Sie sind auf Seite 1von 2

OPS Drainage Committee – 2019-2020 Work plan

The OPS Drainage committee will be reviewing and updating the below standards during its 2019-2020
work plan. Please send any comments or concerns by September 23, 2019 to:

Rick Harms, P.Eng,


Thunder Bay
rharms@thunderbay.ca

1. OPSS.MUNI 411 - GENERAL SPECIFICATION FOR CLEANING AND FLUSHING


http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/cb88589616ade31f8525808200629160/$FILE
/OPSS%20411%20Nov15.pdf

2. OPSD 802.020 - FLEXIBLE PIPE ARCH EMBEDMENT AND BACKFILL EARTH EXCAVATION
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/b0d56c1f9cac30588525808200628f6e/$FILE/
OPSD%20802.020%20Rev%233%20Nov2015.pdf

3. OPSD 802.023 - FLEXIBLE PIPE ARCH EMBEDMENT AND BACKFILL ROCK EXCAVATION
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/eae5266a8f5d1a9d8525808200628f48/$FILE/
OPSD%20802.023%20Rev%233%20Nov2015.pdf

4. OPSD 802.024 - FLEXIBLE PIPE ARCH EMBEDMENT IN EMBANKMENT ORIGINAL GROUND: EARTH
OR ROCK
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/bfbe3e72f561f85b8525808200628fd5/$FILE/
OPSD%20802.024%20Rev%233%20Nov2015.pdf

5. OPSD 802.030 - RIGID PIPE BEDDING, COVER, AND BACKFILL TYPE 1 OR 2 SOIL - EARTH EXCAVATION
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/751749ebe05dde0a852580820062902b/$FIL
E/OPSD%20802.030%20Rev%233%20Nov2015.pdf

6. OPSD 802.031 - RIGID PIPE BEDDING, COVER, AND BACKFILL TYPE 3 SOIL - EARTH EXCAVATION
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/4a8973018cb15e1d8525808200629014/$FILE
/OPSD%20802.031%20Rev%233%20Nov2015.pdf

7. OPSD 802.032 - RIGID PIPE BEDDING, COVER, AND BACKFILL TYPE 4 SOIL - EARTH EXCAVATION
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/dba2ceb1d2afea648525808200628f6a/$FILE/
OPSD%20802.032%20Rev%233%20Nov2015.pdf

8. OPSD 802.033 - RIGID PIPE BEDDING, COVER, AND BACKFILL ROCK EXCAVATION
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/e718e18e8718990c8525808200628f49/$FILE
/OPSD%20802.033%20Rev%233%20Nov2015.pdf

9. OPSD 802.034 - RIGID PIPE BEDDING AND COVER IN EMBANKMENT ORIGINAL GROUND: EARTH OR
ROCK
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/636531ef7cdcd5ee8525808200628f41/$FILE/
OPSD%20802.034%20Rev%233%20Nov2015.pdf
10. OPSD 802.050 - HORIZONTAL ELLIPTICAL RIGID PIPE BEDDING, COVER, AND BACKFILL, TYPE 1 OR 2
SOIL - EARTH EXCAVATION
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/b32d218d30120a0c8525808200628fa0/$FILE
/OPSD%20802.050%20Rev%233%20Nov2015.pdf

11. OPSD 802.051 - HORIZONTAL ELLIPTICAL RIGID PIPE BEDDING, COVER, AND BACKFILL, TYPE 3 SOIL -
EARTH EXCAVATION
http://www.raqsb.mto.gov.on.ca/techpubs/OPS.nsf/0/4b5f9b8d18846e2f8525808200628ff0/$FILE/
OPSD%20802.051%20Rev%233%20Nov2015.pdf

12. OPSD 802.052 - HORIZONTAL ELLIPTICAL RIGID PIPE BEDDING, COVER, AND BACKFILL, TYPE 4 SOIL -
EARTH EXCAVATION
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/e459e06b025a71c08525808200628f6b/$FILE
/OPSD%20802.052%20Rev%233%20Nov2015.pdf

13. OPSD 802.053 - HORIZONTAL ELLIPTICAL RIGID PIPE BEDDING, COVER, AND BACKFILL, ROCK
EXCAVATION
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/2767b90d7a34b80c8525808200628f66/$FILE
/OPSD%20802.053%20Rev%233%20Nov2015.pdf

14. OPSD 802.054 - HORIZONTAL ELLIPTICAL RIGID PIPE BEDDING AND COVER IN EMBANKMENT,
ORIGINAL GROUND: EARTH OR ROCK
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/992f3438d5232fce8525808200628fab/$FILE/
OPSD%20802.054%20Rev%233%20Nov2015.pdf

15. OPSD 803.010 - BACKFILL AND COVER FOR CONCRETE CULVERTS


http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/03bb8b5784a69822852580820062901c/$FIL
E/OPSD%20803.010%20Rev%233%20Nov2015.pdf

16. OPSD 803.030 - FROST TREATMENT PIPE CULVERTS FROST PENETRATION LINE BELOW BEDDING
GRADE
http://www.raqsb.mto.gov.on.ca/techpubs/OPS.nsf/0/047062f3532d38498525808200628f86/$FILE
/OPSD%20803.030%20Rev%233%20Nov2015.pdf

17. OPSD 803.031 - FROST TREATMENT PIPE CULVERTS FROST PENETRATION LINE BETWEEN TOP OF
PIPE AND BEDDING GRADE
http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/874b090a423bbcf58525808200628fa3/$FILE/
OPSD%20803.031%20Rev%234%20Nov2015.pdf

18. OPSS.MUNI 1802 - SMOOTH WALLED STEEL PIPE


http://www.raqsb.mto.gov.on.ca/techpubs/ops.nsf/0/4dc3e617f9068812852582780050b150/$FILE
/OPSS.MUNI%201802%20Apr18.pdf

Das könnte Ihnen auch gefallen