Beruflich Dokumente
Kultur Dokumente
DATUM: 22.09.2015
Bjoern Theberath
Juergen Schmidt
This report shall not be reproduced, except in full without the written approval of
Eaton Test Laboratory
Page 1 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
REFERENCES:
Hose Specification:
- SAE 100R15
Page 2 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
TEST SPECIMENS:
Hose GH466-20
Fitting Type Crimp
Crimp Diameter / Socket 54,3 ± 0,15 mm / 1WB20
Manufacturing Location EATON POLİMER KAUÇUK (Turkey)
Hose GH466-24
Fitting Type Crimp
Crimp Diameter / Socket 63,2 ± 0,15 mm / 1WB24
Manufacturing Location EATON POLİMER KAUÇUK (Turkey)
Hose GH466-32
Fitting Type Crimp
Crimp Diameter / Socket 78,9 ± 0,10 mm / 1WB32
Manufacturing Location EATON POLİMER KAUÇUK (Turkey)
Page 3 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
+2% Elongation
TOLERANCE
-2% Contraction
Page 4 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
BURST PRESSURE
The assemblies were attached by one end to a pressure
source and extended straight without restraint. The free end
PROCEDURE was suitably capped or plugged and pressure was applied at
a uniform rate (pressurization time not to exceed 30 seconds)
until failure.
Page 5 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
OIL
100°C
TEMPERATURE
IMPULSE
BEND RADIUS CYCLES PASSED
HOSE PRESSURE
[mm] [-] YES / NO
[bar]
GH466-20 420 504 500.000 YES
Page 6 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
Page 7 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
FLEX DRIVE CYCLE RATE 34-38% of impulse cycles per minute rate
IMPULSE
BEND RADIUS CYCLES PASSED
HOSE PRESSURE
[mm] [-] YES / NO
[bar]
GH466-20 420 504 2.000.000 YES
Page 8 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
Page 9 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
ADHESION TESTING
MIN. ADHESION
PASSED
SAMPLE REQUIRED
YES / NO
[N/mm]
Hose Inner Tube >2,5 YES
Note:
As adhesion testing is independent from the hose construction (compound related only),
there is no specific size indicated.
Page 10 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
MAX.
AGING ALLOWED
TUBE / MEDIUM TEMPERATURE PASSED
TIME VOLUME
COVER TYPE [°C] YES / NO
[h] CHANGE
[%]
Tube IRM 903 70 120 100 YES
Note:
As fluid compatibility testing is independent from the hose construction (compound
related only), there is no specific size indicated.
Page 11 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
AGING
AGING TIME CRACKING PASSED
SAMPLE TEMPERATURE
[h] OBSERVED YES / NO
[°C]
Hose Inner Tube -40 24 NO YES
Note:
Cold flexibility testing has been performed with small size hoses only (to achieve highest
strain while sample is bended) to ensure proper compound performance.
Page 12 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
ABRASION
MAX. ALLOWED
WEIGHT CYCLES PASSED
SAMPLE WEIGHT LOSS
[N] [-] YES / NO
[g]
Hose Cover 25 2.000 0,5 YES
Note:
Abrasion testing according to ISO 6945 has been performed with similar hoses using the
same cover recipe to ensure proper performance.
Page 13 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
OZONE RESISTANCE
Note:
Ozone resistance according to ISO 7326 has been performed with similar hoses using the
same cover recipe to ensure proper performance.
Page 14 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
PROOF
LEAKAGE PASSED
HOSE PRESSURE
OBSERVED YES / NO
[bar]
GH466-20 840 No YES
Page 15 of 16
Test Report Form, TR-3
Last Revised on 4/19/05
ENGINEERING REPORT NUMBER:
CONCLUSIONS:
All samples tested meet or exceed the performance requirements as
detailed in this report.
Page 16 of 16
Test Report Form, TR-3
Last Revised on 4/19/05