PUMPING STATION 2
PERMANENT PIPE LINE
FITUP INSPECTION
Job No : PP-12--0001

Project : Xayaburi HEPP

Location ; Xayaburi ,Lao PDR

Attention To : Ronnie Pesquerra

CHK MECHANICAL - SR.QC.ENG.,

Date : 04th Sep 2018

Ref. No. : MHI-XAY-QC-IR-598

DSSR Drg No

Sir / Madam, XB-P2-FP-207504

Item / Description:

1 ITT - Pumping Station 2 Gate Pressure and Return Hyd.pipe lines Fitup inspection

Drawing Number

XB-P2-FP-207504

Type of Inspection VISUAL INSPECTION

Requested On : DATE 04th Sep 2018

TIME 2.00 P.M

PLACE AT SITE - at Pumping Station 2

Remarks:

Requested By: Inspected By : Noted by;

MONTAN AND WHESSOE

J.GUNASEKHARAN

Name/signature/Date Client Representative Client QA/QC Manager

Received By :

Name Signature Date


CH. KARNCHANG (LAO) COMPANY LIMITED
Xayaburi Hydrielectric Power Project, Lao PDR
Daily Request

□ Cofferdam □ Spillway □ Quarry Attn : Ref.No. MHI-XAY-QC-IR-598

□ Intermedial Block □ Powerhouse □ Road □ QC, QA Week No.

□ Navigation Lock □ Fish Laddder □ □ Lab Date 04/09/2018

Location PH II - Pumping Station 2 - Fitup Inspection □ SV □ Day shift

Station : □ EM □ Night shift

Section : □ EN Start hrs.

Detail : □ SF Finished hrs.

□ GOL-E Page 1 total 1

□ ……………….

Description Location Time Remark

1 PH II Pumping station 2 Fitup Inspection Pumping Station 2 2.00 PM

4th Sep
2018

For your kind attention and cooperation


Yours faithfully

CHK Site Engineer