QI - J01
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
Doc. No. : Page :
GRESIK - SEMARANG
of
INSTRUMENT CABLE INSULATION RESISTANCE AND CONTINUITY TEST RECORD AFTER
INSTALLATION Project No. :
JB Tag No. :
…………………………………………………………………………………………………………………………….
…………………………………………………………………………………………………………………………….
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J01a
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI Doc No. : Page :
GRESIK - SEMARANG
of
INSTRUMENT CABLE INSULATION RESISTANCE AND CONTINUITY TEST RECORD
AFTER INSTALLATION
Project No. :
Cable Specification
Cable Tag No. Cable Specification
From and Size
To Length .meters
(A) INSULATION TEST : BETWEEN EACH CORE TO GROUND / ARMOUR (MEGA OHMS)
(B) INSULATION TEST : BETWEEN EACH CORE TO SHIELD (MEGA OHMS)
Core 1 2 3 4 5 6 7 8 9 10
(A)
(B)
Core 11 12 13 14 15 16 17 18 19 20
(A)
(B)
Core 21 22 23 24 25 26 27 28 29 30
(A)
(B)
Core 31 32 33 34 35 36 37 38 39 40
(A)
(B)
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Cable No. : ………………………………………………………………
Doc No. : Date :
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI ATTACHMENT
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG QI - J01a
Cable Specification : ……………………………………………………………..
1 2 3 4 5 6 7 8 9 10 11 12 13 14 15 16 17 18 19 20 21 22 23 24 25 26 27 28 29 30 31 32 33 34 35 36 37 38 39 40
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
32
33
34
35
36
37
38
39
40
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI QI - J02
PEMBANGUNAN PIPA TRANSMISI GAS DARI Doc. No. : Page :
GRESIK - SEMARANG of
Press. Rating
Instrument
Measuring
Operating
Range of
(Kg/cm2)
Upstream &
Test Press.
Test Press.
Downstrea
Result
Material &
Press.
Test Fluid
Test Fluid
(Kg/cm2)
(Kg/cm2)
Support
NO. Tag No. REMARKS
Rating
Result
Slope
m
Date Sign
Note :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J03
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG
Doc. No. : Page :
of
RESULT ACCEPTED
NO. TAG NO. REMARKS
LEAK BLOW DATE SIGN
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
QI - J04
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No. : Page :
of
INSTRUMENT CALIBRATION RECORD Project No.:
Client : Project Title :
Tag. No. :
% of Span Actual Actual Scale range % of Deviation Actual Scale range % of Deviation
0
25
50
75
100
% of Span Actual Actual Scale range % of Deviation Actual Scale range % of Deviation
0
25
50
75
100
: :
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J05
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
Doc. No. : Page :
GRESIK - SEMARANG
of
Tag. No. :
Location / Area : Service :
Size & Rating : Serial No. :
Manufacture : Output :
Type No. : Dwg No. & rev. :
Range : Spect/ Data sheet No. :
Scale Range : :
CALIBRATION CHECK
25
50
75
100
75
50
25
REFERENCE
Type of Valve : Control Valve ON / OFF Valve
NOTE : …………………………………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………………………………..
…………………………………………………………………………………………………………………………………………..
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
QI - J06
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No. : Page :
of
INTEGRAL LOOP FUNCTION TEST DCS RECORD Project No.:
Client : Project title :
LOOP No. :
Analog Input (DCS/ESD) Measuring Scale Range Simulated Local DCS / ESD
Tag No. : Range (Unit) ( Unit ) Input Indicator Reading
Alarm / Trip (ESD) Setting Result Alarm / Trip (DCS) Setting Result
Tag No. : HH Tag No. : HH
H H
L L
LL LL
Digital Output (DCS/ESD) Output Field DCS / ESD Local Control Panel
Tag No. : Open
Close
NOTE : ………………………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………………………..
………………………………………………………………………………………………………………………………..
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J06A
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No. : Page :
of
LOOP No. :
NOTE : ……………………………………………………………………………………………………………………………………..
……………………………………………………………………………………………………………………………………..
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J07
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc No. : Page :
of
INSPECTION REPORT FOR PANEL AND JUNCTION BOX INSTALLATION Project No. :
RESULT ACCEPTED
No. INSPECTION REMARKS
YES NO N/A DATE SIGN
1. Visual and Dimensional out side Panel as per Outline
Drawing / Arangement.
2 Check Orientation & Position Panel.
7 Touch-Up Painting.
Note :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J08
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No. : Page :
of
Status of Sequence :
Location / Area :
Interlock Logic Diagram No. :
Sheet No. :
Panel No. :
Result :
The Squence as per logic number have tested correctly ( see attachment drawing ).
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J.09
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No : Page :
of
Tag No. :
RESULT ACCEPTED
NO ITEM TO CHECK REMARKS
YES NO N/A DATE SIGN
1 Tag Number is Correct
9 Orientation is Correct
Reff Document : - Instrument Hook-Up Drawing - Manual Book & Vendor Drawing (if Any)
- Individual Specification or data sheet
Note :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J.09a
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No : Page :
of
Tag No. :
RESULT ACCEPTED
No. ITEM TO CHECK REMARKS
YES NO N/A DATE SIGN
1 Tag Number
6 Check Orientation
11
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
`
Date :
QI - J10
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No. : Page :
of
3. DRAWING No. :
4. LOCATION / SERVICE :
5. SERIAL No. :
8. TYPE :
9. SIZE :
10. CAPACITY :
B. TEST DATA
1. TEST MEDIUM :
2. AMBIENT TEMPERATURE :
6. RESULT :
NOTE : ………………………….……………………………………………………………………………………………………………………
………………………….……………………………………………………………………………………………………………………
………………………….……………………………………………………………………………………………………………………
………………………….……………………………………………………………………………………………………………………
………………………….……………………………………………………………………………………………………………………
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
QI - J11 Date :
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No. : Page :
of
Tag. No. :
Type : Service :
Manufacture : Output No. :
Range : Spec No. :
Span : Data Sheet :
Serial No. : Ambient Temperature : o
C.
Calibration Check
Input INCREASE Input DECREASE
0 100
25 75
50 50
75 25
100 0
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J12
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No. : Page :
of
RESULT ACCEPTED
No. INSPECTION REMARKS
YES NO N/A DATE SIGN
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J13
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
Doc. No. : Page :
GRESIK - SEMARANG
of
TAG NO. :
8. Touch-up Paint
9. Color code
Note :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J14
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc No. : Page :
of
Tag. No. :
MEASURED RANGE.
We certify that the switches provided on this order have been tested and calibrated at our works
and are in and unsed condition
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J15
JASA PERANCANGAN PENGADAAN DAN
KONSTRUKSI PEMBANGUNAN PIPA TRANSMISI GAS
DARI GRESIK - SEMARANG Doc. No. : Page :
of
TAG NO. :
( )
( )
( )
( )
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
Q I- J16
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No. Page :
of
ANALYZER CALIBRATION RECORD Project No.
Tag No. :
TRANSMITTER
OUTPUT
Before After
BUFER SOLUTION
RANGE Remarks
STANDARD Conductivity / Conductivity /
pH / O2 / Chlorine mA Error (%) pH / O2 / Chlorine mA Error (%)
: :
: :
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J17
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No. : Page :
of
Client : PROJECT :
RESULT ACCEPTED
No. ITEM TO CHECK REMARKS
YES NO N/A DATE SIGN
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J18
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
Doc. No. : Page :
GRESIK - SEMARANG
of
RESULT ACCEPTED
No. INSPECTION
YES NO N/A DATE SIGN REMARKS
NOTE :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
QI - J19
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc No. : Page :
of
Tag. No. :
Note :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date
QI - J20
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI
GRESIK - SEMARANG Doc. No Page
of
RESULT ACCEPT
ITEM TO CHECK REMARKS
YES NA DATE SIGNATURE
11
Remarks :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date
QI - J21
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI Doc. No Page
GRESIK - SEMARANG
of
Termination CONCLUSION
Equipment No. Continuity
Connection ACCEPTED/ REJECTED
REMARKS :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date
QI - J22
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI Doc. No Page
GRESIK - SEMARANG
of
REMARKS :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date
QI - J23
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI
PEMBANGUNAN PIPA TRANSMISI GAS DARI Doc. No. Page
GRESIK - SEMARANG
of
REMARKS :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :
Date :
JASA PERANCANGAN PENGADAAN DAN KONSTRUKSI QI - J24
PEMBANGUNAN PIPA TRANSMISI GAS DARI Doc. No. : Page :
GRESIK - SEMARANG
of
NO. DATE DESCRIPTION SIZE GRADE HEAT NO. BATCH NO. MILL CERTIFICATE SUPPLIER COLOUR EXPIRED DATE DOC NO. REMARKS
Notes :
Prepared by : : Review/Witness/Approved by : :
Konsorsium Wika Rabana Kelsri PMC/PT Pertamina Gas
QC Representative/QC
Name : Name :
Sign : Sign :
Date : Date :