Beruflich Dokumente
Kultur Dokumente
S1
S2
Page | 1
S3
HERE FOLLOW THE ABOVE PROCESS TO MAKE SETTINGS FOR COPY CONTROL FOR SALES DOCUMENT
TO DELIVERY DOCUMENT AS SHOWN IN S1-S3
Page | 2
10. : - CLICK HERE TO SAVE THE SETTINGS
11. :- IT CONTROLS THE SETTINGS FOR ITEM LEVEL
12. : - CLICK HERE TO DO NEW ENTRY FOR ITEM (U CAN COPY ALSO FROM STANDARD)
13. ITEM CATEGORY: - HERE WE CAN ATTACH THE SOURCE ITEM CATEGORY
14. ORDER REQUIREMENTS: - IT CONTROLS SOME ROUTINE WHICH CHECK SOME REQUIREMENT NEED
TO BE MET DURING COPY OF SALES DOCUMENT TO A DELIVERY
15. ITEM DATA: - IT CONTROLS SOME ROUTINE WHICH CHECK SOME REQUIREMENT WHICH NEEDS TO
BE MET DURING TRANSFER OF DATA FROM SALES DOCUMENT ITEM FIELD
16. BUSINESS DATA: - IT CONTROLS SOME ROUTINE WHICH NEED TO BE SATISFIED DURING TRANSFER
OF DATA FROM SALES DOCUMENT BUSNIESS DATA FIELD
17. UPDATE DOCUMENT FLOW: - THIS INDICATOR CONTROLS THE RECORD OF QUANTITY AND VALUE--
WHICH WAS COPIED FROM A SOURCE DOCUMENT TO TARGET DOCUMENT
18. POSITIVE/ NEGATIVE QUANTITY: - IT CONTROLS DURING COPY THE QUANTIY OR VALUE PRESENT--
IN TARGET DOCUMENT SHALL HAVE A +TVE, -TVE OR NO EFFECT ON THE QUANTITY THAT NEED TO BE
COMPLETED IN SOURCE DOCUMENT
PREPARED BY
RAJESH DASH
SAP MM/SD CONSULTANT
Page | 3