TEST REPORT FOR TRANSFORMER

1. Date of Erection : Date of Energization (or) :


Last Calibration :
2. Equipment Details :

LOA No :
Make :
Type :
Rating :
HV Volts :
LV Volts :
%Z :
Vector Group :
HV Rated Current :
LV Rated Current :
Sl. No. :
Mfg Year :

3. Location & Feeder Name :

4. General Inspection :

5. Insulation Resistance Test : (Value in Meg Ohms) (Using ____________ Megger) Date :

Make : Range : Sl. No. Calib due Date :

Make : Range : Sl. No. Calib due Date :

HV to Earth
LV to Earth
HV to LV

6. Oil dielectric test (with……………………..mm gap)

Top Sample
Bottom Sample

7. Ratio Test : (Using Equipment Details)

Make : Range : Sl. No. Calib due Date :


TEST REPORT FOR TRANSFORMER

Tap Applied HV Volts Measured LV Volts Ratio Calculated Ratio


Position 1U1V 1V1W 1W1U 2U2V 2V2W 2W2U 1U2V 1V1W 1W1U Actual
2U2V 2V2W 2W2U
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17

8. Magnetising Current Test : (Using Equipment Details)

Make : Range : Sl. No. Calib due Date :

Applied HV Volts Measured LV Volts


1U1V 1V1W 1W1U 1U 1V 1W

9. Magnetic Balance Test : (Using Equipment Details)

Make : Range : Sl. No. Calib due Date :

HV Side

Applied HV Volts Measured LV Volts


1U1V 1V1W 1W1U 1U1V 1V1W 1W1U
TEST REPORT FOR TRANSFORMER

LV Side

Applied HV Volts Measured LV Volts


1U1V 1V1W 1W1U 1U1V 1V1W 1W1U

10. Vector Grop Test : (Using Equipment Details)

Make : Range : Sl. No. Calib due Date :

Applied Volts

Measured Volts

Inference

11. Functional Checks :

1 OTI – Alarm
Trip
2 WTI – Alarm
Trip
3 Bucholtz Relay – Alarm
Trip
4 Low Oil Level – Alarm
5 PRV Trip

12. Remarks :