ENGINEERING GUIDELINE
PDVSA N° TITLE
APPD. Luis Tovar DATE MAR.03 APPD. Daniel Páez DATE MAR.03
1 INTRODUCTION
1.1 Purpose
The purpose of this engineering guideline is to provide designers, vendors and
fabricators with the detailed fabrication requirements for instrumentation junction
boxes.
1.2 Scope
This Guideline presents fabrication details for thermowells, thermocouples and
resistance temperature devices (RTD’s).
2 REFERENCES
2.1 Petroleos de Venezuela Standards (PDVSA)
– HF–201Diseño de Tuberías para Instrumentación e Instalación de
Instrumentos.
– K–329 Instrument Junction Boxes Specification.
– K–334 Instrument Electrical Requirements.
– K–369 Instrumentation QA/QC.
– SI–S–13 Normativa Legal en Seguridad, Higiene y Ambiente (SHA).
Indice manual
4 1/2” SWAGE UP TO 6” OR
INSTALL IN ELBOW
6” – 8” 4 1/2”
10” – 12” 7 1/2”
> 12” 10 1/2”
45° ANGLE INTO < 6” 4 1/2” SWAGE UP TO 6” OR
PIPE, AGAINST INSTALL IN ELBOW
FABRICATION DETAILS
FLOW
ENGINEERING GUIDELINE
6” 4 1/2”
8” – 12” 7 1/2”
TEMPERATURE MEASUREMENT
TEMPERATURE MEASUREMENT
0
PDVSA
Page
FABRICATION DETAILS
REVISION
PAGE 2
2
DATE
Indice norma
PDVSA 90620.1.202
MAR.03
REV.0 MAR.03
90620.1.200
Menú Principal
PDVSA
Indice manual
FABRICATION DETAILS
ENGINEERING GUIDELINE
TEMPERATURE MEASUREMENT
IN ELBOW
Indice volumen
7” SWAGE UP TO 6” OR
INSTALL IN ELBOW
6” – 8” 7”
> 8” 10” TEMPERATURE MEASUREMENT
0
FLOW
6” 7”
3
8” 10”
DATE
Indice norma
MAR.03
PDVSA
REVISION DATE
PDVSA TEMPERATURE MEASUREMENT
REV.0 MAR.03
0
90620.1.200
FABRICATION DETAILS MAR.03
PAGE 4
Page 4
TEMPERATURE MEASUREMENT
FABRICATION DETAILS
Menú Principal
PDVSA
4 1/2” SWAGE UP TO 6” OR
Indice manual
INSTALL IN ELBOW
6” – 8” 4 1/2”
10” – 12” 7 1/2”
> 12” 10 1/2”
45° ANGLE INTO < 6” 4 1/2” SWAGE UP TO 6” OR
PIPE, AGAINST INSTALL IN ELBOW
FLOW
FABRICATION DETAILS
6” 4 1/2”
ENGINEERING GUIDELINE
8” – 12” 7 1/2”
> 12” 10 1/2”
TEMPERATURE MEASUREMENT
TEMPERATURE MEASUREMENT
0
FABRICATION DETAILS
PDVSA
Page
REVISION
PAGE 5
5
DATE
Indice norma
PDVSA 90620.1.202
REV.0 MAR.03
MAR.03
90620.1.200
ENGINEERING GUIDELINE PDVSA 90620.1.202
PDVSA
REVISION DATE
PDVSA TEMPERATURE MEASUREMENT
0 MAR.03
REV.0 MAR.03
FABRICATION DETAILS
90620.1.200
PAGE 6
Page 6
TEMPERATURE MEASUREMENT
FABRICATION DETAILS
TIPICALLY NOT USED. REQUIRES PDVSA APPROVAL
ENGINEERING GUIDELINE PDVSA 90620.1.202
PDVSA
REVISION DATE
PDVSA TEMPERATURE MEASUREMENT
REV.0 MAR.03
0 MAR.03
90620.1.200
FABRICATION DETAILS
PAGE 7
Page 7
TEMPERATURE MEASUREMENT
FABRICATION DETAILS
ENGINEERING GUIDELINE PDVSA 90620.1.202
PDVSA
REVISION DATE
PDVSA TEMPERATURE MEASUREMENT
REV.0 MAR.03
0 MAR.03
90620.1.200
FABRICATION DETAILS
PAGE 8
Page 8
TEMPERATURE MEASUREMENT
FABRICATION DETAILS
ENGINEERING GUIDELINE PDVSA 90620.1.202
PDVSA
REVISION DATE
PDVSA TEMPERATURE MEASUREMENT
REV.0 MAR.03
FABRICATION DETAILS 0 MAR.03
90620.1.200
PAGE 9
Page 9
TEMPERATURE MEASUREMENT
FABRICATION DETAILS