Beruflich Dokumente
Kultur Dokumente
P1 PAINT FININSH 1
P2 PAINT FININSH 2
P3 PAINT FININSH 3
MATERIAL SCHEDULE
10' M1 EXPOSED BRICK FINISH 1
2'-6"
1" band with 21"
TILE ROOF projection
3"
DECORATIVE FRP EAVES
WITH RAIN GUTTER
COLUMN 2 P1
6'
10'-6"
1" band with 21"
5'
projection
PLASTER FINISH
SECTION @ 16'
8'
2" band with 2" P1
2" BAND WITH 2" PROJECTION Detail C projection
PURPOSE:
3"
DRAWING INFORMATION
7"
Detail E 1"
72 P1 +0"
1"
72 P2 63
4" +0" 1"
72 P1
3'
3'
4" P3 4"
2'-6"
DWG TITLE : WEST ELEVATION
6"
22'-6"
Detail F
DWG NO : P8/02/20-21/WD/02/R0
2'-6"
DECORATIVE GABLE
2'
REV NO: R0
SECTION @ 9'6"
DRAWN BY: M.Sangeetha
FRP EAVES
WITH RAIN GUTTER
Detail D MAIN DOOR CHECKED BY: Ar.Prathiba
TEAK WOOD DOOR WITH FRAME
DATE: 03.09.2020
10'-6"
2'-9"
5'-6"
ORNATE LAMP NICHE/ MAADAM P2
+0" PROJECT : Proposed Facade Design @ Vandhavasi
PROJECT INFORMATION
COLUMN 1
P1
8'
9'-6"
SITE ADDRESS: Vandhavasi
Detail A M2 M2
4'
2" 6"
Detail B
2'-6"
1' 1' 1'-3"
EXPOSED BRICK 2 P1
1'
P3 1' 9"
121" band with 21"
21"
2
1"
12
projection
M1
1'-6"
1'-8"
EXPOSED BRICK 1
GROUND LVL