Sie sind auf Seite 1von 5

PROJECT MANAGEMENT

Group Assignment 20 Marks

1. All students are hereby requested to note the


assignments to be prepared and presented by them as a
part of their curriculum.

2. The assignment topic shall be informed by the CR to


individual group and he will have the final authority for
such selection.

3. The assignment presentation will commence from Mid


of December,2007 and the exact date will be announced
after discussing at the class.

4. All assignments must relate to certain specific topic,


which are given separately.

5. The content of each assignment must highlight certain


critical areas of project cycle, which are given separately.

6. Presentation time will be 40 minutes, out of which 30


minutes for clear presentation time and balance 10 minutes
for viva. Duration must be strictly maintained.

7. A group will consist of maximum 5 members. Before any


group comes forward for presentation, their hard copy
must be submitted to faculty. No change at the last
moment will be allowed.

8. All the members of the group must be present during


their presentation and any select set of students may be
given presentation. But the entire group must be ready for
the viva. Any absenteeism will entail deduction of group
marks.

9. The marks will be awarded based upon the presentation


quality, handling of questions and satisfactory answering
the same and teamwork.

10. Two separate CDs to be produced which must


include all group presentation of two sections.
LIST OF ASSIGNMENTS

MARKETING & FINANCE GROUP

ANY ASSIGNMENT MUST INCLUDE THE FOLLOWING AREAS :

1. FEASIBILITY STUDY AND PROJECT PLANNING

2. NETWORKING AND PROJECT SCHDULING

3. TENDERING, BIDDING & CONTRACTING

4. ORGANISATION OF PROJECT TEAM

5. ARRANGEMENT OF PROJECT FINANCE

6. PROJECT QUALITY MANAGEMENT

7. PROJECT SAFETY MANAGEMENT

8. PROJECT MONITORING & CONTROL MECHANISM

9. PROJECT RESOURCE MANAGEMENT

10. APPLICATION OF INFORMATION & TECHNOLOGY

11. PROJECT CLOSE OUT


INFRASTRUCTURE PROJECT RELATED TOPIC MAY BE
CHOOSEN FROM THE FOLLOWING:

 HIGHWAYS

 FLYOVERS & BRIDGES

 RURAL DEVELOPMENT

 TRANSPORT

 POWER (HYDRO / THERMAL / WAVE)

 OIL & GAS

 TELECOMMUNICATION

 STEEL

 CEMENT

 NON-CONVENTIONAL ENERGY

 LAND & PROPERTY DEVELOPMENT

 UTILITIES AND FACILITIES

 SPECIAL ECONOMIC ZONE

 SEA PORT DEVELOPMENT & DRY DOCK FACILITY

 AIR PORT DEVELOPMENT & EXPANSION PLAN

 WATER RESOURCE MANAGEMENT & RIVER LINKING

 RETAILING

 ANY SERVICES MANAGEMENT


SYSTEM & FINANCE GROUP

ANY ASSIGNMENT MUST INCLUDE THE FOLLOWING AREAS :

1. MARKETING OF PROJECT / PRODUCT / SERVICES

2. FEASIBILITY STUDY AND PROJECT PLANNING

3. ORGANISATION OF PROJECT TEAM

4. NETWORKING AND PROJECT SCHDULING

5. PROCESS ENVIRONMENT & DEVELOPMENT CYCLE

6. PROJECT QUALITY MANAGEMENT

7. PROJECT SAFETY MANAGEMENT

8. PROJECT MONITORING & CONTROL MECHANISM

9. VALIDATION AND TESTING

10. PROJECT RESOURCE MANAGEMENT

11. SITE ADMINISTRATION / IMPLEMENTATION / MAINT.

12. PROJECT CLOSE OUT


SYSTEMS RELATED PROJECT TOPIC MAY BE CHOOSEN FROM
THE FOLLOWING:

 ARTIFICIAL NEURAL NETWORK

 MAINTENANCE PROJECT

 GRID COMPUTING

 SYSTEMS ENGINEERING – MODELLING & SIMULATION

 WEB BASED PROJECTS

 MOBILE COMPUTING AND TECHNOLOGY

 BIOMETRICS

 INTERNET AND MOBILE BANKING

 INFRASTRUCTURE PROJECT NETWORKING

 RFID

 SECURITY SYSTEM

 INSURANCE

 TRAVEL AND TOURISM

 SUPPLY CHAIN MANAGEMENT

 TELECOMMUNICATION

 ANY OTHER SERVICES

Das könnte Ihnen auch gefallen