Revision 1
Date 06/10/2020
06/10/2020 3 2 6
7 2 1.2.2 Cost Estimate AO - Project Manager The budget might be insufficient
Impact Rating Scale Cost Schedule Scope Quality Health, Safety and the Environment
The System cannot be
The HW/SW or both do not The system is risky for untrained
5 Very High 70000 More than 8 weeks delivered with the existing
work customer/people/employees safety
requiments
The system can be
Relevant modifications to HW The system is harmfull for the local
4 High 20000 More than 5 weeks delivered removing 1 to 3
and/or SW might be necessary flora and or fauna
key requirments
The system can be The non tested system is risky for
Moderate modifications to HW
3 Moderate 7000 More than 4 weeks delivered changing 1 to 3 untrained
and/or SW might be necessary
key requirments customer/people/employees safety
The system can be
Small modifications to HW and The non tested system is harmfull
3 Low 2000 More than 2 weeks delivered removing 1
SW might be necessary for the local flora and or fauna
minor requirment
The system can be The system presence is not
Small modifications to HW or
1 Very Low 700 More than 1 week delivered changing 1 minor negligible but also not harmful for
SW might be necessary
requirment people, flora or fauna