To,
M/s. sanketa Engineering collage,
visakhapatnam
Sir,
We are here with submitting the following quotation for your collage interior work at the above address.
Grand total
Note:
50% advance along with order and 40% advance according to the work progress of work
10% after completion of work.
Local taxes are extra as applicable.
Additional works will be charged separately.
Actual measurements will be taken after completion of the work.
Electrical labor, lights, switch boards, switch gare are not included.
CC TV camera are not included
Thanking you and assuring you of our best services at all times.
Kaplan Darpan Interiors, 50-94-19, Santhipuram, Visakhapatnam 530 016. Cell no 98481 11570.
7 Supply & Laying of electrical wiring for power sockets 15 No 650 9,750
including material and labor
8 Supplying and fixing of Light fittings in the false 60 Sft 1,200 72,000
ceiling including material and labor
9 Wiring for Cassette Air conditioners including material 2 Sft 4,500 9,000
and labor
Wiring for split Air conditioners including material and 2 Sft 3,000 6,000
labor
10 UPS points for chambers, conference table with two 15 nos 1,350 20,250
sockets, two switches as one point
11 Net working for chambers, conference table through 10 nos 1,500 15,000
PVC pipes.
6 Supply & Laying of electrical wiring for
60 light fittings and 2 fans, two exhaust fans including 45 No 1250 56,250
switches, boards and regulators etc including material
and labor