Sie sind auf Seite 1von 5

SAMSUNG

ENGINEERING CO., LTD

Received
Contracct No. : LSP-C
CA-131 PP Plan
nt Page 1 of 5 EPC P
Project No. : SC0353
S 14 Oct 2020

EPC Doc.Noo.:SC0353
3-
LSP Doc.No.:: INSPE
ECTION AN
ND TEST
Rev. B MFD110P--01-J1ITP001- Rev. B
PP1-2M90-1
1043-006 PLAN 006

IN
NSPEC
CTION
N AND TEST PLAN
N

REQUISIT
TION NO. : MF
FD110P
PURCHAS
SE ORDER
R NO. : 50
000052162
VENDOR’’S DOCUME
ENT NO. : PP
P1-2M90-104
43-006
Add the applicable Tag Nos or Items No.
ITEM & TA
AG NO. : Co
ommon
ITEM DES
SCRIPTION
N : SIL
LO Package

Approved PM
B 13/10/20 Is
ssue For Apprroval CK Choi CW K
Kim SH Park
✔ Approved with comment
A 19/12/19 Is
ssue For Apprroval CKwith
Approved Choi CW K
comment / ResubmitKim SH Park
REV D
DATE(DD/MM//YY) DESCRIPTIO
ON RejectPREPARED
/ Resubmit CHEC
CKED AP
PPROVED
PE ETROCHEM
Reviewed MICAL
/ Information Only CO OMPLEX 14 Oct 2020
IN SOUTH
Reviewed with H OF
Comment VIET
/ ResubmitTNAM SAMSUNG

TỔỔ HỢP HÓA A DẦU MIỀ


This approval or review does not relieve the
ỀN
vendor / subcontractor of his responsibilities to NAM
ENGINEERING CO., LTD

Long So
on Petrochem
micals Co., Ltd
L Meet all requirements VIỆ ỆT
of the NAM
purchase order.

ORIGINAL CHECKED

SIGN.
SAMS
SUNG ENG
GINEERING
G CO., LTD
D.
DATE 14 Oct 2020 14 Oct 2020

SAMSUNG ENGINEERING CO., LTD

DYPNF CO., LT
TD

2020-10-13 17:53:24 송마리아-PC


LSP[PP Silo] Project ITP No.: SC0353-MFD110H-01-J1ITP001-006

Revision No. : B
Inspection & Test Plan for Silo
Date: 2020.10.13

Applicable Spec./ Inspection By


Description of Record /Report No.
No Inspection Detail Acceptance Remark
Inspection and Test (Verifying Document) DONG YANG SEC OWNER
Criteria

1 PIM - - MOM H H R

2 Anchor Bolt Dimensional and Visual Check with Packing Approval Drawings' Test Report WS/W SS/W R

Raw Material -Mechanical and Chemical Properties


Receiving Inspection -Identification of Materials
3 ASME SEC II Mill Certificated
(Metarial for -Transfer of Material Marking WR R R
(Material, Heat No., etc.)
Category"A"B"C"D"Weld Joint )

Non-destructive ASME.SEC.V
4 Examination - Liquid Penetration Examination ASME.SEC VIII DIV.1 Test Report W R R
(Caterory "D"100%) ASME. SEC IX

Intermediate Dimensional
Dimensional and Visual Check
and Visual Inspection for
5 Approval Drawings' Inspection Report W W
Top Nozzle to Roof and
- Tie-in Nozzle Position, Size Rating, etc
- Connection Check of Plateform to Roof
WR
Platform Pre-Assembly

6 Leak Test of Reinforcement Pad - Pad Leak Check Approval Procedure Test Report W SW R

Dimensional and Visual Check


Fit-up Inspection - Root Gap
7 Approval Drawings' - H SW R
For Final Shell("Category"B") Joint - Total Length
- Orientation

Non-destructive
ASME.SEC.V
Examination
8 - Liquid Penetration Examination ASME.SEC VIII DIV.1 Test Report W R R
(Shell L&C Weld Cross Seam 100%)
ASME. SEC IX
150mm x 150mm
One Point Per Each Lot For
Category"A"B"C"D"Weld Joint with
9 Positive Material Identification Approval Procedure Test Report W R R
Flange, Plate, Pipe, Fitting
[Except: Support, Clip, Base, Structure]

Final Dimensional Dimensional and Visual Check


10 Approval Drawings' Inspection Report H W W R
and Visual Inspection - Total Length

- Pressure Check 300mmaq


11 Pneumatic Test Approval Procedure Pneumatic Test Report H HW HW
- Leak Check

Visual
12 Acid Cleaning Approval Drawings' - W R R
-Cleaning

NOTE: R : Document Review S/W : Spot Witness (10) % W : Witness Point M : Manufacturer Inspection H : Hold Point
LSP[PP Silo] Project ITP No.: SC0353-MFD110H-01-J1ITP001-006

Revision No. : B
Inspection & Test Plan for Silo
Date: 2020.10.13

Applicable Spec./ Inspection By


Description of Record /Report No.
No Inspection Detail Acceptance Remark
Inspection and Test (Verifying Document) DONG YANG SEC OWNER
Criteria

Approval Drawings' & Data Sheet


13 Buffing Inspection Approval Drawings' Buffing Report W
[If Applicable Part] WR WR
Surface Preparation & Salt/Dust/Profile check
- Cleaning & Surface Preparation Check
13 Approval Drawings' Painting&Coating Report W
Painting - Coating Thickness Check
Adhesion test SS/W R

- Mark No.
- Process Condition
- Connection. Size, Rating
14 Packing Inspection - Name of Manufacturer Packing List Packing List W W R
- To clean and free from all defects before packing.
- To protect from any damage by plywood, tape,
or other suitable means before shipping.

SQR review SQR R R

IRC R R

NOTE: R : Document Review S/W : Spot Witness (10) % W : Witness Point M : Manufacturer Inspection H : Hold Point
Non-Destructive Examination Plan for Silo

DESCIPTION PT PMI

1 Nozzle to Roof&Shell&Cone 100% One Point Per Each Lot

2 Lifting Lug 100% N/A

10%
3 Circumferential Strength Weld of Roof&Shell&Cone One Point Per Each Lot
(T-Cross 150mm x 150mm x 150mm)

10%
4 Junction of Cone to Skirt One Point Per Each Lot
(T-Cross 150mm x 150mm x 150mm)

* PT shall be performed to the repaired area & defect area