NEW CENTRAL DRUG RESEARCH INSTITUTE CAMPUS AT SITAPUR ROAD, LUCKN

REVISED BILL OF QUANTITIES - GAS PIPELINE WORK FOR NITROGEN, LPG, CO

Sr. No. Description

PIPING and FITTINGS

A Design, detailed Engg, Supply , Fabrication, Ercetion, Testing and Commissiong of SS 304 ,
Sch 40 Piping witherquired Fittings( elbows, union, nipples etc) except branch Tees.
For LPG , Compressed Air and Nitrogen
1 40 NB , Sch 40 , SS 304
2 25 NB , Sch 40 , SS 304
3 15 NB , Sch 40 , SS 304

B Fittings
1 Equal Tee, 40 NB, Butt Weld , SS 304
2 Branch Tee , 40 x 25 x 40 NB, BW , SS 304
3 Branch Tee, 25 X 15 X 25, SW , SS 304
4 Equal Tee, 15 X 15 X 15, SW , SS 304

C Suppy , Fabrication, Ercetion, Testing andCommissiong of SS 316 ,


Sch 40 Piping with rquired Fittings( elbows, union, nipples, Tees etc)
for Steam Application with Inside Electropolished & Outside Insulation (Temp. 200 0 C max.)
1 40 NB , Sch 40 , SS 316
2 25 NB , Sch 40 , SS 316
3 15 NB , Sch 40 , SS 316

D Pressure Reducing Station


1 Nitrogen Gas Pressure Reducing Station Consists of High Pressure Manifold with
requred all components like regulator , Valves, Gauges , SRV , By Pass System /
Stand by system as per Tech Specification given.
2 Compressed Air Pressure Reducing Station Consists requred all components like
Rregulators , Valves, Gauges , SRV , By Pass System / Stand by system as per
Tech Specification given.
3 LPG Gas Pressure Reducing Station Consists of High Pressure Manifold with
requred all components like regulator , Valves, Gauges , By Pass System /
Stand by system as per Tech Specification given.
4 Steam Reducing Station Consists of
requred all components like regulator , Valves, Gauges , By Pass System /
Stand by system as per Tech Specification given.

E Floor Isolation Valves


1 25 NB , SS304 Ball Valves with required end fittings for LPG , Nitrogen
and Compressed Air - For Floor /Line Isolation
2 25 NB , SS316 Ball Valves with required end fittings for Steam
For Floor /Line Isolation

F Pressure Gaues and Temp Gauges


1 Pressure Gauge 4 " Dial with Isolation Valve - 1/2 " for each Gas line for
inside Lab Pressure Indication with all Fittings
2 Temp & Pressure Gauge 4 " Dial with Isolation Valve - 1/2 " forSteam line for
inside Lab Pressure Indication with all Fittings

G Individual Gas line Isolation Valve for Lab


1 Individual Gas line Isolation Valve for each Gas line 1/2 " Size with inlet and outlet Connection
2 Individual Steam Line Isolation Valve for each 1/2 " Size with inlet and outlet connection

H Inlet Isolation Valves for each gas line before Pressure Regulator 1/2" with inlet and Outlet Connectio

i Inlet Isolation Valves for Steam line before Pressure Regulator 1" with inlet and Outlet Connection , SS

J Pressure Regulators
1 Pressure Regulator, Single Stage, S S 304, Inlet and Outlet Connection &
Pressure Gauges etc. for all Nitrogen and Air
2 Pressure Regulator, Single Stage, S S 304, Inlet and Outlet Connection &
Pressure Gauges, Flash Back Arrestors etc for LPG Gas service
3 Pressure Regulator, Single Stage, S S 316 , Inlet and Outlet Connection &
Pressure Gauges etc. for Steam application

K Tubings
1 1/2 " OD SS 304 Tubing with required fittings , Mounting Clamps etc
2 1/2 " OD SS 316 Tubing with required Insulation, fittings , Mounting Clamps etc
internally electropolished

L Point of Use Valves


1 1/2 " NPT F Ball / Neddle Valve with required fittings etc all Gases
Point of Use - After Regulator for LPG , Air and N2 Gas service
2 1/2 " NPT F Ball / Neddle Valve with required fittings etc all Gases
Point of Use - After Regulator for for Steam application

M Set of Two Compressor with one Receiver tank for both Compressors and
require Dyres, Filters , Moisture Separator etc

N Compact Steam Trapping Assembly consisting Bypass valve, inbuilt strainer, check valve, inlet &
outlet valves etc.- complete assembly - 15 mm size

O Stainers
1 Stainers , 40 NB Size
2 Stainers , 25 NB Size

P Steam Reducing Station Consists of requred all components like regulator , Valves, Gauges , By Pass
- 25 mm size

Q M.S. Fabricated Brackets for piping with U clamps for every 2 mtrs or as requird with Not bolts etc
TOTAL
SITAPUR ROAD, LUCKNOW ( Revision 2)
NITROGEN, LPG, COMPRESSED AIR & STEAM
Supply, Erection / Installation and Testing &
Unit Qty. Commissioning
Unit Rate ( In Rupees) Amount (In Rs.)
In In Words
Figures

Mtrs. 3,200
Mtrs. 6,500
Mtrs. 7,200

Nos 54
Nos 108
Nos 540
Nos 1,296

Mtrs 420
Mtrs 750
Mtrs 150

Set 3

Set 3

Set 3

Set 1

Nos 108
Nos 6

Set 432

Set 24

Nos 432
Nos 24

Nos 1,728

Nos 24

Nos 1,152

Nos 576

Nos 24

Mtrs. 4,750
Mtrs. 250

Nos 1,728

Nos 24

Sets 3

Sets 12

Sets 6
Sets 6

Set 6

Kgs 10,000