Week/ Checked

Job/ Task Description


Date by
1/ - First day of internship, went to Kejuruteraan Desir Emas office in
22.7.20 PNM to meet Mr. Hafiz. He is the facility manager and my supervisor.
- Got to meet everyone during a morning briefing which are going to
be held every Monday, Wednesday, and Friday at 9.00 a.m.
- Reported to Mechanical team, consists of 5 members.
- Collect data from Trane and Dunham-bush, this will be the daily
routine
- Standby for the day

1/ - Did the daily routine, collect the data from Trane and Dunham-
23.7.20 bush.
- Recorded the voltage and ampere from the chiller using a clamp
meter
- Cleaned the room, swept dusts, and mopped the floor
- Turn back on the AHU at floor 8 Menara. The AHU trips on starting,
but we able to make some adjustment and it able to run normally
- Standby for the day

1/ - Collected data from Trane and Dunham-bush, everything looks


24.7.20 normal.
- Inspect AHU at the 7th floor. Clean the dust filter, mopped the floor,
and look at the control panel
- Standby for the day

2/ - Did the daily routine, collecting data from Trane and Dunham-bush.
27.7.20 All the values were consistent.
- Checked the voltage of the motors inside the chiller room using the
meter clamp.
- Inspect AHU at the 8th floor. Clean the dust filter, mopped the floor,
check the belting condition, check the voltage.
- Checked the temperature on the thermostat to the room.

2/ - Collected the data from Trane and Dunham-bush.


28.7.20 - Checked main chilled water temperature, flow rate, pressure.
- Inspect AHU at the 9th floor. Clean the filters, check the belt tension,
check the motor bearing, clean the control panel.
- clean the diffusers on the 9th floor Menara.
- Standby

Week/ Checked
Job/ Task Description
Date by
3/ - Collected data from Trane and Dunham-bush
3.8.20 - Recorded the voltage and ampere from the chiller
- Inspect AHU at the 10th floor Menara. Clean the filters, check the
belt tension, check the motor bearing, clean the control panel
- Check a refrigerant level of one of the split units on a G level, fill the
AC with refrigerant gas.
- Standby for the day

3/ - Clean the Trane and Dunham-bush room


4.8.20 - Collected data from Trane and Dunham-bush
- Checked the cooling tower water level
- Checked for excessive vibration in motors, fans, and pumps
- Checked the valves and pipes if they are in good conditions
- Identified a leaking on a coil inside the AHU at the 10 th floor Menara

3/ - Welded the leaking coil using blowtorch. Leaking stopped and the
5.8.20 unit run normally
- Collected the data from Trane and Dunham-bush
- Carried couches and platforms from level 10 to level 7
- Standby for the day

3/ - Collected data from Trane and Dunham-bush


6.8.20 - Accompany lift contractor service lifts at Anjung
- Inspect AHU at the 11th floor Menara. Clean filters, check belt
tension, check the motor bearing, and look at the condition of the
control panel if there is anything unusual
- Standby for the day

3/ - Followed electrical team patrolling Menara on each floor to replace


7.8.20 broken lamps
- 30 fluorescent lamps replaced
- Some lights needed to replace ballast
- Inspect the condition of risers on every floor. Looked for any
unusual stuff like weird sound or unattached wires
- Standby for the day

Week/ Checked
Job/ Task Description
Date by
4/ - Collected data from Trane and Dunham-bush
10.8.20 - Replace broken nuts that hold the motor in the AHU at the ground
level Anjung.
- Realigned the motor and made it stable and able to reduce
vibrations as much as possible
- Replace two worn out belts

4/ - Cleaned diffusers on the 9th floor Menara


11.8.20 - Patrolled every AHU at the Anjung.
- AHU at level 3 needed to be mopped since the water rises because
the exit does not flow out.
- Standby for the day

4/ - Refill gas to air-conditioning unit inside the ICT room


12.8.20 - The unit does not function properly as we found out that the
compressor needs to be replace
- Collected data from Trane and Dunham-bush
- Recorded the voltage of chiller using clamp meter
- Followed electrical team fixed lights on ‘exit’ signs

4/ - Collected data from Trane and Dunham-bush, the daily routine


13.8.20 - Cleaned diffusers on the 10th floor Menara
- Cleaned filters at the AHU on the 11th floor
- Understanding the distribution board (DB) at Anjung and had a
grasp on the current flow at one floor

4/ - Collected data from Trane and Dunham-bush


14.8.20 - Comprehended how the flow from the chiller room to cooling tower
works
- Visited the cooling tower to see if everything works normally
- Turned on the AHUs which happened to be tripped with unknown
reasons

Week/ Checked
Job/ Task Description
Date by
5/ - Cleaned diffusers on the 11th floor Menara
17.8.20 - Collected data from Trane and Dunham-bush
- Remove any dusts and clean the control panel inside the chiller
room
- Helped PNM staffs carried furniture from level 10 to 8 Menara
- Standby for the day

5/ - Collected data from Trane and Dunham-bush


18.8.20 - Measure the voltage and ampere using the meter clamp
- Make sure the chiller ran properly and look for any unusual
vibrations or sounds
- Patrolled the 11th floor Menara. Clean dirty diffusers using dish rag
- Maintained 11th floor AHU Menara. Cleaned filters, remove any
dusts, and checked the control panel. Also checked the ampere when
the compressor ran.

5/ - Did the daily routine


19.8.20 - Refill gas to split unit located at the top floor Menara near the
cooling tower. The split unit serves the meeting room at the 15 th floor
- Adjusted the temperature control, checked the thermostat if its
functioning well
- Replaced the broken red and green led light on the control panel
inside the chiller room
- Standby for the day

5/ - Awal Muharram holiday


20.8.20

5/ - Patrolled 3rd and 4th floor of Anjung to see if there are anything
21.8.20 unusual
- Replace wear belts of AHU at 3rd floor with new belt
- Standby for the day

Week/ Checked
Job/ Task Description
Date by
6/ - Collected data from Trane and Dunham-bush
24.8.20 - Cleaned the chiller room, swept dust, and inspect for any leaking or
any unusual stuff
- Checked the cooling tower water level
- Refilled gas split unit Anjung, 3rd floor
- Standby for the day
6/ - Collected data from Trane and Dunham-bush as daily morning
25.8.20 routine
- Cleaned riser rooms at Menara from dusts and cobweb
- Clean diffusers at Menara at 12th floor
- Replaced fluorescent lamps in offices at Anjung
- Cleaned the lift room Menara

6/ - Collected data from Trane and Dunham-bush


26.8.20 - inspected whether all the vents can run properly
- Turned all the vents, checked the ampere at control panel. All the
vents can be turned on
- Restored bended vents by knocked it using blunt object
- Standby for the day

6/ - Collected data from Trane and Dunham-bush


27.8.20 - Moved table, sofas, and chairs at level 10 Menara
- Service AHU room at level 14. Checked the gas level of the AHU, the
ampere when the compressor running, swept dusts, and checked the
control panel
- Cleaned office
- Standby for the day

6/ - Collected data from Trane and Dunham-bush


28.8.20 - Raise up state flags and Malaysia flag for Merdeka celebration

Week/ Checked
Job/ Task Description
Date by
7/ - Public holiday, Merdeka Celebration
31.8.20

7/ - Had morning briefing


1.9.20 - Collected data from Trane and Dunham-bush
- Checked voltage and ampere at the control panel inside the chiller
room
- Standby for the day
7/ - Collected data from Trane and Dunham-bush as per usual
2.9.20 - Inspected the wires and connections for any corrosion and damage
- Followed Civil team solving leaky water pipes at the holding
- Maintained the good condition of AHUs in Anjung
- Clean diffusers at offices located in Anjung
- Standby for the day

7/ - Daily routine
3.9.20 - Visited boiler room, checked for any corrosion and damage at pipes.
- Replaced one leaking valve
- Attended to a contractor who responsible for cooling tower
- Standby for the day

7/ - Morning briefing
4.9.20 - Collected data from Trane and Dunham-bush, checked the water
pressure and make sure it operates normally
- Refill air conditioner refrigerant to split unit located at the office at
the 15th floor
- Fixed the door sensor at lobby Menara

Week/ Checked
Job/ Task Description
Date by
8/ - Collected data from Trane and Dunham-bush
7.9.20 - Cleaned the chiller room for any dusts, cobweb and mopped the
floor
- Inspected fire control room and tidied the room
- Made sure all the emergency phone located near lifts at every floor
in Menara worked properly. The phone connected to fire control room
at ground level
- Standby for the day

8/ -MC
8.9.20
8/ - Replace worn belts at the ground level AHU
9.9.20 - Checked the condition of motors at lift motor room
- Followed and helped electrical team change fluorescent lamp
- Wait for any complaints for the day

8/ - Collected data from Trane and Dunham-bush


10.9.20 - Visited the cooling tower, checked for vibration on pipes and cleared
up the drain
- Inspect wiring for damage or loose connections
- Wait in the wings, ready to fly

8/ - Visited the AHU 15th floor for maintenance


11.9.20 - Dismantle the filters and cleaned it
- Lubricated and greased motor and blower bearing
- Checked that motor belt and pulley are working properly, the belts
are in good condition
- Inspected wiring for damage or loose connections
- Measured ampere at control panel
- Standby

Week/ Checked
Job/ Task Description
Date by
9/ - Clean diffusers at level 15 Menara
14.9.20 - Clean diffusers at level 7 Menara
- Helped electrical team install electrical outlets at level 7
- Standby

9/ - Helped PNM staffs moved out boxes of book


15.9.20 - Uninstalled office partitions with Civil team
- Collected data from Trane and Dunham-bush
- Standby for the day

9/ - Collected data from Trane and Dunham-bush


16.9.20 - left work early due to extreme backpain
9/ - MC
17.9.20

9/ - Morning briefing by Mr. Hafiz


18.9.20 - Collected data from Trane and Dunham-bush
- Located and recorded all the fire extinguishers in Anjung and
Menara

Week/ Checked
Job/ Task Description
Date by
10/ - Morning briefing by Mr. Hafiz
21.9.20 - Collected all expired fire extinguishers from Menara and Anjung to
be replace. 222 units of them.

10/ - Collected data from Trane and Dunham-bush


22.9.20 - Moved the gathered fire extinguishers to a lorry where contractor
will replace them with new ones
- Put temporary fire extinguishers to every floor in Menara and
Anjung
- Standby

10/ - Clean diffusers at Menara level 7 and 8


23.9.20 - Checked AHU level 7 and 8 Menara for monthly inspection. Checked
for any fault noise and measured the ampere
- Refill the air conditioner gas at various split units
10/ - Clean diffusers at Menara level 9 and 10
24.9.20 - Standby for the day

10/ - Visited cooling tower for monthly inspection


25.9.20 - Inspect fan blades for cracks and cleaned as needed
- Checked the water level in the backup water tank

10/ - Collected data from Trane and Dunham-bush


26.9.20 - Inspected AHU level 11 and 12 as a monthly service
- Inspected the control panel for any loose wires and corrosion
- Cleaned the chiller room. Mopped the floor and cleared the drain
- Standby for the day