Sie sind auf Seite 1von 2

Mirpur University of Science & Technology, MUST Mirpur AJ&K

Department of Software Engineering

Examination: Terminal 2020 Session: 2016-2020


Course Title: Principles of Semester: 8th
Management
Course Code: MG-484 Time Allowed:
Instructor: Maryam Mehmood Date:
Max Marks: 80 Paper Type Subjective

INSTRUCTIONS:

I. There is no ambiguity in the paper and Teacher / Instructor will not be available for any queries
/ clarifications. Make and write relevant / necessary assumptions if required.
II. All Questions are compulsory. The paper is open book.
III. Abbr. CLO (Course Learning Outcome), BTL (Bloom’s Taxonomy Level)
IV. Your file name should be your roll no. in the given format. FA16-BSE-000

Roll Number Signature

Q. Description CLO BTL Marks


1 We have studied Maslow’s Hierarchy of Needs, Please draw the pyramid 2 C2 10
and describe each level with the help of suitable examples from an IT
company. Please make sure that you write 5 examples of each level.

2 How would you explain Contrasting Views of Satisfaction and 2 C4 5


Dissatisfaction in terms of Motivation and hygiene factors?

3 Please draw a Gantt Chart for your final year project (assume that is a software 4 A3 15
product). A few steps should be followed properly:
 You have total time of 4 months
 You have to give proper time to each of the phase of SDLC (software
development life cycle).

A bonus point for a proper Gant Chart in excel.

4 Using the above description now you have to draw the LOAD CHART of your 4 A3 15
final year project.
One thing you need to keep in mind is;
 You have three members in a group
 Work should be divide equally among three members

A bonus point for a proper LOAD Chart in excel.

Department of civil Engineering, Mirpur University of Science & Technology (MUST). Allama Iqbal Road, 10250, Mirpur 1/2
Azad Kashmir, Pakistan
Mirpur University of Science & Technology, MUST Mirpur AJ&K
Department of Software Engineering

5 Please read the PERT Chart below and answer the given questions ; 4 A3 10

1. Find all the paths to complete the project


2. Find the critical path to complete the project
6 Please focus on the image of Common Organizational Communication 4 A3 10
Networks and briefly elaborate how they rate on effectiveness criteria?

For example: what is meant by; speed is moderate in chain communication but
fast in other two channels?

7 Suppose you are running a software house. What are the potential 15
stakeholders of your business?

Good Luck 😊

Department of civil Engineering, Mirpur University of Science & Technology (MUST). Allama Iqbal Road, 10250, Mirpur 2/2
Azad Kashmir, Pakistan

Das könnte Ihnen auch gefallen