Date 03 SEPTEMBER 2020 Station HLP ( PARKING STAND B8 ) Maintenance Type BD CHECK OOP 7 DAYS A/C Releaseman AP A FAISOL JEFRI IVAN A/C Releaseman EA HENDRA OKTO Mechanic ADE N
Logbook Sequence (Pilot Report, SEQ 86 HM 10 MIN NIL
Maint Report) SEQ 87 MAINTENANCE REF ORDER 803711713 ENG #2 STARTER GEN BRUSH LINE OUT OF LIMIT SEQ 88 MAINTENANCE UPDATE NAV DATA BASE REF ORDER 803711714 SEQ 89 REF WO NO 803705388 OIL SYSTEM SEQ 90 MAINTENACE SEQ 91 MAINTENANCE WO NO 803698790,803698791,803698792,803698793 SEQ 92 MAINTENANCE SEQ 93 MAINTENANCE SEQ C07 MAINTENANCE Add more rows if necesscary
SEQ 86 NOTED AND THANKS
ADDED OIL AT 07.45UTC SEQ 87 REPLACE STARTER/GENERATOR ENG#2 REF JIC 24-32-80 RAI 10020 REV 01, NOV 2019, DO OPC TEST WITH RUN UP REF JIC 72-00-00 ERU 10030 REV 01, NOV 2019 RESULT SATISFY PN In : 8260-123 PN Out : 8260-123 SN In : 1647 SN Out : 4640 SEQ 88 PERFORM NAV DATABASE UPDATE REF JIC 45-11-00 LDG 10030 REF 01, NOV 2019 VALID UNTIL 07 OCT 2020 SEQ 89 REMOVE AND INSTALL OF OIL PUMP PRESSURE FILTER ON BOTH ENGINE REF JIC 79-21-62 RAI 10000 REV DATE NOV 2019, CHECK OK. PN In : 3059253-01 PN Out : 3059253-01 SN In : SN Out : SEQ 90 REMOVED AND INSTALLED AGAIN IGNITER PLUG ‘B’ SYSTEM ON BOTH ENGINE FOR ACCESS TURBINE WASH REF JIC 74-21-62 RAI 10000 REV DATE Action / Rectification NOV 2019 CHECK OK SEQ 91 PERFORMED DESALINATION AND TURBINE WASH ON BOTH ENGINE REF FORM CT 2-01/A2-08 AND REF JIC 72-00-00 CLN 10000 REV DATE NOV 2019 SEQ 92 PERFORMED BOTH ERU TO IDLE POWER FOR LEAK CHECK AFTER RAI DC STARGEN #2, RAI BOTH MAIN OIL FILTER, DESALINATION AND TURBINE WASH REF JIC 72-00-00 ERU 10030 REV DATE NOV 2019 NO FOUND LEAK AND NORMAL PARAMETER DURATION TIME IS 15 MIN WITH FU : 40KGS SEQ 93 PERFORMED WORK PACKAGE NO 00133713 OOP 7 DAYS PK-GJR SEQ C07 CABIN STANDARD CHECK AND DAILY INTERIOR CLEANING PERFORMED REF FORM CT-2-01/AG-08 PN In : PN Out : SN In : SN Out
Add more rows if necesscary
NIL Add Job (Engineering Order, etc) ORDER 803711713,803711714, WO NO 803705388, 803698790,803698791,803698792,803698793, MSAO No. NIL L/H LANDING LIGHT NOT Cat : C Exp date:11 SEPTEMBER 2020 ILLUMINATED HIL Input and Match to SWIFT : YES AML HIL Add more rows if necesscary HIL Input and Match to SWIFT : YES
NDB Due Date 07 OCT 2020
EEC Code NIL PEC Code NIL MFC Code NIL Main Battery Voltage 26 Volt Emer Battery Voltage 26 Volt StartGen Brush #1 (WY) 17.0 MM Date of last inspection 03 SEP 2020 StartGen Brush #2 (WY) 22.0 MM Date of last inspection 03 SEP 2020 AIR HIGH FLOW NORMAL FLT COMP TEMP 30 30 FLT DUCT TEMP 10 14 AirConditioning Temp (WY) CAB COMP TEMP 30 30 CAB MFD TEMP 29 29 CAB DUCT TEMP 10 14 Fuel Draining (WY) No water contamination Servicing Engine Oil #1 0 Qrt Servicing Engine Oil #2 2 Qrt Servicing Hyd 0 Qrt Fuel Onboard 2200 KGS Crew Oxygen Press 1600 PSI MW Tire Pressure (Before) (I)125 Psi / R02 (II) 125 Psi / R01 (III) 125 Psi / R02 (IV) 125 Psi / R01 MW Tire Pressure (After) (I) - Psi (II) - Psi (III) - Psi (IV) - Psi NW Tire Pressure (Before) (I) 65 Psi (II) 65 Psi NW Tire Pressure (After) (I) - Psi (II) - Psi Brake Wear Pin (I) 21 mm (II) 09 mm (III) 5 mm (IV) 21 mm Cargo Compartement FWD : GOOD AFT : GOOD Radome Condition GOOD Boom Headset 3 Headset 2 Sign Of Leakage NIL C OF R Valid Until : 27 JAN 2022 C OF A Valid Until : 28 JAN 2021 AASL Valid Until : 25 JAN 2021 Cert Insurance Valid Until : 30 NOV 2020
CML HIL NIL Cat : - Exp Date : -
CML NIL Lavatory GOOD Coffee Maker/Oven GOOD Carpet Condition GOOD Seat cover condition GOOD Cabin Cleanliness GOOD Exterior Appearance GOOD Emergency Equipment COMPLETED
FlyKit Status PN SN Exp Date/Next Inspection/Availability
MW Tire Assy C20586120 03133 NW Tire Assy C20589000 01334 MLG Torque Wrench 2CGKXX827 - 05 JAN 2021 NLG Torque Wrench 2H2XX3030 - 08 DEC 2020 NLG And MLG Jack 02.7830.C0110 7545130409 23 OCT 2020 MLG Adapter Tool M46750 - - NLG Adapter Tool MHB H46828 - - NLG Jack Adapter TMH NA01-00-00 I-24842 - Tire Pressure Gage 2H2XX2148 - 19 SEP 2020 Crew Seat Spring 3A063-0559 - -
(ISPS Book Series) Yrjö O. Alanen, Manuel González de Chávez, Ann-Louise S. Silver, Brian Martindale - Psychotherapeutic Approaches To Schizophrenic Psychoses - Past, Present and Future-Routledge (20