WORK PLAN FOR HAND HOLES IN DATA NETWORK (SCHEDULE)

HAND HOLE WATERPROOFING FIBER OPTICS PROTECTION


HAND HOLE NO. BUILDING NO. ZONE EXCAVATION FDT BLINDING INSTALLATION MEMBRANE Remarks
CABLE BOARD

H.H-01 BO2C-07 2 DONE DONE DONE DONE DONE DONE PENDING

H.H-02 BO2C-01 2 DONE DONE DONE DONE DONE DONE PENDING

H.H-03 BO2B-37 2 DONE DONE DONE DONE 26/9/2020

H.H-04 BO2B-29 2 DONE DONE DONE DONE DONE DONE PENDING

H.H-05 BO2B-22 2 DONE DONE DONE DONE DONE DONE PENDING

H.H-06 BO2B-09 2 DONE DONE DONE DONE DONE DONE DONE

H.H-07 BO2B-05 1 DONE DONE DONE DONE DONE DONE PENDING

H.H-08 BO2B-01 1 DONE DONE DONE DONE DONE DONE PENDING

H.H-09 BO2B-45 1 DONE DONE DONE DONE DONE DONE PENDING

H.H-10 BO2B-49 6 DONE DONE DONE DONE DONE DONE PENDING

H.H-11 BO2B-53 6 DONE DONE DONE DONE DONE DONE PENDING

H.H-12 BO2B-58 6 DONE DONE DONE DONE 26/9/2020

H.H-13 BO2B-61 6 PENDING

H.H-14 BO2B-65 6 PENDING

H.H-15 BO2B-69 6 DONE DONE DONE DONE DONE DONE DONE

H.H-16 BO1-92 6 DONE DONE DONE DONE DONE DONE DONE

H.H-17 BO1-88 6 DONE DONE DONE DONE DONE DONE PENDING

H.H-18 BO1-86 7 DONE DONE DONE DONE DONE DONE PENDING

H.H-19 BO1-81 7 DONE DONE DONE DONE DONE DONE PENDING

H.H-20 BO1-77 7 DONE DONE DONE DONE DONE DONE PENDING

H.H-21 BO1-59 7 DONE DONE DONE DONE DONE DONE PENDING

H.H-22 BO1-62 7 PENDING

H.H-23 BO1-65 7 DONE DONE DONE DONE DONE DONE PENDING

H.H-24 BO1-68 7 DONE DONE DONE DONE DONE DONE PENDING

H.H-25 BO1-67 7 DONE DONE DONE DONE DONE DONE PENDING

H.H-26 BO1-56 8 DONE DONE DONE DONE DONE DONE PENDING

H.H-27 BO1-53 8 DONE DONE DONE DONE PENDING CABLE 26/9

H.H-28 BO1-47 8 DONE DONE DONE DONE PENDING CABLE 26/10

H.H-29 BO1-21 8 DONE DONE DONE DONE PENDING

H.H-30 BO1-18 9 PENDING

H.H-31 BO1-15 9 DONE DONE DONE DONE PENDING CABLE 26/10

H.H-32 BO1-09 9 DONE DONE DONE DONE PENDING CABLE 26/10

H.H-33 BO1-06 9 DONE DONE DONE DONE PENDING

H.H-34 BO1-03 9 DONE DONE DONE PENDING CABLE 26/10

H.H-35 BO1-22 9 DONE DONE DONE DONE DONE PENDING

H.H-36 BO1-25 9 DONE DONE DONE DONE PENDING CABLE 26/10

H.H-37 BO1-31 9 DONE DONE DONE DONE PENDING

H.H-38 BO1-44 9 PENDING

H.H-39 BO1-36 4 DONE DONE DONE DONE PENDING CABLE 26/10

H.H-40 BO2C-65 4 DONE DONE DONE DONE PENDING B

H.H-41 BO2C-55 3 DONE PENDING

H.H-42 BO2C-36 3 DONE DONE DONE DONE PENDING CABLE 26/10

H.H-43 BO2C-28 3 DONE DONE DONE DONE PENDING

H.H-44 BO2C-20 3 DONE DONE DONE DONE DONE DONE DONE


STATUS OF CONDUITING, HAND HOLES & FOC IN DATA & TELECOM NETWORK (INFRASTRUCTURE )

SBH-3 DHAHRAN AL JANOUB

SN HAND HOLE BUILDING NO. ZONE FEEDING TO BUILDING NO CONDUITING RFI NO FOR FEEDING
CONNECTING HH or FDT RFI NO FOR CONNECTING HH OR FDT FIBER OPTIC CABLE RFI NO Remarks
NO. BUILDING

1 H.H-01 BO2C-07 2 7,8,9,10,11,12 26329 FDT-1 & HH-02 26688


30724
2 H.H-02 BO2C-01 2 1,2,3,4,5,6 25540 HH-01 & HH-03 26688

3 H.H-03 BO2B-37 2 37,38,39,40,41 CONDUITING NOT INSTALLED HH-02 & HH-04

4 H.H-04 BO2B-29 2 29,30,31,32, 33,34,35,36 25541 HH-03 & HH-05


30659
5 H.H-05 BO2B-22 2 22,23,24,25, 26,27,28 25311 HH-04 & FDT-2 25385

6 FDT 2 BO2B-15 2 15,16,17,18,19, 20,21 25315 HH-05 & HH-06 25385

7 H.H-06 BO2B-09 2 9,10,11,12,13, 14 25129 HH-07 & FDT-2 25385, 26054 30331

8 H.H-07 BO2B-05 1 5,6,7,8 22277 HH-06 & HH-08 26054


30658
9 H.H-08 BO2B-01 1 1,2,3,4 HH-07 & FDT-3 26054

10 FDT 3 FUTURE MASJID 1 FM,B20, B23 & B25(Z1) 22599, 23874 HH-8 & HH-9

11 H.H-09 BO2B-45 1 42,43,44,45 21427 FDT-3 & HH-10


30723
12 H.H-10 BO2B-49 6 46,47,48,49 21193 HH-9 & HH-11 28309

13 H.H-11 BO2B-53 6 50,51,52,53 21192 HH-10 & FDT-4 28309, 28448 30861

14 FDT 4 BO2B-57 6 54,55,56,57 21191 HH-11 & HH-16 28309, 28448

15 H.H-12 BO2B-58 6 58,59,60 21190 FDT-4 29099 32424

16 H.H-13 BO2B-61 6 61,62,63,64 21189 FDT-4 29099

17 H.H-14 BO2B-65 6 65,66,67,68 21188 FDT-4 & HH-15

18 H.H-15 BO2B-69 6 69,70 21187, 30650 HH-14 30861

19 H.H-16 BO1-92 6 92,93 FDT-4 & FDT-5 30862


21186
20 FDT 5 BO1-90 6 90,91 HH-16,17 & FDT-6

21 H.H-17 BO1-88 6 88,89 23006 FDT-5 30862

22 FDT 6 B08 7 BFS,B06,B08,B14, FDT-5 & FDT-7


B15,B16,B17&B11(Z7)

23 FDT 7 BO1-84 7 82,83,84 22279 FDT-6 & HH-18,19

24 H.H-18 BO1-86 7 85,86,87 23366 FDT-7


30746
25 H.H-19 BO1-81 7 78,79,80,81 22278 FDT-7 & HH-20 22857
STATUS OF CONDUITING, HAND HOLES & FOC IN DATA & TELECOM NETWORK (INFRASTRUCTURE )

SBH-3 DHAHRAN AL JANOUB

26 H.H-20 BO1-77 7 74,75,76,77 21665 HH-19 & FDT-8 22857 30747

27 FDT 8 BO1-68 7 66,67,68 22276 HH-20, HH23, HH24 22856, 22857


STATUS OF CONDUITING, HAND HOLES & FOC IN DATA & TELECOM NETWORK (INFRASTRUCTURE )

SBH-3 DHAHRAN AL JANOUB

28 H.H-21 BO1-59 7 57,58,59 22226 HH-22 30976

29 H.H-22 BO1-62 7 60,61,62 21667 HH-21 & HH-23 23266

30 H.H-23 BO1-65 7 63,64,65 21668 FDT-8 & HH-22 23266 30976

31 H.H-24 BO1-68 7 72,73 21666 FDT-8 & HH-25


30863
32 H.H-25 BO1-67 7 69,70,71 22280 HH-24

33 FDT 12 B07 8 B4,B7,B9,B13 & B11(Z4) 27055 HH-38 & FDT-13

34 H.H-26 BO1-56 8 54,55,56 22228 FDT-13 27054 30747

35 H.H-27 BO1-53 8 51,52,53 22229 FDT-13 27054 32400

36 FDT 13 BO1-50 8 48,49,50 23568 FDT-12 & HH-28 27054

37 H.H-28 BO1-47 8 45,46,47 23573, 24064 FDT-13 & HH-29 25509, 26053, 27054 32400

38 H.H-29 BO1-21 8 19,20,21 25210 HH-28 & HH-30 25509, 26053 32460

39 H.H-30 BO1-18 9 16,17,18 22281 HH-29 & HH-31 25509

40 H.H-31 BO1-15 9 13,14,15 23131 HH-30 & FDT-14 25509 32400

41 FDT 14 BO1-12 9 10,11,12 22770, 23134 HH-31 & HH-32 25509

42 H.H-32 BO1-09 9 7,8,9 22770 FDT-14 & HH-33 25506, 25509 32400

43 H.H-33 BO1-06 9 4,5,6 22282 FDT-14 25506 32401

44 H.H-34 BO1-03 9 1,2,3 22590 FDT-14 25506 LOCATION NOT AS PER Rev.-2, need to be
relocated

45 H.H-35 BO1-22 9 22,23,24 & B25(Z8) 23171 FDT-15 30976

46 H.H-36 BO1-25 9 25,26,27 22591 FDT-15 32401

47 FDT 15 BO1-28 9 28,29,30 HH-36 & HH-37

48 H.H-37 BO1-31 9 31,32 CONDUITING NOT INSTALLED FDT-12 & FDT-15

49 H.H-38 BO1-44 9 41,42,43,44 23133 FDT-12 & FDT-11

50 FDT 11 BO1-40 4 37,38,39,40 22227 HH-38, HH-39 & HH-40 23367

51 H.H-39 BO1-36 4 33,34,35,36 23132 FDT-11 32401

52 H.H-40 BO2C-65 4 65,66,67,68, 69,70 26328 FDT-11 & HH-41 31404

53 H.H-41 BO2C-55 3 55,56,57,58,59,60,61,62,63,64 27152 HH-40 & FDT-10


STATUS OF CONDUITING, HAND HOLES & FOC IN DATA & TELECOM NETWORK (INFRASTRUCTURE )

SBH-3 DHAHRAN AL JANOUB

54 FDT 10 BO2C-45 3 45,46,47,48,49,50,51,52,53,54 HH-41, HH-42 & FDT-9


STATUS OF CONDUITING, HAND HOLES & FOC IN DATA & TELECOM NETWORK (INFRASTRUCTURE )

SBH-3 DHAHRAN AL JANOUB

55 FDT 09 B12 3 B10,B12,B18,B22,B24 & B25(Z3) FDT-10 & B03

56 H.H-42 BO2C-36 3 36,37,38,39,40,41,42,43,44 26712 FDT-10 32401

57 H.H-43 BO2C-28 3 28,29,30,31,32,33,34,35 CONDUITING NOT INSTALLED FDT-1

58 H.H-44 BO2C-20 3 20,21,22,23,24,25,26,27 26713 FDT-1 31430

59 FDT 1 BO2C-13 3 13,14,15,16,17, 18,19 B03 & HH-1