Consultant’s team of Experts Tasks
Senior Sociologist will be Name of Project: Mohmand Dam Hydro Power Project
involved in the following Year: February 2020 to till now
assignments/deliverables: Location: KPK
Client: Water and Power Development Authority (WAPDA) , Govt. of Pakistan
Project Main Features:
Page 1 of 4
Akhtar Saleem
The main feature of the assignment is to conduct Monitoring of Issues that arises due to the
implementation of the project. Position Held: Sr. Sociologist
Activities Performed:
Perform Monitoring and Evaluation activities including resettlement and community relating
issues.
Page 2 of 4
Akhtar Saleem
Social Impact Assessment Survey of Project area, Socio-economic condition of the local people
as well as resettlement impact on the community living in the project area and village profile
survey.
Conduct Socio-economic Survey
Position Held: Jr. Sociologist
Activities Performed:
Preparation of survey tools, data collection, Public Consultation, Focus Group discussion,
Preparing Village Profile, Resettlement Impact Assessment and Data Analysis
Name of Project: Hassanabdal-Hawaiian-Mansehra Expressway E35
Year: July, 2014 to April, 2015 (10 months)
Location: Hassanabdal-Hawaiian-Mansehra
Client: National Highway Authority (NHA)
Project Main Features
To Conduct asset inventory of the project affectees, Preparation of the Resettlement Plan
Position held: Junior Sociologist
Activities Performed:
Preparation of survey tools, data collection, Public Consultation, Focus Group discussion,
Preparing Village Profile, Resettlement Impact Assessment and Data Analysis
Name of Project: Punjab Irrigated Agriculture Investment Program (PIAIP)
Year: 2013 to July 2014 (1 year)
Location: Trimmu Barrage, Punjnad Barrage, Pakpattan Canal Irrigation System, Thal Branch
Canal Irrigation System
Client: Irrigation Department (ID), Govt. of the Punjab
Project Main Features
To conduct Socio-economic study, To prepare assets inventory of the people fall in CoI,
Preparation of Feasibility reports for each separate package
Position held: Junior Sociologist
Activities Performed:
Conducted baseline poverty and socio-econmic survey, Identification of project affectees through
Asset Inventory Survey, Prepared assets inventory of the families affecting due to construction of
spillway and flood channel. Socio-economic and baseline survey of Pakpattan canal distributary
system, Thal Branch Canal Distributary System was also carried out. Completed asset inventory
of Affected Families and Prepared Feasibility reports of Tahl Branch Canal & Pakpattan Canal
Distributary Systems.
Name of Project: Rehabilitation and up gradation of Balloki Barrage and Lower Bari Doab Canal
System (LBDCIP)
Year: 2009
Location: Balloki Barrage and LBDC main canal & its allied irrigation system
Client: Irrigation Department (ID), Govt. of the Punjab
Project Main Features
To conduct Socio-economic study, To prepare assets inventory of the people fall in CoI, and
Preparation of final Resettlement plans for each separate package
Position held: Junior Sociologist
Activities Performed: Conducted survey through RRA technique of twenty villages falling within
Balloki Barrage Project area. Prepared assets inventory of the families affecting due to
construction of spillway and flood channel. Socio-economic and baseline survey of B.S Link
Canal was also carried out. Completed asset inventory of Affected Families of BS Link Canal to
compensate before execution of work. Conducted detailed survey of 15-L Distributary and
prepared Resettlement Plan, Reviewed and updated resettlement plan of Jandaraka distributary.
Worked on LBDC International Contract Biddings (ICBs) 01,02,03,04,05 and 06 and completed
the following activities:-
Conducted detailed socio-economic survey, Data collection and editing, Preparation of
asset inventories, Assisted in preparation of Resettlement Plans (RPs).
Also worked with the Institutional Development Expert to carry out the following activities on ICBs
01,02,03,04 05and 06
Walkthrough surveys to identify social structures like footbridges, village road bridges, cattle
ghats for livestock and cloth washing points (for females), Contacted meetings with farming
communities to ascertain their views for construction of cattleghats for their livestock, footbridge
and cloths washing points (for females), Conducted community consultative meetings with
Farmer Organizations (FOs) formed by the (PIDA) to takeover the responsibilities of O&M of the
channels, Conducted community contracting meetings with FOs to select a minor or a part of
Page 3 of 4
Akhtar Saleem
the distributary to carryout civil work, Conducted meetings with FOs to identify proposed offices
for FOs, Assisted in report preparation
Prepared Resettlement Plans (RPs) based on ADB policy, for CB 01, 02, 03, 04,05 and 06 RPs
submitted to the client well in time.
Name of Project: GIS Database mapping for the area Affected due to Salt Mining Activities in Salt
Range
Year: 2008
Location: Salt Range (Khewra) District Jhelum and Chakwal.
Client: Punjab Mineral Development Corporation
Main Project Features
Conducted socio-economic study of two areas in the selected “salt range” and “coal mines” area
to find out the following:-
To assess the mining impacts on agriculture land, ground water, livelihoods , health of mine
workers & local people as well as religious and community structures.
Position Held: Junior Sociologist
Activities Performed:
Interviewed vast majority of the respondents, Consultation with all stakeholders, Prepared village
profile of the project area, Assisted in data editing, data analysis and report writing.
Name of Project: Field Survey to Assess Poverty Condition of the Project Area
Year: 2008
Location: Rural area of Kalabagh, District Mianwali.
Client: Karwan Community Development Organization.
Main Project Features
To organize local community, training of local leaders, capacity building to uplift their livelihoods.
Position Held: Field Supervisor
Activities Performed.
Developed contacts with local communities and organized them, Arranged training programmes
to improve their existing skill to uplift living standards.
Name of project: Social Assessment of the Communities
Year: 2007
Location: Rural areas of Lahore District
Client: Punjab Rural Support Programme (PRSP)
Main Project Features
Formation of community organizations, Training of organization and its office bearers, Skill
development of the members of community organization, Persuasion towards saving in
community organization members
Position Held: Supervisor/Jr. Sociologist
Activities Performed:
Developed contacts with local communities in form of organization, Training of CO members
regarding saving, skill development, development plans, utilization of skill, and exchanging ideas
& experiences with management and field staff, Exchange of ideas to improve the livelihoods,
and Preparation development plans for approval of micro credits.
Certification
I, the undersigned, certify that to the best of my knowledge and belief, this CV correctly describes myself, my qualifications, and my
experience, and I am available to undertake the assignment in case of an award. I understand that any misstatement or
misrepresentation described herein may lead to my disqualification or dismissal by the Client.
Page 4 of 4