MV "Gloria"
Sietas yard type 161
SAL Heavy Lift GmbH • Brooktorkai 20 • 20457 Hamburg/Germany • Phone +49 (0) 40 380380-0 • www.sal-heavylift.com
OPERATIONS MANUAL
Document No. OPM2013-f307-598 INPG 2
Revision No.
Date 30 December 2013
COVER DOCUMENT Page 2 of 22
COVER DOCUMENT
Revision list
Rev. No. Date Author Check Changes
2 30.12.2013 Gottwald
PS 2013 598- PG
3
Stowage Plan page 1
PS 2013 598- PG
2
Lifting Arrangement page 2
PS 2013 598- PG
2
Lashing arrangement page 3
PS 2013 598- PG
2
Discharging page 4
Distribution list
Name Company E-mail
Fabian Obert SAL HQ projects@sal-heavylift.com
List of abbreviations
All rights are reserved. No part of this publication may be reproduced or used in any form or by means
graphic, electronic or mechanical, including photocopying, recording, taping or information storage
and retrieval systems without the written permission of the publisher.
CONTENT
Inhaltsverzeichnis
COVER DOCUMENT 2
Revision list 2
SAL drawings list 2
Distribution list 2
List of abbreviations 3
1. GENERAL INFORMATION 5
Purpose of document 5
Special requirements 5
QHSE and Certification 5
Communication 5
Responsibilities 6
Project personnel on shore 6
Stowage & Securing 7
Management of Change 7
Shipping Route 7
2. CARGO INFORMATION 9
Packing list/summary 9
Cargo Sketch 10
3. PORTS / SEQUENCES 11
Port of loading 11
Port of discharging 12
4. SHIP CANDIDATE 13
6. DRAWINGS SAL 17
1 GENERAL INFORMATION
SAL Management will ensure that all risks with a potential to cause harm to human life, envi-
ronment and property are reduced to levels as low as reasonably possible. Risk assessment
methods and approach can be obtained from the Safety & Quality department.
The vessels are classed and certified by Germanischer Lloyd. The cranes are tested and certi-
fied as shipboard cranes type B according to Germanischer Lloyd’s Guidelines for the Con-
struction and Survey of Lifting Appliances.
SAL vessels are following BMP and specific, company-developed procedures for passing the
piracy area in the Gulf of Aden.
Further information regarding QHSE and Certification can be supplied upon request.
1.4 Communication
Toolbox meetings will be held with the ship’s officers, cargo representatives, agents, steve-
dores and other parties involved after vessels arrival/before start of operations.
Language of command and working language on the vessel is English. Captain, officers, bo-
sun, crane drivers and watchmen are equipped with handheld-VHF radios with private fre-
quencies for shipboard communication.
1.5 Responsibilities
The merchant shall deliver cargo and project information such as transportation drawings,
weights, dimensions, centre of gravity, lifting points, lashing points, footprints and other vital in-
formation about the shipment. Please note that SAL Engineering is depending on accurate in-
formation for proper planning.
Further to our interaction with the client / merchant, SAL Engineering will communicate with
the captain of the relevant vessel and SAL’s other departments to ensure that all relevant as-
pects of the shipment are taken into account.
The captain is in overall command of the ship and has the right to deviate from this manual
when found necessary or in order to comply with special conditions or situations.
The captain is in charge of the loading / discharging operation and is assisted by the chief
mate and / or the project engineer.
SAL will pre-calculate stability cases when found necessary. The ship will always pre-calculate
all critical stability cases and obtain a relevant weather-report for the loading/ discharging
area.
Any and all operations on board of the vessel are subject to the captain’s discretion of the op-
eration, being thus deemed safe for the vessel, her crew and the cargo.
The Project Manager towards the Client and towards the Project Engineer for all commercial
matters.
The Project Engineer towards the Client and the Vessel for engineering, planning and opera-
tional matters.
The Project Operations Manager is in charge of the information flow between Vessel, Engi-
neering and the Client.
The QHSE Manager is responsible for HSE on the project, HSE documentation and coordina-
tion with the project manager and personnel.
As per standard instructions on board, the crew will check seafastenings daily. During adverse
weather conditions, these checks are carried out more frequently as deemed necessary.
If changes have been decided upon during operations or on a very short notice, then these
changes have to be documented as per the company’s HSE Operational Control (SAL HSE
Manual Add. 1, 4.4.6): ‘Management of Change’.
The captain will send daily position reports including ETA message to the HQ which can be
obtained from the Project Operations Manager.
2 CARGO INFORMATION
3 PORTS / SEQUENCES
4. Cargo securing
Crew preparing vessel for sea.
Closing hatch
5.
Load stability pontoon
store all gears
3. Remove securing
4. Discharge item
Crew preparing vessel for sea
Close hatch
5.
Load stability pontoon
Store all gear
4 SHIP CANDIDATE
(Summer)
Draught 7.85 m
Deadweight: 9,544 tdw
Freshwater Allowance: 149 mm
Freeboard: 2,679 m
Displacement: 14,880 tdw
Cargo gear: 2 cranes each 275 t SWL (in combination 550 t); 1 crane 150 t SWL;
Auxiliary hoist 2 x 32 t SWL; 1 x 10 t SWL.
Hatch cover: MacGregor hydraulic operated combined folding type and lift and roll type
Number of holds: 1
Number of hatches: 1
Dimension of hold: 82.90 x 15.80 x 11.17 m
Volume of hold: 13,614 m!
Bale capacity: 451,800 cuft
Free deckspace: 2,120 m"
Main Engine: MAN B & W 9L 48/60 9,450 kW (12,852 HP Converted 4,955 kW)
Rudder: Flag type spate rudder (high efficiency rudder)
Bow Thruster: Lips 750 kW (1,020 HP)
SAL Heavy Lift GmbH • Brooktorkai 20 • 20457 Hamburg/Germany • Phone: +49 40 380380-0 • www.sal-heavylift.com
OPERATIONS MANUAL
Document No. OPM2013-f307 598 INPG 2
Revision No. 2
Date 30 December 2013
DRAWINGS SAL Page 15 of 22
96
96
10
19 or lever hoist.
10
13
Step A: The 4 beam supports in empty compartment.
00
Step B: Add the 4 lever hoists opposite the beam supports
when pipe has been transferred.
R2 R2 Step C: Transfer the beam supports to same side as lever hoists.
50 50
0 0
10355
This document contains confidential information. All rights are owned by National Oilwell Varco Denmark I/S.
No use or disclosure is to be made without prior written permission of National Oilwell Varco Denmark I/S.
Client Projection
method
Note 3 Vaalco Gabon (Etame) Inc.
Project Standard Tolerance
VAALCO ETAME PROJECT -
Title Part No.
F A Packing Drawing F
B C 2 OFF 5” ID PF AND 1 OFF 5" PJ Client Doc No.
5055 5868
SECTION C-C Scale Size Sheet State PDM Ver. Drawing No.
SECTION B-B SECTION A-A NTS A2 1/1 Released C.3 3769-DWG-PCK-100
1 2 3 4 5 6 7 8
OPERATIONS MANUAL
Document No. OPM2013-f307 598 INPG 2
Revision No. 2
Date 30 December 2013
DRAWINGS SAL Page 18 of 22
6 DRAWINGS SAL