Introduction :
The use of steel as appliedto formwork is considerable,
although
st€€l for panels has largely been replaced in most proprietary
system by plywood panels surrounded and supported by steel
frames.
St€el formwork , unlike timber. cannot be cut otr the site to suit
special conditiotrsor at situations where standard steel units would
be too heavy, awkwardor impossibleto lix or bracesatisfactority,
then it is usually more economicalto usetimber panelswhere
theseconditionsor situationsexists.
Steelformwork may be classifiedin a generalwaysas follows:
1, straight walls formwork
2. Curved walls formwork
3. Climbiug formwork (one side formwork , double side
formword).
4. Square& rectangularcolumnformwork.
5. Circular columnformwork
-3-
1. Straieht Walls Formwork :
This type of walls can be achievedby two kinds of formwork :
a) The modularformwork (For Manual assembly)
b) The large - sigeformwork (For cranageassembly)
( Fig 1)
2 . Clips: They are ayailablein four basicsizes.Theseclipswill
housescatTold
tube .
(Fig2)
3. Key & Wedge : Are usedto assemblethe snapties integrally
with he U-Form pan€l
(Fig 3)
-6-
5. RanseofU - From
StandardForm FractionalExternal
InternalExternal
Form Corner CornerCorner
Form Form Angle
(F1gs)
-7 -
List of components
S T A N D A R OU - F O N M
Approx. wt. K9.
With Ply, Without Ply. F I L L E RA I I G l E S
240x60 44,5 7.3
210r60 39.0 210
180x 60 33-5 25.8 180
1 5 0r 6 0 za.1 21.a 150
1 2 0 x6 0 22.1 17.7 120
90x60 17.2 13.6 90 2.7
60x60 11.8 9.1 60 1.8
F N A C T I O I \ I AU
L .FONM E X T E R I I A LC O R N E RA I I G L E S
240r 50 38.1 29.9 11.8
24Ox40 34.1 27.2 210 10.3
180
150 7.4
180x40 26.3 20.4 120
180x30 23.1 19.3 90
1 5 0 x5 0 23.4 18.8 60 2.9
1 5 0r 4 0 21.5 17.0 u-FoRM ACCESSOnTCS
150x 30 19.3 15.9
120x s0 19.0 15.0 BraceNsilinePlate 1.4
1 2 0 x4 0 17,2 13.6
'12.7 4 . 5( p e r1 0 0 )
1 2 0x 3 0 15.4
4 . 1( p € r1 o 0 )
90x50 15.4 12.2
8.6 (por100)
90x40 13.6 11.1
90x39 11.8 10.0
5 ngleClips 0.7
L O B N E NF O N M S
E X T E R I \ I AC 0.9
Approx. wt, Kg. D o u b l . C l i p s w i tPhl a t e s 1,0
Size
With Ply, Without Ply 1.1
240x 50mmx 50mm 19.5 17.7 1.4
2 1 0 x 5 0 m m x 5 0 m m1 7 . 0 15.4
180x50mmxsomm14.7 13.4
150x50mmx50mnr 12.5 11.3
'l20x50mmx50mm 10-0 9.t
7.7 7.0
-8-
6. Snap ties : Is specially designed for use with the U-Form
system. It fits snugly into the tie slot within the forms and when
necessaryis quickly installedfrom the outsideofforms. Itissetrt
a distanec ofl" back from the face. It can be suppliedwith water
sealsif required. The safeworking load 1360kog .
Sieeltiesfor concrete
wallconslruction
_L
E
r
(Fig 6)
-9-
Applicatior of U-Form Panelin Walls :
(Fis7)
- 1 0_
The large - size Formwork ; Thesepanelswere regard€d as
supplementto the modularFormwork. This systempermit to
speed up the forming jobs even more, and obtaining at the
sametime exc€llentconcreteresults.
The large-size Formwork is mainly usedon construction sites
where large wall surface are to be concretedatrd where the
trecessarytechnical equipementis available ( cranage) With
Iarge - sizeFormworkwe can reducenumberofti€s used, This
contributesa great dealto reduceforming timesand linishing
works. As an exampleof this systemis the big st€€lpanel.
Fig 8
- 1 ' 1-
2- Curved walls Formworlc Circuhr structur€s can be formed
either in one or several phases. In any crse, it is possibleto form
the circle.
Vari-Form system: Using this systemwe can carry out any curved
aod 300 mm
soldier length
(Fig 9)
- 1 3-
ApplicationofVari - Form in walls :
--/- a,'r
\c
(Fie 10)
Columns Formwork:
ColumnClamps
Min.andma,.distance
1 4 . 5K s 1 9 K g
i<-60cm-l
(Fig 11)
- t5 -
when using U - f,'orm for columnsconstruction note the fo[owing :
(rig 12)
- 1 6-
The column panelare erect€dat right angleto eachoth€r in such
a way , that the side part with incorporated angle lillet joins th€
steel fac€ of the next Panel.
(Fis13)
Circular column formwork : Th€se forms consists of 2 half -
moulds with b€nt steel faces with welded stifreners. A small lap
joint between the two halv€sguaranteesan eccurate closingof the
(Fig 14)
- 1 8-
Concrete pressureon Formwork:
4. Concretetemperature t.oc.
MaximumHydrostaticPr€sslreby calculation:
There ar€ three overall limiting criteria to be considered, the
maximumpressurebeingthe LEAST valuecalculat€d.
whichcanoccur
l.Height linit : This is the maximumpressure
wh€n the plac€mentis so fast that the whole of the lift is of
' 1 9-
2. Arching limit:Representthe maximumpressurewhich can occtrr
us€r.
'1.Hsight limitlHydraulic pressur€
taken to b€ 25 kN/m: per
metr6 of height based on d6nsity of concrete b€ing 2500k9/m3,
Hlm) 1 2 3 5 6
P, kN/m,l 25 m h 100 125 r50
2. Archinslimit
t0 30
150 Pt: 35 35 35 40 45 45 50 55 60 75 90 120
2ffi 35 40 40 45 50 50 55 60 65 80 95
300 45 50 50 55 60 60 65 70 75 90 105 1 3 5
zto0 55 60 60 65 70 10 75 80 85 100 115 145
500 65 70 70 75 80 80 85 90 95 110 125 1 5 0
3. Stifianing limit
Slump
temp ('C) 0.75 12 1.8
5 Pz=40 50 60 70 85 95 115 135 150 150
10 35 40 45 55 65 70 85 100 135 150
50 210
35 4/0 45 50 55 65 75 100 125
20 35 35 35 40 45 45 50 55 70 90
5 45 60 70 85 100 |0 140 150 150 150
t0 35 50 55 65 75 85 105 125 150 150
75
35 40 45 50 60 65 80 95 125 150
20 35 35 35 40 45 50 60 70 90 115
5 55 70 85 100 120 130 150 150 150 150
1Cro 10 40 55 65 75 90 100 12I r50 150 150
35 45 50 60 70 75 90 110 150 150
1:O 20 35 35 44 45 50 55 70 80 110 130
-20-
Exalmpl€1 :
Solution
Formtable: Heightlimit Pl = 75kN/mz.
Archinglimit P2 = 80KN /m2
Stifl€tringlimit P3= 150KN/m2 d
P^ur.75 KNln'
I'
, Pmax= 75KN/m2( th€tow$t vrlue)
.'. Designpressure
Example2 :
-21
Stifreninglimit P3 = 45 KN/m'.
, P max= 45KN./m2
.'. Designpressure
h= Pmrx 45
= = 1.8m
liCorne 25
f,rample3 :
Solutiotr:
Pmax = 45
6= = 1.gm
li conc 25 P^ax=45 KN/n'z
-22-
Index Page
l. Introduction........... 3
2. StraighF wall formworlL .......... ...... 4
3. Application of U-form panel in walls. 10
4. The Large-sizeFormwork 11
.......... 11
5.Applicationof big steelpanelin walls. .......................
6,Curv€dwallsFormwork............ 12
7.Appficrtionofvari-Form in walls, .....................
14
8.ColumnsFormwork . ... ... 15
9.Concr€t€pr€ssure
on Formworl<. ....... 19
l0,Examplca. ... 2I
...........