MONITORING EXAVATOR PC 210 TIMBUN JALAN KEBUN PALMA- A

JUMLAH HM BBM HASIL KERJA ( M3 )


Tanggal HM AWAL HM AKHIR Keterangan
H.I S/D H.I H.I S/D H.I H.I S/D H.I
1-Oct-20 14,105.90 14,116.70 10.8 10.8 210.0 210 104.5 104.5
2-Oct-20 14,116.70 14,126.10 9.4 20.2 180.0 390 107.7 212.2
3-Oct-20 14,126.10 14,137.80 11.7 31.9 230.0 620 183.3 395.4
4-Oct-20 14,137.80 14,143.90 6.1 38.0 120.0 740 72.0 467.4
5-Oct-20 14,143.90 14,154.90 11.0 49.0 220.0 960 162.9 630.3
6-Oct-20 14,154.90 14,165.40 10.5 59.5 200.0 1,160 146.0 776.3
7-Oct-20 14,165.40 14,176.20 10.8 70.3 210.0 1,370 201.4 977.7
8-Oct-20 14,176.20 14,181.90 5.7 76.0 110.0 1,480 53.2 1,030.9
9-Oct-20 14,181.90 14,192.70 10.8 86.8 210.0 1,690 168.2 1,199.1 TRIP=KONTRAKTOR25,PALMAA1,PALMAB2,BBUI3,BBUII,3
10-Oct-20 14,192.70 14,203.80 11.1 97.9 220.0 1,910 162.4 1,361.5
11-Oct-20 14,203.80 14,203.80 - 97.9 1,910 - 1,361.5
12-Oct-20 14,203.80 14,203.80 - 97.9 1,910 - 1,361.5
13-Oct-20 14,203.80 14,203.80 - 97.9 1,910 - 1,361.5
14-Oct-20 14,203.80 14,209.80 6.0 103.9 120.0 2,030 85.2 1,446.7
15-Oct-20 - - - 103.9 2,030 - 1,446.7
16-Oct-20 - - - 103.9 2,030 - 1,446.7
17-Oct-20 - - - 103.9 2,030 - 1,446.7
18-Oct-20 - - - 103.9 2,030 - 1,446.7
19-Oct-20 - - - 103.9 2,030 - 1,446.7
20-Oct-20 - - - 103.9 2,030 - 1,446.7
21-Oct-20 - - - 103.9 2,030 - 1,446.7
22-Oct-20 - - - 103.9 2,030 - 1,446.7
23-Oct-20 - - - 103.9 2,030 - 1,446.7
24-Oct-20 - - - 103.9 2,030 - 1,446.7
25-Oct-20 - - - 103.9 2,030 - 1,446.7
26-Oct-20 - - - 103.9 2,030 - 1,446.7
27-Oct-20 - - - 103.9 2,030 - 1,446.7
28-Oct-20 - - - 103.9 2,030 - 1,446.7
29-Oct-20 - - - 103.9 2,030 - 1,446.7
30-Oct-20 - - - 103.9 2,030 - 1,446.7
31-Oct-20 103.9 2,030 - 1,446.7
TOTAL 103.9 103.9 2,030.0 2,030 1,446.7 1,446.7
MONITORING EXAVATOR PC 200 TIMBUN JALAN KEBUN PALMA- A
JUMLAH HM BBM HASIL KERJA ( M3 )
Tanggal HM AWAL HM AKHIR Keterangan
H.I S/D H.I H.I S/D H.I H.I S/D H.I
1-Jul-20 - - - - - - - -
2-Jul-20 - - - - - - - -
3-Jul-20 - - - - - - - -
4-Jul-20 - - - - - - - -
5-Jul-20 - - - - - - - -
6-Jul-20 - - - - - - - -
7-Jul-20 - - - - - - - -
8-Jul-20 - - - - - - - -
9-Jul-20 - - - - - - - -
10-Jul-20 - - - - - - - -
11-Jul-20 - - - - - - - -
12-Jul-20 - - - - - - - -
13-Jul-20 - - - - - - - -
14-Jul-20 - - - - - - - -
15-Jul-20 - - - - - - - -
16-Jul-20 - - - - - - - -
17-Jul-20 - - - - - - - -
18-Jul-20 - - - - - - - -
19-Jul-20 - - - - - - - -
20-Jul-20 - - - - - - - -
21-Jul-20 - - - - - - - -
22-Jul-20 - - - - - - - -
23-Jul-20 - - - - - - - -
24-Jul-20 - - - - - - - -
25-Jul-20 - - - - - - - -
26-Jul-20 - - - - - - - -
27-Jul-20 - - - - - - - -
28-Jul-20 - - - - - - - -
29-Jul-20 - - - - - - - -
30-Jul-20 - - - - - - - -
- - - - - - - -
TOTAL - - - - - -
MONITORING Dozer D3 TIMBUN JALAN KEBUN PALMA- A
JUMLAH HM BBM HASIL KERJA ( Mtr )
Tanggal HM AWAL HM AKHIR Keterangan
H.I S/D H.I H.I S/D H.I H.I S/D H.I
1-Oct-20 12,296.80 12,309.90 13.1 13.1 100.0 100.0 58.4 58.4
2-Oct-20 12,309.90 12,320.90 11.0 24.1 100.0 200.0 64.8 123.3
3-Oct-20 12,320.90 12,334.00 13.1 37.2 125.0 325.0 105.6 228.9
4-Oct-20 12,334.00 12,340.20 6.2 43.4 50.0 375.0 45.3 274.2
5-Oct-20 12,340.20 12,354.30 14.1 57.5 125.0 500.0 123.0 397.2
6-Oct-20 12,354.30 12,367.50 13.2 70.7 125.0 625.0 103.0 500.2
7-Oct-20 12,367.50 12,378.80 11.3 82.0 100.0 725.0 143.0 643.2
8-Oct-20 12,378.80 12,388.80 10.0 92.0 100.0 825.0 38.8 682.0
9-Oct-20 12,388.80 12,401.40 12.6 104.6 125.0 950.0 122.5 804.6
10-Oct-20 12,401.40 12,411.80 10.4 115.0 125.0 1,075.0 106.0 910.6
11-Oct-20 12,411.80 12,411.80 - 115.0 - 1,075.0 - 910.6
12-Oct-20 12,411.80 12,411.80 - 115.0 - 1,075.0 - 910.6
13-Oct-20 12,411.80 12,411.80 - 115.0 - 1,075.0 - 910.6
14-Oct-20 12,411.80 12,421.90 10.1 125.1 100.0 1,175.0 48.0 958.6
15-Oct-20 - 125.1 1,175.0 - 958.6
16-Oct-20 - 125.1 1,175.0 - 958.6
17-Oct-20 - 125.1 1,175.0 - 958.6
18-Oct-20 - 125.1 1,175.0 - 958.6
19-Oct-20 - 125.1 1,175.0 - 958.6
20-Oct-20 - 125.1 1,175.0 - 958.6
21-Oct-20 - 125.1 1,175.0 - 958.6
22-Oct-20 - 125.1 1,175.0 - 958.6
23-Oct-20 - 125.1 1,175.0 - 958.6
24-Oct-20 - 125.1 1,175.0 - 958.6
25-Oct-20 - 125.1 1,175.0 - 958.6
26-Oct-20 - 125.1 1,175.0 - 958.6
27-Oct-20 - 125.1 1,175.0 - 958.6
28-Oct-20 - 125.1 1,175.0 - 958.6
29-Oct-20 - 125.1 1,175.0 - 958.6
30-Oct-20 - 125.1 1,175.0 - 958.6
31-Oct-20 - 125.1 1,175.0 - 958.6
TOTAL 125.1 125.1 1,175.0 1,175.0 958.6 958.6
Dozer D3 TIMBUN JALAN KEBUN PALMA- A

Keterangan
MONITORING COMPECTOR TIMBUN JALAN KEBUN PALMA- A

JUMLAH HM BBM HASIL KERJA ( Mtr )


Tanggal HM AWAL HM AKHIR Keteranga
H.I S/D H.I H.I S/D H.I H.I S/D H.I
1-Oct-20 6,671 6,678 7.0 7.0 - 58.4 58.4
2-Oct-20 6,678 6,680 2.0 9.0 40.0 40.0 64.8 123.3
3-Oct-20 6,680 6,680 - 9.0 40.0 105.6 228.9
4-Oct-20 6,680 6,680 - 9.0 40.0 45.3 274.2
5-Oct-20 6,680 6,688 8.0 17.0 43.0 83.0 123.0 397.2
6-Oct-20 6,688 6,697 9.0 26.0 100.0 183.0 103.0 500.2
7-Oct-20 6,697 6,704 7.0 33.0 140.0 323.0 143.0 643.2
8-Oct-20 6,704 6,713 9.0 42.0 323.0 38.8 682.0
9-Oct-20 6,713 6,722 9.0 51.0 323.0 122.5 804.6
10-Oct-20 - 51.0 323.0 106.0 910.6
11-Oct-20 - 51.0 323.0 - 910.6
12-Oct-20 - 51.0 323.0 - 910.6
13-Oct-20 - 51.0 323.0 - 910.6
14-Oct-20 - 51.0 323.0 48.0 958.6
15-Oct-20 - 51.0 323.0 - 958.6
16-Oct-20 - 51.0 323.0 - 958.6
17-Oct-20 - 51.0 323.0 - 958.6
18-Oct-20 - 51.0 323.0 - 958.6
19-Oct-20 - 51.0 323.0 - 958.6
20-Oct-20 - 51.0 323.0 - 958.6
21-Oct-20 - 51.0 323.0 - 958.6
22-Oct-20 - 51.0 323.0 - 958.6
23-Oct-20 - 51.0 323.0 - 958.6
24-Oct-20 - 51.0 323.0 - 958.6
25-Oct-20 - 51.0 323.0 - 958.6
26-Oct-20 - 51.0 323.0 - 958.6
27-Oct-20 - 51.0 323.0 - 958.6
28-Oct-20 - 51.0 323.0 - 958.6
29-Oct-20 - 51.0 323.0 - 958.6
30-Oct-20 - 51.0 323.0 - 958.6
31-Oct-20 - 51.0 323.0 - 958.6
TOTAL 51.0 51.0 323.0 323.0 958.6 958.6

3,200,000
250,000
500,000
50 450,000
420,000
4,820,000
N JALAN KEBUN PALMA- A

Keterangan

58 -
65 -
106 -
45 -
123 -
103 -
143 -
39 -
123 -
106 -
- -
- -
- -
48 -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
- -
MONITORING TIMBUN JALAN KEBUN PALMA- A TAHUN 2020 KONTRAKTOR
No Plat Lokasi Jam Timbang KM/HM/JAM Brutto Tarra Netto
No Tanggal Kendaraan Driver
Blok MR/CR Divisi Masuk Keluar Menit Jumlah H.I S/D H.I H.I S/D H.I H.I
1 1-Oct-20 BK 9133 CI AKRI T 65 MR IV 8:00:42 8:10:37 0:09:55 62.0 11,920.0 11,920 4,050.0 4,050 7,870
2 1-Oct-20 BM 8197 BU RIAN T 65 MR IV 8:54:53 9:05:06 0:10:13 62.0 13,660.0 25,580 4,250.0 8,300 9,410
3 1-Oct-20 BM 8956 BU ERIK T 65 MR IV 8:35:48 8:44:18 0:08:30 62.0 13,760.0 39,340 4,170.0 12,470 9,590
4 1-Oct-20 BK 8524 CE EKA T 65 MR IV 7:45:10 7:55:51 0:10:41 62.0 11,660.0 51,000 4,120.0 16,590 7,540
5 1-Oct-20 BA 8342 DU PIKAL T 65 MR IV 7:40:13 7:51:03 0:10:50 62.0 12,090.0 63,090 4,080.0 20,670 8,010
6 1-Oct-20 BM 9677 BU SEMBIRING T 65 MR IV 12:21:34 12:33:25 0:11:51 62.0 13,100.0 76,190 4,150.0 24,820 8,950
7 1-Oct-20 BM 9380 CT DASRIL T 65 MR IV 11:12:31 11:20:43 0:08:12 62.0 12,710.0 88,900 4,040.0 28,860 8,670
8 1-Oct-20 BM 9380 CT DASRIL T 65 MR IV 14:19:31 15:08:44 0:49:13 62.0 12,550.0 101,450 4,030.0 32,890 8,520
9 1-Oct-20 BM 8594 GB TANGGANG T 65 MR IV 7:48:35 7:59:21 0:10:46 62.0 13,370.0 114,820 4,130.0 37,020 9,240
10 1-Oct-20 BM 8594 GB TANGGANG T 65 MR IV 14:17:28 14:34:27 0:16:59 62.0 12,250.0 127,070 4,160.0 41,180 8,090
11 1-Oct-20 BA 8232 DU DES T 65 MR IV 7:33:36 7:47:05 0:13:29 62.0 12,810.0 139,880 4,170.0 45,350 8,640
12 1-Oct-20 BA 8232 DU DES T 65 MR IV 14:32:08 15:06:50 0:34:42 62.0 12,270.0 152,150 4,170.0 49,520 8,100
13 1-Oct-20 BA 8546 BU PAET T 65 MR IV 7:31:18 7:43:16 0:11:58 62.0 12,240.0 164,390 3,990.0 53,510 8,250
14 1-Oct-20 BA 8546 BU PAET T 65 MR IV 14:15:45 14:30:55 0:15:10 62.0 12,310.0 176,700 3,990.0 57,500 8,320
15 1-Oct-20 BA 8731 OU SAR T 65 MR IV 7:41:48 7:52:28 0:10:40 62.0 12,380.0 189,080 4,140.0 61,640 8,240
16 1-Oct-20 BA 8731 OU SAR T 65 MR IV 14:22:37 15:34:47 1:12:10 62.0 12,480.0 201,560 4,130.0 65,770 8,350
17 2-Oct-20 BA 8232 DU DES Q 60 MR III 7:33:54 7:56:41 0:22:47 54.0 11,920.0 213,480 4,230.0 70,000 7,690
18 2-Oct-20 BM 8956 BU ERIK Q 60 MR III 9:33:37 9:41:40 0:08:03 54.0 14,050.0 227,530 4,190.0 74,190 9,860
19 2-Oct-20 BM 8956 BU ERIK Q 60 MR III 11:58:24 12:13:12 0:14:48 54.0 13,570.0 241,100 4,170.0 78,360 9,400
20 2-Oct-20 BA 8342 DU PIKAL Q 60 MR III 7:35:20 7:57:49 0:22:29 54.0 12,070.0 253,170 4,120.0 82,480 7,950
21 2-Oct-20 BA 8342 DU PIKAL Q 60 MR III 11:34:53 11:45:21 0:10:28 54.0 11,850.0 265,020 4,100.0 86,580 7,750
22 2-Oct-20 BA 8731 OU SAR Q 60 MR III 7:29:59 7:53:52 0:23:53 54.0 11,200.0 276,220 4,120.0 90,700 7,080
23 2-Oct-20 BA 8731 OU SAR Q 60 MR III 10:41:34 10:52:02 0:10:28 54.0 12,240.0 288,460 4,110.0 94,810 8,130
24 2-Oct-20 BK 9133 CI AKRI Q 60 MR III 8:00:00 8:09:20 0:09:20 54.0 11,540.0 300,000 4,070.0 98,880 7,470
25 2-Oct-20 BK 9133 CI AKRI Q 60 MR III 11:23:08 11:36:17 0:13:09 54.0 12,100.0 312,100 4,060.0 102,940 8,040
26 2-Oct-20 BM 9677 BU SEMBIRING Q 60 MR III 8:01:14 8:11:14 0:10:00 54.0 12,670.0 324,770 4,160.0 107,100 8,510
27 2-Oct-20 BM 9677 BU SEMBIRING Q 60 MR III 11:12:43 11:21:59 0:09:16 54.0 13,140.0 337,910 4,170.0 111,270 8,970
28 2-Oct-20 BA 8546 BU PAET Q 60 MR III 7:32:30 7:55:08 0:22:38 54.0 11,260.0 349,170 4,050.0 115,320 7,210
29 2-Oct-20 BA 8546 BU PAET Q 60 MR III 11:20:45 11:32:04 0:11:19 54.0 11,820.0 360,990 4,040.0 119,360 7,780
30 2-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 7:37:33 7:58:56 0:21:23 54.0 11,870.0 372,860 4,150.0 123,510 7,720
31 2-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 11:24:05 11:38:12 0:14:07 54.0 12,050.0 384,910 4,140.0 127,650 7,910
32 2-Oct-20 BM 9380 CT DASRIL Q 60 MR III 8:52:01 9:02:44 0:10:43 54.0 13,080.0 397,990 4,040.0 131,690 9,040
33 2-Oct-20 BM 9380 CT DASRIL Q 60 MR III 11:25:16 11:40:18 0:15:02 54.0 13,540.0 411,530 4,030.0 135,720 9,510
34 3-Oct-20 BM 8429 MI HERMANSYAH Q 60 MR III 9:59:06 10:10:18 0:11:12 54.0 12,670.0 424,200 4,030.0 139,750 8,640
35 3-Oct-20 BM 8429 MI HERMANSYAH Q 60 MR III 12:49:41 13:03:12 0:13:31 54.0 13,300.0 437,500 4,010.0 143,760 9,290
36 3-Oct-20 BM 8429 MI HERMANSYAH Q 60 MR III 16:20:39 16:31:38 0:10:59 54.0 12,190.0 449,690 4,000.0 147,760 8,190
37 3-Oct-20 BA 8232 DU DES Q 60 MR III 8:22:41 8:44:41 0:22:00 54.0 12,490.0 462,180 4,120.0 151,880 8,370
38 3-Oct-20 BA 8232 DU DES Q 60 MR III 12:05:23 12:17:54 0:12:31 54.0 12,100.0 474,280 4,130.0 156,010 7,970
39 3-Oct-20 BA 8232 DU DES Q 60 MR III 15:39:07 15:58:55 0:19:48 54.0 12,150.0 486,430 4,120.0 160,130 8,030
40 3-Oct-20 BA 8232 DU DES Q 60 MR III 18:57:02 19:21:23 0:24:21 54.0 11,180.0 497,610 4,090.0 164,220 7,090
41 3-Oct-20 BA 8731 OU SAR Q 60 MR III 8:25:38 9:00:54 0:35:16 54.0 12,860.0 510,470 4,150.0 168,370 8,710
42 3-Oct-20 BA 8731 OU SAR Q 60 MR III 12:13:25 12:21:49 0:08:24 54.0 11,970.0 522,440 4,130.0 172,500 7,840
43 3-Oct-20 BA 8731 OU SAR Q 60 MR III 15:40:02 16:01:36 0:21:34 54.0 12,070.0 534,510 4,120.0 176,620 7,950
44 3-Oct-20 BA 8731 OU SAR Q 60 MR III 19:02:02 19:22:33 0:20:31 54.0 11,230.0 545,740 4,110.0 180,730 7,120
45 3-Oct-20 BM 8956 BU ERIK Q 60 MR III 9:27:48 9:35:52 0:08:04 54.0 13,250.0 558,990 4,190.0 184,920 9,060
46 3-Oct-20 BM 8956 BU ERIK Q 60 MR III 12:43:16 12:56:02 0:12:46 54.0 12,940.0 571,930 4,190.0 189,110 8,750
47 3-Oct-20 BM 8956 BU ERIK Q 60 MR III 15:35:01 15:48:26 0:13:25 54.0 12,130.0 584,060 4,180.0 193,290 7,950
48 3-Oct-20 BM 8956 BU ERIK Q 60 MR III 17:59:58 18:13:40 0:13:42 54.0 11,490.0 595,550 4,170.0 197,460 7,320
49 3-Oct-20 BA 8342 DU PIKAL Q 60 MR III 8:19:26 8:38:26 0:19:00 54.0 11,800.0 607,350 4,090.0 201,550 7,710
50 3-Oct-20 BA 8342 DU PIKAL Q 60 MR III 11:57:09 12:15:21 0:18:12 54.0 12,160.0 619,510 4,110.0 205,660 8,050
51 3-Oct-20 BA 8342 DU PIKAL Q 60 MR III 3:37:58 3:57:04 0:19:06 54.0 10,870.0 630,380 4,100.0 209,760 6,770
52 3-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 8:24:35 8:45:44 0:21:09 54.0 13,440.0 643,820 4,180.0 213,940 9,260
53 3-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 12:20:06 12:41:53 0:21:47 54.0 12,040.0 655,860 4,170.0 218,110 7,870
54 3-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 3:36:59 3:51:54 0:14:55 54.0 12,300.0 668,160 4,190.0 222,300 8,110
55 3-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 18:23:17 18:36:41 0:13:24 54.0 11,870.0 680,030 4,140.0 226,440 7,730
MONITORING TIMBUN JALAN KEBUN PALMA- A TAHUN 2020 KONTRAKTOR
No Plat Lokasi Jam Timbang KM/HM/JAM Brutto Tarra Netto
No Tanggal Kendaraan Driver
Blok MR/CR Divisi Masuk Keluar Menit Jumlah H.I S/D H.I H.I S/D H.I H.I
56 3-Oct-20 BM 9677 BU SEMBIRING Q 60 MR III 9:46:32 9:55:30 0:08:58 54.0 13,040.0 693,070 4,170.0 230,610 8,870
57 3-Oct-20 BM 9677 BU SEMBIRING Q 60 MR III 12:51:20 13:05:20 0:14:00 54.0 13,000.0 706,070 4,150.0 234,760 8,850
58 3-Oct-20 BA 8546 BU PAET Q 60 MR III 7:49:18 8:43:05 0:53:47 54.0 12,210.0 718,280 4,030.0 238,790 8,180
59 3-Oct-20 BA 8546 BU PAET Q 60 MR III 11:55:27 12:09:02 0:13:35 54.0 12,350.0 730,630 4,020.0 242,810 8,330
60 3-Oct-20 BA 8546 BU PAET Q 60 MR III 15:32:48 15:46:30 0:13:42 54.0 11,550.0 742,180 4,010.0 246,820 7,540
61 3-Oct-20 BA 8546 BU PAET Q 60 MR III 18:55:20 19:19:20 0:24:00 54.0 11,240.0 753,420 4,000.0 250,820 7,240
62 4-Oct-20 BK 8524 CE EKA Q 60 MR III 1:12:35 1:21:33 0:08:58 54.0 11,920.0 765,340 4,100.0 254,920 7,820
63 4-Oct-20 BK 8524 CE EKA Q 60 MR III 16:04:25 16:16:50 0:12:25 54.0 11,800.0 777,140 4,260.0 259,180 7,540
64 4-Oct-20 BA 8342 DU PIKAL Q 60 MR III 12:12:47 12:31:42 0:18:55 54.0 11,610.0 788,750 4,080.0 263,260 7,530
65 4-Oct-20 BA 8342 DU PIKAL Q 60 MR III 15:41:06 16:00:19 0:19:13 54.0 12,440.0 801,190 4,090.0 267,350 8,350
66 4-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 12:30:09 12:39:52 0:09:43 54.0 12,110.0 813,300 4,150.0 271,500 7,960
67 4-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 15:38:35 15:47:44 0:09:09 54.0 11,920.0 825,220 4,140.0 275,640 7,780
68 4-Oct-20 BA 8232 DU DES Q 60 MR III 12:50:26 13:03:55 0:13:29 54.0 11,480.0 836,700 4,150.0 279,790 7,330
69 4-Oct-20 BA 8232 DU DES Q 60 MR III 16:01:40 16:11:53 0:10:13 54.0 11,980.0 848,680 4,150.0 283,940 7,830
70 4-Oct-20 BA 8546 BU PAET Q 60 MR III 12:48:36 12:58:50 0:10:14 54.0 11,840.0 860,520 3,960.0 287,900 7,880
71 4-Oct-20 BA 8546 BU PAET Q 60 MR III 15:58:52 16:08:21 0:09:29 54.0 12,320.0 872,840 4,000.0 291,900 8,320
72 4-Oct-20 BA 8731 OU SAR Q 60 MR III 12:51:52 13:05:13 0:13:21 54.0 11,990.0 884,830 4,090.0 295,990 7,900
73 4-Oct-20 BA 8731 OU SAR Q 60 MR III 16:02:54 16:15:11 0:12:17 54.0 11,470.0 896,300 4,080.0 300,070 7,390
74 5-Oct-20 BM 9380 CT DASRIL Q 60 MR III 10:19:01 10:28:27 0:09:26 54.0 12,090.0 908,390 4,030.0 304,100 8,060
75 5-Oct-20 BM 9380 CT DASRIL Q 60 MR III 12:52:23 13:02:41 0:10:18 54.0 12,730.0 921,120 4,060.0 308,160 8,670
76 5-Oct-20 BM 9380 CT DASRIL Q 60 MR III 15:59:53 16:09:06 0:09:13 54.0 11,390.0 932,510 4,080.0 312,240 7,310
77 5-Oct-20 BA 8546 BU PAET Q 60 MR III 11:39:30 11:54:45 0:15:15 54.0 11,690.0 944,200 3,990.0 316,230 7,700
78 5-Oct-20 BA 8546 BU PAET Q 60 MR III 15:06:54 15:30:15 0:23:21 54.0 12,240.0 956,440 4,020.0 320,250 8,220
79 5-Oct-20 BH 8799 EI HERMAN Q 60 MR III 07:56:39 08:04:52 0:08:13 54.0 12,450.0 968,890 3,990.0 324,240 8,460
80 5-Oct-20 BH 8799 EI HERMAN Q 60 MR III 10:58:34 11:26:58 0:28:24 54.0 12,360.0 981,250 4,000.0 328,240 8,360
81 5-Oct-20 BH 8799 EI HERMAN Q 60 MR III 15:04:57 15:22:51 0:17:54 54.0 12,620.0 993,870 3,970.0 332,210 8,650
82 5-Oct-20 BA 8232 DU DES Q 60 MR III 07:38:44 08:02:57 0:24:13 54.0 10,870.0 1,004,740 4,150.0 336,360 6,720
83 5-Oct-20 BA 8232 DU DES Q 60 MR III 10:57:38 11:08:47 0:11:09 54.0 12,480.0 1,017,220 4,140.0 340,500 8,340
84 5-Oct-20 BA 8232 DU DES Q 60 MR III 15:17:32 15:41:10 0:23:38 54.0 11,850.0 1,029,070 4,130.0 344,630 7,720
85 5-Oct-20 BA 8342 DU PIKAL Q 60 MR III 07:37:42 07:57:41 0:19:59 54.0 11,410.0 1,040,480 4,100.0 348,730 7,310
86 5-Oct-20 BA 8342 DU PIKAL Q 60 MR III 10:55:49 11:07:33 0:11:44 54.0 12,230.0 1,052,710 4,100.0 352,830 8,130
87 5-Oct-20 BM 9608 ZU SI IS Q 60 MR III 08:27:46 08:42:01 0:14:15 54.0 12,100.0 1,064,810 4,230.0 357,060 7,870
88 5-Oct-20 BM 9608 ZU SI IS Q 60 MR III 11:22:51 11:37:30 0:14:39 54.0 12,030.0 1,076,840 4,230.0 361,290 7,800
89 5-Oct-20 BM 9608 ZU SI IS Q 60 MR III 15:16:09 15:38:24 0:22:15 54.0 13,020.0 1,089,860 4,210.0 365,500 8,810
90 5-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 07:36:40 07:52:23 0:15:43 54.0 11,680.0 1,101,540 4,130.0 369,630 7,550
91 5-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 10:26:25 10:35:56 0:09:31 54.0 11,600.0 1,113,140 4,120.0 373,750 7,480
92 5-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 13:48:10 13:57:42 0:09:32 54.0 12,730.0 1,125,870 4,160.0 377,910 8,570
93 5-Oct-20 BM 8594 GB TANGGANG Q 60 MR III 16:56:32 17:08:37 0:12:05 54.0 11,290.0 1,137,160 4,120.0 382,030 7,170
94 5-Oct-20 BK 8524 CE EKA Q 60 MR III 11:19:26 11:36:06 0:16:40 54.0 12,530.0 1,149,690 4,090.0 386,120 8,440
95 5-Oct-20 BK 8524 CE EKA Q 60 MR III 15:18:58 15:37:15 0:18:17 54.0 11,050.0 1,160,740 4,090.0 390,210 6,960
96 5-Oct-20 BM 8519 SF SABAR Q 60 MR III 08:21:37 08:33:41 0:12:04 54.0 11,360.0 1,172,100 3,950.0 394,160 7,410
97 5-Oct-20 BM 8519 SF SABAR Q 60 MR III 11:00:14 11:17:17 0:17:03 54.0 12,220.0 1,184,320 3,910.0 398,070 8,310
98 5-Oct-20 BM 8519 SF SABAR Q 60 MR III 15:02:47 15:21:35 0:18:48 54.0 12,220.0 1,196,540 3,900.0 401,970 8,320
99 5-Oct-20 BA 8731 OU SAR Q 60 MR III 15:39:58 16:00:52 0:20:54 54.0 11,640.0 1,208,180 4,130.0 406,100 7,510
100 6-Oct-20 BA 8342 DU PIKAL Q 61 CR III 10:33:08 10:43:49 0:10:41 54.0 11,460.0 1,219,640 4,060.0 410,160 7,400
101 6-Oct-20 BA 8342 DU PIKAL Q 61 CR III 14:17:47 14:31:29 0:13:42 54.0 11,250.0 1,230,890 4,050.0 414,210 7,200
102 6-Oct-20 BA 8546 BU PAET Q 61 CR III 07:46:14 07:54:51 0:08:37 54.0 11,250.0 1,242,140 4,030.0 418,240 7,220
103 6-Oct-20 BA 8546 BU PAET Q 61 CR III 10:41:43 10:51:55 0:10:12 54.0 11,830.0 1,253,970 4,040.0 422,280 7,790
104 6-Oct-20 BA 8546 BU PAET Q 61 CR III 13:37:05 13:45:45 0:08:40 54.0 11,550.0 1,265,520 4,020.0 426,300 7,530
105 6-Oct-20 BK 8524 CE EKA Q 61 CR III 07:53:11 08:14:33 0:21:22 54.0 12,720.0 1,278,240 4,100.0 430,400 8,620
106 6-Oct-20 BK 8524 CE EKA Q 61 CR III 11:08:41 11:27:19 0:18:38 54.0 11,730.0 1,289,970 4,110.0 434,510 7,620
MONITORING TIMBUN JALAN KEBUN PALMA- A TAHUN 2020 KONTRAKTOR
No Plat Lokasi Jam Timbang KM/HM/JAM Brutto Tarra Netto
No Tanggal Kendaraan Driver
Blok MR/CR Divisi Masuk Keluar Menit Jumlah H.I S/D H.I H.I S/D H.I H.I
107 6-Oct-20 BM 9677 BU SEMBIRING Q 61 CR III 09:36:12 09:45:20 0:09:08 54.0 12,360.0 1,302,330 4,160.0 438,670 8,200
108 6-Oct-20 BM 9677 BU SEMBIRING Q 61 CR III 12:02:23 12:18:24 0:16:01 54.0 11,240.0 1,313,570 4,140.0 442,810 7,100
109 6-Oct-20 BM 9677 BU SEMBIRING Q 61 CR III 14:29:16 15:05:11 0:35:55 54.0 11,850.0 1,325,420 4,160.0 446,970 7,690
110 6-Oct-20 BA 8232 DU DES Q 61 CR III 07:47:51 07:57:57 0:10:06 54.0 12,060.0 1,337,480 4,100.0 451,070 7,960
111 6-Oct-20 BA 8232 DU DES Q 61 CR III 11:01:27 11:12:01 0:10:34 54.0 11,860.0 1,349,340 4,110.0 455,180 7,750
112 6-Oct-20 BA 8232 DU DES Q 61 CR III 14:26:56 14:45:12 0:18:16 54.0 11,230.0 1,360,570 4,080.0 459,260 7,150
113 6-Oct-20 BH 8799 EI HERMAN Q 61 CR III 07:50:14 08:13:26 0:23:12 54.0 11,880.0 1,372,450 3,980.0 463,240 7,900
114 6-Oct-20 BH 8799 EI HERMAN Q 61 CR III 11:07:40 11:23:58 0:16:18 54.0 11,560.0 1,384,010 4,020.0 467,260 7,540
115 6-Oct-20 BH 8799 EI HERMAN Q 61 CR III 14:51:55 15:03:20 0:11:25 54.0 12,510.0 1,396,520 4,000.0 471,260 8,510
116 6-Oct-20 BA 8731 OU SAR Q 61 CR III 07:48:59 08:12:11 0:23:12 54.0 12,230.0 1,408,750 4,110.0 475,370 8,120
117 6-Oct-20 BA 8731 OU SAR Q 61 CR III 11:03:09 11:22:57 0:19:48 54.0 12,570.0 1,421,320 4,130.0 479,500 8,440
118 6-Oct-20 BA 8731 OU SAR Q 61 CR III 15:56:55 16:06:59 0:10:04 54.0 12,230.0 1,433,550 4,090.0 483,590 8,140
119 6-Oct-20 BM 8519 SF SABAR Q 61 CR III 09:08:39 09:20:50 0:12:11 54.0 11,430.0 1,444,980 3,920.0 487,510 7,510
120 6-Oct-20 BM 8519 SF SABAR Q 61 CR III 11:49:49 12:00:47 0:10:58 54.0 11,220.0 1,456,200 3,920.0 491,430 7,300
121 6-Oct-20 BM 8519 SF SABAR Q 61 CR III 15:49:21 16:01:43 0:12:22 54.0 11,980.0 1,468,180 3,910.0 495,340 8,070
122 6-Oct-20 BM 9380 CT DASRIL Q 61 CR III 14:30:23 14:47:04 0:16:41 54.0 11,460.0 1,479,640 4,030.0 499,370 7,430
123 7-Oct-20 BK 8232 SH SARAGIH Q 61 CR III 10:55:34 11:17:37 0:22:03 54.0 10,920.0 1,490,560 3,920.0 503,290 7,000
124 7-Oct-20 BM 9677 BU SEMBIRING Q 61 CR III 15:35:44 15:46:17 0:10:33 54.0 11,660.0 1,502,220 4,150.0 507,440 7,510
125 7-Oct-20 BM 9380 CT DASRIL Q 61 CR III 15:44:03 16:10:16 0:26:13 54.0 12,670.0 1,514,890 3,970.0 511,410 8,700
126 7-Oct-20 BM 9697 BU ANDRE Q 61 CR III 15:37:58 15:48:11 0:10:13 54.0 12,020.0 1,526,910 4,190.0 515,600 7,830
127 7-Oct-20 BH B8799 EI HERMAN Q 61 CR III 15:16:10 15:32:11 0:16:01 54.0 11,300.0 1,538,210 3,960.0 519,560 7,340
128 7-Oct-20 BM 9608 ZU SI IS Q 61 CR III 15:29:15 15:45:08 0:15:53 54.0 12,010.0 1,550,220 4,200.0 523,760 7,810
129 7-Oct-20 BM 8519 SF SABAR Q 61 CR III 15:12:23 15:30:47 0:18:24 54.0 11,310.0 1,561,530 3,890.0 527,650 7,420
130 7-Oct-20 BM 8429 MI HERMANSYAH Q 61 CR III 14:59:04 15:13:32 0:14:28 54.0 12,180.0 1,573,710 4,020.0 531,670 8,160
131 7-Oct-20 BA 8731 DU SAR Q 61 CR III 14:57:59 15:08:42 0:10:43 54.0 12,110.0 1,585,820 4,140.0 535,810 7,970
132 7-Oct-20 BA 8546 BU PAET Q 61 CR III 14:45:02 14:52:59 0:07:57 54.0 11,530.0 1,597,350 4,010.0 539,820 7,520
133 7-Oct-20 BA 8546 BU PAET Q 61 CR III 7:37:14 7:52:33 0:15:19 54.0 11,800.0 1,609,150 4,000.0 543,820 7,800
134 7-Oct-20 BM 8429 MI HERMANSYAH Q 61 CR III 8:14:02 8:39:23 0:25:21 54.0 11,390.0 1,620,540 4,010.0 547,830 7,380
135 7-Oct-20 BH 8799 EI HERMAN Q 61 CR III 8:13:07 8:31:20 0:18:13 54.0 12,480.0 1,633,020 4,010.0 551,840 8,470
136 7-Oct-20 BM 8519 SF SABAR Q 61 CR III 8:11:20 8:29:09 0:17:49 54.0 11,840.0 1,644,860 3,920.0 555,760 7,920
137 7-Oct-20 BM 9380 CT DASRIL Q 61 CR III 8:28:00 8:43:59 0:15:59 54.0 12,720.0 1,657,580 4,060.0 559,820 8,660
138 7-Oct-20 BM 9608 ZU SI IS Q 61 CR III 8:15:11 8:42:46 0:27:35 54.0 12,580.0 1,670,160 4,240.0 564,060 8,340
139 7-Oct-20 BK 9133 CI AKRI Q 61 CR III 8:09:24 8:26:43 0:17:19 54.0 12,340.0 1,682,500 4,070.0 568,130 8,270
140 7-Oct-20 BM 9697 BU ANDRE Q 61 CR III 9:12:12 9:22:06 0:09:54 54.0 12,680.0 1,695,180 4,200.0 572,330 8,480
141 7-Oct-20 BK 9133 CI AKRI Q 61 CR III 14:14:19 14:32:53 0:18:34 54.0 12,430.0 1,707,610 4,060.0 576,390 8,370
142 7-Oct-20 BK 9133 CI AKRI Q 61 CR III 11:21:35 11:35:07 0:13:32 54.0 12,470.0 1,720,080 4,070.0 580,460 8,400
143 7-Oct-20 BM 9677 BU SEMBIRING Q 61 CR III 12:21:31 12:36:35 0:15:04 54.0 11,600.0 1,731,680 4,150.0 584,610 7,450
144 7-Oct-20 BH 8799 EI HERMAN Q 61 CR III 11:23:05 11:52:18 0:29:13 54.0 12,330.0 1,744,010 3,990.0 588,600 8,340
145 7-Oct-20 BM 8519 SF SABAR Q 61 CR III 11:24:06 0.4961343 0:30:20 54.0 11,760.0 1,755,770 3,940.0 592,540 7,820
146 7-Oct-20 BM 9380 CT DASRIL Q 61 CR III 11:33:04 11:50:33 0:17:29 54.0 12,260.0 1,768,030 4,040.0 596,580 8,220
147 7-Oct-20 BM 8429 MI HERMANSYAH Q 61 CR III 11:19:27 11:34:10 0:14:43 54.0 12,240.0 1,780,270 4,020.0 600,600 8,220
148 7-Oct-20 BA 8546 BU PAET Q 61 CR III 11:20:26 11:36:15 0:15:49 54.0 11,070.0 1,791,340 4,030.0 604,630 7,040
149 7-Oct-20 BM 9677 BU ANDRE Q 61 CR III 12:09:22 12:16:53 0:07:31 54.0 11,560.0 1,802,900 4,210.0 608,840 7,350
150 7-Oct-20 BM 9608 ZU SI IS Q 61 CR III 11:46:41 12:08:14 0:21:33 54.0 12,160.0 1,815,060 4,210.0 613,050 7,950
151 7-Oct-20 BK 8232 SH SARAGIH Q 61 CR III 13:54:22 14:30:43 0:36:21 54.0 12,560.0 1,827,620 3,910.0 616,960 8,650
152 8-Oct-20 BK 8232 SH SARAGIH T 65 MR IV 11:43:21 12:00:29 0:17:08 62.0 12,380.0 1,840,000 3,910.0 620,870 8,470
153 8-Oct-20 BA 8232 DU YOPI T 64 MR IV 14:39:57 15:01:07 0:21:10 62.0 12,880.0 1,852,880 4,180.0 625,050 8,700
154 8-Oct-20 BH 8799 EI HERMAN T 65 MR IV 11:07:34 11:50:17 0:42:43 62.0 11,770.0 1,864,650 3,990.0 629,040 7,780
155 8-Oct-20 BH 8799 EI HERMAN T 65 MR IV 15:31:03 15:41:16 0:10:13 62.0 13,680.0 1,878,330 3,980.0 633,020 9,700
156 8-Oct-20 BK 8232 SH SARAGIH T 65 MR IV 15:32:23 15:46:07 0:13:44 62.0 13,060.0 1,891,390 3,870.0 636,890 9,190
157 8-Oct-20 BK 8524 CE EKA T 65 MR IV 11:42:22 11:59:21 0:16:59 62.0 12,710.0 1,904,100 4,090.0 640,980 8,620
158 8-Oct-20 BA 8546 BU PAET T 65 MR IV 11:41:05 11:53:57 0:12:52 62.0 11,970.0 1,916,070 4,010.0 644,990 7,960
159 8-Oct-20 BA 8731 OU SAR T 64 MR IV 14:33:54 14:58:13 0:24:19 62.0 12,880.0 1,928,950 4,150.0 649,140 8,730
160 9-Oct-20 BH 8799 EI HERMAN T 64 MR IV 8:15:12 8:26:57 0:11:45 62.0 12,770.0 1,941,720 3,990.0 653,130 8,780
MONITORING TIMBUN JALAN KEBUN PALMA- A TAHUN 2020 KONTRAKTOR
No Plat Lokasi Jam Timbang KM/HM/JAM Brutto Tarra Netto
No Tanggal Kendaraan Driver
Blok MR/CR Divisi Masuk Keluar Menit Jumlah H.I S/D H.I H.I S/D H.I H.I
161 9-Oct-20 BH 8799 EI HERMAN T 65 MR IV 13:08:42 13:19:52 0:11:10 62.0 12,060.0 1,953,780 3,970.0 657,100 8,090
162 9-Oct-20 BA 8232 DU YOPI T 65 MR IV 8:33:37 8:43:07 0:09:30 62.0 14,420.0 1,968,200 4,150.0 661,250 10,270
163 9-Oct-20 BA 8232 DU YOPI T 65 MR IV 13:13:47 13:24:26 0:10:39 62.0 12,600.0 1,980,800 4,130.0 665,380 8,470
164 9-Oct-20 BA 8232 DU YOPI T 65 MR IV 17:24:11 17:39:33 0:15:22 62.0 13,500.0 1,994,300 4,120.0 669,500 9,380
165 9-Oct-20 BK 8232 SH SARAGIH T 65 MR IV 8:10:36 8:20:39 0:10:03 62.0 13,220.0 2,007,520 3,880.0 673,380 9,340
166 9-Oct-20 BK 8232 SH SARAGIH T 65 MR IV 11:23:39 11:38:27 0:14:48 62.0 12,150.0 2,019,670 3,870.0 677,250 8,280
167 9-Oct-20 BK 8232 SH SARAGIH T 65 MR IV 15:21:31 15:31:43 0:10:12 62.0 12,420.0 2,032,090 3,910.0 681,160 8,510
168 9-Oct-20 BA 8546 BU PAET T 65 MR IV 9:44:33 9:57:35 0:13:02 62.0 12,100.0 2,044,190 3,980.0 685,140 8,120
169 9-Oct-20 BA 8546 BU PAET T 65 MR IV 14:33:56 14:52:22 0:18:26 62.0 12,430.0 2,056,620 4,010.0 689,150 8,420
170 9-Oct-20 BA 8731 DU SAR T 65 MR IV 7:34:44 7:47:28 0:12:44 62.0 12,980.0 2,069,600 4,100.0 693,250 8,880
171 9-Oct-20 BA 8731 DU SAR T 65 MR IV 11:37:11 11:53:33 0:16:22 62.0 12,460.0 2,082,060 4,120.0 697,370 8,340
172 9-Oct-20 BA 8731 DU SAR T 65 MR IV 16:42:57 17:01:19 0:18:22 62.0 12,190.0 2,094,250 4,100.0 701,470 8,090
173 9-Oct-20 BK 8524 CE EKA T 65 MR IV 7:46:16 7:57:24 0:11:08 62.0 12,570.0 2,106,820 4,110.0 705,580 8,460
174 9-Oct-20 BK 8524 CE EKA T 65 MR IV 11:21:21 11:34:35 0:13:14 62.0 12,230.0 2,119,050 4,100.0 709,680 8,130
175 9-Oct-20 BM 9677 BU SEMBIRING T 65 MR IV 10:18:01 10:28:40 0:10:39 62.0 12,670.0 2,131,720 4,150.0 713,830 8,520
176 9-Oct-20 BM 9677 BU SEMBIRING T 65 MR IV 13:45:35 14:03:23 0:17:48 62.0 12,460.0 2,144,180 4,140.0 717,970 8,320
177 9-Oct-20 BM 8519 SF SABAR T 65 MR IV 8:57:13 9:10:44 0:13:31 62.0 12,300.0 2,156,480 3,930.0 721,900 8,370
178 9-Oct-20 BM 8519 SF SABAR T 65 MR IV 13:35:01 13:44:21 0:09:20 62.0 12,150.0 2,168,630 3,940.0 725,840 8,210
179 9-Oct-20 BM 9608 ZU SI IS T 65 MR IV 8:56:10 9:09:35 0:13:25 62.0 12,620.0 2,181,250 4,220.0 730,060 8,400
180 9-Oct-20 BM 9608 ZU SI IS T 65 MR IV 13:36:42 13:57:23 0:20:41 62.0 12,470.0 2,193,720 4,210.0 734,270 8,260
181 9-Oct-20 BK 8524 SE EKA T 65 MR IV 14:50:44 14:59:27 0:08:43 62.0 12,140.0 2,205,860 4,070.0 738,340 8,070
182 9-Oct-20 BM 8594 GB TANGGANG T 65 MR IV 17:11:06 17:27:37 0:16:31 62.0 12,180.0 2,218,040 4,170.0 742,510 8,010
183 9-Oct-20 BM 8542 CU MISLAN T 65 MR IV 17:09:17 17:25:19 0:16:02 62.0 11,870.0 2,229,910 4,090.0 746,600 7,780
184 9-Oct-20 BM 8429 MI HERMANSYAH T 65 MR IV 8:55:09 9:04:04 0:08:55 62.0 13,430.0 2,243,340 4,050.0 750,650 9,380
185 10-Oct-20 BM 9677 BU SEMBIRING T 64 MR IV 12:29:48 12:43:13 0:13:25 62.5 13,270.0 2,256,610 4,140.0 754,790 9,130
186 10-Oct-20 BM 8594 GB TANGGANG T 64 MR IV 07:20:27 07:28:25 0:07:58 62.5 11,560.0 2,268,170 4,140.0 758,930 7,420
187 10-Oct-20 BM 8594 GB TANGGANG T 64 MR IV 11:09:54 11:19:01 0:09:07 62.5 13,440.0 2,281,610 4,120.0 763,050 9,320
188 10-Oct-20 BM 8594 GB TANGGANG T 64 MR IV 14:46:29 15:03:23 0:16:54 62.5 11,530.0 2,293,140 4,100.0 767,150 7,430
189 10-Oct-20 BH 8799 EI HERMAN T 64 MR IV 07:55:17 08:08:38 0:13:21 62.5 11,690.0 2,304,830 3,990.0 771,140 7,700
190 10-Oct-20 BH 8799 EI HERMAN T 64 MR IV 11:35:35 11:53:39 0:18:04 62.5 13,830.0 2,318,660 3,990.0 775,130 9,840
191 10-Oct-20 BA 8731 DU SAR T 64 MR IV 07:59:03 08:13:43 0:14:40 62.5 12,000.0 2,330,660 4,150.0 779,280 7,850
192 10-Oct-20 BA 8731 DU SAR T 64 MR IV 11:56:07 12:07:58 0:11:51 62.5 12,290.0 2,342,950 4,140.0 783,420 8,150
193 10-Oct-20 BK 8232 SH SARAGIH T 64 MR IV 07:21:49 07:53:50 0:32:01 62.5 12,420.0 2,355,370 3,890.0 787,310 8,530
194 10-Oct-20 BK 8232 SH SARAGIH T 64 MR IV 11:11:02 11:20:13 0:09:11 62.5 12,730.0 2,368,100 3,890.0 791,200 8,840
195 10-Oct-20 BK 8232 SH SARAGIH T 64 MR IV 15:50:29 16:02:12 0:11:43 62.5 12,960.0 2,381,060 3,890.0 795,090 9,070
196 10-Oct-20 BM 8542 CU MISLAN T 64 MR IV 07:23:52 07:56:18 0:32:26 62.5 13,650.0 2,394,710 4,080.0 799,170 9,570
197 10-Oct-20 BM 8542 CU MISLAN T 64 MR IV 11:12:59 11:26:06 0:13:07 62.5 12,850.0 2,407,560 4,060.0 803,230 8,790
198 10-Oct-20 BM 8542 CU MISLAN T 64 MR IV 15:48:27 15:59:41 0:11:14 62.5 12,410.0 2,419,970 4,040.0 807,270 8,370
199 10-Oct-20 BA 8546 BU PAET T 64 MR IV 14:17:49 14:29:02 0:11:13 62.5 10,930.0 2,430,900 3,990.0 811,260 6,940
200 10-Oct-20 BM 9608 ZU SI IS T 64 MR IV 08:10:28 08:19:49 0:09:21 62.5 11,670.0 2,442,570 4,230.0 815,490 7,440
201 10-Oct-20 BM 9608 ZU SI IS T 64 MR IV 11:28:18 11:41:15 0:12:57 62.5 13,210.0 2,455,780 4,220.0 819,710 8,990
202 10-Oct-20 BM 9608 ZU SI IS T 64 MR IV 15:11:57 15:25:49 0:13:52 62.5 12,370.0 2,468,150 4,210.0 823,920 8,160
203 10-Oct-20 BK 8524 CE EKA T 64 MR IV 07:25:24 08:00:01 0:34:37 62.5 13,270.0 2,481,420 4,140.0 828,060 9,130
204 10-Oct-20 BK 8524 CE EKA T 64 MR IV 11:27:14 11:37:05 0:09:51 62.5 12,150.0 2,493,570 4,120.0 832,180 8,030
205 10-Oct-20 BA 8232 DU YOPI T 64 MR IV 07:57:56 11:44:26 3:46:30 62.5 12,970.0 2,506,540 4,120.0 836,300 8,850
206 10-Oct-20 BA 8232 DU YOPI T 64 MR IV 15:29:03 15:45:20 0:16:17 62.5 12,490.0 2,519,030 4,130.0 840,430 8,360
207 14-Oct-20 BM 8519 SF SABAR T 64 MR IV 09:25:23 09:34:55 0:09:32 62.5 11,650.0 2,530,680 3,930.0 844,360 7,720
208 14-Oct-20 BM 8956 BU ERIK T 64 MR IV 09:00:32 09:08:24 0:07:52 62.5 12,050.0 2,542,730 4,210.0 848,570 7,840
209 14-Oct-20 BA 8232 DU YOPI T 64 MR IV 08:24:02 08:35:12 0:11:10 62.5 13,370.0 2,556,100 4,160.0 852,730 9,210
210 14-Oct-20 BH 8799 EI HERMAN T 64 MR IV 08:33:25 08:45:16 0:11:51 62.5 12,920.0 2,569,020 4,010.0 856,740 8,910
MONITORING TIMBUN JALAN KEBUN PALMA- A TAHUN 2020 KONTRAKTOR
No Plat Lokasi Jam Timbang KM/HM/JAM Brutto Tarra Netto
No Tanggal Kendaraan Driver
Blok MR/CR Divisi Masuk Keluar Menit Jumlah H.I S/D H.I H.I S/D H.I H.I
211 14-Oct-20 BA 8546 BU PAET T 64 MR IV 07:43:51 08:32:11 0:48:20 62.5 12,000.0 2,581,020 3,990.0 860,730 8,010
212 14-Oct-20 BA 8731 OU SAR T 64 MR IV 07:42:34 08:26:26 0:43:52 62.5 12,540.0 2,593,560 4,100.0 864,830 8,440
213 14-Oct-20 BK 9133 CI AKRI T 64 MR IV 08:46:45 08:58:55 0:12:10 62.5 12,370.0 2,605,930 4,060.0 868,890 8,310
214 14-Oct-20 BH 8748 MF SUPRI T 64 MR IV 11:03:03 11:35:22 0:32:19 62.5 12,370.0 2,618,300 4,310.0 873,200 8,060
215 14-Oct-20 BM 8594 GB TANGGANG T 64 MR IV 07:45:03 08:29:38 0:44:35 62.5 12,360.0 2,630,660 4,140.0 877,340 8,220
216 14-Oct-20 BK 8232 SH SARAGIH T 64 MR IV 08:50:31 09:06:12 0:15:41 62.5 14,190.0 2,644,850 3,920.0 881,260 10,270
217 14-Oct-20 BM 9655 TU ARIS T 64 MR IV 08:30:50 08:41:40 0:10:50 62.5 11,840.0 2,656,690 4,010.0 885,270 7,830
TOTAL 12,391 2,656,690 2,656,690 885,270 885,270 1,771,420
BUN PALMA- A TAHUN 2020 KONTRAKTOR
1,300.0
Netto M3 Panjang Jalan ( Mtr )
S/D H.I H.I S/D H.I H.I S/D H.I
7,870 6.1 6.1 3.4 3.4
17,280 7.2 13.3 2.7 6.1
26,870 7.4 20.7 3.5 9.6
34,410 5.8 26.5 3.2 12.8
42,420 6.2 32.6 3.6 16.4
51,370 6.9 39.5 3.0 19.4
60,040 6.7 46.2 3.8 23.2
68,560 6.6 52.7 3.8 27.0
77,800 7.1 59.8 4.2 31.2
85,890 6.2 66.1 3.7 34.9
94,530 6.6 72.7 3.6 38.5
102,630 6.2 78.9 4.1 42.6
110,880 6.3 85.3 4.2 46.7
119,200 6.4 91.7 4.2 51.0
127,440 6.3 98.0 3.5 54.5
135,790 6.4 104.5 4.0 58.4
143,480 5.9 110.4 4.0 62.4
153,340 7.6 118.0 3.6 66.0
162,740 7.2 125.2 3.3 69.4
170,690 6.1 131.3 3.9 73.3
178,440 6.0 137.3 3.8 77.1
185,520 5.4 142.7 3.8 80.9
193,650 6.3 149.0 3.8 84.7
201,120 5.7 154.7 3.9 88.7
209,160 6.2 160.9 3.9 92.6
217,670 6.5 167.4 3.7 96.2
226,640 6.9 174.3 3.8 100.0
233,850 5.5 179.9 4.1 104.1
241,630 6.0 185.9 3.8 107.9
249,350 5.9 191.8 3.8 111.7
257,260 6.1 197.9 3.8 115.5
266,300 7.0 204.8 4.0 119.5
275,810 7.3 212.2 3.8 123.3
284,450 6.6 218.8 3.5 126.7
293,740 7.1 226.0 3.4 130.2
301,930 6.3 232.3 3.5 133.6
310,300 6.4 238.7 3.8 137.4
318,270 6.1 244.8 3.7 141.1
326,300 6.2 251.0 3.5 144.6
333,390 5.5 256.5 3.6 148.2
342,100 6.7 263.2 3.8 152.1
349,940 6.0 269.2 3.3 155.3
357,890 6.1 275.3 3.1 158.4
365,010 5.5 280.8 4.0 162.4
374,070 7.0 287.7 3.5 165.8
382,820 6.7 294.5 4.1 169.9
390,770 6.1 300.6 3.7 173.6
398,090 5.6 306.2 3.9 177.5
405,800 5.9 312.2 3.5 181.0
413,850 6.2 318.3 3.6 184.6
420,620 5.2 323.6 3.4 188.0
429,880 7.1 330.7 3.6 191.6
437,750 6.1 336.7 3.0 194.6
445,860 6.2 343.0 3.1 197.8
453,590 5.9 348.9 3.0 200.8
BUN PALMA- A TAHUN 2020 KONTRAKTOR
1,300.0
Netto M3 Panjang Jalan ( Mtr )
S/D H.I H.I S/D H.I H.I S/D H.I
462,460 6.8 355.7 3.6 204.4
471,310 6.8 362.5 3.8 208.2
479,490 6.3 368.8 3.5 211.7
487,820 6.4 375.2 4.0 215.7
495,360 5.8 381.0 3.7 219.3
502,600 5.6 386.6 3.3 222.7
510,420 6.0 392.6 3.5 226.2
517,960 5.8 398.4 3.8 230.0
525,490 5.8 404.2 3.9 233.9
533,840 6.4 410.6 3.7 237.6
541,800 6.1 416.8 3.7 241.3
549,580 6.0 422.8 3.8 245.0
556,910 5.6 428.4 3.9 248.9
564,740 6.0 434.4 4.2 253.1
572,620 6.1 440.5 3.3 256.4
580,940 6.4 446.9 3.8 260.3
588,840 6.1 453.0 3.7 263.9
596,230 5.7 458.6 4.0 268.0
604,290 6.2 464.8 4.7 272.7
612,960 6.7 471.5 5.1 277.7
620,270 5.6 477.1 4.3 282.0
627,970 5.9 483.1 4.5 286.5
636,190 6.3 489.4 4.8 291.3
644,650 6.5 495.9 4.9 296.2
653,010 6.4 502.3 4.9 301.1
661,660 6.7 509.0 5.0 306.1
668,380 5.2 514.1 3.9 310.1
676,720 6.4 520.6 4.9 314.9
684,440 5.9 526.5 4.5 319.4
691,750 5.6 532.1 4.3 323.7
699,880 6.3 538.4 4.7 328.4
707,750 6.1 544.4 4.6 333.0
715,550 6.0 550.4 4.5 337.5
724,360 6.8 557.2 5.1 342.7
731,910 5.8 563.0 4.4 347.1
739,390 5.8 568.8 4.4 351.4
747,960 6.6 575.4 5.0 356.4
755,130 5.5 580.9 4.2 360.6
763,570 6.5 587.4 4.9 365.5
770,530 5.4 592.7 4.1 369.6
777,940 5.7 598.4 4.3 373.9
786,250 6.4 604.8 4.8 378.8
794,570 6.4 611.2 4.9 383.6
802,080 5.8 617.0 4.4 388.0
809,480 5.7 622.7 4.2 392.1
816,680 5.5 628.2 4.0 396.2
823,900 5.6 633.8 4.1 400.2
831,690 6.0 639.8 4.4 404.6
839,220 5.8 645.6 4.2 408.8
847,840 6.6 652.2 4.8 413.7
855,460 5.9 658.0 4.3 417.9
BUN PALMA- A TAHUN 2020 KONTRAKTOR
1,300.0
Netto M3 Panjang Jalan ( Mtr )
S/D H.I H.I S/D H.I H.I S/D H.I
863,660 6.3 664.4 4.6 422.5
870,760 5.5 669.8 4.0 426.5
878,450 5.9 675.7 4.3 430.8
886,410 6.1 681.9 4.5 435.3
894,160 6.0 687.8 4.3 439.7
901,310 5.5 693.3 4.0 443.7
909,210 6.1 699.4 4.4 448.1
916,750 5.8 705.2 4.2 452.3
925,260 6.5 711.7 4.8 457.1
933,380 6.2 718.0 4.6 461.7
941,820 6.5 724.5 4.7 466.4
949,960 6.3 730.7 4.6 471.0
957,470 5.8 736.5 4.2 475.2
964,770 5.6 742.1 4.1 479.3
972,840 6.2 748.3 4.5 483.8
980,270 5.7 754.1 4.2 488.0
987,270 5.4 759.4 3.9 491.9
994,780 5.8 765.2 4.2 496.1
1,003,480 6.7 771.9 4.9 501.0
1,011,310 6.0 777.9 4.4 505.4
1,018,650 5.6 783.6 4.1 509.5
1,026,460 6.0 789.6 4.4 513.9
1,033,880 5.7 795.3 4.2 518.1
1,042,040 6.3 801.6 4.6 522.7
1,050,010 6.1 807.7 4.5 527.1
1,057,530 5.8 813.5 4.2 531.3
1,065,330 6.0 819.5 4.4 535.7
1,072,710 5.7 825.2 4.1 539.9
1,081,180 6.5 831.7 4.8 544.6
1,089,100 6.1 837.8 4.4 549.1
1,097,760 6.7 844.4 4.9 553.9
1,106,100 6.4 850.8 4.7 558.6
1,114,370 6.4 857.2 4.6 563.2
1,122,850 6.5 863.7 4.8 568.0
1,131,220 6.4 870.2 4.7 572.7
1,139,620 6.5 876.6 4.7 577.4
1,147,070 5.7 882.4 4.2 581.6
1,155,410 6.4 888.8 4.7 586.3
1,163,230 6.0 894.8 4.4 590.7
1,171,450 6.3 901.1 4.6 595.3
1,179,670 6.3 907.4 4.6 599.9
1,186,710 5.4 912.9 4.0 603.8
1,194,060 5.7 918.5 4.1 608.0
1,202,010 6.1 924.6 4.5 612.4
1,210,660 6.7 931.3 4.9 617.3
1,219,130 6.5 937.8 4.8 622.0
1,227,830 6.7 944.5 4.9 626.9
1,235,610 6.0 950.5 4.4 631.3
1,245,310 7.5 957.9 5.4 636.7
1,254,500 7.1 965.0 5.2 641.9
1,263,120 6.6 971.6 4.8 646.7
1,271,080 6.1 977.8 4.5 651.2
1,279,810 6.7 984.5 4.9 656.1
1,288,590 6.8 991.2 4.9 661.0
BUN PALMA- A TAHUN 2020 KONTRAKTOR
1,300.0
Netto M3 Panjang Jalan ( Mtr )
S/D H.I H.I S/D H.I H.I S/D H.I
1,296,680 6.2 997.4 4.5 665.6
1,306,950 7.9 1,005.3 5.8 671.3
1,315,420 6.5 1,011.9 4.8 676.1
1,324,800 7.2 1,019.1 5.3 681.3
1,334,140 7.2 1,026.3 5.2 686.6
1,342,420 6.4 1,032.6 4.6 691.2
1,350,930 6.5 1,039.2 4.8 696.0
1,359,050 6.2 1,045.4 4.6 700.6
1,367,470 6.5 1,051.9 4.7 705.3
1,376,350 6.8 1,058.7 5.0 710.3
1,384,690 6.4 1,065.1 4.7 715.0
1,392,780 6.2 1,071.4 4.5 719.5
1,401,240 6.5 1,077.9 4.7 724.2
1,409,370 6.3 1,084.1 4.6 728.8
1,417,890 6.6 1,090.7 4.8 733.6
1,426,210 6.4 1,097.1 4.7 738.3
1,434,580 6.4 1,103.5 4.7 742.9
1,442,790 6.3 1,109.8 4.6 747.6
1,451,190 6.5 1,116.3 4.7 752.3
1,459,450 6.4 1,122.7 4.6 756.9
1,467,520 6.2 1,128.9 4.5 761.4
1,475,530 6.2 1,135.0 4.5 765.9
1,483,310 6.0 1,141.0 4.4 770.3
1,492,690 7.2 1,148.2 5.3 775.6
1,501,820 7.0 1,155.2 4.9 780.5
1,509,240 5.7 1,161.0 4.0 784.5
1,518,560 7.2 1,168.1 5.0 789.5
1,525,990 5.7 1,173.8 4.0 793.5
1,533,690 5.9 1,179.8 4.1 797.6
1,543,530 7.6 1,187.3 5.3 802.9
1,551,380 6.0 1,193.4 4.2 807.1
1,559,530 6.3 1,199.6 4.4 811.5
1,568,060 6.6 1,206.2 4.6 816.1
1,576,900 6.8 1,213.0 4.8 820.9
1,585,970 7.0 1,220.0 4.9 825.7
1,595,540 7.4 1,227.3 5.1 830.9
1,604,330 6.8 1,234.1 4.7 835.6
1,612,700 6.4 1,240.5 4.5 840.1
1,619,640 5.3 1,245.9 3.7 843.8
1,627,080 5.7 1,251.6 4.0 847.8
1,636,070 6.9 1,258.5 4.8 852.7
1,644,230 6.3 1,264.8 4.4 857.1
1,653,360 7.0 1,271.8 4.9 862.0
1,661,390 6.2 1,278.0 4.3 866.3
1,670,240 6.8 1,284.8 4.8 871.1
1,678,600 6.4 1,291.2 4.5 875.6
1,686,320 5.9 1,297.2 3.7 879.3
1,694,160 6.0 1,303.2 3.8 883.1
1,703,370 7.1 1,310.3 4.5 887.6
1,712,280 6.9 1,317.1 4.3 891.9
BUN PALMA- A TAHUN 2020 KONTRAKTOR
1,300.0
Netto M3 Panjang Jalan ( Mtr )
S/D H.I H.I S/D H.I H.I S/D H.I
1,720,290 6.2 1,323.3 3.9 895.8
1,728,730 6.5 1,329.8 4.1 899.9
1,737,040 6.4 1,336.2 4.0 903.9
1,745,100 6.2 1,342.4 3.9 907.8
1,753,320 6.3 1,348.7 4.0 911.8
1,763,590 7.9 1,356.6 5.0 916.8
1,771,420 6.0 1,362.6 3.8 920.6
1,771,420 1,362.6 1,362.6 920.6 920.6
PT. PALMA SATU
Kebun Palma - A 2 2,000

REKAP REALISASI TIMBUN JALAN TAHUN 2020 KONTRAKTOR


REKAP KERJA DUMP TRUK
Jumlah Trip Jarak ( Km ) Timbang PKS Hasil Kerja
Tanggal Jumlah Lokasi Kerja
Brutto Tarra Netto ( Kg ) Meter Kubik ( M³ ) Panjang Jalan ( Mtr )
Unit ( Divisi ) HI s/d HI s/d BI HI s/d HI s/d BI
( Kg ) ( Kg ) Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI
s/d B.Lalu 2,648 132,450 21,236,220 16,336 9,540
### 1-Oct-20 11 IV 16 16 2,664 992 992 133,442 201,560 65,770 135,790 135,790 21,372,010 104 104 16,440 58 58 9,598
### 2-Oct-20 9 III 17 33 2,681 918 1,910 134,360 209,970 69,950 140,020 275,810 21,512,030 108 212 16,548 65 123 9,663
### 3-Oct-20 8 III 28 61 2,709 1,512 3,422 135,872 341,890 115,100 226,790 502,600 21,738,820 174 387 16,722 99 223 9,762
### 4-Oct-20 6 III 12 73 2,721 648 4,070 136,520 142,880 49,250 93,630 596,230 21,832,450 72 459 16,794 45 268 9,808
### 5-Oct-20 10 III 26 99 2,747 1,404 5,474 137,924 311,880 106,030 205,850 802,080 22,038,300 158 617 16,953 120 388 9,928
### 6-Oct-20 9 III 23 122 2,770 1,242 6,716 139,166 271,460 93,270 178,190 980,270 22,216,490 137 754 17,090 100 488 10,028
### 7-Oct-20 10 III 29 151 2,799 1,566 8,282 140,732 347,980 117,590 230,390 1,210,660 22,446,880 177 931 17,267 129 617 10,157
### 8-Oct-20 6 IV 8 159 2,807 496 8,778 141,228 101,330 32,180 69,150 1,279,810 22,516,030 53 984 17,320 39 656 10,196
### 9-Oct-20 13 IV 25 184 2,832 1,550 10,328 142,778 314,390 101,510 212,880 1,492,690 22,728,910 164 1,148 17,484 119 776 10,315
### 10-Oct-20 10 IV 22 206 2,854 1,375 11,703 144,153 275,690 89,780 185,910 1,678,600 22,914,820 143 1,291 17,627 100 876 10,415
### 11-Oct-20 - - - 206 2,854 - 11,703 144,153 - - - 1,678,600 22,914,820 - 1,291 17,627 - 876 10,415
### 12-Oct-20 - - - 206 2,854 - 11,703 144,153 - - - 1,678,600 22,914,820 - 1,291 17,627 - 876 10,415
### 13-Oct-20 - - - 206 2,854 - 11,703 144,153 - - - 1,678,600 22,914,820 - 1,291 17,627 - 876 10,415
### 14-Oct-20 11 IV 11 217 2,865 688 12,391 144,841 137,660 44,840 92,820 1,771,420 23,007,640 71 1,363 17,698 45 921 10,460
15-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
16-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
17-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
18-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
19-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
20-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
21-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
22-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
23-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
24-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
25-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
26-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
27-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
28-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
29-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
30-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460
31-Oct-20 - 217 2,865 - 12,391 144,841 - - - 1,771,420 23,007,640 - 1,363 17,698 - 921 10,460

Total 217 217 2,865 12,391 12,391 144,841 2,656,690 885,270 1,771,420 1,771,420 23,007,640 1,363 1,363 17,698 921 921 10,460
921
PT. PALMA SATU
Kebun Palma - A

REKAP REALISASI TIMBUN


REKAP JALAN
REALISASI
TAHUN
TIMBUN
2020 JALAN
KONTRAKTOR
TAHUN 2020 KONTRAKTOR
REKAP KERJA EXCAVATOR PC 130 REKAP KERJA EXCAVATOR PC 210 REKAP KERJA BULDOZER D3

Tanggal Jumlah Jumlah HM Bahan Bakar ( Ltr ) Hasil Kerja ( M³ ) Jumlah Jumlah HM Bahan Bakar ( Ltr ) Hasil Kerja ( M³ ) Jumlah Jumlah HM Bahan Bakar ( Ltr ) Hasil Kerja ( Mtr )
Unit Unit Unit
Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI
s/d B.Lalu 501.2 6,234 8,887 1,054.2 18,865 25,253 1,476.7 12,950 21,615
1-Oct-20 - - 501.2 - - 6,234 - - 8,887 1 10.8 10.8 1,065.0 210 210 19,075 104 104 25,357 1 13.1 13.1 1,489.8 100 100 13,050 58 58 21,673
2-Oct-20 - - 501.2 - - 6,234 - - 8,887 1 9.4 20.2 1,074.4 180 390 19,255 108 212 25,465 1 11.0 24.1 1,500.8 100 200 13,150 65 123 21,738
3-Oct-20 - - 501.2 - - 6,234 - - 8,887 1 11.7 31.9 1,086.1 230 620 19,485 183 395 25,648 1 13.1 37.2 1,513.9 125 325 13,275 106 229 21,844
4-Oct-20 - - 501.2 - - 6,234 - - 8,887 1 6.1 38.0 1,092.2 120 740 19,605 72 467 25,720 1 6.2 43.4 1,520.1 50 375 13,325 45 274 21,889
5-Oct-20 - - 501.2 - - 6,234 - - 8,887 1 11.0 49.0 1,103.2 220 960 19,825 163 630 25,883 1 14.1 57.5 1,534.2 125 500 13,450 123 397 22,012
6-Oct-20 - - 501.2 - - 6,234 - - 8,887 1 10.5 59.5 1,113.7 200 1,160 20,025 146 776 26,029 1 13.2 70.7 1,547.4 125 625 13,575 103 500 22,115
7-Oct-20 - - 501.2 - - 6,234 - - 8,887 1 10.8 70.3 1,124.5 210 1,370 20,235 201 978 26,231 1 11.3 82.0 1,558.7 100 725 13,675 143 643 22,258
8-Oct-20 - - 501.2 - - 6,234 - - 8,887 1 5.7 76.0 1,130.2 110 1,480 20,345 53 1,031 26,284 1 10.0 92.0 1,568.7 100 825 13,775 39 682 22,297
9-Oct-20 - - 501.2 - - 6,234 - - 8,887 1 10.8 86.8 1,141.0 210 1,690 20,555 168 1,199 26,452 1 12.6 104.6 1,581.3 125 950 13,900 123 805 22,419
10-Oct-20 - - 501.2 - - 6,234 - - 8,887 1 11.1 97.9 1,152.1 220 1,910 20,775 162 1,362 26,614 1 10.4 115.0 1,591.7 125 1,075 14,025 106 911 22,525
11-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 97.9 1,152.1 - 1,910 20,775 - 1,362 26,614 - - 115.0 1,591.7 - 1,075 14,025 - 911 22,525
12-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 97.9 1,152.1 - 1,910 20,775 - 1,362 26,614 - - 115.0 1,591.7 - 1,075 14,025 - 911 22,525
13-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 97.9 1,152.1 - 1,910 20,775 - 1,362 26,614 - - 115.0 1,591.7 - 1,075 14,025 - 911 22,525
14-Oct-20 - - 501.2 - - 6,234 - - 8,887 1 6.0 103.9 1,158.1 120 2,030 20,895 85 1,447 26,700 1 10.1 125.1 1,601.8 100 1,175 14,125 48 959 22,573
15-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
16-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
17-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
18-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
19-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
20-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
21-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
22-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
23-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
24-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
25-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
26-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
27-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
28-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
29-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
30-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573
31-Oct-20 - - 501.2 - - 6,234 - - 8,887 - - 103.9 1,158.1 - 2,030 20,895 - 1,447 26,700 - - 125.1 1,601.8 - 1,175 14,125 - 959 22,573

Total - - 501.2 - - 6,234 - - 8,887 103.9 103.9 1,158.1 2,030 2,030 20,895 1,447 1,447 26,700 125.1 125.1 1,601.8 1,175 1,175 14,125 959 959 22,573
- - - - - -
PT. PALMA SATU
KEBUN PALMA - A

REKAP REALISASI TIMBUN JALAN PER BLOK KONTRAKTOR


Laporan Tgl : 14 November 2020

Bulan April Bulan Mei Bulan Juni Bulan Juli Bulan Agustus Bulan September Bulan Oktober Total
No Blok
Lokasi Lokasi Lokasi Lokasi Lokasi Lokasi Lokasi
M³ Mtr M³ Mtr M³ Mtr M³ Mtr M³ Mtr M³ Mtr M³ Mtr M³ Mtr
MR/CR Div MR/CR Div MR/CR Div MR/CR Div MR/CR Div MR/CR Div MR/CR Div
1 S 69 - - - - - - - - - - - - - - - - - - - - MR IV 83 45 82.5 44.6
2 S 68 - - - - - - - - - - - - - - - - - - - - MR IV 103 59 102.6 59.3
3 S 67 - - - - - - - - - - - - - - - - - - - - MR IV 52 31 52.3 31.0
4 S 66 - - - - - - - - - - - - - - - - - - - - MR IV 28 17 28.0 17.2
5 S 65 MR IV 43 35 - - - - - - - - MR IV 18 9 MR IV 48 21 109.4 65.1
6 S 64 - - - - - - - - - - - - MR IV 181 100 MR IV 120 56 CR IV 1,077 592 1,378.6 748.4
7 S 63 - - - - - - - - - - - - MR IV 21 10 MR IV 478 211 499.2 221.0
8 S 62 - - - - - - - - - - - - MR IV 52 24 MR IV 125 55 177.5 79.8
9 S 61 - - - - - - - - - - - - - - - - MR IV 512 229 511.6 228.7
10 S 61. CR IV 397 205 396.9 205.0
11 S 59 - - - - - - - - MR IV 7.35 4.85 MR IV 205 119 MR IV 174 82 386.4 205.2
12 S 58 - - - - - - - - - - - - MR IV 175 84 MR IV 74 37 249.0 120.6
13 S 57 - - - - - - - - MR IV 6.05 3.99 MR IV 480 242 - - MR IV 218 118 703.9 363.7
14 T 68 - - - - - - - - - - - - MR IV 862 417 - - MR IV 28 12 889.7 428.6
15 T 67 - - - - - - - - - - - - MR IV 445 212 MR IV 70 33 CR IV 558 309 1,073.2 553.7
16 T 66 - - - - - - - - - - - - - - - - MR IV 559 279 MR II 141 100 699.8 379.0
17 T 65 - - - - - - - - - - - - - - - - MR IV 205 103 MR IV 301 202 506.4 304.8
18 T 64 - - - - - - - - - - - - - - - - - - - - MR IV 235 160 234.6 159.7
19 T 61. - - - - - - - - - - - - - - - - - - - - - -
20 P 46 - - - - - - - - - - - - CR III 327 280 - - 327.2 280.0
21 P 44 - - - - - - - - MR II 86 80 - - - - - - 86.1 80.0
22 P 43 - - - - MR II 214 165 MR II 134 68 - - - - - - MR III 335 225 683.0 458.0
23 P 42 CR II 92 80 - - - - - - - - - - - - - - 92.3 80.0
24 P 42. - - - - MR II 230 160 MR II 70 44 - - - - - - MR III 6 3 306.8 207.3
25 P 41 - - - - MR II 61 48 MR II 130 120 - - - - - - MR III 38 21 229.4 189.3
26 Q 59 - - - - - - - - - - - - MR III 50 36 - - 50.2 36.4
27 Q 58 - - - - - - - - - - - - MR III 450 296 - - 450.1 295.9
28 Q 57 - - - - - - - - - - - - MR III 23 14 - - 22.7 13.9
29 Q 49 MR III 229 121 MR II 6 4 235.4 125.2
30 Q 48 - - - - - - - - - - - - - - - - MR III 677 367 MR II 27 11 703.7 377.8
31 Q 47 - - - - - - - - MR III 129 98 - - MR III 298 164 MR II 198 117 624.7 379.0
32 Q 46 - - - - - - - - MR III 137 102 - - - - MR II 344 224 480.6 325.6
33 Q 45 - - - - - - - - MR II 480 350 - - - - - - 480.4 350.3
34 Q 44 - - - - - - - - MR II 244 168 - - - - - - 243.8 167.6
35 Q 43 - - - - - - - - MR II 196 142 - - - - MR II - - 196.5 142.0
36 Q 42 - - - - - - - - MR II 169 115 - - - - MR II - - 168.6 114.6
37 Q 41 - - - - - - - - MR II 76 42 - - - - MR II - - 75.8 41.9
38 Q 40 - - - - - - - - MR II 79 44 - - - - MR II - - 78.8 43.6
39 O 38 - - - - - - - - MR II 71 33 - - - - - - 70.8 33.2
40 O 39 - - - - MR II 44 28 MR II 318 192 - - - - - - 361.5 219.8
41 O 40 - - - - MR II 189 127 - - - - - - - - - - 189.1 126.9
42 O 42 - - - - - - - - MR II 10 6 - - - - - - 10.1 5.6
43 O 41 MR II 118 88 MR II 120 91 MR II 73 42 - - - - - - 311.0 220.8
44 O 45 MR II 105 64 - - - - MR III 217 107 - - - - - - 322.4 171.5
45 O 44 MR II 57 40 - - - - - - - - - - - - - - 57.3 40.0
46 O 49 MR III 23 26 - - - - MR III 325 177 - - - - - - 348.2 203.2
47 O 51 MR III 40 48 - - - - - - - - - - - - 39.7 48.1
48 O 46 MR III 128 104 MR III 29 30 MR III 289 150 - - - - - - 445.6 284.5
49 O 47 MR III 100 95 - - - - - - - - - - 99.9 95.0
50 O 48 MR III 136 104 MR III 72 37 - - - - - - 208.2 141.2
51 N 46 CR III 39 41 MR III - - - - - - - - 39.4 40.5
52 N 42 - MR II 6 3 - - - - - - 5.6 3.1
54 N 49 - - - CR III 294 152 - - - - - - 293.6 152.0
55 S 60 - - - MR IV 195 83 MR IV 256 110 - - 451.4 192.4
56 Q 60 - - - MR III 513 330 512.5 329.5
57 Q 61 - - - CR III 314 229 314.3 229.3
Total 606.5 485 - - 1,161.7 889 - - 3,617.4 2,280 3,485 1,926 4,222 2,072 3,242 1,888 1,363 921 17,698.2 10,460.3
- - - - - - - - - - - - - - 17,698.2 10,460.3
Rekap Per Divisi - -
BULAN
Total
No Divisi Bulan April 2020 Bulan Mei 2020 Bulan Juni 2020 Bulan Juli 2020 Bulan Agus 2020 Bulan Sept 2020 Bulan Okt 2020
Real Per
M³ Mtr M³ Mtr M³ Mtr M³ Mtr M³ Mtr M³ Mtr M³ Mtr M³ Mtr
1 I - - - - - - - - - - - - - - - - 5,372.2
2 II 372.5 272.0 857.8 619.0 2,141.3 1,447.7 - - - - 716 456 - - 4,087 2,795 13.4
3 III 191.0 178.0 303.9 270.0 1,462.7 823.5 850.1 626.2 1,204 652 380 249 827 559 5,219 3,358 5,385.6
4 IV 43.0 35.0 - - 13.4 8.8 2,635.3 1,299.5 3,018 1,420 2,147 1,183 536 362 8,392 4,308
5 V - - - - - - - - - - - - - - - -
Total 606.5 485.0 1,161.7 889.0 3,617.4 2,280.0 3,485.5 1,925.7 4,222 2,072 3,242 1,888 1,363 921 17,698 10,460
- - - - - - - - - - - -
PT.PALMA SATU
KEBUN PALMA - A
REKAP REALISASI TIMBUN JALAN PER DUMP TRUCK SWAKELOLA
Bulan : Oktober 2020
Jarak Tempuh ( Km ) Hasil Kerja
No Tanggal No Polisi Driver Jumlah Keterangan
Trip Awal Akhir Jumlah Km/Trip Kg ( Netto ) Kg/Trip M³ M³/
Trip Mtr Mtr/
Trip
1 DT 30 HUTAHURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
4 DT 33 NAMBELA 0 - - - - - - - - - -
1-Oct-2020

5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 01 OKTOBER 2020 0 - - - - - - - -
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
4 DT 33 NAMBELA 0 - - - - - - - - - -
2-Oct-2020

5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 02 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 02 OKTOBER 2020 0 - - - - - - - -
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
4 DT 33 NAMBELA 0 - - - - - - - - - -
3-Oct-2020

5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 2 34,128 34,172 44 22 11,440 5,720 8.8 4.4 6.2 3.1
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 03 OKTOBER 2020 2 44 22 11,440 5,720 8.8 4.4 6.2 3.1
REALISASI S/D TGL 03 OKTOBER 2020 2 44 22 11,440 5,720 8.8 4.4 6.2 3.1
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
4 DT 33 NAMBELA 0 - - - - - - - - - -
4-Oct-2020

5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 04 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 04 OKTOBER 2020 2 44 22 11,440 5,720 8.8 4.4 6.2 3.1
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
4 DT 33 NAMBELA 0 - - - - - - - - - -
5-Oct-2020

5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 1 34,268 34,309 41 41 5,880 5,880 4.5 4.5 3.0 3.0
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 05 OKTOBER 2020 1 41 41 5,880 5,880 4.5 4.5 3.0 3.0
REALISASI S/D TGL 05 OKTOBER 2020 3 85 28 17,320 5,773 13.3 4.4 9.2 3.1
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
4 DT 33 NAMBELA 0 - - - - - - - - - -
6-Oct-2020

5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 1 34,268 34,308 40 40 5,670 5,670 4.4 4.4 3.0 3.0
8 DT 37 S.NAINGGOLAN 1 34,042 34,102 60 60 5,940 5,940 4.6 4.6 - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 06 OKTOBER 2020 2 100 50 11,610 5,805 8.9 4.5 3.0 1.5
REALISASI S/D TGL 06 OKTOBER 2020 5 185 37 28,930 5,786 22.3 4.5 12.2 2.4
1 DT 30 HUTAURUK 3 28,316 28,384 68 23 16,270 5,423 13 4.2 6 1.9
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
7-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 2 34,198 34,268 70 35 9,430 4,715 7.3 3.6 5.0 2.5
7 DT 36 H.MANURUNG 1 34,582 34,601 19 19 5,710 5,710 4.4 4.4 3.0 3.0
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 07 OKTOBER 2020 6 157 26 31,410 5,235 24.2 4.0 13.7 2.3
REALISASI S/D TGL 07 OKTOBER 2020 11 342 31 60,340 5,485 46.4 4.2 25.9 2.4
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
4 DT 33 NAMBELA 0 - - - - - - - - - -
8-Oct-2020

5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 08 OKTOBER 2020 0 - - - - - - - -
PT.PALMA SATU
KEBUN PALMA - A
REKAP REALISASI TIMBUN JALAN PER DUMP TRUCK SWAKELOLA
Bulan : Oktober 2020
Jarak Tempuh ( Km ) Hasil Kerja
No Tanggal No Polisi Driver Jumlah Keterangan
Trip Awal Akhir Jumlah Km/Trip Kg ( Netto ) Kg/Trip M³ M³/
Trip Mtr Mtr/
Trip
REALISASI S/D TGL 08 OKTOBER 2020 11 342 31 60,340 5,485 46.4 4.2 25.9 2.4
PT.PALMA SATU
KEBUN PALMA - A
REKAP REALISASI TIMBUN JALAN PER DUMP TRUCK SWAKELOLA
Bulan : Oktober 2020
Jarak Tempuh ( Km ) Hasil Kerja
No Tanggal No Polisi Driver Jumlah Keterangan
Trip Awal Akhir Jumlah Km/Trip Kg ( Netto ) Kg/Trip M³ M³/
Trip Mtr Mtr/
Trip
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
4 DT 33 NAMBELA 0 - - - - - - - - - -
9-Oct-2020

5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 1 34,926 34,944 18 18 5,770 5,770 4.4 4.4 3.1 3.1
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 09 OKTOBER 2020 1 18 18 5,770 5,770 4.4 4.4 3.1 3.1
REALISASI S/D TGL 09 OKTOBER 2020 12 360 30 66,110 5,509 50.9 4.2 29.0 2.4
1 DT 30 HUTAURUK 1 - - - - 5,180 5,180 4 4.0 3 3.0
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
10-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 1 - - - - 5,230 5,230 4.0 4.0 3.0 3.0
7 DT 36 H.MANURUNG 2 - - - - 11,110 5,555 8.5 4.3 - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 10 OKTOBER 2020 4 - - 21,520 5,380 16.6 4.1 6.0 1.5
REALISASI S/D TGL 10 OKTOBER 2020 16 360 23 87,630 5,477 67.4 4.2 35.0 2.2
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
11-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 11 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 11 OKTOBER 2020 16 360 23 87,630 5,477 67.4 4.2 35.0 2.2
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
12-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 12 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 12 OKTOBER 2020 16 360 23 87,630 5,477 67.4 4.2 35.0 2.2
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
13-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 13 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 13 OKTOBER 2020 16 360 23 87,630 5,477 67.4 4.2 35.0 2.2
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
14-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 1 - - - - 4,740 4,740 3.6 3.6 - -
7 DT 36 H.MANURUNG 1 - - - - 5,550 5,550 4.3 4.3 3.0 3.0
8 DT 37 S.NAINGGOLAN 1 - - - - 7,630 7,630 5.9 5.9 - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 14 OKTOBER 2020 3 - - 17,920 5,973 13.8 4.6 3.0 1.0
REALISASI S/D TGL 14 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
15-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 15 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 15 OKTOBER 2020 19 - - 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
16-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
PT.PALMA SATU
KEBUN PALMA - A

16-Oct-2020
REKAP REALISASI TIMBUN JALAN PER DUMP TRUCK SWAKELOLA
Bulan : Oktober 2020
Jarak Tempuh ( Km ) Hasil Kerja
No Tanggal No Polisi Driver Jumlah Keterangan
Trip Awal Akhir Jumlah Km/Trip Kg ( Netto ) Kg/Trip M³ M³/
Trip Mtr Mtr/
Trip
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 16 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 16 OKTOBER 2020 19 - - 360 19 105,550 5,555 81.2 4.3 38.0 2.0
PT.PALMA SATU
KEBUN PALMA - A
REKAP REALISASI TIMBUN JALAN PER DUMP TRUCK SWAKELOLA
Bulan : Oktober 2020
Jarak Tempuh ( Km ) Hasil Kerja
No Tanggal No Polisi Driver Jumlah Keterangan
Trip Awal Akhir Jumlah Km/Trip Kg ( Netto ) Kg/Trip M³ M³/
Trip Mtr Mtr/
Trip
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
17-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 17 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 17 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
18-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 18 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 18 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
19-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 19 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 19 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
20-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 20 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 20 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
21-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 21 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 21 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
22-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 22 MEI2 2020 0 - - - - - - - -
REALISASI S/D TGL 22 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
23-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 23 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 23 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
24-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
PT.PALMA SATU
KEBUN PALMA - A
REKAP REALISASI TIMBUN JALAN PER DUMP TRUCK SWAKELOLA
Bulan : Oktober 2020
Jarak Tempuh ( Km ) Hasil Kerja
No Tanggal No Polisi Driver Jumlah Keterangan
Trip Awal Akhir Jumlah Km/Trip Kg ( Netto ) Kg/Trip M³ M³/
Trip Mtr Mtr/
Trip
TOTAL TGL 24 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 24 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
PT.PALMA SATU
KEBUN PALMA - A
REKAP REALISASI TIMBUN JALAN PER DUMP TRUCK SWAKELOLA
Bulan : Oktober 2020
Jarak Tempuh ( Km ) Hasil Kerja
No Tanggal No Polisi Driver Jumlah Keterangan
Trip Awal Akhir Jumlah Km/Trip Kg ( Netto ) Kg/Trip M³ M³/
Trip Mtr Mtr/
Trip
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
25-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 25 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 25 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
26-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 26 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 26 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
27-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 27 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 27 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
28-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 28 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 28 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
29-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 29 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 29 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
30-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 30 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 30 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAURUK 0 - - - - - - - - - -
2 DT 31 DASIMAN 0 - - - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - - - -
31-Oct-2020

4 DT 33 NAMBELA 0 - - - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - - - -
6 DT 35 SINAGA 0 - - - - - - - - - -
7 DT 36 H.MANURUNG 0 - - - - - - - - - -
8 DT 37 S.NAINGGOLAN 0 - - - - - - - - - -
9 DT 38 RIADI 0 - - - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - - - -
TOTAL TGL 31 OKTOBER 2020 0 - - - - - - - -
REALISASI S/D TGL 31 OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
1 DT 30 HUTAHURUK 4 68 17 21,450 5,363 16.5 4.1 8.7 2.2
Rekap Per Dump Truck
Bulan OKTOBER 2020

2 DT 31 DASIMAN 0 - - - - - - - -
3 DT 32 ALIMAN 0 - - - - - - - -
4 DT 33 NAMBELA 0 - - - - - - - -
5 DT 34 SOPIAN.D 0 - - - - - - - -
6 DT 35 SINAGA 4 70 18 19,400 4,850 14.9 3.7 8.0 2.0
7 DT 36 H.MANURUNG 9 162 18 51,130 5,681 39.3 4.4 21.3 2.4
8 DT 37 S.NAINGGOLAN 2 60 30 13,570 6,785 10.4 5.2 - -
9 DT 38 RIADI 0 - - - - - - - -
10 DT 39 GENTA S 0 - - - - - - - -
TOTAL S/D OKTOBER 2020 19 360 19 105,550 5,555 81.2 4.3 38.0 2.0
PT. PALMA SATU
Kebun Palma - A

REKAP REALISASI TIMBUN JALAN TAHUN 2020 SWAKELOLA


REKAP KERJA DUMP TRUK
Jumlah Trip Jarak ( Km ) Timbang PKS Hasil Kerja
Tanggal Jumlah Lokasi Kerja (
Brutto Tarra Netto ( Kg ) Meter Kubik ( M³ ) Panjang Jalan ( Mtr )
Unit Divisi ) HI s/d HI s/d BI HI s/d HI s/d BI
( Kg ) ( Kg ) Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI
s/d B.Lalu I,II,III & IV 4,128 176,717 23,484,340 18,065 14,348
1-Oct-20 - - 4,128 - - 176,717 - - - - 23,484,340 - - 18,065 - - 14,348
2-Oct-20 - - 4,128 - - 176,717 - - - - 23,484,340 - - 18,065 - - 14,348
3-Oct-20 1 2 2 4,130 44 44 176,761 19,300 7,860 11,440 11,440 23,495,780 8.80 9 18,074 6 6 14,355
4-Oct-20 - 2 4,130 - 44 176,761 - - - 11,440 23,495,780 - 9 18,074 - 6 14,355
5-Oct-20 1 1 3 4,131 41 85 176,802 9,770 3,890 5,880 17,320 23,501,660 4.52 13 18,078 3 9 14,358
6-Oct-20 2 2 5 4,133 100 185 176,902 19,280 7,670 11,610 28,930 23,513,270 8.93 22 18,087 3 12 14,361
7-Oct-20 3 6 11 4,139 157 342 177,059 55,150 23,740 31,410 60,340 23,544,680 24.16 46 18,111 14 26 14,374
8-Oct-20 - 11 4,139 - 342 177,059 - - - 60,340 23,544,680 - 46 18,111 - 26 14,374
9-Oct-20 1 1 12 4,140 18 360 177,077 9,720 3,950 5,770 66,110 23,550,450 4.44 51 18,116 3 29 14,377
10-Oct-20 5 17 4,145 - 360 177,077 44,520 19,280 25,240 91,350 23,575,690 19.42 70 18,135 6 35 14,383
11-Oct-20 - 17 4,145 - 360 177,077 - - - 91,350 23,575,690 - 70 18,135 - 35 14,383
12-Oct-20 - 17 4,145 - 360 177,077 - - - 91,350 23,575,690 - 70 18,135 - 35 14,383
13-Oct-20 - 17 4,145 - 360 177,077 - - - 91,350 23,575,690 - 70 18,135 - 35 14,383
14-Oct-20 3 20 4,148 - 360 177,077 29,870 11,950 17,920 109,270 23,593,610 13.78 84 18,149 3 38 14,386
15-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
16-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
17-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
18-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
19-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
20-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
21-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
22-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
23-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
24-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
25-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
26-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
27-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
28-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
29-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
30-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386
31-Oct-20 - 20 4,148 - 360 177,077 - - - 109,270 23,593,610 - 84 18,149 - 38 14,386

Total 20 20 4,148 360 360 177,077 187,610 78,340 109,270 109,270 23,593,610 84 84 18,149 38 38 14,386.47
PT. PALMA SATU
Kebun Palma - A

N TAHUN 2020 SWAKELOLA


REKAP KERJA COMPECTOR REKAP KERJA EXCA PC 200-8

Tanggal Jumlah Jumlah HM Bahan Bakar ( Ltr ) Hasil Kerja ( Mtr ) Jumlah Jumlah HM Bahan Bakar ( Ltr ) Hasil Kerja ( M³ )
Unit Unit
Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI
s/d B.Lalu 649 3,882 14,976 25 250 376
1-Oct-20 1 7.0 7.0 656.0 - - 3,882 58 58 15,035 - - - 25.0 - - 250 - - 376
2-Oct-20 1 2.0 9.0 658.0 40 40 3,922 65 123 15,099 - - - 25.0 - - 250 - - 376
3-Oct-20 - - 9.0 658.0 - 40 3,922 106 229 15,205 - - - 25.0 - - 250 - - 376
4-Oct-20 - - 9.0 658.0 - 40 3,922 45 274 15,250 - - - 25.0 - - 250 - - 376
5-Oct-20 1 8.0 17.0 666.0 43 83 3,965 123 397 15,373 - - - 25.0 - - 250 - - 376
6-Oct-20 1 9.0 26.0 675.0 100 183 4,065 103 500 15,476 - - - 25.0 - - 250 - - 376
7-Oct-20 1 7.0 33.0 682.0 140 323 4,205 143 643 15,619 - - - 25.0 - - 250 - - 376
8-Oct-20 1 9.0 42.0 691.0 - 323 4,205 39 682 15,658 - - - 25.0 - - 250 - - 376
9-Oct-20 1 9.0 51.0 700.0 - 323 4,205 123 805 15,781 - - - 25.0 - - 250 - - 376
10-Oct-20 - - 51.0 700.0 - 323 4,205 106 911 15,887 - - - 25.0 - - 250 - - 376
11-Oct-20 - - 51.0 700.0 - 323 4,205 - 911 15,887 - - - 25.0 - - 250 - - 376
12-Oct-20 - - 51.0 700.0 - 323 4,205 - 911 15,887 - - - 25.0 - - 250 - - 376
13-Oct-20 - - 51.0 700.0 - 323 4,205 - 911 15,887 - - - 25.0 - - 250 - - 376
14-Oct-20 - - 51.0 700.0 - 323 4,205 48 959 15,935 - - - 25.0 - - 250 - - 376
15-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
16-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
17-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
18-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
19-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
20-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
21-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
22-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
23-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
24-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
25-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
26-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
27-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
28-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
29-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
30-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376
31-Oct-20 - - 51.0 700.0 - 323 4,205 - 959 15,935 - - - 25.0 - - 250 - - 376

Total 51.0 51.0 700.0 323 323 4,205 959 959 15,935 - - 25.0 - - 250 - - 376
PT. PALMA SATU
KEBUN PALMA - A

REKAP REALISASI TIMBUN JALAN PER BLOK SWAKELOLA


Laporan Tgl : 14 November 2020
Real Timbun Jalan Thn 2020
Total
Bulan Februari Bulan Maret Bulan April Bulan Mei Bulan Juni Bulan Juli Bulan Agustus Bulan September Bulan Oktober
No Blok
Lokasi Lokasi Lokasi Lokasi Lokasi Lokasi Lokasi Lokasi Lokasi
Mtr Mtr Mtr Mtr Mtr Mtr Mtr Mtr Mtr Mtr
MR/CR Div MR/CR Div MR/CR Div MR/CR Div MR/CR Div MR/CR Div MR/CR Div MR/CR Div MR/CR Div
1 N 34 MR I 250 186 - - - - - - - - - - - - - - - - - - MR I 4.88 3.00 - - - - 255 189.0
2 N 35 MR I 269 215 - - - - - - - - - - - - MR I 4.92 4.34 MR I 5.31 3.58 - - - - - - 280 222.9
3 N 46 CR III 1,026 1,000 - - - - - - - - CR III 14 12 CR III 33.48 22.37 CR III 15.44 9.39 CR III 4.86 2.99 - - - - 1,094 1,046.8
4 N 44 CR II 4.44 3.1 4 3.1
5 N 42 CR II 496 565 CR II 331 290 - - - - - - - - CR II 5.29 3.23 CR II 10.71 7.71 CR II 5.06 3.00 CR II 5.05 3.04 - - 853 872.0
6 N 42. - - - - - - - - - - - - - - - - MR II 26.64 23.46 - - - - - - - - 27 23.5
7 N 41 - - - - - - - - - - - - - - - - MR II 19.41 14.28 - - - - - - - - 19 14.3
8 O 38 - - - - - - - - - - - - - - - - MR II 4.77 3.77 MR II 11.33 6.20 - - - - - - 16 10.0
9 O 39 - - - - - - - - - - - - MR II 73 60 MR II 130.05 96.36 - - - - - - - - 203 156.4
10 O 40 - - - - - - - - MR II 23 16 MR II 122 84 MR II 4.92 3.64 - - - - - - - - 149 104.1
11 O 41 - - - - MR II 164 235 MR II 63 48 MR II 33 28 - - - - - - - - - - - - 260 310.6
12 O 42 - - - - CR II 925 955 CR II 29 24 CR II 9 10 - - - - - - - - - - - - 964 989.4
13 O 42. - - - - MR II 204 220 - - - - - - - - MR II 9.02 7.94 MR II 6.00 4.20 - - - - - - 219 232.1
14 O 43 - - - - MR II 221 220 - - - - - - - - - - - - - - - - MR II 4.68 2.86 MR II 4.39 3.0 230 225.9
15 O 44 - - - - MR II 24 30 MR II 153 120 - - - - - - - - MR II 4.78 2.53 MR II 4.84 2.71 - - - - 186 155.2
16 O 45 - - - - - - - - MR II 339 308 - - - - CR III - - - - - - - - - - 339 308.0
17 O 46. - - - - - - - - MR III 56 42 MR III 31 32 MR III - - - - - - - - - - 87 74.0
18 O 46 - - - - - - - - CR III 192 212 - - - - CR III 199.43 124.80 - - CR III 4.78 2.77 CR III 10.09 6.17 - - 406 345.7
19 O 47 - - - - - - - - MR III 9 8 MR III 117 125 MR III 5.55 3.42 - - MR III 9.08 5.59 - - - - 140 141.7
20 O 48 - - - - - - - - MR III 14 11 MR III 136 125 MR III 49.66 31.39 - - MR III 17.32 10.03 - - - - 216 177.7
21 O 49 - - - - - - - - - - - - - - - - MR III 116.60 69.17 - - MR III 8.82 5.58 - - - - 125 74.8
22 O 50 - - - - - - - - - - - - - - - - - - - - - - - - MR III 34.72 21.49 MR III 5.01 3.86 - - 40 25.3
23 O 51 - - - - - - - - MR III 16 10 - - - - - - - - - - MR III 5.12 3.00 - - - - 21 13.0
P 40 CR II 4.27 3.0 4 3.0
24 P 41 - - - - - 0 - - - - - - MR II 83 72 MR II 45.82 38.02 - - - - - - - - 129 110.0
25 P 42 - - - - CR II 104 95 CR II 953 903 - - - - - - - - - - - - - - - - 1,057 998.0
26 P 42. - - - - - - - - - - - - MR II 118 96 MR II 28.72 16.29 - - - - - - - - 147 112.3
27 P 43 - - - - - - - - - - - - MR II 10 6 MR II 59.38 32.48 - - - - - - - - 70 38.5
28 P 44 - - - - - - - - - - - - - - - - MR II 81.62 44.65 - - - - MR II 4.42 3.00 - - 86 47.7
29 P 46 - - - - - - - - CR III 46 44 - - - - CR III 184.97 155.05 CR III 123.84 115.52 - - - - - - 355 314.6
30 P 52 CR III 3.98 3.0 4 3.0
30 M 46 - - - - - - - - - - - - - - - - CR III 4.04 3.41 - - - - - - - - 4 3.4
31 M 42 - - - - - - - - CR II 4 4 - - - - - - - - - - - - - - - - 4 4.0
32 M 36 - - - - - - - - - - - - CR II 5 4 - - - - CR II 5.06 3.21 CR II 15.15 8.43 - - - - 25 15.6
33 M 35 - - - - MR I 171 200 - - - - - - - - - - - - - - - - MR I 5.60 3.43 - - 177 203.4
34 M 34 - - - - MR I 232 200 - - - - - - - - - - - - MR I 11.75 7.76 MR I 6.58 3.81 - - - - 250 211.6
35 M 33 - - - - MR I 285 279 - - - - - - - - - - - - - - MR I 6.52 3.00 - - - - 292 282.3
36 M 32 - - - - MR I 240 207 - - - - - - - - - - - - - - MR I 11.11 6.43 - - - - 251 213.7
37 M 31 - - - - MR I 268 236 - - - - - - - - - - - - - - MR I 4.91 3.00 - - - - 273 238.8
38 M 30 - - - - MR I 281 248 - - - - - - - - MR I 4.98 4.00 - - MR I 4.68 3.00 - - - - 291 255.0
39 M 29 - - - - MR I 252 207 MR I 76 68 - - - - - - - - - - - - MR I 5.10 3.28 - - 334 278.3
40 M 28 - - - - - - - - MR I 301 272 - - - - - - - - MR I 10.01 6.35 - - - - - - 311 278.3
41 M 27 - - - - - - - - MR I 232 220 - - - - MR I 3.86 4.00 MR I 10.38 6.19 - - - - - - 246 230.2
42 M 26 - - - - - - - - MR I 291 286 - - - - - - - - - - - - - - - - 291 286.0
43 M 25 - - - - - - - - MR I 183 158 MR I 147 104 - - - - - - - - - - - - 331 262.0
44 M 24 - - - - - - - - MR I 18 12 MR I 185 168 - - - - - - - - - - - - 202 180.0
45 N 41 - - - - - - - - - - - - - - - - MR II 19.41 14.28 - - - - - - - - 19 14.3
46 N 44 - - - - - - - - - - - - - - - - MR II 18.65 13.64 MR II 4.52 3.05 - - - - - - 23 16.7
47 N 45 - - - - - - - - - - - - - - - - MR II 13.70 10.02 - - - - - - - - 14 10.0
48 N 47 - - - - - - - - - - - - - - - - - - - - - - - - MR III 5.58 3.43 - - - - 6 3.4
49 N 49 - - - - - - - - - - - - - - - - MR II 5.05 4.44 - - - - - - - - 5 4.4
50 L 29 - - - - - - - - - - - - CR I 67 80 CR I 605.69 509.35 CR I 10.93 6.51 - - - - - - 684 595.9
51 L 28 - - - - - - - - CR I 5 3 - - - - - - - - - - - - - - - - 5 3.0
52 L 27 - - - - - - - - - - - - - - - - CR I 4.73 4.17 CR I 26.36 15.12 CR I 12.05 7.44 - - - - 43 26.7
53 L 26 - - - - - - - - - - - - - - - - - - - - - - - - MR I 29.48 17.66 - - - - 29 17.7
54 L 24 - - - - - - - - MR I 49 40 - - - - MR I 4.73 4.00 MR I 33.79 18.69 MR I 21.16 13.25 MR I 21.66 13.30 - - 130 89.2
55 L 23 - - - - - - - - MR I 4 4 - - - - MR I 4.75 4.19 - - MR I 33.57 19.65 - - - - 42 27.5
56 L 22 - - - - - - - - CR I 5 5 - - - - - - - - - - - - - - - - 5 5.0
57 K 18 - - - - - - - - CR I 9 8 - - - - - - - - - - - - - - - - 9 8.5
58 L 30 - - - - CR I 9 8 - - - - - - - - - - - - CR I 5.69 3.46 - - - - - - 15 11.5
59 T 68 - - - - - - - - - - - - - - - - - - - - MR IV 176.08 109.31 - - MR IV 5.84 4.21 - - 182 113.5
60 R 43 - - - - - - - - - - - - - - - - - - - - - - - - - - - - MR IV 5.09 3.28 - - 5 3.3
61 S 67 - - - - - - - - - - - - - - - - MR IV 9.77 6.95 - - - - MR IV 48.31 30.59 - - 58 37.5
62 S 66 - - - - MR IV 42 29 MR IV 68 52 MR IV 60 45 MR IV 4.68 4.00 - - - - MR IV 4.51 3.25 - - 179 133.7
63 S 65 - - - - - - - - - - - - - - - - MR IV 123.86 72.48 MR IV 20.12 13.74 MR IV 4.16 3.00 MR IV 5.05 3.89 - - 153 93.1
64 S 64 - - - - MR IV 3 1 MR IV 8 8 - - - - - - - - MR IV 76.16 48.92 - - - - - - 88 57.9
65 S 63 - - - - MR IV 16 5 MR IV 44 21 - - - - - - - - MR IV 111.48 66.35 MR IV 36.83 23.03 - - - - 208 115.3
66 S 62 - - - - MR IV 11 3 - - - - - - - - - - - - MR IV 22.84 13.37 MR IV 26.19 14.91 MR IV 5.81 3.60 - - 66 35.2
67 S 61 - - - - CR IV 81 53 CR IV 37 32 - - - - - - - - - - CR IV 37.11 23.25 CR IV 378.24 234.34 - - 533 342.2
68 S 61. - - - - - - - - MR IV 32 20 - - - - - - - - - - MR IV 25.72 15.88 - - - - 58 36.0
69 S 60 - - - - MR IV 29 20 MR IV 5 5 - - - - MR IV 4.90 2.93 MR IV 64.84 41.56 MR IV 46.95 28.11 MR IV 5.38 4.15 - - 156 102.2
70 S 59 - - - - MR IV 55 67 - - - - - - - - - - - - MR IV 108.79 71.96 MR IV 10.07 4.93 MR IV 4.62 3.56 - - 178 147.4
71 S 58 - - - - MR IV 161 109 - - - - - - - - - - - - MR IV 66.33 38.99 MR IV 75.07 42.12 MR IV 5.08 3.67 - - 307 194.1
72 S 57 - - - - - - - - MR IV 130 100 - - - - MR IV 33.88 22.63 MR IV 118.66 73.82 MR IV 4.85 2.88 MR IV 5.04 3.88 - - 293 203.2
73 S 52 - - - - - - - - - - - - - - - - - - - - MR V 41.69 26.28 - - - - - - 42 26.3
74 S 51 - - - - - - - - - - - - - - - - - - - - MR V 5.90 3.72 - - - - - - 6 3.7
75 T 69 - - - - MR IV 7 5 - - - - - - - - - - - - - - - - - - - - 7 5.0
76 T 67 - - - - MR IV 12 9 - - - - - - - - - - - - MR IV 63.72 33.60 - - - - - - 75 42.1
77 T 66 - - - - MR IV 4 3 - - - - - - - - - - - - - - MR IV 14.82 8.58 - - - - 19 11.3
78 T 65 - - - - MR IV 7 6 - - - - - - - - - - - - - - MR IV 4.85 2.81 MR IV 21.15 13.78 - - 33 22.2
79 T 64 - - - - CR IV 3 3 - - - - - - - - - - - - - - - - - - - - 3 2.9
80 T 61 - - - - MR IV 5 3 - - - - - - - - - - - - - - - - - - - - 5 3.1
81 T 61. - - - - CR IV 150 92 - - - - - - - - - - - - - - - - CR IV 63.39 41.75 - - 213 133.6
82 T 59 - - - - - - - - MR IV 5 4 - - - - - - - - - - - - - - - - 5 4.0
83 Gudang - - - - - IV 86 - - IV 33 - - - - - - IV 8.17 - - - - - - - Central IV 4.57 - 131 -
84 R 61 - - - - - - - - CR IV 9 4 - - - - - - - - - - - - - - - - 9 4.0
85 R 48 - - - - - - - - - - - - - - - - - - - - MR V 18.67 11.34 - - - - - - 19 11.3
86 Q 61 - - - - - - - - CR III 37 40 - - - - - - - - - - - - CR III 4.30 3.03 - - 41 42.6
87 Q 59 - - - - - - - - MR III 53 25 - - - - MR III 5.25 3.84 - - - - - - - - 58 28.8
88 Q 58 - - - - - - - - - - - - - - - - - - - - - - - - MR III 15.94 8.35 MR III 6.06 4.67 - - 22 13.0
89 Q 57 - - - - - - - - MR III 4 4 - - - - - - - - - - MR III 5.01 3.09 MR III 6.26 3.88 - - 15 10.9
90 Q 55 - - - - - - - - - - - - - - - - MR III 9.74 7.12 MR III 5.05 3.15 MR III 19.95 12.02 - - - - 35 22.3
91 Q 52 - - - - - - - - - - - - MR III 4 4 - - - - MR III 4.85 2.57 - - - - - - 9 6.6
92 Q 50 - - - - - - - - - - - - MR III 4 4 - - - - MR III 73.41 54.65 MR III 4.72 2.98 MR III 11.78 7.77 - - 94 69.4
93 Q 50 CR III 4.20 2.9 4 2.9
94 Q 49 - - - - - - - - - - - - MR III 4 4 - - - - MR III 9.90 6.93 MR III 4.05 3.00 - - - - 18 14.0
95 Q 48 - - - - - - - - - - - - - - - - - - - - MR III 46.38 31.56 MR III 4.23 2.45 - - - - 51 34.0
96 Q 47 - - - - - - - - - - - - MR III 4 4 MR III 79.70 68.56 MR III 156.47 140.95 - - MR III 4.67 2.86 - - 245 216.4
97 Q 46 - - - - - - - - - - - - MR III
Total 2,041 1,966 4,385 4,038 3,750 3,148 1,560 1,376 2,890.25 1,973.0 1,891.9 1,015.5 781 363 766 469 84 38 18,149 14,386
- - - - - - - - - - - - - - - - - - - -
PT.PALMA SATU
KEBUN PALMA - A

PETA REALISASI TIMBUN JALAN S/D PER 14 OKTOBER THN 2020


K L M N O P Q R S T
01. SWAKLOLA
U Jumlah
Jarak Tempuh ( Km ) Hasil Kerja
70 70 No Polisi Driver Mtr/
Trip Jumlah Km/Trip Kg ( Netto ) Kg/Trip M³ M³/Trip Mtr
Trip
69 1 69
68 B T .
68 DT 30 HUTAURUK 324 13,840 43 1,755,430 5,418 1,350 4.2 1,085 3.3
67 1 67 DT 31 DASIMAN 394 17,117 43 2,318,430 5,884 1,783 4.5 1,410 3.6
7
66
65
Sampai Ke Jalan Poros CPO . 17 5
66
65
DT 32
DT 33
ALIMAN
NAMBELA
420
339
18,262
14,117
43
42
2,373,850
1,881,960
5,652
5,552
1,826
1,448
4.3
4.3
1,464
1,217
3.5
3.6
S 0
64 0 64 DT 34 SOPIAN.D 410 17,503 43 2,233,660 5,448 1,718 4.2 1,360 3.3
63 0 16 63 DT 35 SINAGA 432 18,051 42 2,405,120 5,567 1,850 4.3 1,439 3.3
62 20 5.000 M 0 1 62 DT 36 H.MANURUNG 472 20,407 43 2,724,740 5,773 2,096 4.4 1,620 3.4
61 M 61 DT 37 S.NAINGGOLAN 430 18,039 42 2,471,330 5,747 1,901 4.4 1,481 3.4
J 60 DT 38 RIADI 464 19,912 43 2,732,540 5,889 2,102 4.5 1,679 3.6
60
a M 2.000 M 59 DT 39 GENTA S 462 19,829 43 2,692,830 5,829 2,071 4.5 1,631 3.5
59
l Tidak Ada 2 2
58
a Multiplate 13 .14 22 3
58 TOTAL 4,147 177,077 43 23,589,890 5,688 18,146 4.4 14,386.5 3.5
57
n
.
. .
15 57 1 - 3,720 3 -
56 0 7 56 Per 14 Oktober 2020
55 5 2 5 55 Divisi Realisasi per lokasi ( Mtr ) Keterangan
P 0 M³
54 5 0 54 CR MR Total
o 0 0 650.6 3,465.8 4,116.4
53
0 53 I 4,999.8
r 3 0
52 1 52 II 6,211.2 2,885.0 2,381.9 5,266.9
o M . 51 III 3,379.6 2,109.5 989.6 3,099.1
51
M2.000 M M
62. M
50 s 50 IV 3,259.0 482.7 1,368.4 1,851.1
5 - 41.3 41.3
49 V 94.4
49
3
9 0
48 C
2 24 48 BBU-II 13.1 - - 11.5
P . 0 PS-B 108.52 - - -
47
5 . 47
O 2
46
45 0 5
5 11
4
46
45
KAT-III
Total
83.18
18,149
-
6,128
-
8,247
-
14,386
0 . M
12 44 -
44
0
43
5 0 0 43
1 M 42 02. KONTRAKTOR
42
. 1 0
41 M 41 Per 14 Oktober 2020
2
3.000 M 1 M 0
40 . 1 40 Divisi Realisasi per lokasi ( Mtr ) Keterangan
.8

5 7 . 10
39 CR MR Total
39
7
38
0 5 2 M 38 I - - - -
7 II 4,087.1 80.0 2,443.9 2,523.9
37
1.000 M 7 5
37
36 0 5 36 III 5,218.8 701.8 2,827.0 3,528.8
35 5
M 0 0 35 IV 8,392.3 205.0 4,202.7 4,407.7
34
19 0 34 V - - - -
33 M 33 Total 17,698.2 987 9,473 10,460.3
32
M M 32 -
3
31 M 31
. 3. REKAP GLOBAL
30
29
18 2
Legenda :
Realisasi Timbun Jalan
30
29 Per 14 Oktober 2020
Rencana
28 5 Rencana Timbun Jalan 28 Divisi

Realisasi per lokasi ( Mtr )
Timbun ( Mtr )
% tase Keterangan
27 Jalan Poros CPO 27 CR MR Total
0
26 Batas Divisi 26 I 4,999.8 650.6 3,465.8 4,116.4
25 Batas Kebun 25 II 10,298.4 2,965.0 4,825.8 7,790.8
24 M Areal Okupasi 24 III 8,598.4 2,811.3 3,816.6 6,627.9
23 23 IV 11,651.3 687.7 5,571.0 6,258.8
48,500 51%
22 22 V 94.4 - 41.3 41.3
21 21 BBU-II 13.1 - - 11.5
20 20 PS-B 108.5 - - -
19 19 KAT-III 83.2 - - -
18 18 Total 35,847 7,115 17,721 24,847 48,500 51%
24,847
-

K L M N O P Q R S T
PT . PALMA SATU
Kebun Palma - A
MONITORING CURAH HUJAN
Bulan : Oktober 2020
CURAH HUJAN
Tgl
MM
1 3.0
2 2.5
3 -
4 -
5 -
6 -
7 6.3
8 2.0
9 -
10 -
11 -
12 -
13 -
14 -
15 -
16 -
17 -
18 -
19 -
20 -
21 -
22 -
23 -
24 -
25 -
26 -
27 -
28 -
29 -
30 -
31 -
TOTAL 13.8
PT. PALMA SATU
Kebun Palma - A

REKAP TIMBUN JALAN KONTRAKTOR DAN SWAKLOLA


REKAP KERJA DUMP TRUK
Jumlah Trip Jarak ( Km ) Timbang PKS Hasil Kerja
Tanggal Jumlah Lokasi Kerja
Brutto Tarra Netto ( Kg ) Meter Kubik ( M³ ) Panjang Jalan ( Mtr )
Unit ( Divisi ) HI s/d HI s/d BI HI s/d HI s/d BI
( Kg ) ( Kg ) Hi s/d HI s/d BI Hi s/d HI s/d BI Hi s/d HI s/d BI
s/d B.Lalu I,II,III & IV 6,776 309,162 44,720,560 34,400 23,888
1-Oct-20 11 16 16 6,792 992 992 310,154 201,560 65,770 135,790 135,790 44,856,350 104 104 34,505 58 58 23,947
2-Oct-20 9 17 33 6,809 918 1,910 311,072 209,970 69,950 140,020 275,810 44,996,370 108 212 34,613 65 123 24,011
3-Oct-20 9 30 63 6,839 1,556 3,466 312,628 361,190 122,960 238,230 514,040 45,234,600 183 395 34,796 106 229 24,117
4-Oct-20 6 12 75 6,851 648 4,114 313,276 142,880 49,250 93,630 607,670 45,328,230 72 467 34,868 45 274 24,162
5-Oct-20 11 27 102 6,878 1,445 5,559 314,721 321,650 109,920 211,730 819,400 45,539,960 163 630 35,031 123 397 24,285
6-Oct-20 11 25 127 6,903 1,342 6,901 316,063 290,740 100,940 189,800 1,009,200 45,729,760 146 776 35,177 103 500 24,388
7-Oct-20 13 35 162 6,938 1,723 8,624 317,786 403,130 141,330 261,800 1,271,000 45,991,560 201 978 35,378 143 643 24,531
8-Oct-20 6 8 170 6,946 496 9,120 318,282 101,330 32,180 69,150 1,340,150 46,060,710 53 1,031 35,431 39 682 24,570
9-Oct-20 14 26 196 6,972 1,568 10,688 319,850 324,110 105,460 218,650 1,558,800 46,279,360 168 1,199 35,600 123 805 24,693
10-Oct-20 10 27 223 6,999 1,375 12,063 321,225 320,210 109,060 211,150 1,769,950 46,490,510 162 1,362 35,762 106 911 24,799
11-Oct-20 - - 223 6,999 - 12,063 321,225 - - - 1,769,950 46,490,510 - 1,362 35,762 - 911 24,799
12-Oct-20 - - 223 6,999 - 12,063 321,225 - - - 1,769,950 46,490,510 - 1,362 35,762 - 911 24,799
13-Oct-20 - - 223 6,999 - 12,063 321,225 - - - 1,769,950 46,490,510 - 1,362 35,762 - 911 24,799
14-Oct-20 11 14 237 7,013 688 12,751 321,913 167,530 56,790 110,740 1,880,690 46,601,250 85 1,447 35,847 48 959 24,847
15-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
16-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
17-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
18-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
19-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
20-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
21-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
22-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
23-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
24-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
25-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
26-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
27-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
28-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
29-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
30-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847
31-Oct-20 - - 237 7,013 - 12,751 321,913 - - - 1,880,690 46,601,250 - 1,447 35,847 - 959 24,847

Total 237 237 7,013 12,751 12,751 321,913 2,844,300 963,610 1,880,690 1,880,690 46,601,250 1,447 1,447 35,847 959 959 24,847