CLT Construction Projects

in Eastern Canada

Franck Faelli

October 12, 2011


Moncton, NB, Canada
Presentation Program

 Nordic Engineered Wood Products

 Condos, Chibougamau, QC (4-Storey Building)

 Retirement Home, Desbiens, QC (3-Storey Building)

 Storage Building & Offices, Chibougamau, QC


 Conclusion
Nordic X-Lam
  

   #!"  #


 #) )% &084/%& '2"#
   #

 ,
 
    
 # 
(  21/)1/0$" *+


  

"!#1632*8'+

"#08%4*53'+
 #65)270*2)04'+
  #2%4 6) 
Nordic Design Tools

Literature, design software, and project specific information


 Product characteristics, load tables
 Design tools (Nordic Sizer)
 Architectural details
 Erection plans and construction details
 Technical support
CLT Handbook

We rely on the multidisciplinary CLT handbook, by FPInnovations, developed


under the Transformative Technologies Program of Natural Ressources
Canada.
PROJECT

CONDOMINIUMS
CHIBOUGAMAU, QC
Project Description

 Location: Chibougamau
23 Apartments & 1 Store
 Date on Site: 2011-10-10

 Materials Volume:

 CLT= 1150m3
 Glulam= 70m3

 Steel= 7000 Kg

 Fabrication Time (Estimated): 5 weeks

 Erection Time (Estimated): 7-8 weeks for the structure


Overview

    
  
  
Erection Plans




  
  

Exterior Wall Build-Up
Wall-to-Concrete Detail
Wall-to-Concrete Detail
Wall-to-Wall Detail
Floor-to-Wall Detail
Floor-to-Wall Detail
Floor-to-Floor / Roof-to-Roof Detail
Project Summary

 Good thermal & acoustic properties

 Simple typical details to understand, not to many drawings

 Easy to coordinate with architect


 Shear walls
 Openings

 Details

 Opening placement freedom


PROJECT

RETIREMENT HOME
DESBIENS, QC
Project Description

 Location: Desbiens (Québec)

 Date on Site: 2011-10-26

 Materials Volume:

 CLT= 480m3

 Glulam= 20m3

 Steel= 2400kg

 Fabrication Time (Estimated): 4 weeks

 Erection Time (Estimated): 5 weeks


Isometric Projection

$   


 $    
   
$!   
   
   & #  
   

     #
Plan View

 
       
    

     
   
  

   
Wall-to-Concrete Detail
Floor-to-Wall Detail
Panel Handling

    


 
   
 
    
 

    

Project Summary

 Excellent in-plane and out-of-plane resistance (high shear capacity)

 Fast erection due to prefabrication and large panel dimensions

 Construction quality and accuracy (from shop fabrication)

 High span-to-depth ratios (less weight, smaller foundations, etc.)


PROJECT

STORAGE & OFFICE


BUILDING
CHIBOUGAMAU, QC
Project Description

 Location: CHIBOUGAMAU, QC

 Date on Site: 2011-09-07

 Materials Volume:

 CLT= 70m3
 Glulam= 5m3

 Steel= Insignificant

 Fabrication Time: 3 days

 Erection Time: 1-1/2 days



 
  

Wall-to-Concrete Detail

 
  

Beam-on-the-Wall Detail

     
 & 
!!"!% 
#" $#"
 !# !""!
" $"#

 
  


 
  

Wall & Roof Build-Ups

 

 

 
 
  

 

 

 
 !
 
Project Summary

 Simple construction system

 Easy to understand details

 Short erection time

 Full-height wall panels


 Very satisfied erector
OTHER X-LAM PROJETCS

  
 
 

      
      

  

 

  

 

  

 

  

 

  

 

  

 

 

 
 



 

   

 

 




 
CONCLUSION

 Know-how increasing on every project

 Design expertise and process

 Logistics (manufacturing, machining, shipping)

 Connection details

 Handling and erection

 Recommendations
THANK YOU!