives and obtaining the required work results.
Action
I attended various training sessions’ related to mechanical engineering and achieved the work results within the set work timeframe. There were various training sessions conducted
and attended based on analyzing the work concepts and improving the technical knowledge with the full implementation of mechanical engineering skills.
Outcome
All the specified training sessions were attended and obtained the appropriate training skills within the defined work timeline.
Applicant: 3
Situation
I was required to prepare the professional development plan when undertaken the work activities and achieved the required work results.
Action
I was responsible as qualified to act as a material engineer at site thereby witness all material sampling and testing for the mechanical work. I prepared all supporting documents for
electro-mechanical activities prior to pre-commissioning and testing & commissioning. I assisted in reviewing method statements and ITP. I inspected deliveries/installed/constructed
work to ensure that it is in accordance with the shop drawings and the specifications. I met with local authorities to facilitate the processing of submittals by the contractor and arrange
site visits as necessary for authorities to inspect the work to ensure compliance with their requirements. I worked on witnessing the testing and commissioning of various plants and
systems. There were snag defects/outstanding minor work for the contractor to action and follow up on their progress. I reviewed as built drawings’ and operation and maintenance
manuals for ensuring correctness, completeness, and that they are in-line with the specifications.
Outcome
All the associated work objectives were accomplished within the specified work timeline and defined work results were accomplished with the implementation of the appropriate
professional development plan.
Applicant: 3