Sie sind auf Seite 1von 1

This Drawings/Design are property of MEGA.

The Drawings/ Design cannot be issued by any other


person,firm,authority or used by consultant for any other purpose/project without prior written permission of
MEGA.The consultant shall indemnify MEGA against all claims arisen due to infringement of any right
EAST BOUND protected by design,copyright or other intellectual property rights.
N

KEY PLAN

ISSUED FOR
AS BUILT DRAWING DEFINATIVE DESIGN
GOOD FOR CONSTRUCTION - WD PRELIMINARY DESIGN
CONSTRUCTION REFERENCE DRAWING FOR REFERENCE / DISCUSSION
REFERENCE REPORT WITH REVISION NO. & DATE :-

REFERENCE DESIGN DOCUMENT WITH REVISION NO. & DATE :-


SCHEMATIC FOR CROSS PASSAGE AND STATIONS (E/B)
REFERENCE DWG. (Alignment/Land Plan/Arch./Stru./E&M/TVS-HVSC) WITH REVISION NO. & DATE :-

SR. NO. REFERENCE DRAWING NUMBER REVISION NO. DATE


WEST BOUND

LEGENDS : ABBREVIATIONS

REVISION CONTROL

SCHEMATIC FOR CROSS PASSAGE AND STATIONS (W/B)


REV. NO. DATE DESCRIPTION OF CHANGES /CLOUDING DESIGNER
EMPLOYER:

METROLINK EXPRESS FOR GANDHINAGAR AND AHMEDABAD(MEGA) COMPANY LIMITED


(A SPV of Government of India and Government of Gujarat)

CURVE TABLE FOR EAST BOUND NO OBJECTION FROM EMPLOYER IS BEING ACCORDED FOR CONSTRUCTION

(SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE)

AGM / MANAGER (S&T) AGM / MANAGER (SYS) AGM / MANAGER (P&D) AGM / MANAGER (CONST.)

(SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE)

GM(S&T) GM(SYS) GM(P&D) GM(CONST.)


ENGINEER:
GENERAL ENGINEERING CONSULTANT
CONSORTIUM OF SYSTRA-RITES-OCG-AECOM
THE DESIGN & DRAWING AS CERTIFIED BELOW AND SUBMITTED BY THE CONTRACTOR HAVE BEEN PROOF CHECKED BY GENERAL
ENGINEERING CONSULTANT ON BEHALF OF MEGA AND IS RECOMMENDED TO MEGA FOR REFERENCE OF :-
NO OBJECTION NO OBJECTION SUBJECT TO THE COMMENTS AS NOTED

REVISION AND RESUBMISSION REQUIRED SUBJECT TO THE COMMENTS AS NOTED

(SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE)

ENGINEER / ARCHITECT CTE / Dy. CTE CTRAE/Dy. CTRAE CIE/ Dy CIE CDE (E & M)/Dy CDE

(SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE)

CDA / Dy. CDA CSDE / Dy. CSDE PROJECT MANAGER (UG) DY. PROJECT DIRECTOR PROJECT DIRECTOR

EXCEPTION BY CONTRACTOR : NIL


CONTRACTOR : Afcons Infrastructure Limited
Afcons House-16, Shah Industrial Estate, Veera Desai Road, Azad Nagar,
Post Box No. 11978, Andheri (W), Mumbai – 400053 Ph:
+91-22-66773121 Fax:+91-22-26730047/1031, Email: ajay@afcons.com
IT IS CERTIFIED THAT DETAILED DRAWING PREPARED IS COMPLIED WITH THE TERM & CONDITIONS OF CONTRACT WITH MEGA AND
CONTRACTOR OWNS FULL RESPONSIBILITY OF QUALITY CONTROL, CHECKING AND VERIFICATION OF ACCURACY, CORRECTNESS,
COMPLETENESS, INTEGRATION, INTERFACING WITH OTHER DESIGN DISCIPLINES & CONTRACTORS AND FULL COMPLIANCE OF
EMPLOYER & CONTRACT REQUIREMENT PROVISIONS AND STANDARDS, SPECIFICATIONS, SAFETY AND STATUTORY RULES &
REGULATIONS APPLICABLE. IT IS CERTIFIED THAT, THIS DRAWING HAS NO EXCEPTIONS UNLESS DEFINED AS ABOVE EXPLICITLY.

CURVE TABLE FOR WEST BOUND (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE)

(ENGINEER'S NAME) (ENGINEER'S NAME) (ENGINEER'S NAME) (ENGINEER'S NAME) (ENGINEER'S NAME)
CHECKED BY CHECKED BY REVIEWED BY APPROVED BY ISSUED BY
INTERFACE ENGINEER
INDEPENDENT LEAD DESIGN CHECKER (I-LDC) :

IT IS CERTIFIED THAT DETAILED DRAWING PREPARED BY “DDC” HAS BEEN INDEPENDENTLY ANALYZED & DESIGNED FOR CHECKING BY “I-LDC” & IT IS
COMPLIED WITH THE TERM & CONDITIONS OF CONTRACT REQUIREMENTS AND I-LDC OWNS FULL RESPONSIBILITY FOR ACCURACY OF DESIGN AS PER
ODS & OCS, ADEQUACY & MEETING FUNCTIONAL, PERFORMANCE AND OPERATIONAL REQUIREMENTS INCLUDING CONSIDERATION FOR INTERFACE
REQUIREMENTS WITH OTHER CONCERNED DESIGNERS & CONTRACTORS AND COMPLIANCE TO STANDARDS, SPECIFICATIONS, SAFETY AND STATUTORY
RULES & REGULATIONS APPLICABLE. IT IS CERTIFIED THAT, THIS DRAWING HAS NO EXCEPTIONS UNLESS DEFINED AS ABOVE EXPLICITLY.IT IS
CERTIFIED BY I-LDC FOR ONWARD SUBMISSION OF THIS DRAWING BY CONTRACTOR TO ENGINEER.

(SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE) (SIGNATURE) (DATE)

(ENGINEER'S NAME) (ENGINEER'S NAME) TARUN D.K. SHARMA (ENGINEER'S NAME)


CHECKED BY INDEPENDENTLY INDEPENDENTLY INDEPENDENTLY ISSUED BY
INTERFACE ENGINEER CHECKED BY REVIEWED BY APPROVED BY
DETAILED DESIGN CONSULTANT (DDC) : TUNNEL CONSULTANT
TANDON CONSULTANTS PVT. LTD. GEOCONSULT India Pvt.Ltd
STRUCTURAL ENGINEERING SPECIALISTS
17 LINK ROAD, JANGPURA EXTENSION NEW DELHI-110 014
E-mail: tcpl_123@yahoo.com,tandon@tcpl.com,Website : www.tcpl.com

PROJECT NAME : AHMEDABAD METRO-LINK RAIL PROJECT PHASE I


Design and Construction of Underground Stations and Tunnel including Finishes and excluding PHE, Electrical and HVAC from East End of East
Ramp to East End of Launching Shaft near Kalupur Metro Station from Chainage 14328.88m to Chainage 11882.88m, which comprises of East
Ramp,Twin Bored Underground Tunnel between East Ramp and Kalupur Metro Station all cut and cover portion including two Underground
Stations Kankaria East and Kalupur Metro Station, including a portion of NATM and Launching and Receiving Chambers of TBM for Ahmedabad
Metro Rail Project, Phase-1,vide IFB No: MEGA/EW/UGSAT/PKG-1/CIVIL/2016

CONTRACT ID :
DRAWING NAME/TITLE : GENERAL
ARRANGEMENT DRAWINGS SIZE : A1
(PLAN & PROFILE)
LOCATION : UG1 CONTRACT LIMITS
DRAWING NO. : UG1-C-GEN-1001 SHEET NO. :
REV. NO. :
SCALE : AS SHOWN DATE :
IT IS CERTIFIED THAT DETAILED DRAWING PREPARED IS COMPLIED WITH THE TERM & CONDITIONS OF CONTRACT WITH MEGA AND DDC OWNS FULL
RESPONSIBILITY FOR DESIGN AS PER ODS & OCS, ADEQUACY & MEETING FUNCTIONAL, PERFORMANCE AND OPERATIONAL REQUIREMENTS
INCLUDING CONSIDERATION FOR INTERFACE REQUIREMENTS WITH OTHER CONCERNED DESIGNERS & CONTRACTORS AND COMPLIANCE TO
STANDARD, SPECIFICATIONS, SAFETY AND STATUTORY RULES & REGULATIONS APPLICABLE. IT IS CERTIFIED THAT, THIS DRAWING HAS NO
EXCEPTIONS UNLESS DEFINED AS ABOVE EXPLICITLY. THIS DRAWING WITH RELEVANT ANALYSIS & DESIGN HAS BEEN PRODUCED BY DDC AND
INDEPENDENTLY CHECKED BY I-LDC & CONTRACTOR BEFORE SUBMISSION TO ENGINEER.

YBe SKc DBa PRAVEEN KUMAR


CHECKED BY
DESIGNED BY CHECKED BY APPROVED BY ISSUED BY
INTERFACE ENGINEER

FILE NAME: D:\BIKRAM RAM\DIWAKER SIR\10.08.19\MODEMAP-9\WITH OUT SIGNED PDF\UG1-C-GEN-1001-001 TO 003_R9, 004 & 005_R10, 006_R7, 007_R5(MODEMAP9).DWG

Das könnte Ihnen auch gefallen