Sie sind auf Seite 1von 2

Al Maha Centre for Children & Young Adult

Contract No.:WCAW06

OPEN Site Observation Report Log


31 Oct. 2020

REPLY (REMEDIAL WORKS EXECUTED)


DOCUMENT REFERENCE TARGET DATE OF
S/N SUBJECT HDEC RECEIVED DATE IN-CHARGE DETAILS FOR CLOSING SOR REMARKS
NO. CLOSURE
SUBMITTED DATE GEIC REMARKS (PCA) RESPONDED DATE

ARCHITECTURAL

1 WCAW06-SOR-ARC-039 Cracks on External Wall Plastering 11-Sep-2019 7-Nov-20 FREDDIE / AHMAD OPEN

Drywall Framing & Board Installed Continously on


2 WCAW06-SOR-ARC-050 8-Oct-2019 30-Nov-19 REJECTED 12-Dec-19 FREDDIE / AHMAD OPEN
Expansion Joint Alignment

3 WCAW06-SOR-ARC-076 Unacceptable Installations of Ceramic Wall Tiles 30-Mar-2020 8-Nov-20 FREDDIE / RONEL OPEN

Unacceptable Installations of Corner Curtain Wall


4 WCAW06-SOR-ARC-088 30-Jun-2020 FREDDIE / AHMAD OPEN
Frame

5 WCAW06-SOR-ARC-089 Cracks at Ceramic Walls 4-Jul-2020 8-Nov-20 FREDDIE / RONEL OPEN

Installation of fire rated curtain wall panel without


6 WCAW06-SOR-ARC-099 3-Sep-2020 6-Nov-20 FREDDIE / AHMAD OPEN
approved MIR

ELECTRICAL

Possibility of Stepping Floor Box by Operator in CCTV


1 WCAW06-SOR-ELE-082 23-Apr-2020 CRIS / PATRICK OPEN
Control Room Ground Floor Zone 3

Required FAS MCP in Corridor Fire Exit Way


2 WCAW06-SOR-ELE-101 3-Sep-2020 CRIS / PATRICK OPEN
Connecting from GF Z4 to Z1, Z5 to Z1 & Z6 to Z1

Required SD in High Level Electrical Riser Level 1 Z4 &


3 WCAW06-SOR-ELE-102 3-Sep-2020 CRIS / PATRICK OPEN
Level 2 Z1

No Proper Coverage in Double Height Ceiling GF to FF


4 WCAW06-SOR-ELE-103 3-Sep-2020 CRIS / PATRICK OPEN
Zone 1 Zone 3.9 & Zone 4

5 WCAW06-SOR-ELE-114 No Installation of SACS in BF Corridor TRV026 8-Oct-2020 CRIS / PATRICK OPEN

Obstruction of Channel Support with Abort Switch


6 WCAW06-SOR-ELE-118 27-Oct-2020 CRIS / PATRICK OPEN
(FM200 Systems) in GF Z3 Coms Rm ENG033

MECHANICAL

1 WCAW06-SOR-MEC-042 Crossing of AC Ducts in IDF Room BF, GF & Level 1 23-Sep-2019 26-Mar-20 REJECTED 1-Apr-20 KANG / AZHAR OPEN

2 WCAW06-SOR-MEC-073 VAV Accessibility 30-Jan-2020 KANG / AZHAR OPEN

No Provision for vertical inline pump motor


3 WCAW06-SOR-MEC-086 9-Jun-2020 KANG / AZHAR OPEN
maintenance in chilled yard cooling tower area

4 WCAW06-SOR-MEC-090 Maintenance ladder for Cooling Tower at CEP 1 9-Jul-2020 KANG / AZHAR OPEN

Improper protection to the AHU and Damaging the


54 WCAW06-SOR-MEC-095 26-Aug-2020 10-Sep-20 REJECTED 14-Sep-20 KANG / AZHAR OPEN
AHU

Clear Access for the VAV is obstructed, Contractor to


6 WCAW06-SOR-MEC-096 26-Aug-2020 KANG / AZHAR OPEN
ensure to provide clear access

7 WCAW06-SOR-MEC-107 Wall Penetration Closure 16-Sep-2020 KANG / AZHAR OPEN

8 WCAW06-SOR-MEC-117 Unaccessible DRV 15-Oct-2020 KANG / AZHAR OPEN

As of : 11/02/20201 of 2
Al Maha Centre for Children & Young Adult
Contract No.:WCAW06

OPEN Site Observation Report Log


31 Oct. 2020

REPLY (REMEDIAL WORKS EXECUTED)


DOCUMENT REFERENCE TARGET DATE OF
S/N SUBJECT HDEC RECEIVED DATE IN-CHARGE DETAILS FOR CLOSING SOR REMARKS
NO. CLOSURE
SUBMITTED DATE GEIC REMARKS (PCA) RESPONDED DATE

LANDSCAPE

1 WCAW06-SOR-ARC-084 Visible Plaster joint Marks at Boundary Walls 3-Jun-2020 8-Nov-20 REJECTED 16-Aug-20 FREDDIE / RONEL OPEN

HSE

TOTAL SOR ISSUED LAST SOR CLOSED TARGET FOR


SECTION TOTAL ISSUED TOTAL OPEN TARGET FOR CLOSURE LAST WEEK UNDER REVIEW BY GEIC
CLOSED WEEK LAST WEEK CLOSURETHIS WEEK

ARCHITECTURAL 33 27 6 0 0 1 1 0
LANDSCAPE 4 3 1 0 0 0 0 0

MECH 57 49 8 0 7 5 3 0

ELEC 24 18 6 1 0 0 0 0
HSE 47 47 0 1 2 1 0 0
TOTAL 165 144 21 2 9 7 4 0

As of : 11/02/20202 of 2