Sie sind auf Seite 1von 73

S. No.

Tags
1 Authority's/Engineer's delays
2 Borrow Area/Mining Approval
3 CIL CHANGE IN LAW
4 Claims
5 COS Change of Scope
6 Damages
7 Design & Drawings
8 Force Majeure
9 Land Issues
10 Maintenance/DLP
11 Miscellaneous
12 MPR
13 Other Obstructions
14 Payments
15 Program
16 Provisional/Completion Certificate
17 Quality of Works
18 Security Deposit
19 Slow Progress
20 Statutory
21 Termination
22 Time Extension
23 Trees
24 Utilities
25 Descoping
26 Quality
27 COVID-19
28 Hindrance List

371
ProjectRehabilitation and Upgradation to Four Laning of Baharagora to Singhara Section (Km 199.200 to Km 310.806) of NH-6 (Length - 111.606 Km) in the State of Odisha under NHDP Phase-IV, on EPC Mode
Updated As
Details of Correspondences Exchanged 25-Nov-20
On: EIP

Letter Details Sender / Recipient Reply


Sl. No. Group Tags Subject Required If Y - Replied Vide letter Ref. & date letter Issued by
L Letter No. inc. Hyperlink Letter Date From To (Y/N)

1 NHAI 11011-PIUNHAI-SBP-Meeting-4621-2015 11-May-15 M.Ravindra rao,PD M/s.L&T Ltd ,Jashipur Miscellaneous Meeting N

3 L&T LT-BSRP-OUT-15-16-01 14-Sep-15 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Sambalpur Design & Drawings Mobilization of Design Consultant N

4 NHAI 11035-PIU-NHAI-SBP-NH-6-Concessionaire-4303 14-Sep-15 M.Sailaja,DGM,Project Director M/s.L&T Ltd ,Jashipur Miscellaneous To whom soever it may concern N

5 L&T LT-BSRP-OUT-15-16-02 16-Sep-15 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Miscellaneous Permission for Site Investigation & Preparation of Trace Map N

6 L&T LT-BSRP-OUT-15-16-03 16-Sep-15 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Sambalpur Design & Drawings Design Team - Field Survey Activities N

7 L&T LT-BSRP-OUT-15-16-04 26-Sep-15 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Land Issues Submission of Land Plan & Land Schedule N

8 L&T LT-BSRP-OUT-15-16-05 26-Sep-15 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Sambalpur Design & Drawings Design Team - Field Survey Activities N

9 L&T LT-BSRP-OUT-15-16-06 3-Oct-15 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Sambalpur Miscellaneous Form-V N


Mr.K V Praveen,Business Unit
10 NHAI NHAI-13011-10-RO-OD-4769-2015 8-Oct-15 CM Sinha,Manager (Tech) Miscellaneous Meeting N
Heads,Roads,Chennai.
11 L&T LT-BSRP-OUT-15-16-08 9-Oct-15 M/s.L&T Ltd ,Bangriposi NHAI-RO-BBSR Miscellaneous Request for Change in Meeting Schedule Y NHAI/13011/10/RO/OD/4769/2015

The Asst.Labour
14 L&T LT-BSRP-OUT-15-16-17 4-Nov-15 M/s.L&T Ltd ,Bangriposi Miscellaneous Labour license N
Commissioner,Keonjhar,Odisha
15 L&T LT-BSRP-OUT-15-16-09 6-Nov-15 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Land Issues Submission of Land Plan & Land Schedule N
17 L&T LT-BSRP-OUT-15-16-10 20-Nov-15 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Miscellaneous Request for Genealogy & Trace Maps N
18 L&T LT-BSRP-OUT-15-16-11 25-Nov-15 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Statutory Permission for Extraction of River Sand N
19 L&T LT-BSRP-OUT-15-16-12 26-Nov-15 M/s.L&T Ltd ,Bangriposi The Tahsildar,Saraskana Statutory Permission for Extraction of River Sand N
20 L&T LT-BSRP-OUT-15-16-13 1-Dec-15 M/s.L&T Ltd ,Bangriposi Omega Consultancy Services Quality of Works Testing of Construction Material N
21 L&T LT-BSRP-OUT-15-16-14 10-Dec-15 M/s.L&T Ltd ,Bangriposi YoungEngineer/
Chief Eng. & Calibrations
Basin Quality of Works Calibration of Testing Instruments N
Mr.P. Nageswara rao,DGM Manager,SNV
23 NHAI NHAI-11011-8-SBL -BAHA-2016-PIU-BLS-41 21-Jan-16 Design & Drawings Request for Issuance of permission for conducting Geo-technical Investigation at Km. 212.625 N
(Tech),PD Basin,Laxmiposi,Baripada,Mayur
bhanjCompetent Authority and
The
Mr.P. Nageswara rao,DGM Rehabilitation & Upgradation of Baharagora-Singhara section of NH-6 from Km. 199.200 to Km.310.806 in
24 NHAI NHAI-11011-1-LA-2016-PIU-BLS-51 3-Feb-16 Land Acquisition Officer,O/o Miscellaneous N
(Tech),PD the state of Odisha under NHDP Phase IV
The Tahasildar,Jashipur
25 L&T LT-BSRP-OUT-15-16-18 26-Mar-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Utilities Computation of scope / value of work for the mentioned project falling in the state of Jharkhand N
26 L&T LT-BSRP-OUT-15-16-19 30-Mar-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore CIL Change in law pursuant to cl.19.17 of the agreement N
Mr.P. Nageswara rao,DGM
27 NHAI NHAI-11011-8-LT-2016-PIU-BLS-133 12-Apr-16 M/s.L&T Ltd ,Jashipur Miscellaneous Computation of scope/Value of work for the mentioned project falling in the stagte of jharkhand N
(Tech),PD
Mr.P. Nageswara rao,DGM
28 NHAI NHAI-11011-8-SBL-BAHA-2016-PIU-BLS-134 12-Apr-16 M/s.L&T Ltd ,Jashipur Miscellaneous To whom soever it may concern N
(Tech),PD
Service tax on royalty amount for extraction of minor and major minerals-change in law pursuant to
30 L&T LT-BSRP-OUT-15-16-20 19-May-16 M/s.L&T Ltd, Bangriposi NHAI-PIU-Balasore CIL
cl.19.17 of the agreement
N

Mr.P. Nageswara rao,DGM Inspection & Review meeting of NHAI Projects in the state of Odisha by chairman,NHAI during his visit to
32 NHAI NHAI-13011-8-Meeting-2016-PIU-BLS-213 30-May-16 M/s.L&T Ltd ,Jashipur Miscellaneous N
(Tech),PD Odisha on 04 June 16 & 05 June 16.
33 L&T LT-BSRP-OUT-16-17-001 20-Jun-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Statutory Submission of Water Requirement for project work and water management Plan N

34 L&T LT-BSRP-OUT-16-17-002 20-Jun-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Submission of Proposal of Proof Consultant Y LT/BSRP/OUT/16-17/002 & LT/BSRP/OUT/16-17/020

35 L&T LT-BSRP-OUT-16-17-003 20-Jun-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Submission of Proposal of Safety Consultant N

36 L&T LT-BSRP-OUT-16-17-004 20-Jun-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Submission of Design Reports N

37 L&T LT-BSRP-OUT-16-17-005 5-Jul-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore CIL Change in Law N
38 L&T LT-BSRP-OUT-16-17-006 11-Jul-16 M/s.L&T Ltd ,Bangriposi Asst. Labour Commissioner Claims Submission of Returns N

39 L&T LT-BSRP-OUT-16-17-007 17-Jul-16 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Design & Drawings Submission of Land Plan & Land Schedule N

40 L&T LT-BSRP-OUT-16-17-008 18-Jul-16 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Statutory Crusher Plant Location N
Mr.P. Nageswara rao,DGM
41 NHAI NHAI-11011-8-LT-2016-PIU-BLS-324 18-Jul-16 M/s.L&T Ltd ,Jashipur Miscellaneous To whom soever it may concern N
(Tech),PD
Mr.P. Nageswara rao,DGM
42 NHAI NHAI-13011-14-Misc-2016-PIU-BLS-314 18-Jul-16 M/s.L&T Ltd ,Jashipur Statutory Implementation of the provision of notification of fly ash Utilization N
(Tech),PD
43 L&T LT-BSRP-OUT-16-17-009 19-Jul-16 M/s.L&T Ltd ,Bangriposi The Tahsildar,Saraskana Statutory Natural Gravel Source N

44 L&T LT-BSRP-OUT-16-17-010 21-Jul-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Trees Felling of Trees under Cl. 9.4 N
46 L&T LT-BSRP-OUT-16-17-011 25-Jul-16 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Statutory Crusher Plant Installation N
47 L&T LT-BSRP-OUT-16-17-012 28-Jul-16 M/s.L&T Ltd ,Bangriposi EE - Water Resource Dept. Statutory Water drawn Permission N
The senior Geologist,GWD
Division
49 L&T LT-BSRP-OUT-16-17-014 10-Aug-16 M/s.L&T Ltd ,Bangriposi Statutory NOC of Ground Water N
,Takatpur,Mayurbhanj,Baripada,
Odisha
52 L&T LT-BSRP-OUT-16-17-016 8-Sep-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Submission of proposal of the safety Consultant N

Mr.P. Nageswara rao,DGM


53 NHAI NHAI-13011-14-Misc.-2016-PIU-BLS-516 6-Oct-16 M/s.L&T Ltd ,Jashipur Miscellaneous Greening (Plantation and its maintenanced of National Highways-Creation of Fund N
(Tech),PD
Mr.P. Nageswara rao,DGM Research proposal onlaboratory and field investigation on panelled cement concrete pavements & High
56 NHAI NHAI- 13011-14-Misc.-2016-PIU-BLS-615 11-Nov-16 M/s.L&T Ltd ,Jashipur Miscellaneous Y LT/BSRP/OUT/17-18/076
(Tech),PD modulus Asphalt (Hima) Mixes for india Highways by IIT,Kharagpur

57 L&T LT-BSRP-OUT-16-17-017 16-Nov-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Toll Plaza Location Y RITES-BSRP-OD-L&T-2018-194

58 L&T LT-BSRP-OUT-16-17-018 16-Nov-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Submission of Proposal of Proof Consultant N

59 L&T LT-BSRP-OUT-16-17-019 16-Nov-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Submission of Proposal of Safety Consultant N

60 L&T LT-BSRP-OUT-16-17-020 16-Nov-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Submission of Proposal of Proof Consultant N

61 L&T LT-BSRP-OUT-16-17-021 16-Nov-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Submission of Proposal of Safety Consultant Y LT/BSRP/OUT/16-17/003
62 L&T LT-BSRP-OUT-16-17-022 21-Nov-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore CIL Notice pursuant to cl.19.17 of the agreement for increase in the rate of VAT N
63 L&T LT-BSRP-OUT-16-17-023 21-Nov-16 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Miscellaneous To whom so ever it may concern N
The principal
64 L&T LT-BSRP-OUT-16-17-024 22-Nov-16 M/s.L&T Ltd ,Bangriposi Design & Drawings Request to approval of Hydro Geological survey and VES Test Y NHAI/NHDP/OR/10/EPC/2013/181
sacretary,Bhubaneswar
The office of the Regional
65 L&T LT-BSRP-OUT-16-17-033 30-Nov-16 M/s.L&T Ltd ,Bangriposi Miscellaneous BOCW Application N
Labour Commissioner central
Mr.P. Nageswara rao,DGM
66 NHAI NHAI-13011-14-Misc.-2016-PIU-BLS-678 30-Nov-16 M/s.L&T Ltd ,Jashipur Payments Payment of wages to workers through Bank Account N
(Tech),PD
The Regional Office,Orissa
67 L&T LT-BSRP-OUT-16-17-026 19-Dec-16 M/s.L&T Ltd ,Bangriposi Statutory Request to issue a CTE or 30 cum Batching plant at vill:Kanimahuli,Saraskhana,Mayurbhanj N
Pollution Control Board
70 L&T LT-BSRP-OUT-16-17-027 23-Dec-16 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Miscellaneous Appointment of Contractors representative N
Application of permission for temporary use of Govt.Land in work related to NH-6 project at revenue village
71 L&T LT-BSRP-OUT-16-17-028 23-Dec-16 M/s.L&T Ltd ,Bangriposi The Tahsildar,Saraskana Statutory N
kanimahuli
The Executive
72 L&T LT-BSRP-OUT-16-17-029 3-Jan-17 M/s.L&T Ltd ,Bangriposi Engineer/Divisional Statutory Supply of Electrical Energy on Temporary Basis N
Engineer,Mayurbhanj,Odisha
73 L&T LT-BSRP-OUT-16-17-030 7-Jan-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Miscellaneous Declaration of Appointed Date N
74 L&T LT-BSRP-OUT-16-17-031 12-Jan-17 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Land Issues Regarding land lease for Installation Mobile Crusher & Stock yard N
The assistant Labour
75 L&T LT-BSRP-OUT-16-17-032 13-Jan-17 M/s.L&T Ltd ,Bangriposi Miscellaneous Half Yearly & Annual as on 31st dec 2016 N
Commissioner (Central),
BEL-MCL (JV),Ward
No.25,Bypass chhancha,Behind
Mr.P. Nageswara rao,DGM
76 NHAI NHAI-13011-14-Misc.-2017-piu-bls-89 1-Feb-17 IOCL Petrol pump,Baripada, Miscellaneous Preparation of Diversion plan before starting of work N
(Tech),PD
M/s.L&T Ltd
,Jashipur
77 L&T LT-BSRP-OUT-16-17-034 2-Feb-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Payments Commencement of Tree Felling and Utility shifting works and payments N
78 L&T LT-BSRP-OUT-16-17-035 20-Feb-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Miscellaneous Approval of external/third party testing agency N
BEL-MCL (JV),Ward
No.25,Bypass chhancha,Behind
Mr.P. Nageswara rao,DGM
79 NHAI NHAI-13011-14-Misc.-2017-PIU-BLS-170 1-Mar-17 IOCL Petrol Trees Volvo Trucks tree Transplantation Solution N
(Tech),PD
pump,Baripada,M/s.L&T Ltd
,Jashipur
Mr.P. Nageswara rao,DGM National Highway Authority of india,Project Implementation unit plot no.1086,chandamari padia
80 NHAI NHAI-13011-4-Admin.-2017-PIU-BLS-190 7-Mar-17 Project Director,NHAI,Balasore Miscellaneous N
(Tech),PD Road,Sahadevakhunta,Balasore
Mr.Kapil prasad,Team
81 RITES-OD RITES-BSRP-OD-LT-2018-129 16-Mar-17 M/s.L&T Ltd ,Bangriposi Design & Drawings Widening of Existing Carriageway Y
leaderSr.Highway Engg.
A.K.Nayak,Chief Labour
82 LABOUR LABOUR 20-Apr-17 Miscellaneous Labour Rates N
Commissioner
Divisional forest officer,Karanjia
84 NHAI NHAI-11011-5-Forest-2017-PIU-BLS-334 3-May-17 Project Director Trees Diversion of 85.104 Ha.of forest land for rehabilitation and upgradation of NH-6 Pkg-1 N
forest division,Karanjia.
85 L&T LT-BSRP-OUT-17-18-002 8-May-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Miscellaneous Declaration of Appointed Date N
87 L&T LT-BSRP-OUT-17-18-003 15-May-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Miscellaneous Declaration of Appointed Date N
BEL-MCL (JV),Ward
No.25,Bypass chhancha,Behind
Mr.P. Nageswara rao,DGM Pre-Mansoon / Monsoon situation chaired by Shri R.K.Jain,Membr,national Disaster management
88 NHAI NHAI-13011-14-Misc.-2017-PIU-BLS-349 18-May-17 IOCL Petrol pump,Baripada, Miscellaneous N
(Tech),PD Authority(NDMA)
M/s.L&T Ltd
,Jashipur
(A.K.Ray),General Manager
89 NHAI NHAI-11014-9-RO-OD-1240-2017 2-Jun-17 Project Director,NHAI,Balasore Design & Drawings Appointment of safety consultant N
(Tech)
(A.K.Ray),General Manager
90 NHAI NHAI-11014-9-RO-OD-1239-2017 2-Jun-17 Project Director,NHAI,Balasore Design & Drawings Appointment of safety consultant N
(Tech)
Mr.P. Nageswara rao,DGM
91 NHAI NHAI-11011-8-LT-2017-PIU-BLS-471 16-Jun-17 M/s.L&T Ltd ,Bangriposi Miscellaneous Target for award and construction of road projects for the FY-2017-18 N
(Tech),PD
92 L&T LT-BSRP-OUT-17-18-005 29-Jun-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Claims GST registration Updates - Reg. Y LT/BSRP/OUT/17-18/005
95 L&T LT-BSRP-OUT-17-18-006 17-Jul-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore CIL Introduction of goods and services tax -change in law pursuant to CL. 19.17 of the agreement - Reg N

97 L&T LT-BSRP-OUT-17-18-007 18-Jul-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Quality of Works Submission of proposal of the safety Consultant -Reg Y NHAI/11014/9/RO/OD/1239/2017
99 L&T LT-BSRP-OUT-17-18-009 20-Jul-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Quality of Works Submission of proposal of the proof consulting-Reg Y NHAI/11014/9/RO/OD/1240/2017
Executive Engineer/ Divisional
Application for supply of Electrical Energy on Temporary Basis at our camp eshtablisment Area coming
101 L&T LT-BSRP-OUT-17-18-011 1-Aug-17 M/s.L&T Ltd ,Bangriposi Engineer, Baripada Electrical Statutory
under Bangriposi sub-divison
N
Divisional, Baripada
103 L&T LT-BSRP-OUT-17-18-013 9-Aug-17 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Statutory Request to issue a permit for soil/Moorum Y NHAI/11011/15/RITES/2018/PIU/BLS/80
Submission of proposal of the safety Consultant : Info Trans engineers Private Limited in lieu of THISHA
105 L&T LT-BSRP-OUT-17-18-015 18-Aug-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Miscellaneous Y NHAI/11014/9/RO/OD/1239/2017
consulting LLP-Reg
Mr.P. Nageswara rao,DGM Regional officer,NHAI,Regional
106 NHAI NHAI-11011-7-LT-2016-PIU-BLS-582 18-Aug-17 Miscellaneous Appointment of Proof consultant Y LT/BSRP/OUT/17-18/009
(Tech),PD office,Bhubaneswar
Mr.P. Nageswara rao,DGM Regional officer,NHAI,Regional
107 NHAI NHAI-11011-8-LT-2017-PIU-BLS-583 18-Aug-17 Design & Drawings Appointment of safety consultant Y LT/BSRP/OUT/17-18/015 & LT/BSRP/OUT/17-18/007
(Tech),PD office,Bhubaneswar
110 L&T LT-BSRP-OUT-17-18-019 6-Sep-17 M/s.L&T Ltd ,Bangriposi The Tahsildar,Jashipur Statutory Request to issue a permit for soil/Moorum extraction N
111 L&T LT-BSRP-OUT-17-18-018 6-Sep-17 M/s.L&T Ltd ,Bangriposi The Tahasildar, Bisoi Statutory Request to issue a permit for soil/Moorum extraction N
(A.K.Ray),General Manager Projec Diector ,NHAI,Project
112 NHAI NHAI-11013-12-RO-OD-1975-2017 7-Sep-17 Design & Drawings Appointment of safety consultant N
(Tech) implementation unit,Balasore
The mining Officer,
113 L&T LT-BSRP-OUT-17-18-020 8-Sep-17 M/s.L&T Ltd ,Bangriposi Statutory Request to issue a permit for soil/Moorum extraction N
Jamshedpur, Jarkhand
(A.K.Ray),General Manager Projec Diector ,NHAI,Project
114 NHAI NHAI-11013-12-RO-OD-1980-2017 8-Sep-17 Miscellaneous Appointment of Proof consultant N
(Tech) implementation unit,Balasore
116 L&T LT-BSRP-OUT-17-18-028 10-Sep-17 M/s.L&T Ltd ,Bangriposi The Tahsildar,Jashipur Statutory Request to issue permit for soil/Moorum extract from Govt. land
117 L&T LT-BSRP-OUT-17-18-027 10-Sep-17 M/s.L&T Ltd ,Bangriposi The Tahsildar,Jashipur Statutory Request to issue permit for soil/Moorum extract from Govt. land
Mr.Bikash Kumar
Mr.Anjan Das & Seemachal Sale of material(Sand) including handling(Loading,Transportation & Unloading)up to kanimohili stock yard
118 OIMPL 019-110917-OIMPL 11-Sep-17 Agrawal,MD,Ommtayal infra & Miscellaneous
Tripti near jharpokharia
Mines pvt ltd
121 L&T LT-BSRP-OUT-17-18-021 12-Sep-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Maintenance/DLP Existing road conditions and proposal of joint videoghaphy of existing road

Mr.P. Nageswara rao,DGM


122 NHAI NHAI-13011-39-SBM-2017-PIU-BLS-768 12-Sep-17 M/s.L&T Ltd ,Jashipur Miscellaneous Action Plan of Swachhata HI Sewa (SHS) Campaign from 15.09.2017 to 02.10.2017
(Tech),PD
Mr.P. Nageswara rao,DGM
123 NHAI NHAI-11011-8-LT-2017-PIU-BLS-766 12-Sep-17 M/s.L&T Ltd ,Jashipur Design & Drawings Appointment of safety consultant
(Tech),PD
Mr.P. Nageswara rao,DGM
124 NHAI NHAI-11011-8-LT-2017-PIU-BLS-765 12-Sep-17 M/s.L&T Ltd ,Jashipur Miscellaneous Appointment of Proof consultant Y LT/BSRP/OUT/17-18/009
(Tech),PD
Divisional forest
Mr.P. Nageswara rao,DGM
125 NHAI NHAI-11011-5-Forest-2017-PIU-BLS-781 15-Sep-17 officer,Rairangpur forest Trees Issue of tree Felling permission on Reserve & Revenue Forest Area
(Tech),PD
division,Rairangpur.

Mr.P. Nageswara rao,DGM Divisional forest officer,Karanjia


126 NHAI NHAI-11011-5-Forest-2017-PIU-BLS-780 15-Sep-17 Trees Issue of tree Felling permission on Reserve & Revenue Forest Area
(Tech),PD forest division,Karanjia.

Mr.P. Nageswara rao,DGM Divisional forest officer,Baripoda


127 NHAI NHAI-11011-5-Forest-2017-PIU-BLS-779 15-Sep-17 Trees Issue of tree Felling permission on Reserve & Revenue Forest Area
(Tech),PD forest division,Baripoda

Mr.P. Nageswara rao,DGM Regional officer,NHAI,Regional


128 NHAI NHAI-11011-8-LT-2017-PIU-BLS-778 15-Sep-17 Miscellaneous Declaration of Appointed Data
(Tech),PD office,Bhubaneswar
130 L&T LT-BSRP-OUT-17-18-023 18-Sep-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Maintenance/DLP Submission of DVDs of video ghraphy of existing road

The Member (Projects)-


131 NHAI NHAI-11014-9-RO-OD-2287-2017 19-Sep-17 D.Sarangi,CGM (Tech) & RO Odisha,NHAI,G-5 &6,Sector- Miscellaneous Declaration of Appointed Data
10,Dwaraka.New Delhi-75

Superintending Engineer,Electricle Permission for supply of 667KVA load in favour of M/s Larsen & Toubro
132 NESCO NESCO 20-Sep-17 M/s.L&T Ltd ,Kanimahuli Statutory
circle,Baripada Ltd.,Kanimahuli,Jharpokharia,Mayurbhanj at 33KV supply system

135 L&T LT-BSRP-OUT-17-18-025 6-Oct-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Statutory Pending issues prior to occurance of the appointed date
Mr.P. Nageswara rao,DGM
140 NHAI NHAI-13011-29-Road safety-2017-PIU-BLS-860 18-Oct-17 M/s.L&T Ltd ,Jashipur Design & Drawings Verification and inspection pf all Black sports on the NHs of NHAI by the road safety Experts (RSE)
(Tech),PD
Collection and analysis of bridge condition and bridges inventory data by MEIU or any other equipment for
Mr.P. Nageswara rao,DGM
141 NHAI NHAI-13011-14-MISC-2017-PIU-BLS-859 18-Oct-17 M/s.L&T Ltd ,Jashipur Design & Drawings purpose of Major/ Minor Bridges /Culverts/Level Crossings on all NHs for a period of 3 years -List of
(Tech),PD distressed bridges requiring immediate attention
Mr.P. Nageswara rao,DGM The Executive Engineer,RWS & Release of 6% Supevision Charges for shifting of Hand pump,Tube wells and pipe lines under Baripada
142 NHAI NHAI-11011-3-RWSS-2017-PIU-BLS-865 20-Oct-17 Payments
(Tech),PD S Division,Baripada Division (Ref:1373-04.06.207)

Mr.P. Nageswara rao,DGM


143 NHAI NHAI-11011-8-LT-2017-PIU-BLS-873 24-Oct-17 M/s.L&T Ltd ,Bangriposi Miscellaneous Declaration of Appointed Data
(Tech),PD
Divisional forest Felling of trees existing within Right of way (ROW) of NH-6 standing on Non-Forest areas of ,Rairangpur
Mr.P. Nageswara rao,DGM
146 NHAI NHAI-11011-5-Forest-2016-PIU-BLS-895 27-Oct-17 officer,Rairangpur forest Trees forest division and Disposal of Forest materials-(Ref:DFO,Rairangpur Leter No.2087 dated 4 may 2016,
(Tech),PD RCCF,Baripada Memo no.3755 dated 21 Dec 2016)
division,Rairangpur.
Felling of trees existing within Right of way (ROW) of NH-6 standing on Non-Forest areas of
,Rairangpur,Karanjia, baripoda forest division and Disposal of Forest materials-(Ref:DFO,Rairangpur Leter
Mr.P. Nageswara rao,DGM Divisional Manager,Baripoda
147 NHAI NHAI-11011-4-OFDC-2016-PIU-BLS-898 27-Oct-17 Trees No.2087 dated 4 may 2016, RCCF,Baripada Memo no.3755 dated 21 Dec 2016,DFO,Karanjia Leter No.1817
(Tech),PD (Com) Division dated 4 may 2016, RCCF,Baripada Memo no.3752 dated 21 Dec 2016,DFO,Baripada Leter No.2150 dated 6
may 2016)
Felling of trees existing within Right of way (ROW) of NH-6 standing on Non-Forest areas of ,Karanjia forest
Mr.P. Nageswara rao,DGM Divisional forest officer,Karanjia
148 NHAI NHAI-11011-5-Forest-2016-PIU-BLS-897 28-Oct-17 Trees division and Disposal of Forest materials-(Ref:DFO,Karanjia Leter No.1817 dated 4 may 2016,
(Tech),PD forest division,Karanjia. RCCF,Baripada Memo no.3752 dated 21 Dec 2016)
Mr.P. Nageswara rao,DGM
150 NHAI NHAI-11011-8-LT-2017-PIU-BLS-909 2-Nov-17 M/s.L&T Ltd ,Bangriposi Miscellaneous Appointment of the authority's Engineer
(Tech),PD
Mr.P. Nageswara rao,DGM
151 NHAI NHAI-11011-8-LT-2017-PIU-BLS-918 2-Nov-17 M/s.L&T Ltd ,Bangriposi Trees Communication of details of Approval of Estimates in respect of Utility shifting and Tree Cutting
(Tech),PD
The Divisonal Manager, OFDC, Felling of standing Trees with in the right of way (Row) of NH 6 for non forest Areas of Baripada,
153 L&T LT-BSRP-OUT-17-18-036 3-Nov-17 M/s.L&T Ltd ,Bangriposi Trees Y NHAI/11011/4/OFDC/2016/PIU/BLS/898
Baripada Rairangpur and karanjia forest division
The manager,ICICI Bank Issue of confirmation letter towards Bank Guarantee issued on behalf of Larsen & Toubro Ltd in favour of
154 NHAI NHAI-12011-6-BG-2017-PIU-BLS-925 3-Nov-17 NHAI Payments
Ltd,Chennai-600034 NHAI
155 L&T LT-BSRP-OUT-17-18-039 6-Nov-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites CIL Appointment of desigh Director, Pursuant to Article 10 of EPC Agreement
The Resident Engineer Rites
156 L&T LT-BSRP-OUT-17-18-037 6-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of project" Quality Assurance Plan"
LTD
The Resident Engineer Rites
157 L&T LT-BSRP-OUT-17-18-046 7-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Source Approval of steel,cement, admixture & Flyash
LTD
163 L&T LT-BSRP-OUT-17-18-040 7-Nov-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Maintenance/DLP Road Repairing of existing Highway

The Resident Engineer Rites


164 L&T LT-BSRP-OUT-17-18-038 7-Nov-17 M/s.L&T Ltd ,Bangriposi Miscellaneous submission of Project " Health, Saefty & Environment plan"
LTD
The Regional Officer,State
170 L&T LT-BSRP-OUT-17-18-049 8-Nov-17 M/s.L&T Ltd ,Bangriposi Statutory Request to issue consent to operate of Dahisahi Gravel Quarry III ,Dahisahi,Mayurbhanj
pollution Board,Balasore,Odisha

The Regional Officer,State


171 L&T LT-BSRP-OUT-17-18-048 8-Nov-17 M/s.L&T Ltd ,Bangriposi Statutory Request to issue consent to operate of Dahisahi Gravel Quarry IV, At+PODahisahi,Mayurbhanj
pollution Board,Balasore,Odisha
The Resident Engineer Rites
172 L&T LT-BSRP-OUT-17-18-047 8-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of Tentative concretemix design
LTD
The Regional Officer,State Regarding Request to issue consent to operate of Batching
174 L&T LT-BSRP-OUT-17-18-055 10-Nov-17 M/s.L&T Ltd ,Bangriposi Statutory
pollution Board,Balasore,Odisha plant,Village:Kanimahuli,Manbhanj,Jharpokaria,Mayurbhanj

The Resident Engineer,RITES


175 L&T LT-BSRP-OUT-17-18-056 13-Nov-17 M/s.L&T Ltd ,Bangriposi Claims Submission of Project "Applicable Permits"
Limited,Baripada
177 L&T LT-BSRP-OUT-17-18-058 14-Nov-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL test result summary
178 L&T LT-BSRP-OUT-17-18-057 14-Nov-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of Company credential of Hume pipe for source approval
The Collector & District
179 L&T LT-BSRP-OUT-17-18-061 15-Nov-17 M/s.L&T Ltd ,Bangriposi Statutory Request to issue NOC for installation of Diesel Browser at village kenjhara,pantho,Jharpokharia,Mayurbhanj
Magistrate,Mayurbhanj,Odisha
The Collector & District
180 L&T LT-BSRP-OUT-17-18-060 15-Nov-17 M/s.L&T Ltd ,Bangriposi Statutory Request to issue NOC for installation of Diesel Browser at village kANIMAHULI,Manbhanj,Mayurbhanj
Magistrate,Mayurbhanj,Odisha
The Resident Engineer,RITES
181 L&T LT-BSRP-OUT-17-18-059 15-Nov-17 M/s.L&T Ltd ,Bangriposi Claims Submission Of Project Insurance
Limited,Baripada
182 L&T LT-BSRP-OUT-17-18-062 16-Nov-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submisssion of company credential of independent testing laboratory & calibration agency
183 L&T LT-BSRP-OUT-17-18-065 17-Nov-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Claims Submission Of Bank Account Details,GST No.and PAN No N
Borrow
184 L&T LT-BSRP-OUT-17-18-064 17-Nov-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Source Approval of stone Quarry & River Sand
Approval
185 L&T LT-BSRP-OUT-17-18-063 17-Nov-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of Company credentials of Rashmibrand Cement & TMT
Mr.Kapil prasad,Team
188 RITES-OD RITES-BSRP-OD-LT-2017-01 17-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Source approval of steel , cement,Admixture and Fly ash Y LT/BSRP/OUT/17-18/046
leaderSr.Highway Engg.
Team leader,RITES,NHAI-
189 L&T LT-BSRP-OUT-17-18-067 20-Nov-17 M/s.L&T Ltd ,Bangriposi Maintenance/DLP Site Agitation due to fatality on Existing road arising out of poor road condition
PIU,Balalasore
190 L&T LT-BSRP-OUT-17-18-066 20-Nov-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Trees Disposal of Felled Trees in Bisoi at the OFDC Dept at Baripada
Mr.Kapil prasad,Team
191 RITES-OD RITES-BSRP-OD-LT-2017-02 20-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Quality Assurance Plan Y LT/BSRP/OUT/17-18/037
leaderSr.Highway Engg.
RITES/BSRP/OD/L&T/2017/59 &
192 L&T LT-BSRP-OUT-17-18-071 21-Nov-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Land Issues Available Free Front / Unencumbered Length to take up construction Activities Y
NHAI/11011/8/L&T/2017/PIU/BLS/873
Team leader,RITES,NHAI-
193 L&T LT-BSRP-OUT-17-18-069 21-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of Project "Quality Assurance Plan" Y RITES/BSRP/OD/L&T/2017/02
PIU,Balalasore
194 L&T LT-BSRP-OUT-17-18-068 21-Nov-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Maintenance/DLP Maintenance and Repair of Existing Road

Mr.Kapil prasad,Team
195 RITES-OD RITES-BSRP-OD-LT-2017-06 21-Nov-17 M/s.L&T Ltd ,Bangriposi Miscellaneous Obligations prior to commencement of works Y LT/BSRP/OUT/18-19/128
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
196 RITES-OD RITES-BSRP-OD-LT-2017-05 21-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Source approval of Hume pipe Y LT/BSRP/OUT/18-19/128,LT/BSRP/OUT/17-18/57
leaderSr.Highway Engg.
Mr.Kapil prasad,Team LT/BSRP/OUT/18-19/25,126 & LT/BSRP/OUT/17-
197 RITES-OD RITES-BSRP-OD-LT-2017-04 21-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of tentative concrete mix design Y
leaderSr.Highway Engg. 18/47
Mr.Kapil prasad,Team
198 RITES-OD RITES-BSRP-OD-LT-2017-03 21-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of OGL test results summary Y LT/BSRP/OUT/17-18/058
leaderSr.Highway Engg.
Team leader,RITES,NHAI-
200 L&T LT-BSRP-OUT-17-18-070 22-Nov-17 M/s.L&T Ltd ,Bangriposi Maintenance/DLP submission of work Program pursuant to clause 10.1.3 of the contract Agreement
PIU,Balalasore
Mr.Kapil prasad,Team
201 RITES-OD RITES-BSRP-OD-LT-2017-07 22-Nov-17 M/s.L&T Ltd ,Bangriposi Security Deposit Submission of project Insurance Y LT/BSRP/OUT/17-18/059
leaderSr.Highway Engg.
Team leader,RITES,NHAI-
202 L&T LT-BSRP-OUT-17-18-072 23-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Independent Laboratory test of Construction materials for source approval
PIU,Balalasore
203 L&T LT-BSRP-OUT-17-18-032 24-Nov-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Security Deposit 1st Instalment of advance payment(2% of contract price)
Mr.Kapil prasad,Team
204 RITES-QC RITES-BSRP-QC-OD-LT-2017-01 24-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Testing of vaious Construction Mterials Y LT/BSRP/OUT/17-18/072
leaderSr.Highway Engg.
205 L&T LT-BSRP-OUT-17-18-73 25-Nov-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Discard Discard N
Mr.Kapil prasad,Team
206 RITES-OD RITES-BSRP-OD-LT-2017-08 27-Nov-17 M/s.L&T Ltd ,Bangriposi Land Issues Available free Front/Unencumbered Length to take up Construction Activities Y LT/BSRP/OUT/17-18/071
leaderSr.Highway Engg.
Mr.P. Nageswara rao,DGM Divisional forest officer,Baripoda Felling of trees existing within Right of way (ROW) of NH-6 standing on Non-Forest areas of baripoda Forest
207 NHAI NHAI-11011-5-Forest-2016-PIU-BLS-894 27-Nov-17 Trees
(Tech),PD forest division,Baripoda Division and Disposal of Forest materials-(Ref:DFO,Baripada Leter No.2150 dated 6 may 2016)

Submission of Bank Guarantee against 2nd installment of Advance and 2nd installment of advance payment
208 L&T LT-BSRP-OUT-17-18-074 28-Nov-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Security Deposit
(3% of contract price)
Y NHAI/11011/8/L&T/2017/PIU/BLS/873
210 L&T LT-BSRP-OUT-17-18-034 28-Nov-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Security Deposit Submisssion of 1st Instalment Mobilisation Advance Bank Guarantee- Amended
Mr.Kapil prasad,Team
212 RITES-OD RITES-BSRP-OD-LT-2017-12 28-Nov-17 M/s.L&T Ltd ,Bangriposi Claims Applicable Permits LT-BSRP-OD-LT-2017-18-056
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
213 RITES-OD RITES-BSRP-OD-LT-2017-11 28-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of company credential of independent testing Laboratory & Calibration agency Y LT/BSRP/OUT/17-18/062
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
214 RITES-OD RITES-BSRP-OD-LT-2017-10 28-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of company credential of Rashmi brand Cement & TMT Y LT/BSRP/OUT/18-19/151 & LT/BSRP/OUT/17-18/63
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
215 RITES-OD RITES-BSRP-OD-LT-2017-09 28-Nov-17 M/s.L&T Ltd ,Bangriposi Miscellaneous Health,Safety & Environment Plan Y LT/BSRP/OUT/17-18/038
leaderSr.Highway Engg.
216 RITES-OD RITES-BSRP-OD-LT-2017-12 28-Nov-17 Mr.Kapil prasad,Team leaderSr.HighwaM/s.L&T Ltd ,Bangriposi Claims Submission of Project "Applicable Permits" Y LT/BSRP/OUT/17-18/056
Borrow
217 L&T LT-BSRP-OUT-17-18-075 29-Nov-17 M/s.L&T Ltd, Bangriposi NHAI-PIU-Balasore Area/Mining Change in Royalty Rates of Quarry mining
Approval
218 L&T LT-BSRP-OUT-17-18-078 30-Nov-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Payments Submission of Invoice for 1st Advance Payment
Research proposal for High Modulus Asphalt (HIMA) Mix by IIT-Kharagpur and Identification of test section
219 L&T LT-BSRP-OUT-17-18-076 30-Nov-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Quality of Works Y NHAI/ 13011/14/Misc./2016/PIU/BLS/615
on NH-6
Mr.Kapil prasad,Team
220 RITES-QC RITES-BSRP-QC-OD-LT-2017-02 30-Nov-17 M/s.L&T Ltd ,Bangriposi Quality of Works Source Approval of Hume Pipe Y LT/BSRP/OUT/17-18/057
leaderSr.Highway Engg.
221 OFDC OFDC 4958 30-Nov-17 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees Field Inspection of Divisional Manager ,Baripada Division ,OFDC Ltd Baripada Y
Submission of Monthly progress report on felling and removal of marked trees along NH-06 from
222 OFDC OFDC 4983 30-Nov-17 Divisional manager,Baripada DGM (Tech),PDNHAI,Balasore Trees Y
Baharagora-Singara Section
The Divisional Forest
223 L&T LT-BSRP-OUT-17-18-080 1-Dec-17 M/s.L&T Ltd ,Bangriposi Officer,Baripada Forest Miscellaneous Request for Authorisation Y NHAI/11011/5/Forest/2016/PIU/BLS/894
Division,Baripada
Borrow
224 L&T LT-BSRP-OUT-17-18-079 1-Dec-17 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Area/Mining Demarcation request of Dahisahi RBM sources
Approval
225 L&T LT-BSRP-OUT-17-18-081 2-Dec-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Security Deposit Requested for return of Original 2nd Bank Guarantee for Advance payment
Mr.Kapil prasad,Team
226 RITES-OD RITES-BSRP-OD-LT-2017-14 2-Dec-17 M/s.L&T Ltd ,Bangriposi Miscellaneous Submission of Work program pursuant to clause 10.1.3 of the contact Agreement Y LT/BSRP/OUT/17-18/070
leaderSr.Highway Engg.
Mr.Kapil prasad,Team Undertaking Landscaping & Beautification project at the traffic islands and land parcels or any other
227 RITES-OD RITES-BSRP-OD-LT-2017-13 2-Dec-17 M/s.L&T Ltd ,Bangriposi Land Issues NHAI-13011-73-02-RO-OD-2772-2017
leaderSr.Highway Engg. available appropriate locations
The Divisional
228 L&T LT-BSRP-OUT-17-18-082 4-Dec-17 M/s.L&T Ltd ,Bangriposi Manager,Baripada Trees Disposal of Felled Trees in Bisoi at the OFDC Dept at Baripada Y NHAI/11011/4/OFDC/2016/PIU/BLS/898
Division,Mayurbhanj
229 OFDC OFDC 5024 4-Dec-17 Divisional manager,Baripada DGM (Tech),PDNHAI,Balasore Trees Field Inspection of Divisional Manager ,Baripada Division ,OFDC Ltd Baripada Y
230 OFDC OFDC 5052 4-Dec-17 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees Disposal of felled trees in Bisoi at the OFDC Dept at Baripada Y
Authorization of L&T representative to collect the Original Bank Guarantee against 2nd Installment of
231 L&T LT-BSRP-OUT-17-18-083 5-Dec-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Security Deposit
Advance payment
234 L&T LT-BSRP-OUT-17-18-087 6-Dec-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of company credentials of brand Birla Gold Cement
Submission of Bank Guarantee against 2nd installment of Advance and 2nd installment of advance payment
235 L&T LT-BSRP-OUT-17-18-085 6-Dec-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Security Deposit Y NHAI/11011/8/L&T/2017/PIU/BLS/873
(3% of contract price)
236 L&T LT-BSRP-OUT-17-18-084 6-Dec-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Trees Permission for Tree felling Y NHAI/11011/8/L&T/2017/PIU/BLS/918
237 L&T LT-BSRP-OUT-17-18-086 7-Dec-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of Typical cross section drawing &design basis report (Highway) for approval
238 L&T LT-BSRP-OUT-17-18-091 8-Dec-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Security Deposit Requested for return of Original 2nd Bank Guarantee for Advance payment
Authorization of L&T representative to collect the Original Bank Guarantee against 2nd Installment of
239 L&T LT-BSRP-OUT-17-18-090 8-Dec-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Security Deposit
Advance payment
240 L&T LT-BSRP-OUT-17-18-089 8-Dec-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Utilities Deposition of Inspection fees for ElectricalUtility Works in Odisha Stretch Y NHAI/11011/8/L&T/2017/PIU/BLS/918
241 L&T LT-BSRP-OUT-17-18-088 8-Dec-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of GAD culvert & Design bsisi report (Structure) for approval

243 L&T LT-BSRP-OUT-17-18-092 11-Dec-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of plan & profile drawing from 199 to 299

Mr.Kapil prasad,Team
244 RITES-OD RITES-BSRP-OD-LT-2017-16 12-Dec-17 M/s.L&T Ltd ,Bangriposi Quality of Works Design Mix for Concrete Y LT/BSRP/OUT/17-18/047
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
245 RITES-OD RITES-BSRP-OD-LT-2017-15 12-Dec-17 M/s.L&T Ltd ,Bangriposi Quality of Works Source Approval of Steel,Cement,Admixture Y LT/BSRP/OUT/17-18/072
leaderSr.Highway Engg.
Team leader,RITES,NHAI-
246 L&T LT-BSRP-OUT-17-18-094 13-Dec-17 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission Of Box Culvert for Approval
PIU,Balalasore
247 L&T LT-BSRP-OUT-17-18-093 13-Dec-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Maintenance/DLP Overlaying of Existing Highway as per Memorandum & Approval of Existing Road Repair Executed

248 L&T LT-BSRP-OUT-17-18-097 14-Dec-17 M/s.L&T Ltd, Bangriposi The Tahasildar, Bangriposi Payments Royalty Amount 1792800 for River bed material
Submission of Bank Guarantee against 2nd installment of Advance and 2nd installment of advance payment
250 L&T LT-BSRP-OUT-17-18-095 14-Dec-17 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Security Deposit Y NHAI/11011/8/L&T/2017/PIU/BLS/1038
(3% of contract price)
Mr.Kapil prasad,Team
251 RITES-OD RITES-BSRP-OD-LT-2017-17 14-Dec-17 M/s.L&T Ltd ,Bangriposi Quality of Works Source Approval of Steel Grade Fe500 and Fe 500d Y LT/BSRP/OUT/18-19/191,LT/BSRP/OUT/17-18/63
leaderSr.Highway Engg.
252 L&T LT-BSRP-OUT-17-18-105 16-Dec-17 M/s.L&T Ltd ,Bangriposi The Tahsildar,Jashipur Statutory issue permit for soil/Moorum
253 L&T LT-BSRP-OUT-17-18-104 16-Dec-17 M/s.L&T Ltd ,Bangriposi The Tahsildar,Jashipur Statutory issue permit for soil/Moorum
254 L&T LT-BSRP-OUT-17-18-103 16-Dec-17 M/s.L&T Ltd ,Bangriposi The Tahsildar,Jashipur Statutory issue permit for soil/Moorum
Borrow
The Regional Officer,State
255 L&T LT-BSRP-OUT-17-18-098 19-Dec-17 M/s.L&T Ltd ,Bangriposi Area/Mining CTO Application for our Mundhabani Crusher plant Unit
pollution Board,Balasore,Odisha Approval
Mr.Kapil prasad,Team
259 RITES-OD RITES-BSRP-OD-LT-2017-19 21-Dec-17 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of Comapany Credential of Brand Birla Gold Cement Y LT/BSRP/OUT/17-18/087
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
260 RITES-OD RITES-BSRP-OD-LT-2017-18 21-Dec-17 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Typical Cross section & Design basis report (Highway) for approval Y LT/BSRP/OUT/17-18/086
leaderSr.Highway Engg.
261 L&T LT-BSRP-OUT-17-18-101 22-Dec-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Regarding the tollplaza land acquisition at modified location N

Mr.Kapil prasad,Team
262 RITES-OD RITES-BSRP-OD-LT-2017-20 22-Dec-17 M/s.L&T Ltd ,Bangriposi Quality of Works Source approval of Hume pipe Y LT/BSRP/OUT/17-18/057
leaderSr.Highway Engg.
Submission of Construction Programme using networking techniques and contractor's key personnel &
263 L&T LT-BSRP-OUT-17-18-102 23-Dec-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Program
equipments
Y RITES/BSRP/OD/L&T/2017/14
Borrow
264 L&T LT-BSRP-OUT-17-18-107 26-Dec-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Barrow area soil test result for Construction of Embankment
Approval
265 L&T LT-BSRP-OUT-17-18-106 26-Dec-17 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL Soil test result Y RITES/BSRP/OD/L&T/2017/03
266 NHAI NHAI-11011-8-LT-2017-PIU-BLS-1104 26-Dec-17 K.Hari prasad,Dy.Manager (Tech.) M/s.L&T Ltd ,Bangriposi Land Issues Eviction of unauthorised encroachments of nh side land (Nayanjodi) and medical land of jashipur CHC
Requirement of Hydraulicc details for irrigation canal at chainage 212+625 for design of minor bridge
267 NHAI NHAI-11011-8-LT-2017-PIU-BLS-1103 26-Dec-17 K.Hari prasad,Dy.Manager (Tech.) M/s.L&T Ltd ,Bangriposi Design & Drawings
(SMCC)between panaposi and jalda village

268 NHAI NHAI-11011-8-LT-2017-PIU-BLS-1102 26-Dec-17 K.Hari prasad,Dy.Manager (Tech.) M/s.L&T Ltd ,Bangriposi Utilities Shifting of affected PWS schemes and spot sources of water utilities

Team leader,RITES,NHAI-
271 L&T LT-BSRP-OUT-17-18-108 27-Dec-17 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of service road plan & profile drawing from 214.8 to 215.6 & 226 to 227.56 for approval
PIU,Balalasore
Mr.P. Nageswara rao,DGM
272 NHAI NHAI-11012-1-LA-2017-PIU-BLS-1109 27-Dec-17 M/s.L&T Ltd ,Bangriposi Miscellaneous Forwarding of Gazette
(Tech),PD
Mr.Kapil prasad,Team
273 RITES-OD RITES-BSRP-OD-LT-2017-22 27-Dec-17 M/s.L&T Ltd ,Bangriposi Design & Drawings Structural drawing Observations Y LT/BSRP/OUT/17-18/88,94
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
274 RITES-OD RITES-BSRP-OD-LT-2017-21 27-Dec-17 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of OGL soil test result Y LT/BSRP/OUT/17-18/106
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
279 RITES-OD RITES-BSRP-OD-LT-2017-25 28-Dec-17 M/s.L&T Ltd ,Bangriposi MPR Submission of Monthly progress report on felling and removal of marked trees NHAI-11011-15-RITES-2017-PIU-BLS-1089
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
280 RITES-OD RITES-BSRP-OD-LT-2017-24 28-Dec-17 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Plan & Profile drwaing from Km 199 to Km 229 Y LT/BSRP/OUT/17-18/092
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
281 RITES-OD RITES-BSRP-OD-LT-2017-23 28-Dec-17 M/s.L&T Ltd ,Bangriposi Miscellaneous Submission of work program pursuant to clause 10.1.3 of the C A Y LT/BSRP/OUT/17-18/102
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
284 RITES-OD RITES-BSRP-OD-LT-2017-26 29-Dec-17 M/s.L&T Ltd ,Bangriposi Slow Progress Slow progress of work Y
leaderSr.Highway Engg.
Mr.P. Nageswara rao,DGM
285 NHAI NHAI-11011-5-Forest-2017-piu-bls-1119 29-Dec-17 M/s.L&T Ltd ,Bangriposi Trees Preparation and submission of Estimates for felling of trees standing on the forest Land
(Tech),PD
Mr.P. Nageswara rao,DGM
286 NHAI NHAI-11011-5-Forest-2017-piu-bls-1118 29-Dec-17 M/s.L&T Ltd ,Bangriposi Miscellaneous Registration of propperty hammer in favour of project Director,NHAI,PIU,Balasore
(Tech),PD
Mr.Kapil prasad,Team
289 RITES-OD RITES-BSRP-OD-LT-2017-27 30-Dec-17 M/s.L&T Ltd ,Bangriposi CIL Submission of work program pursuant to clause 10.1.3 of the C A Y LT/BSRP/OUT/17-18/070,102,114
leaderSr.Highway Engg.
290 L&T LT-BSRP-OUT-18-19-001 2-Jan-18 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Maintenance/DLP Maintenance and Repair of Existing Road

291 L&T LT-BSRP-OUT-18-19-007 3-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Miscellaneous Submission of project "Health,safety,& environment

292 L&T LT-BSRP-OUT-18-19-005 3-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of GAD of Box culvert for approval Y RITES/BSRP/OD/L&T/2017/22

293 L&T LT-BSRP-OUT-18-19-004 3-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of typical cross section drawing & design basis report (Highway) for approval Y RITES/BSRP/OD/L&T/2017/18
Borrow
Mr.Kapil prasad,Team
296 RITES-OD RITES-BSRP-OD-LT-2017-29 3-Jan-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for construction of embankment Y LT/BSRP/OUT/17-18/111
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
297 RITES-OD RITES-BSRP-OD-LT-2017-28 3-Jan-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment-Approval Y LT/BSRP/OUT/17-18/107
leaderSr.Highway Engg. Approval
298 L&T LT-BSRP-OUT-18-19-009 4-Jan-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Miscellaneous To whom so ever it may concern N

303 L&T LT-BSRP-OUT-18-19-011 6-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of Reinforcement drawing of culvert along with design notes

304 L&T LT-BSRP-OUT-18-19-010 6-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of Reinforcement drawing of culvert along with design notes

305 L&T LT-BSRP-OUT-18-19-006 6-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of Plan & Profile drawing from Km 199 to Km 229 & Traffic report for approval Y RITES/BSRP/OD/L&T/2017/24
Borrow
Mr.Kapil prasad,Team
306 RITES-OD RITES-BSRP-OD-LT-2017-30 6-Jan-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment-Approval Y LT/BSRP/OUT/18-19/002
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
307 RITES-OD RITES-BSRP-OD-LT-2017-31 6-Jan-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of borrow area soil for construction of Embankment Y LT/BSRP/OUT/18-19/003
leaderSr.Highway Engg. Approval
Borrow
308 L&T LT-BSRP-OUT-18-19-016 8-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA soil test for construction of subgrade
Approval
Borrow
309 L&T LT-BSRP-OUT-18-19-015 8-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA soil test result for construction of Embankment/Subgrade
Approval
Borrow
310 L&T LT-BSRP-OUT-18-19-014 8-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA soil test result for construction of Embankment
Approval
311 L&T LT-BSRP-OUT-18-19-013 8-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL SOIL TEST RESULT (291+000 TO 296+000 KM)
Submission of Bank Guarantee against 3rd instalment of Advance and 3rd instalment of Advance payment
312 L&T LT-BSRP-OUT-18-19-012 8-Jan-18 M/s.L&T Ltd ,Bangriposi Project Director,NHAI,Balasore Security Deposit
(5% OF Contract price)
Y NHAI/11011/8/L&T/2017/PIU/BLS/1038
Borrow
Mr.Kapil prasad,Team
313 RITES-OD RITES-BSRP-OD-LT-2017-34 8-Jan-18 M/s.L&T Ltd ,Bangriposi Area/Mining Approval of B0rrow area Soil for Construction of Embankment Y
leaderSr.Highway Engg. Approval
Mr.Kapil prasad,Team
314 RITES-OD RITES-BSRP-OD-LT-2017-33 8-Jan-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Obligation prior to commencement of Works
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
315 RITES-OD RITES-BSRP-OD-LT-2017-32 8-Jan-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Design & Drawing of culvert for approval Y LT/BSRP/OUT/17-18/100
leaderSr.Highway Engg.
316 L&T LT-BSRP-OUT-18-19-022 9-Jan-18 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Submission of MJB CH.303+032 SUPERSTRUCTURE DRAWING WITH DESIGN NOTES

317 L&T LT-BSRP-OUT-18-19-021 9-Jan-18 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Submission of MJB Ch.210+885 superstructure drawing with design notes

318 L&T LT-BSRP-OUT-18-19-020 9-Jan-18 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Design & Drawings Submission of VUP drawing of with design notes

319 L&T LT-BSRP-OUT-18-19-019 9-Jan-18 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Miscellaneous Intimation for opening of our Govt.Auctioned stone Quarry,Mundhabani

322 L&T LT-BSRP-OUT-18-19-023 10-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of plan & profile drawing from Km 297 to 310.839 for approval

324 L&T LT-BSRP-OUT-18-19-025 11-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Independent laboratory test of construction materials for source approval
Mr.Kapil prasad,Team
326 RITES-OD RITES-BSRP-OD-LT-2017-36 11-Jan-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Typical Cross section & Design basis report (Highway) for approval Y LT/BSRP/OUT/17-18/086 LT/BSRP/OUT/18-19/004
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
327 RITES-OD RITES-BSRP-OD-LT-2017-35 11-Jan-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of OGL soil test results approval Y LT/BSRP/OUT/17-18/112
leaderSr.Highway Engg.
Borrow
328 L&T LT-BSRP-OUT-18-19-028 12-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA soil test result
Approval
329 L&T LT-BSRP-OUT-18-19-027 12-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL soil test result (303+000 to 305 +000 LHS &RHS)
330 L&T LT-BSRP-OUT-18-19-026 12-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL soil test result (243+500 to 247 +000)

331 L&T LT-BSRP-OUT-18-19-032 15-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Slow Progress Slow progress of work Y RITES/BSRP/OD/L&T/2017/27 & RITES/BSRP/OD/L&T/2017/26
Borrow
333 L&T LT-BSRP-OUT-18-19-030 15-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA SOIL test result FOR CONSTRUCTION OF Embankment/Subgrade
Approval
334 L&T LT-BSRP-OUT-18-19-029 15-Jan-18 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Trees Slow progress for transportation of felled trees
Borrow
Mr.Kapil prasad,Team
335 RITES-OD RITES-BSRP-OD-LT-2017-41 15-Jan-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil test result for construction of subgrade Y LT/BSRP/OUT/18-19/016
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
336 RITES-OD RITES-BSRP-OD-LT-2017-40 15-Jan-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of BA soil test result for construction of Embankment/Subgrade Y LT/BSRP/OUT/18-19/015
leaderSr.Highway Engg. Approval
Mr.Kapil prasad,Team
337 RITES-OD RITES-BSRP-OD-LT-2017-37 15-Jan-18 M/s.L&T Ltd ,Bangriposi MPR Submission of Monthly progress reports Y
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
338 RITES-OD RITES-BSRP-OD-LT-2017-38 15-Jan-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Health,Safety & Environment Plan approval Y LT/BSRP/OUT/18-19/007
leaderSr.Highway Engg.
Borrow
341 L&T LT-BSRP-OUT-18-19-039 16-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment
Approval
342 L&T LT-BSRP-OUT-18-19-038 16-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL soil test result (308+000 to 311 +000 LHS &RHS)
Borrow
343 L&T LT-BSRP-OUT-18-19-037 16-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result
Approval
Borrow
344 L&T LT-BSRP-OUT-18-19-036 16-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result
Approval
Borrow
345 L&T LT-BSRP-OUT-18-19-035 16-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of borrow area soil test result
Approval
Team leader,RITES,NHAI-
346 L&T LT-BSRP-OUT-18-19-034 16-Jan-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of MNB Design and Drawing at Ch.248+987 for Approval
PIU,Balalasore
Mr.Kapil prasad,Team
348 RITES-QC RITES-BSRP-QC-OD-LT-2017-03 16-Jan-18 M/s.L&T Ltd ,Bangriposi Quality of Works Testing of vaious Construction Mterials LT-BSRP-OD-LT-2018-19-025
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
349 RITES-OD RITES-BSRP-OD-LT-2017-42 16-Jan-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of pavements design Y
leaderSr.Highway Engg.
350 L&T LT-BSRP-OUT-18-19-043 17-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL soil test result (Km 300 to 303 LHS & RHS)
351 L&T LT-BSRP-OUT-18-19-042 17-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL soil test result (Km 247+250 to 250+000)

352 L&T LT-BSRP-OUT-18-19-041 17-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of plan & profile drawing from km 269 to 283 for approval

Mr.Kapil prasad,Team
353 RITES-OD RITES-BSRP-OD-LT-2017-43 17-Jan-18 M/s.L&T Ltd ,Bangriposi COS Change of scope notice for the construction of 12 Nos Elephant underpasses Y LT/BSRP/OUT/17-18/109
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
354 RITES-NHAI RITES-BSRP-OD-NHAI-2017-21 17-Jan-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Establishment of office N
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
355 RITES-OD RITES-BSRP-OD-LT-2017-44 18-Jan-18 M/s.L&T Ltd ,Bangriposi Quality of Works Execution of Earthwork and C&G Y
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
366 RITES-OD RITES-BSRP-OD-LT-2017-46 22-Jan-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of plan & Profile drwaing from Km 199 to Km 229 & traffic report for approval Y LT/BSRP/OUT/18-19/092, LT/BSRP/OUT/17-18/006
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
367 RITES-OD RITES-BSRP-OD-LT-2017-45 22-Jan-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Overlaying of Existing highway as per memorandum & Approval of existing Y LT/BSRP/OUT/17-18/093
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
374 RITES-OD RITES-BSRP-OD-LT-2017-47 23-Jan-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Comments/Observations of structural drawings Y LT/BSRP/OUT/17-18/5,11,21,22,20
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
375 RITES-OD RITES-BSRP-OD-LT-2017-47-A 23-Jan-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Typical cross dection drawing & Design Basis Report (Highway) Y LT/BSRP/OUT/17-18/004,046
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
376 RITES-OD RITES-BSRP-OD-LT-2017-55 24-Jan-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submisssion of OGL soil test result Approval Y LT/BSRP/OUT/18-19/042
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
377 RITES-OD RITES-BSRP-OD-LT-2017-54 24-Jan-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of OGL soil test results approval Y LT/BSRP/OUT/18-19/031
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
378 RITES-OD RITES-BSRP-OD-LT-2017-53 24-Jan-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of OGL soil test results approval Y LT/BSRP/OUT/18-19/043
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
379 RITES-OD RITES-BSRP-OD-LT-2017-52 24-Jan-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of OGL test results - Approval Y LT/BSRP/OUT/18-19/027
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
380 RITES-OD RITES-BSRP-OD-LT-2017-51 24-Jan-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of OGL test results - Approval Y LT/BSRP/OUT/18-19/038
leaderSr.Highway Engg.
Borrow
Mr.Kapil prasad,Team
381 RITES-OD RITES-BSRP-OD-LT-2017-50 24-Jan-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of borrow area soil for construction of Embankment approval Y LT/BSRP/OUT/18-19/039
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
382 RITES-OD RITES-BSRP-OD-LT-2017-49 24-Jan-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of borrow area soil for construction of Embankment approval LT-BSRP-OD-LT-2018-19-015
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
383 RITES-OD RITES-BSRP-OD-LT-2017-48 24-Jan-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of borrow area soil for construction of Embankment approval Y LT/BSRP/OUT/18-19/014
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
392 RITES-OD RITES-BSRP-OD-LT-2017-58 27-Jan-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment-Approval Y LT/BSRP/OUT/18-19/276, 279,28
leaderSr.Highway Engg. Approval
Mr.Kapil prasad,Team
393 RITES-OD RITES-BSRP-OD-LT-2017-57 27-Jan-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Design CBR value Y LT/BSRP/OUT/18-19/16,30,47
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
394 RITES-OD RITES-BSRP-OD-LT-2017-56 27-Jan-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Submission of measurement sheet pertaining to repair of Existing Highway Y LT/BSRP/OUT/18-19/51 & LT/BSRP/OUT/17-18/093
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
399 RITES-OD RITES-BSRP-OD-LT-2017-59 30-Jan-18 M/s.L&T Ltd ,Bangriposi MPR Submission of monthly progress reports Y LT/BSRP/OUT/18-19/059
leaderSr.Highway Engg.
Borrow
403 L&T LT-BSRP-OUT-18-19-066 31-Jan-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA soil test result
Approval
404 L&T LT-BSRP-OUT-18-19-071 1-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites MPR submission of Monthly Progress Report
405 L&T LT-BSRP-OUT-18-19-070 1-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Force Majeure Suspencion of work due to local strike
Borrow
Mr.Kapil prasad,Team
406 RITES-OD RITES-BSRP-OD-LT-2017-60 1-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment-Approval-BA 09 Y LT/BSRP/OUT/18-19/036
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
407 RITES-OD RITES-BSRP-OD-LT-2017-61 1-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment-Approval-BA 05 Y LT/BSRP/OUT/18-19/047
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
408 RITES-OD RITES-BSRP-OD-LT-2017-62 1-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment-Approval-BA 06 Y LT/BSRP/OUT/18-19/047
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
409 RITES-OD RITES-BSRP-OD-LT-2017-63 1-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment-Approval-BA 14 LT-BSRP-OD-LT-2018-19-037
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
410 RITES-OD RITES-BSRP-OD-LT-2017-64 1-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment-Approval-BA-12 Y LT/BSRP/OUT/18-19/035
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
411 RITES-OD RITES-BSRP-OD-LT-2017-65 1-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment-Approval-BA-07 Y LT/BSRP/OUT/18-19/054
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
412 RITES-OD RITES-BSRP-OD-LT-2017-66 1-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment-Approval-BA-17 A Y LT/BSRP/OUT/18-19/052
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
413 RITES-OD RITES-BSRP-OD-LT-2017-67 1-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment-Approval-BA-06 Y LT/BSRP/OUT/18-19/030
leaderSr.Highway Engg. Approval

414 L&T LT-BSRP-OUT-18-19-073 2-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of VUP & PUP DESIGN & DRAWING at ch 285+706 ,289+057,296+144 for approval

415 L&T LT-BSRP-OUT-18-19-072 2-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Utilities Submission of electrical utility shifting invoice as per approved Estimate under NESCO-Odisha section
416 L&T LT-BSRP-OUT-18-19-078 3-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Source approval of flyashM/s Adhunic& Natural resource Ltd
Borrow
417 L&T LT-BSRP-OUT-18-19-077 3-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment/Subgrade
Approval

418 L&T LT-BSRP-OUT-18-19-076 3-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of box culvert Design & drawing for approval

419 L&T LT-BSRP-OUT-18-19-075 3-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of box culvert Design & drawing for approval

421 L&T LT-BSRP-OUT-18-19-081 5-Feb-18 M/s.L&T Ltd ,Bangriposi Satendra prasad Payments Debit note
Borrow
422 L&T LT-BSRP-OUT-18-19-080 5-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment
Approval
423 L&T LT-BSRP-OUT-18-19-079 5-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL area soil test result (265+000 to 268+000) LHS & RHS
Mr.Kapil prasad,Team
424 RITES-OD RITES-BSRP-OD-LT-2017-68 5-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Fixing of marker pegs and chainage boards N
leaderSr.Highway Engg.
425 L&T LT-BSRP-OUT-18-19-085 6-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Comments/ Observation of structural drawing Y RITES/BSRP/OD/L&T/2017/47
426 L&T LT-BSRP-OUT-18-19-084 6-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Miscellaneous Request to approve authorized Signatories for verification of project work and signing of Rfis
427 L&T LT-BSRP-OUT-18-19-083 6-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of borrow area soil test result
Application for permission for quarrying of river bed gravels to be used for Road Construction on the above
428 L&T LT-BSRP-OUT-18-19-082 6-Feb-18 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Statutory
mentioned project
Mr.Kapil prasad,Team
429 RITES-OD RITES-BSRP-OD-LT-2017-69 6-Feb-18 M/s.L&T Ltd ,Bangriposi Quality of Works Eviction drive for the removal of Enchroachments along the project Highway within ROW Y LT/BSRP/OUT/18-19/044
leaderSr.Highway Engg.
431 L&T LT-BSRP-OUT-18-19-090 7-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of Box culvert Deaign & Drawing for approval

Submission of independent laboratory test result of construction material of hume pipe-W/S WESIX Hume
432 L&T LT-BSRP-OUT-18-19-089 7-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works
pipe industrial pvt ltd
Y RITES/BSRP/OD/L&T/2017/20
433 L&T LT-BSRP-OUT-18-19-088 7-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL area soil test result (255+000 to 260+000)
Borrow
434 L&T LT-BSRP-OUT-18-19-087 7-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment
Approval
Borrow
435 L&T LT-BSRP-OUT-18-19-086 7-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment & subgrade
Approval
Mr.Kapil prasad,Team
436 RITES-OD RITES-BSRP-OD-LT-2017-70 7-Feb-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of OGL soil test results approval Y LT/BSRP/OUT/18-19/079
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
437 RITES-OD RITES-BSRP-OD-LT-2017-71 7-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Structural drawings- Observations Y LT/BSRP/OUT/18-19/073
leaderSr.Highway Engg.
438 L&T LT-BSRP-OUT-18-19-092 8-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of Plan & Profile drawing from km 283 to 297 for approval

439 L&T LT-BSRP-OUT-18-19-091 8-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of typical cross section drawing & design basis report (Highway) for approval Y RITES/BSRP/OD/L&T/2017/36 & RITES/BSRP/OD/L&T/2017/18
Team leader,RITES,NHAI-
440 L&T LT-BSRP-OUT-18-19-094 9-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submisssion of Plan & Profile drawing from Km 255 to 269 for approval
PIU,Balalasore
Borrow
441 L&T LT-BSRP-OUT-18-19-093 9-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of borrow area soil test result for construction of Embankment Y RITES/BSRP/OD/L&T/2017/40 & RITES/BSRP/OD/L&T/2017/41
Approval
Mr.Kapil prasad,Team
442 RITES-OD RITES-BSRP-OD-LT-2018-72 9-Feb-18 M/s.L&T Ltd ,Bangriposi MPR SUBMISSION OF MONTHLY PROGRESS REPORT Y LT/BSRP/OUT/18-19/059,39,071
leaderSr.Highway Engg.
Borrow
Mr.Kapil prasad,Team
443 RITES-OD RITES-BSRP-OD-LT-2018-73 9-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining SUBMISSION OF OGL SOIL TEST Approval Y LT/BSRP/OUT/18-19/013
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
444 RITES-OD RITES-BSRP-OD-LT-2018-74 9-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining SUBMISSION OF OGL SOIL TEST Approval Y LT/BSRP/OUT/18-19/067
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
445 RITES-OD RITES-BSRP-OD-LT-2018-75 9-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment approval Y LT/BSRP/OUT/18-19/068
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
446 RITES-OD RITES-BSRP-OD-LT-2018-76 9-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment approval Y LT/BSRP/OUT/18-19/55
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
447 RITES-OD RITES-BSRP-OD-LT-2018-77 9-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of borrow area soil for construction of Embankment approval Y LT/BSRP/OUT/18-19/69
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
448 RITES-OD RITES-BSRP-OD-LT-2018-78 9-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment approval Y LT/BSRP/OUT/18-19/66
leaderSr.Highway Engg. Approval
Mr.Kapil prasad,Team
449 RITES-OD RITES-BSRP-OD-LT-2018-79 9-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of plan& profile Y LT/BSRP/OUT/18-19/092,006,023,041,053,065,092
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
450 RITES-OD RITES-BSRP-OD-LT-2018-80 9-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Safety measures during execution of work Y
leaderSr.Highway Engg.
Team leader,RITES,NHAI-
451 L&T LT-BSRP-OUT-18-19-101 10-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Comments/Observation of structural drawing Y RITES/BSRP/OD/L&T/2017/22 & RITES/BSRP/OD/L&T/2017/47
PIU,Balalasore
Borrow
452 L&T LT-BSRP-OUT-18-19-100 10-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment
Approval
Borrow
453 L&T LT-BSRP-OUT-18-19-099 10-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment
Approval
454 L&T LT-BSRP-OUT-18-19-098 10-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL area soil test result (265+000 to 268+000) LHS & RHS

455 L&T LT-BSRP-OUT-18-19-097 10-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Concrete trial mix with diffetent source of cement Y RITES/BSRP/OD/L&T/2017/01 & RITES/BSRP/OD/L&T/2017/19
456 L&T LT-BSRP-OUT-18-19-096 10-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of concrete mix design M15-Grade pcc
Borrow
457 L&T LT-BSRP-OUT-18-19-095 10-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment
Approval
458 RITES-OD RITES-BSRP-OD-LT-2018-81 10-Feb-18 Mr.Kapil prasad,Team leaderSr.HighwaM/s.L&T Ltd ,Bangriposi Utilities Electrical utility shifting From Km 199+200 to Km 206+000 OF NH-6 Y LT/BSRP/OUT/18-19/062
Mr.Kapil prasad,Team
459 RITES-OD RITES-BSRP-OD-LT-2018-82 12-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Comments Y LT/BSRP/OUT/18-19/063,085
leaderSr.Highway Engg.
Mr.Kapil prasad,Team Request for amendment of stages mentioned in schedule-H of the agreement as per circular/Clarifications
460 RITES-OD RITES-BSRP-OD-LT-2018-83 12-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Y LT/BSRP/OUT/18-19/045
leaderSr.Highway Engg. issued by MORTH.
462 L&T LT-BSRP-OUT-18-19-106 13-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of Independent Laboratory test report of Construction materials
Re-submission of Electrical utility shifting invoice as per Approved Estimate under Jharkhand Bijili Vitram
463 L&T LT-BSRP-OUT-18-19-105 13-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Utilities
Limited
Y RITES/BSRP/OD/L&T/2018/81

464 L&T LT-BSRP-OUT-18-19-104 13-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of MJB 303+032 substructure Design and Drawing Y RITES/BSRP/OD/L&T/2018/82

465 L&T LT-BSRP-OUT-18-19-103 13-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of Service road plan & profile drawing from 214.8 to 215.6 ,226 to 227.56 for approval

466 L&T LT-BSRP-OUT-18-19-102 13-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Miscellaneous Safety measures during execution of work Y RITES/BSRP/OD/L&T/2018/80
Mr.Kapil prasad,Team
467 RITES-OD RITES-BSRP-OD-LT-2018-84 13-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Horizontal curve Geometrics Y LT/BSRP/OUT/18-19/065
leaderSr.Highway Engg.
Borrow
468 L&T LT-BSRP-OUT-18-19-108 14-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment & subgrade
Approval
Borrow
469 L&T LT-BSRP-OUT-18-19-107 14-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment & subgrade
Approval
Mr.Kapil prasad,Team
470 RITES-NHAI RITES-BSRP-OD-NHAI-2018-27 14-Feb-18 M/s.L&T Ltd ,Bangriposi Payments Bills for shifting of Electrical Utilities Y LT/BSRP/OUT/18-19/072
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
471 RITES-OD RITES-BSRP-OD-LT-2018-85 14-Feb-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of concrete mix design M-15 GRADE PCC Y LT/BSRP/OUT/18-19/096
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
472 RITES-OD RITES-BSRP-OD-LT-2018-86 14-Feb-18 M/s.L&T Ltd ,Bangriposi Quality of Works Concrete trial mix with different source of cement Y LT/BSRP/OUT/18-19/097
leaderSr.Highway Engg.
Borrow
Mr.Kapil prasad,Team
473 RITES-OD RITES-BSRP-OD-LT-2018-87 14-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment approval Y LT/BSRP/OUT/18-19/077
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
474 RITES-OD RITES-BSRP-OD-LT-2018-88 14-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment approval Y LT/BSRP/OUT/18-19/083
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
475 RITES-OD RITES-BSRP-OD-LT-2018-89 14-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Embankment approval Y LT/BSRP/OUT/18-19/061
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
476 RITES-OD RITES-BSRP-OD-LT-2018-90 14-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment approval Y LT/BSRP/OUT/18-19/087
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
477 RITES-OD RITES-BSRP-OD-LT-2018-91 14-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment approval Y LT/BSRP/OUT/18-19/086
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
478 RITES-OD RITES-BSRP-OD-LT-2018-92 14-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of soil for construction of Embankment approval Y LT/BSRP/OUT/18-19/080
leaderSr.Highway Engg. Approval
Mr.Kapil prasad,Team
479 RITES-OD RITES-BSRP-OD-LT-2018-93 14-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Approval of representative for test checks and closing of RFI Y LT/BSRP/OUT/18-19/084
leaderSr.Highway Engg.
Team leader,RITES,NHAI-
480 L&T LT-BSRP-OUT-18-19-114 15-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Plan & Profile Y RITES/BSRP/OD/L&T/2018/79 & RITES/BSRP/OD/L&T/2017/46 & RITES/BSRP/OD/L&T/2017/24
PIU,Balalasore
Team leader,RITES,NHAI-
481 L&T LT-BSRP-OUT-18-19-113 15-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Plan & Profile drawing from km 242 to 255 for approval
PIU,Balalasore
Borrow
484 L&T LT-BSRP-OUT-18-19-110 15-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment & subgrade
Approval
Borrow
485 L&T LT-BSRP-OUT-18-19-109 15-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment & subgrade
Approval
486 L&T LT-BSRP-OUT-18-19-118 16-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites MPR Submission of Monthly progress report upto 31st January 2018 Y RITES/BSRP/OD/L&T/2018/72

Team leader,RITES,NHAI-
487 L&T LT-BSRP-OUT-18-19-116 16-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Horizonal Curve Geometrics Y RITES/BSRP/OD/L&T/2017/24 & RITES/BSRP/OD/L&T/2017/65 & RITES/BSRP/OD/L&T/2018/84
PIU,Balalasore

Borrow
488 L&T LT-BSRP-OUT-18-19-115 16-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment & subgrade
Approval
Mr.Kapil prasad,Team
490 RITES-OD RITES-BSRP-OD-LT-2018-94 17-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Submission of Compliance Report Y NHAI-13011-29-ROAD SAFETY-2018-PIU-BLS-153
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
491 RITES-OD RITES-BSRP-OD-LT-2018-95 17-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Approval of drawing Y LT/BSRP/OUT/18-19/101
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
492 RITES-OD RITES-BSRP-OD-LT-2018-96 17-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Request for Incorporation of our observations and re submission of drawing Y LT/BSRP/OUT/18-19/020,073,021,049
leaderSr.Highway Engg.
Mr.Kapil prasad,Team NHAI-13011-SAFETY-RO-OD-395-2017 NHAI-
493 RITES-OD RITES-BSRP-OD-LT-2018-97 17-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Award of Avenue plantation along the available
leaderSr.Highway Engg. 13011-SAFETY-RO-OD-395-2017
Re-submission of Electrical utility shifting invoice as per Approved Estimate under Jharkhand Bijili Vitram
496 L&T LT-BSRP-OUT-18-19-119 19-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Utilities Y RITES/BSRP/OD/L&T/2018/81
Limited

Team leader,RITES,NHAI-
497 L&T LT-BSRP-OUT-18-19-117 19-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Comments Y RITES/BSRP/OD/L&T/2017/22 & RITES/BSRP/OD/L&T/2017/47 & RITES/BSRP/OD/L&T/2018/82 & RITES/BSRP/OD/L&T/2018/95
PIU,Balalasore

Mr.Kapil prasad,Team
498 RITES-OD RITES-BSRP-OD-LT-2018-98 19-Feb-18 M/s.L&T Ltd ,Bangriposi Quality of Works Issues regarding Quality Control Y
leaderSr.Highway Engg.

Team leader,RITES,NHAI-
499 L&T LT-BSRP-OUT-18-19-121 20-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Clarification upon observations for the structural drawing Y RITES/BSRP/OD/L&T/2017/22 & RITES/BSRP/OD/L&T/2017/47 & RITES/BSRP/OD/L&T/2018/82 & RITES/BSRP/OD/L&T/2018/95
PIU,Balalasore

Team leader,RITES,NHAI-
500 L&T LT-BSRP-OUT-18-19-120 20-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Comments Y RITES/BSRP/OD/L&T/2017/22 & RITES/BSRP/OD/L&T/2017/47 & RITES/BSRP/OD/L&T/2018/82 & RITES/BSRP/OD/L&T/2018/95
PIU,Balalasore

Mr.Kapil prasad,Team
501 RITES-OD RITES-BSRP-OD-LT-2018-99 20-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Design speed for Plain terrain (Km 199 to 229) Y LT/BSRP/OUT/18-19/065
leaderSr.Highway Engg.
Borrow
502 L&T LT-BSRP-OUT-18-19-125 21-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA soil test Result
Approval
Team leader,RITES,NHAI-
503 L&T LT-BSRP-OUT-18-19-124 21-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Construction of Box Culverts
PIU,Balalasore
505 L&T LT-BSRP-OUT-18-19-122 21-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Payments Submission of Tree Felling Invoice as per Approved Estimate Y NHAI/11011/8/L&T/2017/PIU/BLS/918
506 L&T LT-BSRP-OUT-18-19-128 22-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Independent Laboratory test of construction materials for source approval
507 L&T LT-BSRP-OUT-18-19-127 22-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of Concrete Mix Design Grade M30
Borrow
Team leader,RITES,NHAI-
508 L&T LT-BSRP-OUT-18-19-126 22-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of borrow area soil test result for construction of Embankment
PIU,Balalasore Approval
509 RITES-NHAI RITES-BSRP-OD-NHAI-2018-31 22-Feb-18 Mr.Kapil prasad,Team leaderSr.HighwaM/s.L&T Ltd ,Bangriposi Utilities Bills for shifting of Electrical Utilities Y LT/BSRP/OUT/18-19/119
Borrow
Team leader,RITES,NHAI-
510 L&T LT-BSRP-OUT-18-19-136 23-Feb-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of borrow area soil test result for construction of Embankment / Subgrade
PIU,Balalasore Approval
The Joint Chief controller of
511 L&T LT-BSRP-OUT-18-19-135 23-Feb-18 M/s.L&T Ltd ,Bangriposi Statutory Issuance of Storage License for our petrolium Class B
Explosives
The Joint Chief controller of
512 L&T LT-BSRP-OUT-18-19-134 23-Feb-18 M/s.L&T Ltd ,Bangriposi Statutory Issuance of Storage License for our petrolium Class B
Explosives
The Joint Chief controller of
513 L&T LT-BSRP-OUT-18-19-133 23-Feb-18 M/s.L&T Ltd ,Bangriposi Statutory Undertaking towards Land wonership for our petrolium class B
Explosives
Team leader,RITES,NHAI-
514 L&T LT-BSRP-OUT-18-19-132 23-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous comments
PIU,Balalasore
Borrow
516 L&T LT-BSRP-OUT-18-19-130 23-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment & subgrade
Approval
Borrow
517 L&T LT-BSRP-OUT-18-19-129 23-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment & subgrade
Approval
Mr.Kapil prasad,Team
518 RITES-OD RITES-BSRP-OD-LT-2018-100 23-Feb-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of OGL soil test results approval Y LT/BSRP/OUT/18-19/26,88,98
leaderSr.Highway Engg.
Mr.Kapil prasad,Team LT/BSRP/OUT/18-19/101,10,11,076 &
519 RITES-OD RITES-BSRP-OD-LT-2018-101 23-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Approval of GAD,Design Notes & Reinforcement Drawing of Box Culvert Y
leaderSr.Highway Engg. LT/BSRP/OUT/17-18/88,94,100
Mr.Kapil prasad,Team
520 RITES-OD RITES-BSRP-OD-LT-2018-102 23-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Approval of Design & GAD of VUP,MNB&PUP Y LT/BSRP/OUT/18-19/20,49,73
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
521 RITES-OD RITES-BSRP-OD-LT-2018-103 23-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of pavement design Y
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
522 RITES-OD RITES-BSRP-OD-LT-2018-104 23-Feb-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of concrete mix design M-30 GRADE PCC Y LT/BSRP/OUT/18-19/127
leaderSr.Highway Engg.
523 L&T LT-BSRP-OUT-18-19-139 24-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of Concrete mix design M-35 Grade for pile
Re-Evaluating the amount mentioned in Notice No. 609 & 610 of dated 20.02.18 under bangriposi
524 L&T LT-BSRP-OUT-18-19-138 24-Feb-18 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Payments
tehsildhar for storage of gravel in Dahisahi Mouza under Khata No.33,Plot No.489
Borrow
525 L&T LT-BSRP-OUT-18-19-137 24-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result for construction of Embankment
Approval
Mr.Kapil prasad,Team
526 RITES-OD RITES-BSRP-OD-LT-2018-105 24-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Approval of Typical Reinforcement details of RCC Y LT/BSRP/OUT/18-19/090
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
527 RITES-OD RITES-BSRP-OD-LT-2018-106 24-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Safety Audit at the design stage of the project Y LT/BSRP/OUT/18-19/065,79,114
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
528 RITES-OD RITES-BSRP-OD-LT-2018-107 24-Feb-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Erection of speed Limit Board at NHs Y
leaderSr.Highway Engg.
529 L&T LT-BSRP-OUT-18-19-141 26-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of box culvert Design & drawing

Team leader,RITES,NHAI-
530 L&T LT-BSRP-OUT-18-19-140 26-Feb-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of test pile design & drawing for MJB at chainage 210+885 & 303+032
PIU,Balalasore
533 L&T LT-BSRP-OUT-18-19-143 27-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Reply for Observation regarding VUP,PUP,MJB & MNB Y RITES/BSRP/OD/L&T/2017/71,96,102
534 L&T LT-BSRP-OUT-18-19-142 27-Feb-18 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Payments Acknowledgement of Receipt of payments against Advance and Utility Shifting bill
Mr.Kapil prasad,Team
535 RITES-OD RITES-BSRP-OD-LT-2018-108 27-Feb-18 M/s.L&T Ltd ,Bangriposi Trees Submission of Tree felling invoice as per approved estimate Y LT/BSRP/OUT/18-19/122
leaderSr.Highway Engg.
Borrow
536 L&T LT-BSRP-OUT-18-19-145 28-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result
Approval
Submission of MJB Ch.210+885 substructure Design and Drwaing with geotechnical report for MJB
537 L&T LT-BSRP-OUT-18-19-144 28-Feb-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings
210+885 & 303+032
Y RITES/BSRP/OD/L&T/2018/82 , 95, 96
Mr.Kapil prasad,Team
538 RITES-OD RITES-BSRP-OD-LT-2018-07 28-Feb-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of OGL soil test results approval Y LT/BSRP/OUT/18-19/129,52
leaderSr.Highway Engg.
540 L&T LT-BSRP-OUT-18-19-146 1-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of Reinforcement Design & Drawing for Box Culvert

Mr.Kapil prasad,Team NHAI-11012-15-SHELADIA-2018-PIU-BLS-185


541 RITES-OD RITES-BSRP-OD-LT-2018-109 1-Mar-18 M/s.L&T Ltd ,Bangriposi Payments Implementation of GOVT.RULES/NORMS and payment of royalty Y
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
542 RITES-OD RITES-BSRP-OD-LT-2018-110 1-Mar-18 M/s.L&T Ltd ,Bangriposi MPR Observations of AE on Monthly progress report for the month January 2018 Y LT/BSRP/OUT/18-19/136
leaderSr.Highway Engg.
Borrow
Mr.Kapil prasad,Team
543 RITES-OD RITES-BSRP-OD-LT-2018-111 1-Mar-18 M/s.L&T Ltd ,Bangriposi Area/Mining Approval of Borrow area soil for construction of Subgrade Y LT/BSRP/OUT/18-19/136
leaderSr.Highway Engg. Approval
Mr.Kapil prasad,Team
544 RITES-OD RITES-BSRP-OD-LT-2018-112 1-Mar-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of concrete mix Design M-35 Grade for pile Y LT/BSRP/OUT/18-19/139
leaderSr.Highway Engg.
545 L&T LT-BSRP-OUT-18-19-150 3-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submisssion of MNB Design and Drawing for approval

546 L&T LT-BSRP-OUT-18-19-149 3-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Submission of Plan & Profile drawing from Km 199 to 229 & Traffic report for approval Y RITES/BSRP/OD/L&T/2017/24 ,RITES/BSRP/OD/L&T/2017/46,79,84,106
Team leader,RITES,NHAI-
547 L&T LT-BSRP-OUT-18-19-148 3-Mar-18 M/s.L&T Ltd ,Bangriposi COS Submission of details for change of scope for 12 No's Elephant underpass Y RITES/BSRP/OD/L&T/2017/43
PIU,Balalasore
548 L&T LT-BSRP-OUT-18-19-147 3-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Payments Submission of tree felling invoice as per Approved Estimate-RA Bill-01 (Revised) Y RITES/BSRP/OD/L&T/2018/108
Mr.Kapil prasad,Team
549 RITES-OD RITES-BSRP-OD-LT-2018-113 5-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Plan & Profile drawing from Km 199.200 to 229 Y LT/BSRP/OUT/18-19/149
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
550 RITES-OD RITES-BSRP-OD-LT-2018-114 5-Mar-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Remedial measures of reduction of road accident/fatilities of national Highways Y NHAI-13011-29-Road safety-2018-piu-bls-193
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
551 RITES-OD RITES-BSRP-OD-LT-2018-115 5-Mar-18 M/s.L&T Ltd ,Bangriposi Quality of Works Source approval ofTMT steel bars from SRMB SRIJAN PRIVATE LIMITED,Durgapur Y LT/BSRP/OUT/18-19/046
leaderSr.Highway Engg.
Re-Evaluating the amount mentioned in Notice No. 609 & 610 of dated 20.02.18 under bangriposi
553 L&T LT-BSRP-OUT-18-19-152 6-Mar-18 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Payments
tehsildhar for storage of gravel in Dahisahi Mouza under Khata No.33,Plot No.489
Borrow
554 L&T LT-BSRP-OUT-18-19-151 6-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result
Approval
Borrow
Mr.Kapil prasad,Team
555 RITES-OD RITES-BSRP-OD-LT-2018-116 6-Mar-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of BA soil test result for construction of Embankment FOR APPROVAL
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
556 RITES-OD RITES-BSRP-OD-LT-2018-117 6-Mar-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of BA soil test result for construction of Embankment FOR APPROVAL
leaderSr.Highway Engg. Approval
Team leader, RITES, NHAI-PIU,
559 L&T LT-BSRP-OUT-18-19-154 8-Mar-18 M/s.L&T Ltd, Bangriposi CIL Notification of Change in law for Royalty Fee of Ordinary sand and Ordinary Earth
Balasore
Team leader,RITES,NHAI-
560 L&T LT-BSRP-OUT-18-19-153 8-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of MNB Design for Approval
PIU,Balalasore
Mr.Kapil prasad,Team
561 RITES-OD RITES-BSRP-OD-LT-2018-118 8-Mar-18 M/s.L&T Ltd ,Bangriposi Maintenance/DLP Maintenance during Construction period Y
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
562 RITES-OD RITES-BSRP-OD-LT-2018-119 8-Mar-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Safety Measures at site Y
leaderSr.Highway Engg.
563 L&T LT-BSRP-OUT-18-19-161 9-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Issues regarding Quality control Y RITES/BSRP/OD/L&T/2017/02
Borrow
564 L&T LT-BSRP-OUT-18-19-160 9-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Approval of borrow area for construction of Subgrade Y RITES/BSRP/OD/L&T/2017/04
Approval
Borrow
565 L&T LT-BSRP-OUT-18-19-159 9-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Approval of borrow area for construction of Subgrade Y RITES/BSRP/OD/L&T/2018/116
Approval
Team leader,RITES,NHAI-
567 L&T LT-BSRP-OUT-18-19-156 9-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Plan & Profile drawing from Km-199 to 229 & Traffic report for approval Y RITES/BSRP/OD/L&T/2018/113
PIU,Balalasore
Borrow
568 L&T LT-BSRP-OUT-18-19-155 9-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow area soil test result
Approval
Mr.Kapil prasad,Team
569 RITES-OD RITES-BSRP-OD-LT-2018-120 9-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Pavement Design Y
leaderSr.Highway Engg.
Team leader,RITES,NHAI-
570 L&T LT-BSRP-OUT-18-19-163 10-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of MNB Design and Drawing for Approval
PIU,Balalasore
Team leader,RITES,NHAI- Submission of Horizontal curve Geometrics where additional land required for improving Design speed to
571 L&T LT-BSRP-OUT-18-19-162 10-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Y RITES/BSRP/OD/L&T/2018/84
PIU,Balalasore 100 kmph
Borrow
573 L&T LT-BSRP-OUT-18-19-166 12-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of Borrow araea soil test result
Approval
Team leader,RITES,NHAI-
574 L&T LT-BSRP-OUT-18-19-165 12-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Shear key Drawings for Box Culvert
PIU,Balalasore
Borrow
Team leader,RITES,NHAI-
575 L&T LT-BSRP-OUT-18-19-164 12-Mar-18 M/s.L&T Ltd ,Bangriposi Area/Mining Construction Of Embankment/Subgrade Y RITES-BSRP-OD-L&T-2018-136
PIU,Balalasore Approval
Mr.Kapil prasad,Team
576 RITES-OD RITES-BSRP-OD-LT-2018-121 12-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Plan & Profile drawing from Km 199 to 229 Y LT/BSRP/OUT/18-19/114,149,156
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
577 RITES-OD RITES-BSRP-OD-LT-2018-08 12-Mar-18 M/s.L&T Ltd ,Bangriposi Quality of Works source approval of Aggregates ,steel,cement,water and fly ash Y LT/BSRP/OUT/18-19/160
leaderSr.Highway Engg.
578 L&T LT-BSRP-OUT-18-19-171 13-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Miscellaneous Erection of speed limit boards at NHs Y RITES/BSRP/OD/L&T/2018/102
579 L&T LT-BSRP-OUT-18-19-170 13-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Miscellaneous Safety measures at site Y RITES/BSRP/OD/L&T/2018/119
580 L&T LT-BSRP-OUT-18-19-169 13-Mar-18 M/s.L&T Ltd ,Bangriposi Bijwa infra pvt ltd Miscellaneous File note

581 L&T LT-BSRP-OUT-18-19-167 13-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of concrete mix design M-15,M-20,M-25 & M-30 Grade Y RITES/BSRP/OD/L&T/2018/104 & RITES/BSRP/OD/L&T/2018/85
Borrow
Mr.Kapil prasad,Team
582 RITES-OD RITES-BSRP-OD-LT-2018-122 13-Mar-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for Construction of Subgrade Approval Y
leaderSr.Highway Engg. Approval
Mr.Kapil prasad,Team
583 RITES-OD RITES-BSRP-OD-LT-2018-123 13-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Box Drain Design & Drawing Y LT/BSRP/OUT/18-19/075
leaderSr.Highway Engg.
Team leader,RITES,NHAI-
585 L&T LT-BSRP-OUT-18-19-172 14-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of pavement Design report for approval Y RITES/BSRP/OD/L&T/2018/120 & RITES-BSRP-OD-L&T-2018-121
PIU,Balalasore
Mr.Kapil prasad,Team
586 RITES-OD RITES-BSRP-OD-LT-2018-124 14-Mar-18 M/s.L&T Ltd ,Bangriposi Quality of Works Approval of various Construction material
leaderSr.Highway Engg.
Borrow
Mr.Kapil prasad,Team
587 RITES-OD RITES-BSRP-OD-LT-2018-125 14-Mar-18 M/s.L&T Ltd ,Bangriposi Area/Mining Construction of Embankment / Subgrade Y LT/BSRP/OUT/18-19/164
leaderSr.Highway Engg. Approval
Mr.Kapil prasad,Team
588 RITES-OD RITES-BSRP-OD-LT-2018-126 14-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Approval of GAD of Box & Pipe Culverts Y LT/BSRP/OUT/18-19/141
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
589 RITES-OD RITES-BSRP-OD-LT-2018-127 14-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Approval of typical Shear key details for all Box type structures Y LT/BSRP/OUT/18-19/165
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
590 RITES-OD RITES-BSRP-OD-LT-2018-128 14-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Request for Providing GT,Hydrological & Hydraulic Analysis Y LT/BSRP/OUT/18-19/034,150
leaderSr.Highway Engg.
591 L&T LT-BSRP-OUT-18-19-175 15-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites MPR Submission of Monthly progress report Y RITES/BSRP/OD/L&T/2018/110
592 L&T LT-BSRP-OUT-18-19-174 15-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Independent laboratory test of construction materials for source approval
593 L&T LT-BSRP-OUT-18-19-179 16-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Source approval of steel-M/s shyam steel industries Limited
594 L&T LT-BSRP-OUT-18-19-178 16-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Deleterious content test of Borrow area soil Y RITES-BSRP-OD-L&T-2018-122 , 117
595 L&T LT-BSRP-OUT-18-19-177 16-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Independent laboratory test of reinforcement steel Y RITES/BSRP/OD/L&T/2018/115 & RITES/BSRP/OD/L&T/2017/17
Borrow
596 L&T LT-BSRP-OUT-18-19-176 16-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA soil test result
Approval
597 L&T LT-BSRP-OUT-18-19-186 17-Mar-18 M/s.L&T Ltd, Bangriposi The Tahasildar, Bangriposi Payments Payment of royalty for River bed Gravel Source for Dahisahi III & IV for the FY'17-18
Team leader,RITES,NHAI-
598 L&T LT-BSRP-OUT-18-19-185 17-Mar-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Submission of minutes of meeting from 16.03.2018 to 17.03.2018 N
PIU,Balalasore
Team leader,RITES,NHAI-
599 L&T LT-BSRP-OUT-18-19-184 17-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Box culvert Drawing
PIU,Balalasore
Team leader,RITES,NHAI-
600 L&T LT-BSRP-OUT-18-19-183 17-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of wingwall design & drawing for Box Structures
PIU,Balalasore
Team leader,RITES,NHAI-
601 L&T LT-BSRP-OUT-18-19-182 17-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of saety certificate Y RITES/BSRP/OD/L&T/2018/106
PIU,Balalasore
Borrow
602 L&T LT-BSRP-OUT-18-19-181 17-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA soil test result
Approval
603 L&T LT-BSRP-OUT-18-19-180 17-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of concrete mix design grade M35-RCC & M35-PILE Y RITES/BSRP/OD/L&T/2018/112
Mr.Kapil prasad,Team
604 RITES-OD RITES-BSRP-OD-LT-2018-130 17-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Computation of linear length and lane Kilometers Y NHAI-11012-15-SAI-2018-PIU-BLS-230
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
605 RITES-OD RITES-BSRP-OD-LT-2018-131 17-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Approval of typical reinforcement of Box Culvert Y LT/BSRP/OUT/18-19/141,146
leaderSr.Highway Engg.
Request for granting surface rights on the quarry lease area for 1Acre for period of 12 months on the
606 L&T LT-BSRP-OUT-18-19-189 19-Mar-18 M/s.L&T Ltd ,Bangriposi The sub collector,Baripada Statutory
Dahisahi III & IV on the Govt.Land for establishing a temporary mobile crusher unit (Crawler mounted)

Borrow
607 L&T LT-BSRP-OUT-18-19-188 19-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA soil test result
Approval
Mr.Kapil prasad,Team
609 RITES-OD RITES-BSRP-OD-LT-2018-132 19-Mar-18 M/s.L&T Ltd ,Bangriposi MPR Submission of Monthly Progress Report Y LT/BSRP/OUT/18-19/175
leaderSr.Highway Engg.
The Sr.Inspector,Weight &
Measurement
610 L&T LT-BSRP-OUT-18-19-197 20-Mar-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Request to stamping of Diesel Browser
Department,Baripada,Mayurbha
nj
611 L&T LT-BSRP-OUT-18-19-192 20-Mar-18 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Claims Submission of GST claim
612 L&T LT-BSRP-OUT-18-19-191 20-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Quality of Works Submission of OGL soil test result from km. 288+000 to 291+000
Borrow
613 L&T LT-BSRP-OUT-18-19-190 20-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA soil test result
Approval
Mr.Kapil prasad,Team
614 RITES-OD RITES-BSRP-OD-LT-2018-133 20-Mar-18 M/s.L&T Ltd ,Bangriposi Maintenance/DLP Maintenance During Construction Period LT-BSRP-OUT-17-18-070
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
615 RITES-OD RITES-BSRP-OD-LT-2018-134 20-Mar-18 M/s.L&T Ltd ,Bangriposi Quality of Works Checking of GAD of Major Bridge Y LT/BSRP/OUT/18-19/021,22,104,144
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
616 RITES-OD RITES-BSRP-OD-LT-2018-135 20-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Checking Drawing of Test pile of Major Bridge at ch.210+885 & 302+032 Y LT/BSRP/OUT/18-19/140
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
617 RITES-OD RITES-BSRP-OD-LT-2018-09 20-Mar-18 M/s.L&T Ltd ,Bangriposi Quality of Works Independent Laboratory test of Construction Materials Y LT/BSRP/OUT/18-19/174
leaderSr.Highway Engg.
Team leader,RITES,NHAI-
619 L&T LT-BSRP-OUT-18-19-200 21-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of MNB Design for approval Y RITES-BSRP-OD-L&T-2018-128
PIU,Balalasore
Borrow
620 L&T LT-BSRP-OUT-18-19-199 21-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Submission of BA soil test result
Approval
Team leader,RITES,NHAI-
621 L&T LT-BSRP-OUT-18-19-198 21-Mar-18 M/s.L&T Ltd ,Bangriposi COS Additional culverts to be constructed which are not listed in schedule -B of contract agreement
PIU,Balalasore
Team leader,RITES,NHAI-
622 L&T LT-BSRP-OUT-18-19-196 21-Mar-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Computation of Linear length and lane -Kilometers Y RITES-BSRP-OD-L&T-2018-130
PIU,Balalasore
623 L&T LT-BSRP-OUT-18-19-195 21-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Land Issues Land Acquisition compensation issue

624 L&T LT-BSRP-OUT-18-19-194 21-Mar-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Reply for Observation regarding VUP,PUP,MJB & MNB Y RITES/BSRP/OD/L&T/2018/102
Team leader,RITES,NHAI-
625 L&T LT-BSRP-OUT-18-19-193 21-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of safety certificate for service road
PIU,Balalasore
Borrow
Mr.Kapil prasad,Team
626 RITES-OD RITES-BSRP-OD-LT-2018-10 21-Mar-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment-Approval LT-BSRP-OUT-17-18-063
leaderSr.Highway Engg. Approval
Mr.Kapil prasad,Team
627 RITES-OD RITES-BSRP-OD-LT-2018-11 21-Mar-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of concrete mix design M15,M20,M25 AND M30 Grade Approval Y LT/BSRP/OUT/18-19/167
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
628 RITES-OD RITES-BSRP-OD-LT-2018-12 21-Mar-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of concrete mix design for M35-RCC & M35 for pile approval Y LT/BSRP/OUT/18-19/180
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
629 RITES-OD RITES-BSRP-OD-LT-2018-136 21-Mar-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Safety measure at the location of structures Y LT/BSRP/OUT/18-19/226
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
630 RITES-OD RITES-BSRP-OD-LT-2018-137 21-Mar-18 M/s.L&T Ltd ,Bangriposi Maintenance/DLP Safe-guarding ROW pillars and reection of chainage boards Y
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
631 RITES-OD RITES-BSRP-OD-LT-2018-138 21-Mar-18 M/s.L&T Ltd ,Bangriposi COS Submission of details for change of scope for 12 no.s Elephant underpasses Y LT/BSRP/OUT/18-19/148
leaderSr.Highway Engg.
Borrow
Mr.Kapil prasad,Team
632 RITES-QC RITES-BSRP-QC-OD-LT-2018-13 21-Mar-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment-Approval. Y LT/BSRP/OUT/18-19/166
leaderSr.Highway Engg. Approval

633 L&T LT-BSRP-OUT-18-19-201 22-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Design & Drawings Safety measures at site Y RITES-BSRP-OD-L&T-2018-129
Borrow
Mr.Kapil prasad,Team
634 RITES-QC RITES-BSRP-QC-OD-LT-2018-14 22-Mar-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment/ Subgrade approval Y LT/BSRP/OUT/18-19/181
leaderSr.Highway Engg. Approval
Borrow
Mr.Kapil prasad,Team
635 RITES-QC RITES-BSRP-QC-OD-LT-2018-15 22-Mar-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment/ Subgrade approval Y LT/BSRP/OUT/18-19/176
leaderSr.Highway Engg. Approval
Mr.Kapil prasad,Team
637 RITES-OD RITES-BSRP-OD-LT-2018-139 23-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Approval of GAD of VUP Y LT/BSRP/OUT/18-19/143,194
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
638 RITES-OD RITES-BSRP-OD-LT-2018-140 23-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Request for lateral load test on pile Y
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
639 RITES-OD RITES-BSRP-OD-LT-2018-141 23-Mar-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Submission of Safety Certificate Y LT/BSRP/OUT/18-19/182
leaderSr.Highway Engg.
Borrow
Mr.Kapil prasad,Team
640 RITES-QC RITES-BSRP-QC-OD-LT-2018-16 23-Mar-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of BA soil for construction of Embankment/Subgrade approval Y LT/BSRP/OUT/18-19/188
leaderSr.Highway Engg. Approval
Mr.Kapil prasad,Team
641 RITES-QC RITES-BSRP-QC-OD-LT-2018-17 23-Mar-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of OGL soil test results from Km 288+000 to 291+000 Approval LT-BSRP-OUT-18-19-191
leaderSr.Highway Engg.
642 L&T LT-BSRP-OUT-18-19-407 23-Mar-18 M/s.L&T Ltd ,Bangriposi Tahasildar,Jashipur Payments Request to issue money receipt N
Borrow
643 L&T LT-BSRP-OUT-18-19-204 24-Mar-18 M/s.L&T Ltd ,Bangriposi The team leader,Rites Area/Mining Approval of BA soil for constrution of subgrade Y RITES-BSRP--QC-OD-L&T-2018/14
Approval
Team leader,RITES,NHAI-
645 L&T LT-BSRP-OUT-18-19-202 24-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of typical reinforcement Details of RCC Box culvert for approval
PIU,Balalasore
Mr.Kapil prasad,Team
646 RITES-OD RITES-BSRP-OD-LT-2018-142 24-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Observations on Drawing Y LT/BSRP/OUT/18-19/150,34,200
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
647 RITES-OD RITES-BSRP-OD-LT-2018-143 24-Mar-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Revised GAD of Box Culvert Y LT/BSRP/OUT/18-19/184
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
648 RITES-OD RITES-BSRP-OD-LT-2018-144 24-Mar-18 M/s.L&T Ltd ,Bangriposi Miscellaneous Submission of Safety Certificate for service road Y LT/BSRP/OUT/18-19/108 , 193
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
649 RITES-OD RITES-BSRP-OD-LT-2018-145 24-Mar-18 M/s.L&T Ltd ,Bangriposi Slow Progress Slow progress of work Y LT/BSRP/OUT/18-19/032
leaderSr.Highway Engg.
Mr.Kapil prasad,Team
650 RITES-OD RITES-BSRP-OD-LT-2018-146 24-Mar-18 M/s.L&T Ltd ,Bangriposi Maintenance/DLP Mainenance and repair of Existing Road Y
leaderSr.Highway Engg.
651 L&T LT-BSRP-OUT-18-19-405 25-Mar-18 M/s.L&T Ltd ,Bangriposi Tahasildar,Jashipur Payments Request to issue money receipt N
652 L&T LT-BSRP-OUT-18-19-205 26-Mar-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of Borrow area soil test result
Borrow
654 RITES-QC RITES-BSRP-QC-OD-LT-2018-18 26-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment-Approval Y LT/BSRP/OUT/18-19/155
Approval

655 L&T LT-BSRP-OUT-18-19-207 27-Mar-18 M/s.L&T Ltd ,Bangriposi The Team Leader,Rites Design & Drawings Submission of SBC report Y RITES-BSRP-OD-L&T-2018-126 , 142

657 RITES-OD RITES-BSRP-OD-LT-2018-147 27-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Wing wall Drawing for Box structure Y LT/BSRP/OUT/18-19/183

658 RITES-OD RITES-BSRP-OD-LT-2018-148 27-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval for Plan and Profile from Km 297.000 to Km 310.839(Rev-B) Y LT/BSRP/OUT/18-19/114,182

659 RITES-OD RITES-BSRP-OD-LT-2018-149 27-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Pavement Design report for approval Y LT/BSRP/OUT/18-19/172

661 L&T LT-BSRP-OUT-18-19-209 28-Mar-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of revised Safety Certificate Y RITES-BSRP-OD-L&T-2018-141,144

662 L&T LT-BSRP-OUT-18-19-208 28-Mar-18 M/s.L&T Ltd ,Bangriposi The Team Leader,Rites Design & Drawings Submission of Irrigation MNB GAD

663 RITES-OD RITES-BSRP-OD-LT-2018-150 28-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress Slow Progress of work Y LT/BSRP/OUT/18-19/145
The Regional Officer,State Application for Consent To Operate(CTO) Crusher plant at Village: Ghosada, Tehasil: Karanjia, Dist-
665 L&T LT-BSRP-OUT-18-19-210-B 29-Mar-18 M/s.L&T Ltd ,Bangriposi Statutory
pollution Board,Balasore,Odisha Mayurbhanj, Odisha

Borrow
666 L&T LT-BSRP-OUT-18-19-210 29-Mar-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow area soil test result
Approval
Provisional approval of Minor Bridge Drawing/reinforcementat locations 236+810, 260+457, 261+358,
667 RITES-OD RITES-BSRP-OD-LT-2018-150-A 29-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
262+006, 268+747, 269+589
Y LT/BSRP/OUT/18-19/142

668 RITES-OD RITES-BSRP-OD-LT-2018-151 30-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Box Culvert Drawing Y LT/BSRP/OUT/18-19/184
669 RITES-OD RITES-BSRP-OD-LT-2018-152 30-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Grant of Tree Felling permission for 15.977ha of land of Baripada Forest Division DFO 1296

670 RITES-OD RITES-BSRP-OD-LT-2018-153 30-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing of Highway Drainage System

671 RITES-OD RITES-BSRP-OD-LT-2018-154 30-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Corrigendum to Approval for Plan and Profile from Km 297.000 to Km 310.839(Rev-B) Y

Borrow
672 RITES-QC RITES-BSRP--QC-OD-LT-2018-19 30-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment/sub-grade-Approval Y LT/BSRP/OUT/18-19/190
Approval
673 RITES-QC RITES-BSRP-QC-OD-LT--2018-20 30-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Steel-M/s Shyam steel Industries limited Y LT/BSRP/OUT/18-19/179
674 RITES-QC RITES-BSRP-QC-OD-LT-2018-21 30-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Construction Materials for source Approval Y LT/BSRP/OUT/18-19/128
Borrow
676 L&T LT-BSRP-OUT-18-19-212 2-Apr-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow area soil test result
Approval
Submission of Concrete Mix Design M-15,M-20,M-30,M-35(PILE) & M-35(RCC) Grade with Birla Gold OPC 43
677 L&T LT-BSRP-OUT-18-19-211 2-Apr-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works
cement & Chryso Admixture
678 RITES-OD RITES-BSRP-OD-LT-2018-154-A 2-Apr-18 Mr.Kapil prasad,Team leaderSr.HighwaM/s.L&T Ltd ,Bangriposi Design & Drawings Approval of Typical Reinforcement of Box Culverts Y LT/BSRP/OUT/18-19/202
679 L&T LT-BSRP-OUT-18-19-270 3-Apr-18 M/s.L&T Ltd ,Bangriposi NHAI-PIU-Balasore Payments Issue of TDS Certificate for the TDS deducted against Advance payments
680 L&T LT-BSRP-OUT-18-19-214 3-Apr-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Payments Request to issue money receipt

The Regional Officer,State Application for Consent To Establish(CTE) Crusher plant at village: Kenjhara,Tehasil: Jashipur, Dist-
681 L&T LT-BSRP-OUT-18-19-213 3-Apr-18 M/s.L&T Ltd ,Bangriposi Statutory
pollution Board,Balasore,Odisha Mayurbhanj, Odisha

683 L&T LT-BSRP-OUT-18-19-215 4-Apr-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Trees Grant of Tree Felling permission under Baripada Forest Division Y RITES-BSRP-OD-L&T-2018-152
Submission of Concrete Mix Design M-15,M-20,M-25,M-30,M-35(RCC) & M-35(Pile) Grade with Emami OPC
684 L&T LT-BSRP-OUT-18-19-219 6-Apr-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works
53 cement & Chryso Admixture
Borrow
685 L&T LT-BSRP-OUT-18-19-218 6-Apr-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow area soil test result
Approval
Team leader,RITES,NHAI-
686 L&T LT-BSRP-OUT-18-19-216 6-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Pavement design report for approval Y RITES-BSRP-OD-L&T-2018-149
PIU,Balalasore
Team leader,RITES,NHAI- Submission of Service Road Plan & Profile drawing from Km 263.640 to Km.264.640 & Km.284.000 to
690 L&T LT-BSRP-OUT-18-19-219-A 7-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings
PIU,Balalasore Km.311.000 for Approval
Team leader,RITES,NHAI-
691 L&T LT-BSRP-OUT-18-19-218-A 7-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Safety Certificate
PIU,Balalasore
Team leader,RITES,NHAI- Submission of Horizontal curve Geometrics where additional land required for improving Design speed to
692 L&T LT-BSRP-OUT-18-19-217 7-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Y RITES/BSRP/OD/L&T/2018/84
PIU,Balalasore 100 kmph
693 RITES-OD RITES-BSRP-OD-LT-2018-155 7-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Assessment of requirement NHAI-4323,NHAI-318

694 RITES-OD RITES-BSRP-OD-LT-2018-156 7-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Plan and Profile Y LT/BSRP/OUT/18-19/209

695 RITES-OD RITES-BSRP-OD-LT-2018-157 7-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of typical reinforcement of Box Culvert Y LT/BSRP/OUT/18-19/202

696 RITES-OD RITES-BSRP-OD-LT-2018-158 7-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of GAD and reinforcement Drawing of Minor Bridges at Locations 244+077, 265+754, 294+427 Y LT/BSRP/OUT/18-19/163

697 RITES-OD RITES-BSRP-OD-LT-2018-159 7-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Provisional approval of Minor Bridge Drawing/reinforcement at locations 248+978

Collection and analysis of bridge condition and identification of Major Bridge/ Minor Bridges /Culverts/Level
698 RITES-OD RITES-BSRP-OD-LT-2018-160 7-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings NHAI-309
Crossings that require immediate action
699 RITES-OD RITES-BSRP-OD-LT-2018-161 7-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval for Plan and Profile from Km 269.000 to Km 283.000 (Rev-C) Y LT/BSRP/OUT/18-19/114,209

Borrow
700 RITES-QC RITES-BSRP-QC-OD-LT--2018-22 7-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment/sub-grade-Approval Y LT/BSRP/OUT/18-19/199,210
Approval
Borrow
701 RITES-QC RITES-BSRP-QC-OD-LT-2018-23 7-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment/sub-grade-Approval Y LT/BSRP/OUT/18-19/212
Approval
Borrow
702 RITES-QC RITES-BSRP-QC-OD-LT--2018-24 7-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment/sub-grade-Approval Y LT/BSRP/OUT/18-19/205
Approval

705 RITES-OD RITES-BSRP-OD-LT-2018-162 9-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval for Plan and Profile from Km 283.000 to Km 297.000 (Rev-C) Y LT/BSRP/OUT/18-19/114,218-A

706 RITES-OD RITES-BSRP-OD-LT-2018-163 9-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval for Plan and Profile from Km 199.115 to Km 229.000 (Rev-D) Y LT/BSRP/OUT/18-19/114,209

707 RITES-OD RITES-BSRP-OD-LT-2018-164 9-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Corrigendum to Approval for plan and Profile from Km 283.000 to Km 297+000 (Rev-B) Y LT/BSRP/OUT/18-19/162
708 RITES-OD RITES-BSRP-OD-LT-2018-165 9-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Safety Measures at site Y LT/BSRP/OUT/18-19/170
709 RITES-OD RITES-BSRP-OD-LT-2018-166 9-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Plan & Profile from Km 242+000 to Km 255+000 (Rev-B) Y LT/BSRP/OUT/18-19/114,218-A

710 RITES-OD RITES-BSRP-OD-LT-2018-167 9-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Plan & Profile from Km 255 +000 to 269+000 Y LT/BSRP/OUT/18-19/114,218-A

Superintending Engineer Application for supply of Electrical Energy on Temporary Basis for 30 months at our camp eshtablisment
711 L&T LT-BSRP-OUT-18-19-222 11-Apr-18 M/s.L&T Ltd ,Bangriposi Statutory
(ELEC),Baripada Area coming under Bangriposi sub-divison
Team leader,RITES,NHAI-
712 L&T LT-BSRP-OUT-18-19-225 12-Apr-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of Job mix formula of WMM & BM used for road repairing work
PIU,Balalasore
Team leader,RITES,NHAI-
713 L&T LT-BSRP-OUT-18-19-224 12-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of MNB at Ch. 263+423 Design and Drawing for approval
PIU,Balalasore
Team leader,RITES,NHAI-
714 L&T LT-BSRP-OUT-18-19-223 12-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of test pile design & drawing for MJB at chainage 210+885 & 303+032 Y RITES-BSRP-OD-L&T-2018-135 & RITES-BSRP-OD-L&T-2018-140
PIU,Balalasore
715 RITES-OD RITES-BSRP-OD-LT-2018-168 12-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Provision for Liabilities for Finalization of Annual Accounts for the Financial Year 2017-18 NHAI-12011-9-TDS-2018-PIU-BLS-337

716 RITES-OD RITES-BSRP-OD-LT-2018-169 12-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Additional culverts / structures to be constructed which is not listed in schedule-B of contract Agreement Y LT/BSRP/OUT/18-19/198
Submission of Horizontal curve Geometrics where additional land required for improving Design speed to
717 RITES-OD RITES-BSRP-OD-LT-2018-170 12-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
100 kmph
Y LT/BSRP/OUT/18-19/217

718 RITES-OD RITES-BSRP-OD-LT-2018-171 12-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of SBC report Y LT/BSRP/OUT/18-19/207

719 RITES-OD RITES-BSRP-OD-LT-2018-172 12-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance and Repair of Existing Road

Team leader,RITES,NHAI-
720 L&T LT-BSRP-OUT-18-19-234 13-Apr-18 M/s.L&T Ltd ,Bangriposi Payments Submission of Tree felling RA Bill -01
PIU,Balalasore
Team leader,RITES,NHAI-
721 L&T LT-BSRP-OUT-18-19-232 13-Apr-18 M/s.L&T Ltd ,Bangriposi Payments Provision for labilities for Finalization of Annual Accounts for the Financial Year 2017-18 Y RITES-BSRP-OD-L&T-2018-168
PIU,Balalasore
Team leader,RITES,NHAI-
722 L&T LT-BSRP-OUT-18-19-230 13-Apr-18 M/s.L&T Ltd ,Bangriposi Payments Submission of RA Bill-01 for Maintenance of Existing Road
PIU,Balalasore
Team leader,RITES,NHAI-
723 L&T LT-BSRP-OUT-18-19-229 13-Apr-18 M/s.L&T Ltd ,Bangriposi Payments Submission of RWSS RA Bill-01
PIU,Balalasore
District Cultural Officer, Demand Draft for Rupees One Lakh towards the Chaitrya Praba and Polishri Mela 2018 organised by
724 L&T LT-BSRP-OUT-18-19-228 13-Apr-18 M/s.L&T Ltd ,Bangriposi Payments
Baripada Mayurbhanj Chou Nrutya Pratisthan and District Administration, Mayurbhanj
Team leader,RITES,NHAI-
725 L&T LT-BSRP-OUT-18-19-227 13-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Box Culvert Design and Drawing for approval Y RITES-BSRP-OD-L&T-2018-143,151
PIU,Balalasore
Team leader,RITES,NHAI-
726 L&T LT-BSRP-OUT-18-19-226 13-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of MNB at Ch. 255+711 Design and Drawing for approval
PIU,Balalasore
Team leader,RITES,NHAI-
727 L&T LT-BSRP-OUT-18-19-235 14-Apr-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of concrete mix design M-15 Grade PCC
PIU,Balalasore
Team leader,RITES,NHAI-
728 L&T LT-BSRP-OUT-18-19-233 14-Apr-18 M/s.L&T Ltd ,Bangriposi MPR Submission of Monthly Progress Report for the month of Mar'18
PIU,Balalasore
Team leader,RITES,NHAI-
729 L&T LT-BSRP-OUT-18-19-231 14-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Design and Drawing of Box Culvert for approval Y RITES-BSRP-OD-L&T-2018-143,151
PIU,Balalasore
730 RITES-OD RITES-BSRP-OD-LT-2018-173 14-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance and Repair of Existing Road Y LT/BSRP/OUT/18-19/247
Source Approval of TMT steel bars from M/s Shyam Steel Industries Limited, Raturia, Durgapur 9Wst
731 RITES-QC RITES-BSRP-QC-OD-LT--2018-27 14-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Y LT/BSRP/OUT/18-19/179
Bengal)
732 L&T LT-BSRP-OUT-18-19-238 16-Apr-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Source approval of Bitumen and Emulsion
733 L&T LT-BSRP-OUT-18-19-237 16-Apr-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works submission of SBC Test report Y RITES-BSRP-OD-L&T-2018-171
Borrow
Team leader,RITES,NHAI-
734 L&T LT-BSRP-OUT-18-19-236 16-Apr-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil test result
PIU,Balalasore Approval
735 RITES-NHAI RITES-BSRP-OD-NHAI-2018-45-B 16-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of Bills for tree felling Y LT/BSRP/OUT/18-19/122,147,234
Team leader,RITES,NHAI-
736 L&T LT-BSRP-OUT-18-19-242 17-Apr-18 M/s.L&T Ltd ,Bangriposi Quality of Works Source approval of HT Strand
PIU,Balalasore
740 L&T LT-BSRP-OUT-18-19-243 18-Apr-18 M/s.L&T Ltd ,Bangriposi Miscellaneous PLANNING
Team leader,RITES,NHAI-
741 L&T LT-BSRP-OUT-18-19-247 19-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Box Culvert Design and Drawing for approval
PIU,Balalasore
Team leader,RITES,NHAI-
743 L&T LT-BSRP-OUT-18-19-245 19-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Design and Drawing of Box Culvert for approval Y RITES-BSRP-OD-L&T-2018-143,151
PIU,Balalasore
Team leader,RITES,NHAI-
744 L&T LT-BSRP-OUT-18-19-244 19-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Box Culvert & Pipe Culvert Design and Drawing for approval
PIU,Balalasore
Team leader,RITES,NHAI-
745 L&T LT-BSRP-OUT-18-19-251 20-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Lined Drain Plan & Profile drawing from Km199.000 to Km.229.000 for approval
PIU,Balalasore
Team leader,RITES,NHAI-
746 L&T LT-BSRP-OUT-18-19-250 20-Apr-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of Concrete mix design with BASF & SIKA brand admixture
PIU,Balalasore
Team leader,RITES,NHAI-
747 L&T LT-BSRP-OUT-18-19-249 20-Apr-18 M/s.L&T Ltd ,Bangriposi Quality of Works Independent Laboratory test of Construction materials
PIU,Balalasore
Submission of Concrete Mix Design M15,M20,M25,M30,M35 (RCC) and M35 (Pile) Grade with 
749 RITES-QC RITES-BSRP-QC-OD-LT-2018-27-A 20-Apr-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works
Emami opc 53 Cement & Chryso Admixture-Approva
750 RITES-QC RITES-BSRP-QC-OD-LT-2018-83-A 20-Apr-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Third Party Test Results-Approval N
Team leader,RITES,NHAI- RITES/BSRP/OD/L&T/2017/01 &
751 L&T LT-BSRP-OUT-18-19-252-A 21-Apr-18 M/s.L&T Ltd ,Bangriposi Quality of Works Source approval of Admixture Y
PIU,Balalasore RITES/BSRP/OD/L&T/2018/86
Team leader,RITES,NHAI-
752 L&T LT-BSRP-OUT-18-19-252 21-Apr-18 M/s.L&T Ltd ,Bangriposi Quality of Works Submission of GSB mix design, Source - L&T Crusher Plant Mundavani
PIU,Balalasore
753 RITES-OD RITES-BSRP-OD-LT-2018-174 21-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval for Plan and Profile from Km 237.000 to 242.000 (Rev-B) Y LT/BSRP/OUT/18-19/114,218-A

Test pile Design & drawing for MJB at Ch.210+885 & 303+032 and requst for submission for other
754 RITES-OD RITES-BSRP-OD-LT-2018-175 21-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
categories
Y LT/BSRP/OUT/18-19/223

755 RITES-OD RITES-BSRP-OD-LT-2018-176 21-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Drawing observations of MNB at Ch. 255+711 LT/BSRP/OUT/18-19/226

756 RITES-QC RITES-BSRP-QC-OD-LT-2018-28 21-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of concrete mix Deisgn M-15 Grade PCC Y LT/BSRP/OUT/18-19/235
Borrow
757 RITES-QC RITES-BSRP-QC-OD-LT-2018-29 21-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment/subgrade Approval Y LT/BSRP/OUT/18-19/218,236
Approval

758 RITES-OD RITES-BSRP-OD-LT-2018-177 21-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of GAD of Box Culverts Y LT/BSRP/OUT/18-19/231

759 RITES-OD RITES-BSRP-OD-LT-2018-177-A 21-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of revised GAD and typical reinforcement of Box Culverts Y LT/BSRP/OUT/18-19/247
760 RITES-OD RITES-BSRP-OD-LT-2018-178 21-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Submission of details for change of scope for 12 no.s Elephant underpasses Y LT/BSRP/OUT/18-19/148
Team leader,RITES,NHAI- Test Pile Design & Drawing for MJB at Ch 210+885 & 303+032 and request for submission for other
761 L&T LT-BSRP-OUT-18-19-253 23-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Y RITES-BSRP-OD-L&T-2018-175
PIU,Balalasore categories
763 RITES-OD RITES-BSRP-OD-LT-2018-179 24-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submission of Monthly Progress Report (31st March 2018) Y LT/BSRP/OUT/18-19/175, 233
764 RITES-NHAI RITES-BSRP-OD-NHAI-2018-47 24-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of RWSS RA Bill-01 Y LT/BSRP/OUT/18-19/229
Borrow
Team leader,RITES,NHAI-
767 L&T LT-BSRP-OUT-18-19-258 25-Apr-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil test result
PIU,Balalasore Approval
Borrow
Team leader,RITES,NHAI-
768 L&T LT-BSRP-OUT-18-19-257 25-Apr-18 M/s.L&T Ltd ,Bangriposi Area/Mining Submission of Borrow area soil test result
PIU,Balalasore Approval
RITES-BSRP-OD-L&T-2018-148 & RITES-BSRP-OD-
Team leader,RITES,NHAI-
769 L&T LT-BSRP-OUT-18-19-255 25-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Approval of ECW Y L&T-2018-161 & RITES-BSRP-OD-L&T-2018-
PIU,Balalasore 162,166,167,174
770 RITES-OD RITES-BSRP-OD-LT-2018-180 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Construction activity at Major Bridges Y LT/BSRP/OUT/18-19/240
771 RITES-QC RITES-BSRP-QC-OD-LT-2018-30 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of GSB mix design, source- L&T Crusher Plant Mundavani Y LT/BSRP/OUT/18-19/252
772 RITES-QC RITES-BSRP-QC-OD-LT-2018-31 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction Materials Y LT/BSRP/OUT/18-19/249
773 RITES-QC RITES-BSRP-QC-OD-LT-2018-32 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Bitumen and Emulsion LT/BSRP/OUT/18-19/238
774 RITES-OD RITES-BSRP-OD-LT-2018-181 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Sortage of Stack at Depot Y LT/BSRP/OUT/18-19/238
775 RITES-OD RITES-BSRP-OD-LT-2018-182 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Submission of GST Claim Y LT/BSRP/OUT/18-19/192
776 RITES-OD RITES-BSRP-OD-LT-2018-183 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of SBC test report Y LT/BSRP/OUT/18-19/237

777 RITES-OD RITES-BSRP-OD-LT-2018-184 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Pavement dsign report (Service Road) Approval Y LT/BSRP/OUT/18-19/216
778 RITES-QC RITES-BSRP-QC-OD-LT-2018-33 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approal of Admixture Y LT/BSRP/OUT/18-19/252-A
779 RITES-OD RITES-BSRP-OD-LT-2018-185 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Plan & Profile of ECW Y LT/BSRP/OUT/18-19/255

780 RITES-OD RITES-BSRP-OD-LT-2018-186 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval Lined Drain Plan and Profile (KM 199 to KM 229) Y LT/BSRP/OUT/18-19/251

781 RITES-OD RITES-BSRP-OD-LT-2018-187 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observations of MNB Drawing at Ch.263+423 Y LT/BSRP/OUT/18-19/224

782 RITES-OD RITES-BSRP-OD-LT-2018-188 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Typical reinforcement & GAD of Box Culvert Y LT/BSRP/OUT/18-19/244

783 RITES-OD RITES-BSRP-OD-LT-2018-189 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of GAD & typical reinforcement of Box Culvert Y LT/BSRP/OUT/18-19/227,245

784 RITES-NHAI RITES-BSRP-OD-NHAI-2018-48 25-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of RA Bill 01 for maintenance of Existing road Y LT/BSRP/OUT/18-19/230
Team leader,RITES,NHAI-
785 L&T LT-BSRP-OUT-18-19-263 26-Apr-18 M/s.L&T Ltd ,Bangriposi Trees Correction of error in Tree Felling estimate of Karanjia Forest Range
PIU,Balalasore
Team leader,RITES,NHAI-
786 L&T LT-BSRP-OUT-18-19-262 26-Apr-18 M/s.L&T Ltd ,Bangriposi Trees No. of poles exceeding the approved Tree Felling Estimate under Bangriposi Forest Range
PIU,Balalasore
Team leader,RITES,NHAI-
788 L&T LT-BSRP-OUT-18-19-256 26-Apr-18 M/s.L&T Ltd ,Bangriposi Quality of Works Source approval for RBM for GSB
PIU,Balalasore
789 RITES-QC RITES-BSRP-QC-OD-LT-2018-34 26-Apr-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third Party test results-Approval / Recommendations Y LT/BSRP/OUT/18-19/174
RITES-BSRP-OD-L&T-2018-179 &
790 L&T LT-BSRP-OUT-18-19-265 27-Apr-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Land Issues Land Acquisition payment Issue Y
RITES/BSRP/OD/L&T/2017/69
Borrow
791 L&T LT-BSRP-OUT-18-19-269 28-Apr-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow araea soil test result
Approval
Team leader,RITES,NHAI-
792 L&T LT-BSRP-OUT-18-19-268 28-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Safety Certificate for service Road
PIU,Balalasore
Team leader,RITES,NHAI-
793 L&T LT-BSRP-OUT-18-19-267 28-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Box Culvert Design and Drawing for approval
PIU,Balalasore
Team leader,RITES,NHAI-
795 L&T LT-BSRP-OUT-18-19-264 28-Apr-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Design and drawing of culvert for approval Y RITES-BSRP-OD-L&T-2018-151
PIU,Balalasore
Team leader,RITES,NHAI-
796 L&T LT-BSRP-OUT-18-19-273 3-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Safety Certificate for service Road Y RITES-BSRP-OD-L&T-2018-197
PIU,Balalasore
Team leader,RITES,NHAI-
798 L&T LT-BSRP-OUT-18-19-271 3-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Box Culvert Design & Drawing for approval Y RITES-BSRP-OD-L&T-2018-203
PIU,Balalasore
799 RITES-OD RITES-BSRP-OD-LT-2018-190 3-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request for submission of Design & Drawing of Test Pile of Other Categories Y LT/BSRP/OUT/18-19/253
800 L&T LT-BSRP-OUT-18-19-277 4-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of 28 Days strength of concrete Mix Design M-15 Grade Y RITES-BSRP-QC-OD-L&T-2018-49
801 L&T LT-BSRP-OUT-18-19-276 4-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of Concrete Mix Design M-30 & M-35 Pile Y RITES-BSRP-QC-OD-L&T-2018-38
Team leader,RITES,NHAI-
803 L&T LT-BSRP-OUT-18-19-274 4-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Company profile of M/s.Techfab india industries Limited Y
PIU,Balalasore
805 L&T LT-BSRP-OUT-18-19-282 5-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Independent Laboratory test of Bentonite powder for source approval Y RITES-BSRP-QC-OD-L&T-2018-43
806 L&T LT-BSRP-OUT-18-19-281 5-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of WMM mix design,Source-L&T Crusher plant mundavani Y RITES-BSRP-QC-OD-L&T-2018-37
807 L&T LT-BSRP-OUT-18-19-280 5-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Payments Submission of RWSS RA Bill-02 Y RITES/BSRP/OD/L&T/2017/60
808 L&T LT-BSRP-OUT-18-19-279 5-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of Concrete Mix Design M-35 RCC Y RITES-BSRP-QC-OD-L&T-2018-38
809 L&T LT-BSRP-OUT-18-19-278 5-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Regading the Toll Plaza land acquisition at modified location Y RITES-BSRP-OD-L&T-2018-194
NHAI-11011-15-RITES-2018-PIU-BLS-444, NHAI-
810 RITES-OD RITES-BSRP-OD-LT-2018-191 5-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Pending Grievance petitions Y
13011-7-RO-OD-1016-2017
LT/BSRP/OUT/18-19/314, LT/BSRP/OUT/18-
811 RITES-QC RITES-BSRP-QC-OD-LT-2018-35 5-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of RBM for GSB Y
19/302,256
812 RITES-QC RITES-BSRP-QC-OD-LT-2018-36 5-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Emami Cement Y LT/BSRP/OUT/18-19/046
813 RITES-OD RITES-BSRP-OD-LT-2018-192 5-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request for submission of Geotechnical report of MJB at Ch.205+700 & 287 Y

814 RITES-OD RITES-BSRP-OD-LT-2018-193 5-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Correction of Error in Tree felling estimate of Karanjia Forest Range Y LT/BSRP/OUT/18-19/263
The Regional Transport
815 L&T LT-BSRP-OUT-18-19-289 7-May-18 M/s.L&T Ltd ,Bangriposi Officer,Baripada,Mayurbhanj,Od Payments Road Tax deposit for Machineries
isha
818 L&T LT-BSRP-OUT-18-19-286 7-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of CBR test result of GSB Mix,source-L&T Crusher plant Mundavani Y RITES-BSRP-QC-OD-L&T-2018-39,30

RITES-BSRP-OD-L&T-2018-154,RITES-BSRP-OD-L&T-
2018-161,RITES-BSRP-OD-L&T-2018-163,RITES-
820 L&T LT-BSRP-OUT-18-19-284 7-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of Setting out details of project Highway Y BSRP-OD-L&T-2018-164,RITES-BSRP-OD-L&T-2018-
166,RITES-BSRP-OD-L&T-2018-167,RITES-BSRP-OD-
L&T-2018-174,RITES/BSRP/OD/L&T/2017/47-A

821 L&T LT-BSRP-OUT-18-19-283 7-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Payments Submission of Tree Felling RA Bill -02 Y

822 RITES-OD RITES-BSRP-OD-LT-2018-194 7-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Regarding the Toll plaza location Y LT/BSRP/OUT/18-19/278
823 RITES-OD RITES-BSRP-OD-LT-2018-195 7-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress Slow progress of work Y LT/BSRP/OUT/18-19/341,145,150
The Executive Engineer,PWD
824 L&T LT-BSRP-OUT-18-19-290 8-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Intimation for Dismantling of Culverts at Km 226+606 and Km 226+616 LHS within ROW N
,Rairangpur
826 RITES-QC RITES-BSRP-QC-OD-LT-2018-37 8-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of WMM mix design,Source -L&T crusher plant Mundavani-Approval Y LT/BSRP/OUT/18-19/281
827 RITES-QC RITES-BSRP-QC-OD-LT-2018-38 8-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of concrete mix design M-30,M-35 RCC,M-35 (Pile) Grade-Approval Y LT/BSRP/OUT/18-19/329
828 RITES-OD RITES-BSRP-OD-LT-2018-196 8-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing of Highway Drainage System Y LT/BSRP/OUT/18-19/153
829 RITES-OD RITES-BSRP-OD-LT-2018-197 8-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submission of Plan & Profile and safety certificate for service Road-Approval Y LT/BSRP/OUT/18-19/273,268,219-A
Measurement and and stacking of timber,firewood at Badampahar depot despatched from Tree felling
830 RITES-OD RITES-BSRP-OD-LT-2018-198 8-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Y OFDC 1149,151
inBisoi and Karanjia ranges
Borrow
832 L&T LT-BSRP-OUT-18-19-293 9-May-18 M/s.L&T Ltd ,Bangriposi PKG/NKP/MKS/SB/VS/RKB Area/Mining Proposal for change of Transportation lead from Quarry to crusher at Murgapat stone quarry in BSRP N
Approval
833 L&T LT-BSRP-OUT-18-19-292 9-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Miscellaneous Intimation for Authorized Signatory from 10th May 2018 to 15Th may 2018 Y
834 L&T LT-BSRP-OUT-18-19-291 9-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Source Approval of Steel -M/S Jindal steel & Power Limited Y RITES-BSRP-OD-L&T-2018-200
835 RITES-OD RITES-BSRP-OD-LT-2018-199 9-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval for Plan & Profile from Km 206+500 to Km 207+200 (Rev D) Y LT/BSRP/OUT/18-19/114,149,209

836 L&T LT-BSRP-OUT-18-19-295 10-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites MPR Submission of Mothly Progress Report fot the month of April 2018 Y RITES-BSRP-OD-L&T-2018-221,179,132,110
Team leader,RITES,NHAI-
838 L&T LT-BSRP-OUT-18-19-297 11-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Revised Design and drwaing of Minor Bridge for Approval Y RITES-BSRP-OD-L&T-2018-214,159
PIU,Balalasore
Team leader,RITES,NHAI-
839 L&T LT-BSRP-OUT-18-19-296 11-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Concrete Dimension & Reinforcement Details of Proposed RE Wall Panel Y RITES-BSRP-OD-L&T-2018-215
PIU,Balalasore
840 RITES-OD RITES-BSRP-OD-LT-2018-200 11-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approval of Steel-M/s Jindal Steel & Power Limited Y LT/BSRP/OUT/18-19/291
841 RITES-OD RITES-BSRP-OD-LT-2018-201 11-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Company profile of M/s.Techfab India Industries Ltd.. Y LT/BSRP/OUT/18-19/324, 274
Request for submission of balance Required Design & Drawing of initial test pile for MJB 210+885 &
842 RITES-OD RITES-BSRP-OD-LT-2018-202 11-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Y LT/BSRP/OUT/18-19/253,240
303+037
843 L&T LT-BSRP-OUT-18-19-303 12-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Independent Laboratory test of Construction Materials Y RITES-BSRP-QC-OD-L&T-2018-42
RITES-BSRP-QC-OD-L&T-2018-45 & RITES-BSRP-QC-
844 L&T LT-BSRP-OUT-18-19-302 12-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of revised JMF of blended GSB Mix,Source-L&T Crusher Plant Y
OD-L&T-2018-35
Team leader,RITES,NHAI-
845 L&T LT-BSRP-OUT-18-19-301 12-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Box culvert Design and Drawing for Approval Y RITES-BSRP-OD-L&T-2018-208
PIU,Balalasore
Team leader,RITES,NHAI- RITES-BSRP-OD-L&T-2018-207, RITES-
846 L&T LT-BSRP-OUT-18-19-299 12-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Box culvert Design and Drawing for Approval Y
PIU,Balalasore BSRP-OD-L&T-2018-206

847 RITES-OD RITES-BSRP-OD-LT-2018-204 12-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance and Repair of Existing Road Y

848 RITES-QC RITES-BSRP-QC-OD-LT-2018-39 12-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of CBR Test results for GSB Mix (Source L&T Crusher Plant Mundavani)-Approval Y LT/BSRP/OUT/18-19/286
Borrow
849 L&T LT-BSRP-OUT-18-19-306 14-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow area soil test results Y RITES-BSRP-QC-OD-L&T-2018-50
Approval
Borrow
850 L&T LT-BSRP-OUT-18-19-305 14-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Area/Mining Submisssion of Borrow area soil test result for construction of Embankmenty & subgrade Y RITES-BSRP-QC-OD-L&T-2018-46
Approval
851 L&T LT-BSRP-OUT-18-19-304 14-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Slow Progress Slow progress of work Y RITES-BSRP-OD-L&T-2018-219,150,127
Team leader,RITES,NHAI-
852 L&T LT-BSRP-OUT-18-19-300 14-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Plan and Profile (Km 242.000 to Km 255.000) Rev-C Y RITES-BSRP-OD-L&T-2018-216,166
PIU,Balalasore
853 RITES-OD RITES-BSRP-OD-LT-2018-205 14-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request to mention the total No.s of required test pile in the certified drawing Y

854 RITES-QC RITES-BSRP-QC-OD-LT-2018-40 14-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Issue regarding quality control Y LT/BSRP/OUT/18-19/161
855 RITES-QC RITES-BSRP-QC-OD-LT-2018-41 14-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Plant visit at Haldia (WEST Bengal) Y LT/BSRP/OUT/18-19/238
856 L&T LT-BSRP-OUT-18-19-298 15-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites CIL Submission of GST Claim against change in Law Y RITES-BSRP-OD-L&T-2018-182
857 RITES-OD RITES-BSRP-OD-LT-2018-203 15-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of typical reinforcement of Box Culverts Y LT/BSRP/OUT/18-19/271
858 RITES-QC RITES-BSRP-QC-OD-LT-2018-42 15-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Testing of vaious Construction Mterials Y LT/BSRP/OUT/18-19/303
859 RITES-QC RITES-BSRP-QC-OD-LT-2018-43 15-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Testing of vaious Construction Mterials Y LT/BSRP/OUT/18-19/282
860 RITES-OD RITES-BSRP-OD-LT-2018-206 15-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of GAD typical reinforcement of Box Culverts AND PIPE CULVERTS Y LT/BSRP/OUT/18-19/244,264,299

861 RITES-OD RITES-BSRP-OD-LT-2018-207 15-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of typical reinforcement of Box Culverts Y LT/BSRP/OUT/18-19/299

864 RITES-OD RITES-BSRP-OD-LT-2018-208 16-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of typical reinforcement Y LT/BSRP/OUT/18-19/267,301

865 RITES-OD RITES-BSRP-OD-LT-2018-209 16-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of workmethod statement Y LT/BSRP/OUT/18-19/223
Team leader,RITES,NHAI-
866 L&T LT-BSRP-OUT-18-19-381 16-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Revised plan & profile drawing from km 199 to 299& for approval Y
PIU,Balalasore
867 L&T LT-BSRP-OUT-18-19-312 17-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Payments Submission of RA-01 for main works as per Schedule-H Y RITES/BSRP/OD/L&T/2017/48
868 L&T LT-BSRP-OUT-18-19-311 17-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of Box culvert Design and Drawing for Approval Y RITES-BSRP-OD-L&T-2018-213
Team leader,RITES,NHAI- RITES-BSRP-OD-NHAI-2018-63 & RITES-BSRP-OD-
869 L&T LT-BSRP-OUT-18-19-310 17-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Additional culverts to be constructed which are not listed in schedule -B of contract agreement Y
PIU,Balalasore L&T-2018-169

870 L&T LT-BSRP-OUT-18-19-309 17-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of Design and Drawing of pile load test using Kentledge method for Approval Y RITES-BSRP-OD-L&T-2018-218
871 L&T LT-BSRP-OUT-18-19-406 17-May-18 M/s.L&T Ltd ,Bangriposi Tahasildar,Karanjia Payments Request to issue money receipt N
873 L&T LT-BSRP-OUT-18-19-315 18-May-18 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Statutory Request to issue Money Receipt against Conversion of Agriculture land to non-Agriculture purpose N
RITES-BSRP-QC-OD-L&T-2018-45 & RITES-BSRP-QC-
874 L&T LT-BSRP-OUT-18-19-314 18-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of mix design of blended GSB Y
OD-L&T-2018-35
RITES-BSRP-QC-OD-L&T-2018-51 & RITES-BSRP-QC-
875 L&T LT-BSRP-OUT-18-19-313 18-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Source Approval of Bitumen Y
OD-L&T-2018-32
876 RITES-OD RITES-BSRP-OD-LT-2018-210 18-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Submission of details for change of scope for 12 no.s Elephant underpasses Y LT/BSRP/OUT/18-19/148
877 RITES-OD RITES-BSRP-OD-LT-2018-211 19-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance and Repair of Existing Road Y
Team leader,RITES,NHAI-
878 L&T LT-BSRP-OUT-18-19-317 21-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of pipe culvert Drawing for Approval Y RITES-BSRP-OD-L&T-2018-217
PIU,Balalasore
Team leader,RITES,NHAI-
879 L&T LT-BSRP-OUT-18-19-316 21-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Revised safety certificate of Km.242+000 to Km 255+000 (Revision C) FOR Approval Y RITES-BSRP-OD-L&T-2018-166
PIU,Balalasore
880 RITES-OD RITES-BSRP-OD-LT-2018-212 21-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Request for Summer internship/Industrial Training NHAI-11011-15-RITES-2018-PIU-BLS-481

881 RITES-OD RITES-BSRP-OD-LT-2018-213 21-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of typical reinforcement of Box Culverts Y LT/BSRP/OUT/18-19/244,264,311

882 RITES-OD RITES-BSRP-OD-LT-2018-214 21-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Revised GAD of minor Bridge at 248+963 Y LT/BSRP/OUT/18-19/297
Team leader,RITES,NHAI-
883 L&T LT-BSRP-OUT-18-19-323 22-May-18 M/s.L&T Ltd ,Bangriposi Utilities Submission of RA Bill-02 for electrical utility shifted under Jharpokharia and karanjia -II Electrical section Y
PIU,Balalasore
Team leader,RITES,NHAI- RITES-BSRP-OD-NHAI-2018-63 , RITES-BSRP-OD-
884 L&T LT-BSRP-OUT-18-19-322 22-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Additional culverts to be constructed which are not listed in schedule -B of contract agreement Y
PIU,Balalasore L&T-2018-169
Submission of CBR test result of GSB Mix,source-L&T Crusher plant Mundavani & crushed RBM from
885 L&T LT-BSRP-OUT-18-19-321 22-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works
Budabalangi River
Y RITES-BSRP-QC-OD-L&T-2018-45
886 L&T LT-BSRP-OUT-18-19-320 22-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Independent Laboratory Test of Construction materials Y RITES-BSRP-QC-OD-L&T-2018-44
887 L&T LT-BSRP-OUT-18-19-319 22-May-18 M/s.L&T Ltd ,Bangriposi Project Director,NHAI,Balasore CIL Increse in minimum wages of labour-Change in law pursuant to CI.19.17 of the agreement Y RITES-BSRP-OD-L&T-2018-223
Borrow
888 L&T LT-BSRP-OUT-18-19-318 22-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Area/Mining Notification of Stoppage of Mundabani Quarry operation due to local issue Y RITES-BSRP-OD-L&T-2018-220
Approval

889 RITES-OD RITES-BSRP-OD-LT-2018-215 22-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Drawing observation of RE WALL Panel Y LT/BSRP/OUT/18-19/296
890 RITES-QC RITES-BSRP-QC-OD-LT-2018-44 23-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction Materials Y LT/BSRP/OUT/18-19/320
Submission of CBR Test results of GSB Mix (Source L&T Crusher Plant Mundavani and crushed RBM from
891 RITES-QC RITES-BSRP-QC-OD-LT-2018-45 23-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
Budabalanga River-Approval
Y LT/BSRP/OUT/18-19/302,314,321

892 RITES-OD RITES-BSRP-OD-LT-2018-216 23-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Plan & Profile (Km 242+000 to Km 255+000)-Rec-v-C Y LT/BSRP/OUT/18-19/300

893 RITES-OD RITES-BSRP-OD-LT-2018-217 23-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of GAD OF Pipe culverts Y LT/BSRP/OUT/18-19/317

894 RITES-OD RITES-BSRP-OD-LT-2018-218 23-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observation on design & Drawing of Pile load Test Using Kentledge Method Y LT/BSRP/OUT/18-19/309
895 RITES-OD RITES-BSRP-OD-LT-2018-219 23-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress Slow progress of work Y LT/BSRP/OUT/18-19/304
896 L&T LT-BSRP-OUT-18-19-325 24-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submisssion of REPANEL Design Y RITES-BSRP-OD-L&T-2018-201

897 L&T LT-BSRP-OUT-18-19-324 24-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submissiion of Profile of Tech fab india Industries Limited Y

Team leader,RITES,NHAI-
898 L&T LT-BSRP-OUT-18-19-324-A 24-May-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Design of Pile Load test Using Kentledge Method with 2m deep plate girder for approval Y
PIU,Balalasore
Borrow
899 RITES-QC RITES-BSRP-QC-OD-LT-2018-46 24-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment Approval Y LT/BSRP/OUT/18-19/305
Approval
Borrow
900 RITES-QC RITES-BSRP-QC-OD-LT-2018-47 24-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment Approval Y LT/BSRP/OUT/18-19/269
Approval
Borrow
901 RITES-QC RITES-BSRP-QC-OD-LT-2018-48 24-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil for construction of Embankment Approval Y LT/BSRP/OUT/18-19/236
Approval
902 RITES-QC RITES-BSRP-QC-OD-LT-2018-49 24-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 Days strength of Concrete Mix design M-15 Grade Approval Y LT/BSRP/OUT/18-19/277
903 L&T LT-BSRP-OUT-18-19-330 25-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of Credentials of Hume pipe Manufacture Y
904 L&T LT-BSRP-OUT-18-19-329 25-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of 28 Days strength test report of concrete Mix Design Y RITES-BSRP-QC-OD-L&T-2018-38
905 L&T LT-BSRP-OUT-18-19-328 25-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of GSB mix design test report Y
Borrow
906 L&T LT-BSRP-OUT-18-19-327 25-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow araea soil test result for construction of Embankment & Subgrade Y
Approval
907 L&T LT-BSRP-OUT-18-19-326 25-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of OGL soil test result (Km 275+000 to Km 280+000 LHS & rhs) Y
Borrow
908 RITES-OD RITES-BSRP-OD-LT-2018-220 25-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Notification for stoppage of Mundabani quarry operation due to local issue Y LT/BSRP/OUT/18-19/318
Approval
909 RITES-OD RITES-BSRP-OD-LT-2018-221 25-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submission of Monthly progress report (30Th april 2018) Y LT/BSRP/OUT/18-19/295
NHAI-11012-15-SAI-2018-PIU-BLS-510, NHAI-
13011-5-RO-OD-1294-2018
910 RITES-OD RITES-BSRP-OD-LT-2018-222 25-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Enforcement and management of EPC Contracts Y

912 L&T LT-BSRP-OUT-18-19-335 26-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of Plan& Profile from 242 to 255 Rev c Y NHAI-13011-5-RO-OD-1294-2018
Submission of Concete mix design M-15,20,M25,M30,M35 RCC,M-35 Pile Grades with emami OPC 53
913 L&T LT-BSRP-OUT-18-19-334 26-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Y
CEMENT & BASF Admixture
Submission of Concete mix design M-15,20,M25,M30,M35 RCC,M-35 Pile Grades with emami OPC 53
914 L&T LT-BSRP-OUT-18-19-333 26-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Y
CEMENT & sika Admixture
Submission of Concete mix design M-15,20,M25,M30,M35 RCC,M-35 Pile Grades with ULTRATECH OPC 43
915 L&T LT-BSRP-OUT-18-19-332 26-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works
CEMENT & CHRYSO Admixture
Y

916 L&T LT-BSRP-OUT-18-19-331 26-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of plan and profile line drain 255 to 284 Rev -B Y

917 L&T LT-BSRP-OUT-18-19-337 28-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of Bus bay and Truck laybyes for approval. Y

918 L&T LT-BSRP-OUT-18-19-336 28-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Payments Submission of RA-02 under jharkhand Section Y
Borrow
919 RITES-QC RITES-BSRP-QC-OD-LT-2018-50 28-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test results-Approval Y LT/BSRP/OUT/18-19/306
Approval
920 RITES-QC RITES-BSRP-QC-OD-LT-2018-51 28-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approval of Bitumen Y LT/BSRP/OUT/18-19/313
921 RITES-OD RITES-BSRP-OD-LT-2018-223 28-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi CIL Increase in minimum wages of labours-Change in law pursuant to Cl.19.17 of the agreement Y LT/BSRP/OUT/18-19/319
LT/BSRP/OUT/18-19/332 , LT/BSRP/OUT/18-
922 RITES-NHAI RITES-BSRP-OD-NHAI-2018-63 28-May-18 The Team Leader, AE - RITES The Project director,NHAI Design & Drawings Additional culverts to be constructed which are not listed in Schedule-B of Contract Agreement Y
19/310,37
RITES-BSRP-OD-L&T-2018-195,RITES-BSRP-OD-L&T-
923 L&T LT-BSRP-OUT-18-19-341 29-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Slow Progress Slow progress of work Y
2018-150,RITES-BSRP-OD-L&T-2018-145
924 L&T LT-BSRP-OUT-18-19-340 29-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Source approval of GSB -Processed steel slag of M/s Tata Steel Limited N
Borrow
925 L&T LT-BSRP-OUT-18-19-339 29-May-18 M/s.L&T Ltd ,Bangriposi The Tahasildar,Bangriposi Area/Mining Mundabani Quarry Operation issue to Tahasildar N
Approval

RITES-BSRP-OD-L&T-2018-154,RITES-BSRP-OD-L&T-
2018-161,RITES-BSRP-OD-L&T-2018-162,RITES-
926 L&T LT-BSRP-OUT-18-19-338 29-May-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of Original Safety Certificate Y
BSRP-OD-L&T-2018-163,RITES-BSRP-OD-L&T-2018-
167,RITES-BSRP-OD-L&T-2018-174

927 RITES-OD RITES-BSRP-OD-LT-2018-224 29-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi CIL Submission of GST CLAIM AGAINST CHANGE IN Law Y LT/BSRP/OUT/18-19/298
928 RITES-OD RITES-BSRP-OD-LT-2018-225 29-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance and Repair of Existing Road Y RITES-BSRP-OD-L&T-2018-211,118,133,146,172,173,204,211
Borrow
929 Crusher 29-May-18 Tahasildar,Bangriposi M/s.L&T Ltd, Bangriposi Area/Mining Demarcation of the lease Quarry area at Mundabani & Kumbharmundhakata Y
Tahasildar-1568 Approval
930 L&T LT-BSRP-OUT-18-19-343 30-May-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees Correction of error in Tree Felling estimate of Karanjia Forest Range RITES-BSRP-OD-L&T-2018-134
Team leader,RITES,NHAI-
931 L&T LT-BSRP-OUT-18-19-342 30-May-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Box culvert for approval
PIU,Balalasore
932 RITES-OD RITES-BSRP-OD-LT-2018-226 31-May-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Submission of details for change of scope for 12 no.s Elephant underpasses Y LT/BSRP/OUT/18-19/148
933 L&T LT-BSRP-OUT-18-19-352 31-May-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of Concrete mix design with BASF & SIKA brand admixture LT/BSRP/OUT/18-19/250
934 L&T LT-BSRP-OUT-18-19-351 31-May-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Source approval of different construction materials
935 L&T LT-BSRP-OUT-18-19-350 31-May-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Source approval of Curing Compound
A.K.DAS,OMEGA Consultant
936 L&T LT-BSRP-OUT-18-19-349 31-May-18 M/s.L&T Ltd, Bangriposi Quality of Works Submission of Water sample for testing as Drinking purpose
services
Team leader,RITES,NHAI-
937 L&T LT-BSRP-OUT-18-19-348 31-May-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Box culvert for approval RITES-BSRP-OD-L&T-2018-208
PIU,Balalasore
Borrow
939 L&T LT-BSRP-OUT-18-19-346 31-May-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of OGL soil test result (Km 268+000 TO 275+000 LHS & RHS)
Approval
Borrow
940 L&T LT-BSRP-OUT-18-19-345 31-May-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow area soil test result for Construction of Embankment & Subgrade
Approval
941 L&T LT-BSRP-OUT-18-19-344 31-May-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of 28 Days strength test report of concrete Mix Design RITES-BSRP-OD-L&T-2018-202
943 RITES-NHAI RITES-BSRP-OD-NHAI-2018-65 1-Jun-18 Project Director,NHAI,Balasore The Team Leader, Rites Payments Submission of RA-Bill 02 for electrical utility shifting under Jharpokharia and Karanjia-II Ekectrical section Y LT/BSRP/OUT/18-19/323
944 RITES-NHAI RITES-BSRP-OD-NHAI-2018-66 1-Jun-18 Project Director,NHAI,Balasore The Team Leader, Rites Payments Bills for shifting of Electrical Utilities Y LT/BSRP/OUT/18-19/336
945 RITES-OD RITES-BSRP-OD-LT-2018-227 1-Jun-18 The Team Leader, AE - RITES The Project director,NHAI Miscellaneous World Environment Day Celebration Y NHAI-11012-15-SAI-2018-PIU-BLS-539

946 RITES-OD RITES-BSRP-OD-LT-2018-228 1-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of design of Pile load Test Using Kentledge Method with 2m deep plate Girder for approval Y LT/BSRP/OUT/18-19/324-A

947 RITES-OD RITES-BSRP-OD-LT-2018-229 1-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of RE Panel Design for Approval Y LT/BSRP/OUT/18-19/325

948 RITES-NHAI RITES-BSRP-OD-NHAI-2018-67 1-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Correction of Error in Tree felling estimate of Karanjia Forest Range Y LT/BSRP/OUT/18-19/343
Issuing of Revised Estimate & Rate for execution of HT UG Cable laying through HDD Method under
949 L&T LT-BSRP-OUT-18-19-356 1-Jun-18 M/s.L&T Ltd, Bangriposi NHAI-PIU-Balasore Utilities
electrical Utility shifting works
Y NHAI-11011-8-L&T-2017-PIU-BLS-918

Team leader,RITES,NHAI-
951 L&T LT-BSRP-OUT-18-19-354 1-Jun-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of drawing and design of Test pile for MJB 210+885 for approval Y RITES-BSRP-OD-L&T-2018-223
PIU,Balalasore
Team leader,RITES,NHAI-
952 L&T LT-BSRP-OUT-18-19-353 1-Jun-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of drawing and design of Test pile for MJB 210+885 for approval Y RITES-BSRP-OD-L&T-2018-134
PIU,Balalasore
Submission of Concete mix design M-15,20,M25,M30,M35 RCC,M-35 Pile Grades with ULTRATECH OPC 43
953 L&T LT-BSRP-OUT-18-19-360 2-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Y
CEMENT & CHRYSO Admixture WITHOUT FLY ASH
954 L&T LT-BSRP-OUT-18-19-359 2-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Independent Laboratory test of Construction materials Y
955 L&T LT-BSRP-OUT-18-19-358 2-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of M20 grade concrete mix design for kerb Y
956 L&T LT-BSRP-OUT-18-19-357 2-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites CIL Submission of GST claim against change in law Y RITES-BSRP-OD-L&T-2018-182

957 RITES-OD RITES-BSRP-OD-LT-2018-230 4-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Revised design & drawing of Abutment A1 & A2 of MJB 210+885 Y LT/BSRP/OUT/18-19/353

958 RITES-OD RITES-BSRP-OD-LT-2018-231 4-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of design & drawing of test pile Y LT/BSRP/OUT/18-19/354

959 RITES-OD RITES-BSRP-OD-LT-2018-232 4-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of GAD OF Box Culverts Y LT/BSRP/OUT/18-19/342,348

960 RITES-QC RITES-BSRP-QC-OD-LT-2018-52 5-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Company Profile of M/s Techfab India Industries Limited. Y LT/BSRP/OUT/18-19/324

961 RITES-QC RITES-BSRP-QC-OD-LT-2018-53 5-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of GSB Mix design test report-Approval. Y LT/BSRP/OUT/18-19/328
962 RITES-QC RITES-BSRP-QC-OD-LT-2018-54 5-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Borrow area Soil test results-Approval. Y LT/BSRP/OUT/18-19/327
963 RITES-QC RITES-BSRP-QC-OD-LT-2018-55 5-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of OGL soil test results (Km 275+000 to 280+000 LHS & RHS)-Approval Y LT/BSRP/OUT/18-19/326
964 RITES-QC RITES-BSRP-QC-OD-LT-2018-56 5-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Credentials of Hume pipe Manufacture. Y LT/BSRP/OUT/18-19/330
965 RITES-QC RITES-BSRP-QC-OD-LT-2018-57 5-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory  Test of Construction materials. Y LT/BSRP/OUT/18-19/359

966 RITES-OD RITES-BSRP-OD-LT-2018-233 5-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request for submission of Geo technical report of MJB at  205+700 & 287. Y LT/BSRP/OUT/18-19/192

967 RITES-QC RITES-BSRP-QC-OD-LT-2018-58 5-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Plant Visit at Visakhapatnam (Andhra pradesh). Y LT/BSRP/OUT/18-19/359
968 RITES-QC RITES-BSRP-QC-OD-LT-2018-59 5-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third Party Test Results-Approval. Y LT/BSRP/OUT/18-19/249
Submission of Concrete Mix Design M15,M20 ,M25 ,M30,M35 RCC,M35 PILE Grade with emami OPC 53
969 RITES-QC RITES-BSRP-QC-OD-LT-2018-60 5-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Y LT/BSRP/OUT/18-19/167
CEMENT & SIKA Admixture Approval.
970 RITES-QC RITES-BSRP-QC-OD-LT-2018-61 5-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of M20 Grade concrete Mix Design for Kerb-Approval. Y LT/BSRP/OUT/18-19/358
971 L&T LT-BSRP-OUT-18-19-361 5-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites COS Submission of details for change of scope for 12 No's Elephant underpass Y
972 L&T LT-BSRP-OUT-18-19-415 5-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Submission of RA Bill-02 for maintenance of Existing road N
973 L&T LT-BSRP-OUT-18-19-364 6-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Submission of Schedule-H OF THE Agreement as per circular / clarifications issued by MORTH RITES-BSRP-OD-L&T-2018-83 , 33
Borrow
974 L&T LT-BSRP-OUT-18-19-363 6-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow area soil test result
Approval
976 L&T LT-BSRP-OUT-18-19-367 8-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Submission of RA Bill-02 for main works as per Schedule-H of Agreement Y
978 L&T LT-BSRP-OUT-18-19-369 9-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites MPR Submission of monthly progress report for May 2018 Y

979 L&T LT-BSRP-OUT-18-19-368 9-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of geotechnical report of MJB 210+890 Y

980 L&T LT-BSRP-OUT-18-19-362 9-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Drawing of Pile load test using kentledge method for approval Y RITES-BSRP-OD-L&T-2018-218

982 L&T LT-BSRP-OUT-18-19-370 9-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Lab Equipments for the testing of bitumen Y
984 L&T LT-BSRP-OUT-18-19-375 12-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of borrow area soil test result for construction of Embankment& Subgrade Y
985 L&T LT-BSRP-OUT-18-19-374 12-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of cut soil test result 276+260 to 276+520 LHS & rhs Y
Team leader,RITES,NHAI-
986 L&T LT-BSRP-OUT-18-19-373 12-Jun-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Drawing of Median drain Details for Approval Y
PIU,Balalasore
Team leader,RITES,NHAI-
987 L&T LT-BSRP-OUT-18-19-372 12-Jun-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Drawing of Kerb for approval Y
PIU,Balalasore
Consent to operate is hereby granted u/s 21 of Air (Prevention & Control of Pollution) Act,1981 and rules
988 APB APB-1506-CTO-3050 12-Jun-18 The Regional Officer` M/s.L&T Ltd, Bangriposi Miscellaneous
framed there
Submission of Borrow area soil for construction of Embankment- Approval.
989 RITES-QC RITES-BSRP-QC-OD-LT-2018-62 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Y LT/BSRP/OUT/18-19/363

990 RITES-QC RITES-BSRP-QC-OD-LT-2018-63 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Borrow area soil for construction of Embankment- Approval. Y LT/BSRP/OUT/18-19/366
991 RITES-QC RITES-BSRP-QC-OD-LT-2018-64 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of OGL soil test results-Approval. Y LT/BSRP/OUT/18-19/346
992 RITES-QC RITES-BSRP-QC-OD-LT-2018-65 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Borrow area soil for construction of Embankment- Approval. Y LT/BSRP/OUT/18-19/345
993 RITES-QC RITES-BSRP-QC-OD-LT-2018-66 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Lab equipment's for testing of Bitumen. Y LT/BSRP/OUT/18-19/370
Submission of concrete mix design M 15, M20, M25, M30, M35(RCC) M35 (Pile) grade with Emami OPC 53
994 RITES-QC RITES-BSRP-QC-OD-LT-2018-67 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Y LT/BSRP/OUT/18-19/333
grade cement & Sika admixture - Approval.
Submission of concrete mix design M 15, M20, M25, M30, M35(RCC) M35 (Pile) grade with Ultra tech OPC
995 RITES-QC RITES-BSRP-QC-OD-LT-2018-68 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Y LT/BSRP/OUT/18-19/360
43 grade cement & Chryso admixture with out flyash - Approval.
Submission of concrete mix design M 15, M20, M25, M30, M35(RCC) M35 (Pile) grade with Emami OPC 53
996 RITES-QC RITES-BSRP-QC-OD-LT-2018-69 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Y LT/BSRP/OUT/18-19/334
grade cement & BASF admixture - Approval.
997 RITES-QC RITES-BSRP-QC-OD-LT-2018-70 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 days strength test report of concrete Mix design - Approval. Y LT/BSRP/OUT/18-19/329
998 RITES-QC RITES-BSRP-QC-OD-LT-2018-71 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of GSB- processed steel slag of M/s Tata steel Limited. Y LT/BSRP/OUT/18-19/332
Submission of concrete mix design M 15, M20 (Kerb), M25, M30, M35(RCC) M35 (Pile) grade with ultratech
999 RITES-QC RITES-BSRP-QC-OD-LT-2018-72 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Y LT/BSRP/OUT/18-19/340
OPC43 grade cement & Chryso admixture - Approval.
1000 RITES-OD RITES-BSRP-OD-LT-2018-234 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Submission of details for change of scope for 12 nos Elephant underpass. Y LT/BSRP/OUT/18-19/361

1001 RITES-OD RITES-BSRP-OD-LT-2018-235 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Plan & Profile (242+000 to 255+000)-Rev-C. Y LT/BSRP/OUT/18-19/335,316,300
1002 RITES-OD RITES-BSRP-OD-LT-2018-236 14-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Layout of Bus Bay and Truck Lay bye Approval Y LT/BSRP/OUT/18-19/337
1003 L&T LT-BSRP-OUT-18-19-435 14-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of Borrow areas soil test results Y
Submission of Concrete mix Design M15,M20,M25,M30,M35-RCC ,M35-PILE Grade with ultra tech OPC 43
1005 L&T LT-BSRP-OUT-18-19-379 15-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works
Grade cement & chryso admixture without flyash
Y RITES-BSRP-OD-L&T-2018-68
1006 L&T LT-BSRP-OUT-18-19-378 15-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Independent Laboratory test of construction materials Y RITES-BSRP-OD-L&T-2018-200
1007 L&T LT-BSRP-OUT-18-19-377 15-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Source approval of steel -M/S Jindal steel & Power Limited Y
1008 L&T LT-BSRP-OUT-18-19-376 15-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Trees Submission of Tree felling RA Bill-03 Y
Team leader,RITES,NHAI-
1009 L&T LT-BSRP-OUT-18-19-382 16-Jun-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Compliance report for MNB 244+062 against AE/RITES Observation Y RITES-BSRP-OD-L&T-2018-235
PIU,Balalasore
1010 RITES-OD RITES-BSRP-OD-LT-2018-237 16-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of RA Bill-02 for main works as per Schedule -H of Agreement Y LT/BSRP/OUT/18-19/367
1011 RITES-QC RITES-BSRP-QC-OD-LT-2018-73 16-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction Materials LT/BSRP/OUT/18-19/378
1012 RITES-QC RITES-BSRP-QC-OD-LT-2018-74 16-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 days strength test report of concrete Mix design - Approval. LT/BSRP/OUT/18-19/344
1013 RITES-QC RITES-BSRP-QC-OD-LT-2018-75 16-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Concrete Mix Design with BASF & SIKA Brand Admixture-Approval LT/BSRP/OUT/18-19/352
1014 RITES-QC RITES-BSRP-QC-OD-LT-2018-76 16-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of M20 Grade concrete Mix Design for Kerb-Approval. LT/BSRP/OUT/18-19/358

1015 RITES-OD RITES-BSRP-OD-LT-2018-238 18-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Plan & Profile (242+000 to 255+000)-Rev-C LT/BSRP/OUT/18-19/335,382

1016 RITES-OD RITES-BSRP-OD-LT-2018-239 18-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Lined Drain Plan & Profile (255 to 284 - Rev-B) LT/BSRP/OUT/18-19/331

1017 RITES-OD RITES-BSRP-OD-LT-2018-240 18-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing for Kerb for approval LT/BSRP/OUT/18-19/372
Application-No-1 for time extension (For delay upto 30th Mar 2018) pursuant to Sub-Clause- 10.5 o the
1018 RITES-OD RITES-BSRP-OD-LT-2018-241 18-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Time Extension LT/BSRP/OUT/18-19/243
Agreement
Application No.1 FOR Time Extension (for the delays up to 30th March 2018 pursuant to sub-
1020 L&T LT-BSRP-OUT-18-19-432 18-Jun-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Time Extension
Clause 10.5 of the Agreement Y RITES-BSRP-OD-L&T-2018-241

Team leader,RITES,NHAI-
1021 L&T LT-BSRP-OUT-18-19-386 19-Jun-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submisssion of RCC Return wall / Retaining wall for Box culverts for approval Y
PIU,Balalasore
Team leader,RITES,NHAI-
1022 L&T LT-BSRP-OUT-18-19-385 19-Jun-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Widening scheme for Box type MNB for approval Y RITES-BSRP-OD-L&T-2018-249
PIU,Balalasore
Team leader,RITES,NHAI-
1023 L&T LT-BSRP-OUT-18-19-384 19-Jun-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of Fly over Design & Drawing for approval Y
PIU,Balalasore
1024 L&T LT-BSRP-OUT-18-19-383 19-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Payments Submission of RA Bill-02 for main works as per Schedule-H of Agreement Y RITES-BSRP-OD-L&T-2018-237
1025 RITES-OD RITES-BSRP-OD-LT-2018-242 19-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submission of Schedule -H of the agreement as per circular /Clarifications issued by MORTH LT/BSRP/OUT/18-19/364

1026 RITES-OD RITES-BSRP-OD-LT-2018-243 19-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design & Drawing of Kentledge for pile load TEST LT/BSRP/OUT/18-19/362

1027 L&T LT-BSRP-OUT-18-19-389 20-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Claims Submission of Renwed group personal Accident policy N
Team leader,RITES,NHAI-
1029 L&T LT-BSRP-OUT-18-19-390 21-Jun-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Approval Lined Drain plan & Profile (255 to 284 Rev B) Y RITES-BSRP-OD-L&T-2018-239
PIU,Balalasore
1030 L&T LT-BSRP-OUT-18-19-387 21-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Payments Invoicing to NHAI Y
1031 RITES-OD RITES-BSRP-OD-LT-2018-244 22-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Safety Measures at site. Y
1032 RITES-QC RITES-BSRP-QC-OD-LT-2018-77 22-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Borrow area soil for construction of Embankment & Sub grade-Approval. LT/BSRP/OUT/18-19/375
1033 RITES-QC RITES-BSRP-QC-OD-LT-2018-78 22-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Steel-M/s Jindal Steel & Power Limited. LT/BSRP/OUT/18-19/377
1034 RITES-NHAI RITES-BSRP-OD-NHAI-2018-74 22-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Submission of tree felling RA Bill-No-03 LT/BSRP/OUT/18-19/376

1035 L&T LT-BSRP-OUT-18-19-393 23-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of Revised plan & profile drawing from km 199 to 299& for approval Y RITES-BSRP-OD-L&T-2018-381

1036 L&T LT-BSRP-OUT-18-19-392 23-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of lined drain plan & Profile for approval Y

Team leader,RITES,NHAI-
1037 L&T LT-BSRP-OUT-18-19-391 23-Jun-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Submission of MNB superstructure Design & Drawing for approval Y
PIU,Balalasore
1038 RITES-OD RITES-BSRP-OD-LT-2018-245 23-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress Slow progress of work. LT/BSRP/OUT/18-19/341
1039 RITES-OD RITES-BSRP-OD-LT-2018-246 23-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of drawing of Median drain Details-Approval. LT/BSRP/OUT/18-19/373

1040 L&T LT-BSRP-OUT-18-19-397 25-Jun-18 M/s.L&T Ltd ,Bangriposi The Office Incharge,Karanjia Design & Drawings Conducting Traffic volume count survey at BSRP Project site from 27.06.2018 N

1041 L&T LT-BSRP-OUT-18-19-396 25-Jun-18 M/s.L&T Ltd ,Bangriposi The Office Incharge,Jashipur Design & Drawings Conducting Traffic volume count survey at BSRP Project site from 27.06.2018 N

1042 L&T LT-BSRP-OUT-18-19-395 25-Jun-18 M/s.L&T Ltd ,Bangriposi The Office Incharge,Jharpokaria Design & Drawings Conducting Traffic volume count survey at BSRP Project site from 27.06.2018 N

Team leader,RITES,NHAI-
1043 L&T LT-BSRP-OUT-18-19-394 25-Jun-18 M/s.L&T Ltd ,Bangriposi Design & Drawings Conducting Re-Confirmation of Traffic volume count survey at BSRP Project site from 27.06.2018 N
PIU,Balalasore
1050 RITES-NHAI RITES-BSRP-OD-NHAI-2018-75 25-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of stage payment statement-02 for main works as per Schedule-H LT/BSRP/OUT/18-19/383

1051 L&T LT-BSRP-OUT-18-19-399 26-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Maintenance/DLP Safety Measures at site N

1052 RITES-QC RITES-BSRP-QC-OD-LT-2018-79 26-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Laboratory test of Construction materials Y
1053 RITES-QC RITES-BSRP-QC-OD-LT-2018-80 26-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of cut soil test results (Km 276+260 km to 276+520 LHS & RHS )-Approval. LT/BSRP/OUT/18-19/374
1054 RITES-QC RITES-BSRP-QC-OD-LT-2018-81 26-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Curing compound-Approval LT/BSRP/OUT/18-19/350
Submission of Concrete Mix Design M20,M30 Grade with Ultratech OPC 43 CEMENT & Chryso Admixture
1055 RITES-QC RITES-BSRP-QC-OD-LT-2018-82 26-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works LT/BSRP/OUT/18-19/379
without Fly ash Approval.
1056 L&T LT-BSRP-OUT-18-19-404 27-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of WMM MIX DESIGN Test report Y
1057 L&T LT-BSRP-OUT-18-19-403 27-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Quality of Works Submission of filtermedia test result for structure Y

1058 L&T LT-BSRP-OUT-18-19-402 27-Jun-18 M/s.L&T Ltd ,Bangriposi Project Director,NHAI,Balasore Trees Submission & Approval of Tree Felling Estimate for Jharkhand Section N

1059 L&T LT-BSRP-OUT-18-19-401 27-Jun-18 M/s.L&T Ltd ,Bangriposi The Reional Office,Balasore Statutory Request to issue a CTO of WMM & HMP Plant at village:Kanimahuli,saraskana,Mayurbhanj,Odisha N

1060 L&T LT-BSRP-OUT-18-19-400 27-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of design document of Minor bridge for approval Y

1061 L&T LT-BSRP-OUT-18-19-398 27-Jun-18 M/s.L&T Ltd ,Bangriposi The Team Leader, Rites Design & Drawings Submission of DESIGN & Drawing of MNB 212+586 APPROVAL Y

1063 RITES-OD RITES-BSRP-OD-LT-2018-247 27-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Drawing of Fly over. LT/BSRP/OUT/18-19/384

1064 RITES-QC RITES-BSRP-QC-OD-LT-2018-83 27-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approval of Different Construction materials LT/BSRP/OUT/18-19/351
1065 RITES-OD RITES-BSRP-OD-LT-2018-248 28-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Insurance Policy Y

1066 RITES-OD RITES-BSRP-OD-LT-2018-249 29-Jun-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of widening of scheme for Box Type MNB for approval N LT/BSRP/OUT/18-19/385

1069 L&T LT-BSRP-OUT-18-19-409 2-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of company credential of independent laqboratory Y RITES-BSRP-OD-L&T-2017-11
1070 L&T LT-BSRP-OUT-18-19-412 3-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees Release of 10% Hold amount for utility shifting ,Treefelling & Road repairing works Y RITES-BSRP-OD-NHAI-2018-74
1071 L&T LT-BSRP-OUT-18-19-411 3-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Utilities Submission of RWSS RA Bill-03 Y
1072 OEE OEE 3292 3-Jul-18 The Executive Engineer M/s.L&T Ltd, Bangriposi Miscellaneous Application of allocation ofwater for their construction of four laning BS secion
1073 RITES-OD RITES-BSRP-OD-LT-2018-251 4-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Delay in conducting Test piles Y LT/BSRP/OUT/18-19/240

Raising of Compensatory Plantation against felling of trees over Non-forest land for construction
1074 RITES-OD RITES-BSRP-OD-LT-2018-252 4-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Y
and widening of road projects
1075 L&T LT-BSRP-OUT-18-19-414 4-Jul-18 PKG M/s.L&T Ltd, Bangriposi Trees Proposal for rate for stump removal work Y

1076 RITES-OD RITES-BSRP-OD-LT-2018-253 6-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Drawing observations Y LT/BSRP/OUT/18-19/391
1077 RITES-OD RITES-BSRP-OD-LT-2018-254 6-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Pouring of concrete at site Y

1078 RITES-OD RITES-BSRP-OD-LT-2018-255 6-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of line drain Plan & Profile (294 TO 297 Rev-B) Y LT/BSRP/OUT/18-19/392,420

1079 RITES-OD RITES-BSRP-OD-LT-2018-256 6-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of line drain Plan & Profile (255 TO 284 Rev-B) Y LT/BSRP/OUT/18-19/390

Team leader,RITES,NHAI-
1080 L&T LT-BSRP-OUT-18-19-420 6-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Lined drain plan & profile (Km 294 to 297Rev B) Y
PIU,Balalasore
Team leader,RITES,NHAI- Request for submission of balance required design & drawing of initial test pile for MJB 210+885
1081 L&T LT-BSRP-OUT-18-19-418 6-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Y RITES-BSRP-OD-L&T-2018-202
PIU,Balalasore & 303+037

The Executive
Engineer,Irrigation
1082 L&T LT-BSRP-OUT-18-19-417 6-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Start of Construction activities of MNB KM 212+625 (Irrigation canal ) over NH-6 Y
Department,Jharpokharia,Mayur
bhanj,Odisha

Team leader,RITES,NHAI-
1083 L&T LT-BSRP-OUT-18-19-416 6-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of test pile drawing and design for approval Y RITES-BSRP-OD-L&T-2018-175
PIU,Balalasore
1084 RITES-OD RITES-BSRP-OD-LT-2018-257 7-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Delay in submission of Job Mix Formula Y
1085 RITES-OD RITES-BSRP-OD-LT-2018-258 7-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress Delay during in construction Y
1086 L&T LT-BSRP-OUT-18-19-419 7-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Submission of sps 03 for main works as per schedule -H of Agreement Y

The General Manager


Payment released due to supply of 667kva load at 33KV supply system at our
1087 L&T LT-BSRP-OUT-18-19-422 7-Jul-18 M/s.L&T Ltd, Bangriposi (Comm.),NESCO Payments
premises,kanimahuli,jharpokharia,Mayurbhanj N FC/CO/908/4839
utility,Januganj
Borrow
1089 L&T LT-BSRP-OUT-18-19-425 9-Jul-18 M/s.L&T Ltd, Bangriposi The Tahasildar,Karanjia Area/Mining Request to Issue a permit for soil/moorum Y NHAI-NHDP IV-TECH-OR-10-EPC-2013-181
Approval
1092 RITES-OD RITES-BSRP-OD-LT-2018-259 10-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Statutory Submission of SPS-03 for main works as per Schedule-H OF Agreement Y LT/BSRP/OUT/18-19/419
Sri Nirbhay Kumar Palei ,Hitech Borrow
1093 Crusher 10-Jul-18 Tahasildar,Bangriposi Rocket Products & Aggregates Area/Mining Deposition of Royalty and other Govt.dues for mundabani stone Quarry -II for the year 2018-19 Y
Limited Approval
Tahasildar-2241
1094 RITES-OD RITES-BSRP-OD-LT-2018-260 10-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request for submission of required document. Y LT/BSRP/OUT/18-19/398

1095 RITES-OD RITES-BSRP-OD-LT-2018-261 10-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Initial and Routine Load test of Pile. Y LT/BSRP/OUT/18-19/418

1097 RITES-OD RITES-BSRP-OD-LT-2018-262 11-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Testing of 2nd Initial test pile for MJB 210+885. Y LT/BSRP/OUT/18-19/240

1098 RITES-OD RITES-BSRP-OD-LT-2018-263 11-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance and Repairing of Existing Road. Y

1099 L&T LT-BSRP-OUT-18-19-429 11-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites MPR Submission of monthly progress report for the month of June'18 Y
1100 L&T LT-BSRP-OUT-18-19-428 11-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of OGL soil test result (Km 280+000 to 284+000 LHS & rhs) Y

1101 L&T LT-BSRP-OUT-18-19-427 11-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of BorroW area Soil test Result for Construction of Embankment & Subgrade Y

1102 L&T LT-BSRP-OUT-18-19-426 11-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Submission of Renewed plant & Machinary insurance Policy RITES-BSRP-OD-L&T-2018-248
1103 RITES-QC RITES-BSRP-QC-OD-LT-2018-85 12-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of company credential of Independent Laboratory. Y LT/BSRP/OUT/18-19/404
1104 RITES-QC RITES-BSRP-QC-OD-LT-2018-86 12-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Filter Media Test result for Structures-Approval. Y LT/BSRP/OUT/18-19/403
1105 RITES-OD RITES-BSRP-OD-LT-2018-264 12-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Video recording for status and progress of works. Y

1106 L&T LT-BSRP-OUT-18-19-431 12-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Submission of SPS-03 FOR MAIN WORKS AS PER Schedule-H OF Agreement N RITES-BSRP-OD-L&T-2018-259
Team leader,RITES,NHAI-
1107 L&T LT-BSRP-OUT-18-19-430 12-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design & Drawing of MNB at ch.223+268 for approval Y
PIU,Balalasore
1109 OEE OEE 1801 13-Jul-18 The Executive Engineer M/s.L&T Ltd, Bangriposi Miscellaneous Regarding start of Construction activities of MNB
Team leader,RITES,NHAI-
1110 L&T LT-BSRP-OUT-18-19-434 14-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing & Design Document of Minor Bridge at ch.253+625 for approval Y RITES-BSRP-OD-L&T-2018-253
PIU,Balalasore
1111 RITES-OD RITES-BSRP-OD-LT-2018-265 16-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Laying of GSB from Km 207+700 to Km 208+280 (RHS) Y

1112 RITES-OD RITES-BSRP-OD-LT-2018-266 16-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Curing of Concrete Structures. Y

1113 RITES-OD RITES-BSRP-OD-LT-2018-266 (A) 16-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of RWSS RA Bill-03 Y LT/BSRP/OUT/18-19/411
1114 RITES-OD RITES-BSRP-OD-LT-2018-267 16-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of RA Bill-02 for maintenance of Existing Road Y LT/BSRP/OUT/18-19/415
1115 RITES-OD RITES-BSRP-OD-LT-2018-268 16-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Insurance Policy Y LT/BSRP/OUT/18-19/426,329
1116 RITES-OD RITES-BSRP-OD-LT-2018-269 17-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress Slow progress of work Y
Grievance application filed by Sri sanjay kumar behera  of manda under Bangriposi Ps for
1117 RITES-NHAI RITES-BSRP-OD-NHAI-2018-81 17-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Other Obstructions change of direction for construction of  New Bridge (No.226+620 & 226+600) in NH No.6 near Y NHAI-11012-15-RITES-2018-PIU-BLS-691
Manda Chakk.
1118 RITES-QC RITES-BSRP-QC-OD-LT-2018-87 17-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of OGL soil test results-Approval. Y LT/BSRP/OUT/18-19/428

1119 RITES-QC RITES-BSRP-QC-OD-LT-2018-88 17-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Borrow area soil for construction of Embankment & Sub Grade-Approval. Y LT/BSRP/OUT/18-19/427

1120 RITES-QC RITES-BSRP-QC-OD-LT-2018-87 17-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of OGL soil test results -Approval
1121 RITES-QC RITES-BSRP-QC-OD-LT-2018-88 17-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Borrow area soilfor construction of Embankment & Sub Grade-Approval
1122 RITES-OD RITES-BSRP-OD-LT-2018-270 18-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Design & Drawing of initial pile load test at pier-1 location for category-II Y LT/BSRP/OUT/18-19/416
1123 RITES-OD RITES-BSRP-OD-LT-2018-271 18-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Adherence to the process for requestion of fund Y LT/BSRP/OUT/18-19/376,383
1124 RITES-OD RITES-BSRP-OD-LT-2018-272 18-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submission of locations of project facilities Y
1125 L&T LT-BSRP-OUT-18-19-439 18-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of DBM Grade-Imix design Y RITES-BSRP-OD-L&T-2018-257
1126 L&T LT-BSRP-OUT-18-19-437 A 18-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Utilities Submission of RA Bill-03 for RWSS Works Y RITES-BSRP-OD-L&T-2018-266
Team leader,RITES,NHAI- Submission of Bearing details of minor Bridge at
1127 L&T LT-BSRP-OUT-18-19-437 18-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Y
PIU,Balalasore ch.223+268,ch.253+641,ch.255+735,ch.265+759,ch.294+433 for approval
1128 L&T LT-BSRP-OUT-18-19-436 18-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Submission of RA Bill-02 for maintenance of Existing road Y RITES-BSRP-OD-L&T-2018-267
1129 RITES-NHAI RITES-BSRP-OD-NHAI-2018-83 19-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Location of Toll plaza Y LT/BSRP/OUT/18-19/278
1130 L&T LT-BSRP-OUT-18-19-441 19-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees Shortage of Stack at Depot Y RITES-BSRP-OD-L&T-2018-181
1131 L&T LT-BSRP-OUT-18-19-440 19-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Delay during Construction Y RITES-BSRP-OD-L&T-2018-241
1132 RITES-QC RITES-BSRP-QC-OD-LT-2018-89 20-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Laying of GSB from Km 253+900 to 254+100 (RHS) Y

Team leader,RITES,NHAI-
1133 L&T LT-BSRP-OUT-18-19-438 20-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of SBC Test report for approval Y RITES-BSRP-OD-L&T-2018-248
PIU,Balalasore
1134 RITES-QC RITES-BSRP-QC-OD-LT-2018-89 20-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Laying of GSB from Km 253+900 to 254+100 (RHS)
1135 RITES-OD RITES-BSRP-OD-LT-2018-273 21-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance of damaged portions of stretches due to heavy rains N

1136 L&T LT-BSRP-OUT-18-19-448 21-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Independent Laboratory Test of Construction Materials Y
Team leader,RITES,NHAI-
1137 L&T LT-BSRP-OUT-18-19-447 21-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised plan & profile drawing from km 297+000 to 311+000 for approval Y RITES-BSRP-OD-L&T-2018-023
PIU,Balalasore
Team leader,RITES,NHAI-
1138 L&T LT-BSRP-OUT-18-19-446 21-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised plan & profile drawing from km 283+000 to 297+000 for approval Y RITES-BSRP-OD-L&T-2018-164
PIU,Balalasore
Team leader,RITES,NHAI-
1139 L&T LT-BSRP-OUT-18-19-445 21-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised Design & Drawing Box culvert for approval Y RITES-BSRP-OD-L&T-2018-232,177
PIU,Balalasore
Team leader,RITES,NHAI-
1140 L&T LT-BSRP-OUT-18-19-444 21-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised plan & profile drawing from km 237+000 to 242+000 for approval Y RITES-BSRP-OD-L&T-2018-174
PIU,Balalasore
1141 L&T LT-BSRP-OUT-18-19-443 21-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of Filter media Test Result for Structure Y

1142 L&T LT-BSRP-OUT-18-19-442 21-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of Borrow area soil test result for Construction of Embankment & Subgrade Y

1143 RITES-QC RITES-BSRP-QC-OD-LT-2018-90 24-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent laboratory test of construction materials Y LT/BSRP/OUT/18-19/448
1144 RITES-OD RITES-BSRP-OD-LT-2018-274 24-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent laboratory test of construction materials Y LT/BSRP/OUT/18-19/448
1145 RITES-OD RITES-BSRP-OD-LT-2018-275 24-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submission of Monthly Progress Report (30th June 2018) Y LT/BSRP/OUT/18-19/429
1146 L&T LT-BSRP-OUT-18-19-449 24-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of diversion plan for VUP construction at Km 296+144 Y RITES-BSRP-OD-L&T-2018-139
1147 RITES-QC RITES-BSRP-QC-OD-LT-2018-91 24-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third part test results -Approval
1148 RITES-OD RITES-BSRP-OD-LT-2018-275 24-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submission of Monthly Progress Report (30th June 2018)
Increase in minimum wages of labour -Change inlaw pursuant to clause 19.17 of the contract
1149 L&T LT-BSRP-OUT-18-19-452 25-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites CIL
agreement Y RITES-BSRP-OD-L&T-2018-223

1150 L&T LT-BSRP-OUT-18-19-451 25-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1 1
Submission of Test result of Grizzly material produced from crusher plant for Sub grade ,Back
1151 L&T LT-BSRP-OUT-18-19-450 25-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works
filling & Earthwork Fill

1152 RITES-NHAI RITES-BSRP-OD-NHAI-2018-85 25-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Release of 10% hold Amount against RWSS and Electrical Utility Shifting up to June 2018 N

1153 RITES-NHAI RITES-BSRP-OD-NHAI-2018-86 25-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Submission of RWSS RA-Bill-03
Team leader,RITES,NHAI-
1156 L&T LT-BSRP-OUT-18-19-453 26-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Geotech Report and Canal Hydraulic details of MNB 212+586 for Review
PIU,Balalasore
Application No.1 for Time Extension (For the delay up to 30th march 2018) pursuant to Sub-
1157 RITES-OD RITES-BSRP-OD-LT-2018-276 27-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Time Extension
Clause 10.5 of the Agreement.
1158 RITES-OD RITES-BSRP-OD-LT-2018-277 27-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Drawing Observations

1159 RITES-OD RITES-BSRP-OD-LT-2018-278 27-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings GAD for Widening of Box Culverts
Team leader,RITES,NHAI-
1160 L&T LT-BSRP-OUT-18-19-454 27-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised SBC Report at Ch.260+482 for Approval
PIU,Balalasore
1161 L&T LT-BSRP-OUT-18-19-455 27-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees Difference in Girth of Tree under Bisoi and MandaForest Range
1162 L&T LT-BSRP-OUT-18-19-456 27-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Obstruction at Service Road Locations
Team leader,RITES,NHAI-
1165 L&T LT-BSRP-OUT-18-19-457 28-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Plan & Profile of Lined Drain for approval
PIU,Balalasore
Team leader,RITES,NHAI-
1166 L&T LT-BSRP-OUT-18-19-458 28-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Plan& Profile drawing from 269+000 to 293+00 for approval
PIU,Balalasore
Team leader,RITES,NHAI-
1167 L&T LT-BSRP-OUT-18-19-459 28-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Plan& Profile drawing from 255+000 to 269+00 for approval
PIU,Balalasore
1168 RITES-OD RITES-BSRP-OD-LT-2018-279 30-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Diversion plan for VUP Construction at Km 296+144 Approval

1169 RITES-OD RITES-BSRP-OD-LT-2018-280 30-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observations on SBC Report-Approval
Details of Observations along the project highway with in proposed ROW for Enchroachment
1171 L&T LT-BSRP-OUT-18-19-461 30-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous
Removal Eviction Drive
Team leader,RITES,NHAI-
1172 L&T LT-BSRP-OUT-18-19-462 30-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing & Design of Revised Minor Bridge at Ch.263+423 for Approval
PIU,Balalasore
Team leader,RITES,NHAI-
1173 L&T LT-BSRP-OUT-18-19-463 30-Jul-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing & Design of Revised Minor Bridge at Ch.255+711 for Approval
PIU,Balalasore
1174 L&T LT-BSRP-OUT-18-19-464 30-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of 28 Days strength test report of concrete Mix Design
1175 L&T LT-BSRP-OUT-18-19-465 30-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of 28 days of strength test report of contract Mix Design
Borrow
1176 L&T LT-BSRP-OUT-18-19-466 30-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow area soil test result for Construction of Embankment & Subgrade
Approval
1177 L&T LT-BSRP-OUT-18-19-467 30-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of Laboratory Equipments calibration report-2
Borrow
1178 L&T LT-BSRP-OUT-18-19-468 30-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow areas soil test results
Approval
Submission of concrete mix design M-15,M-20,M-20 KERB,M-25,M-30,M-35 RCC,M-35 PILE &
1179 L&T LT-BSRP-OUT-18-19-469 30-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works
M-40Grades with ultratech OPC 43 cement & SIKA Admixture (Without Flyash)
1180 RITES-QC RITES-BSRP-QC-OD-LT-2018-93 31-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Submission of Borrow area soil for construction of Embankment/subgrade Approval
Quality of Works
1181 RITES-QC RITES-BSRP-QC-OD-LT-2018-94 31-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Source approval of Steel -M/s Jindal Steel & Power Limited
Quality of Works
1182 RITES-QC RITES-BSRP-QC-OD-LT-2018-95 31-Jul-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Submission of Borrow area soil for Construction of Embankment / Sub Grade-Approval
Quality of Works
1183 L&T LT-BSRP-OUT-18-19-471 31-Jul-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Submission of SPS-04 for main works as per Schedule-H of Agreement
1184 L&T LT-BSRP-OUT-18-19-472 1-Aug-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Time Extension Application no-01 for time Extension pursuant to Sub-Clause 10.5 of the Agreement
Notice under clause 9.4 & 10.5 of our contract agreementregarding delay in tree felling
1185 L&T LT-BSRP-OUT-18-19-473 1-Aug-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees
progress under Reserve Forest Area
1189 RITES-OD RITES-BSRP-OD-LT-2018-280A 3-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings GAD OF MNB at Ch.223+268+Approval

1190 RITES-OD RITES-BSRP-OD-LT-2018-281 3-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings GAD of MNB at Ch.212+586-Approval

1191 RITES-OD RITES-BSRP-OD-LT-2018-282 3-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi CIL Increase in Minimum Wages of labours-Change in law pursuant to Cl.19.17 of the agreement

1192 RITES-OD RITES-BSRP-OD-LT-2018-283 3-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Safety Measures at site
The Collector and District
1193 CDM CDM 3-Aug-18 Magitrate
M/s.L&T Ltd, Bangriposi Payments Sanction and placement of funds of paymemt of compensation NH-6

1194 RITES-OD RITES-BSRP-OD-LT-2018-284 4-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Drawings Observations
Team leader,RITES,NHAI-
1196 L&T LT-BSRP-OUT-18-19-476 4-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of report for confirmatory soil test at Fly over Location
PIU,Balalasore
1197 RITES-OD RITES-BSRP-OD-LT-2018-285 5-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observations on GT report,Soil Report & Drawing

1198 RITES-OD RITES-BSRP-OD-LT-2018-286 6-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings GAD of MNB @ Ch.263+423
Team leader,RITES,NHAI-
1199 L&T LT-BSRP-OUT-18-19-470 6-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works Submission of GAD of Box culvert for approval
PIU,Balalasore
1200 L&T LT-BSRP-OUT-18-19-477 6-Aug-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Vertical Initial(Cyclic) pile load testv report at MJB ch. 210+885
1201 L&T LT-BSRP-OUT-18-19-478 6-Aug-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Release of 10% balance amount for IPC-01
Team leader,RITES,NHAI-
1202 L&T LT-BSRP-OUT-18-19-479 6-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Request for new Hume pipe culvert at Bisoi Ch. 255+555
PIU,Balalasore
Team leader,RITES,NHAI- Submission of Revised Plan & Profile drawing from km 199 to km 229 with safety certificate for
1203 L&T LT-BSRP-OUT-18-19-480 6-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings
PIU,Balalasore Approval

1204 RITES-QC RITES-BSRP-QC-OD-LT-2018-96 7-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Borrow area soil test result for construction of Embankment / subgrade-Approval

Team leader,RITES,NHAI-
1205 L&T LT-BSRP-OUT-18-19-481 7-Aug-18 M/s.L&T Ltd, Bangriposi Claims Submission of SPS-04 for main works as per Schedule-H of Agreement
PIU,Balalasore
Team leader,RITES,NHAI- Submission of M-40 grade concrete mix design with ultratech OPC 43G & fly ash (Tata power
1206 L&T LT-BSRP-OUT-18-19-482 7-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works
PIU,Balalasore limited) with different brands of admixture
Team leader,RITES,NHAI- Submission of M-40 grade concrete mix design with emami OPC 53G & fly ash (tata power
1207 L&T LT-BSRP-OUT-18-19-483 7-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works
PIU,Balalasore limited) with different brands of admixture (CHRYSO & SIKA)
Team leader,RITES,NHAI-
1208 L&T LT-BSRP-OUT-18-19-484 7-Aug-18 M/s.L&T Ltd, Bangriposi Trees Delay in felling of trees under non-forest area pursuant to clause 9.4
PIU,Balalasore
Team leader,RITES,NHAI-
1209 L&T LT-BSRP-OUT-18-19-485 8-Aug-18 M/s.L&T Ltd, Bangriposi Miscellaneous Suspension of work pursuant to clause 21.2 of contract agreement
PIU,Balalasore
Team leader,RITES,NHAI-
1210 L&T LT-BSRP-OUT-18-19-486 8-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of report for confirmatory soil test at flyover location
PIU,Balalasore
Team leader,RITES,NHAI-
1211 L&T LT-BSRP-OUT-18-19-487 8-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing Design of MNB at ch. 255+711, ch. 294+427, ch. 265+754
PIU,Balalasore
Team leader,RITES,NHAI-
1212 L&T LT-BSRP-OUT-18-19-488 8-Aug-18 M/s.L&T Ltd, Bangriposi Miscellaneous Safety measures at site
PIU,Balalasore
Team leader,RITES,NHAI-
1213 L&T LT-BSRP-OUT-18-19-489 9-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Vertical Initial(Cyclic) pile load testv report at MJB ch. 210+885
PIU,Balalasore
Submission of concrete mix design of grade M-15, M-20, M-25, M-30, M-35, (RCC & PILE) with
Team leader,RITES,NHAI-
1214 L&T LT-BSRP-OUT-18-19-490 9-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works ultratech OPC 43G,fly ash (Adhunik power & natural resources limited )with different brands of
PIU,Balalasore admixture
Submission of M40 Grade concrete with Ultratech OPC 43 & Fly ash(TATA Power ltd.)with
1215 RITES-QC RITES-BSRP-QC-OD-LT-2018-97 10-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
different brands of admixture Approval
Submission of M40 grade concrete with Emami OPC 53 & Fly ash with different brands of
1216 RITES-QC RITES-BSRP-QC-OD-LT-2018-98 10-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
admixture Approval
Submission of Concrete mix design M15,M20,M25,M30,M35 (RCC) and M35 (Pile) Grade with 
1217 RITES-QC RITES-BSRP-QC-OD-LT-2018-99 10-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
Emami opc 53 Cement & Chryso Admixture-Approva
Submission of Concrete mix design M15,M20,M25,M30,M35 (RCC) and M35 (Pile)& M40 Grade
1218 RITES-QC RITES-BSRP-QC-OD-LT-2018-100 10-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
with  Ultratech opc 43 & Sika Admixture-Approva
Borrow
Team leader,RITES,NHAI-
1219 L&T LT-BSRP-OUT-18-19-491 10-Aug-18 M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test result for Construction of Embankment & Subgrade.
PIU,Balalasore Approval
Team leader,RITES,NHAI-
1220 L&T LT-BSRP-OUT-18-19-492 10-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 days strength test report of concrete mix design.
PIU,Balalasore
Team leader,RITES,NHAI-
1222 L&T LT-BSRP-OUT-18-19-495 10-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works Construction Activity at Major Bridge
PIU,Balalasore
1228 RITES-OD RITES-BSRP-OD-LT-2018-288 11-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observation

1229 RITES-OD RITES-BSRP-OD-LT-2018-289 11-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Contruction activity at major bridges
Team leader,RITES,NHAI-
1230 L&T LT-BSRP-OUT-18-19-496 11-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works Compliance report for AE's observation regarding Flyover
PIU,Balalasore
Submission of plan &Profile of Lined Drain From ch:285+190 To Ch 286+310 on both side
1231 RITES-OD RITES-BSRP-OD-LT-2018-291 13-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
approval
1232 RITES-OD RITES-BSRP-OD-LT-2018-292 13-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request to make arrangement for Plate load test
Team leader,RITES,NHAI-
1233 L&T LT-BSRP-OUT-18-19-497-A 13-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works Construction Activity at Major Bridge
PIU,Balalasore
Forest Range officer,Bangripose
1234 L&T LT-BSRP-OUT-18-19-498 13-Aug-18 M/s.L&T Ltd, Bangriposi Trees Permission for time extension for Transportation of CL-05 under bangriposi forest range
Forest Range,
Team leader,RITES,NHAI-
1236 L&T LT-BSRP-OUT-18-19-500 14-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Request to make arrangement for plate Load test
PIU,Balalasore
The Sarpanc Asana
1238 GP GP-1252 14-Aug-18 Grampanchayat M/s.L&T Ltd, Bangriposi Miscellaneous Request for re-construction of Radhakrushna Temple at Asana village

1239 RITES-OD RITES-BSRP-OD-LT-2018-293 16-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance and repair of Existing Road
Withdrawal of '' Change of Scope Notice '' for the Construction of 12 Nos . Elephant
1240 RITES-OD RITES-BSRP-OD-LT-2018-294 16-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS
Underpasses
1241 RITES-OD RITES-BSRP-OD-LT-2018-295 16-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Laying of WMM meterial
1242 RITES-OD RITES-BSRP-OD-LT-2018-296 16-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised plan and Profile Approval

1243 RITES-OD RITES-BSRP-OD-LT-2018-297 16-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised plan and Profile Approval

1244 RITES-OD RITES-BSRP-OD-LT-2018-298 16-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised plan and Profile Approval
1245 RITES-OD RITES-BSRP-OD-LT-2018-101 16-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 days strengh test report of concrete Mix Design-approval
Team leader,RITES,NHAI-
1246 L&T LT-BSRP-OUT-18-19-501 16-Aug-18 M/s.L&T Ltd, Bangriposi MPR Submission of monthly progress report for july 2018
PIU,Balalasore
Team leader,RITES,NHAI-
1248 L&T LT-BSRP-OUT-18-19-503 16-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of revised reinforcement drawing of MJB at ch. 303+032
PIU,Balalasore
Team leader,RITES,NHAI-
1250 L&T LT-BSRP-OUT-18-19-505 16-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Vertical Initial(Cyclic) pile load testv report at MJB ch. 210+885
PIU,Balalasore
1251 RITES-QC RITES-BSRP-QC-OD-LT-2018-101 16-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 days strengh test report of concrete Mix Design-approval

1252 RITES-QC RITES-BSRP-QC-OD-LT-2018-102 16-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Design & GAD of VUP,MNB&PUP

1254 RITES-OD RITES-BSRP-OD-LT-2018-299 17-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Apploval for plan and Profile from KM 199.000 to Km 229.000 (Rev -E)
1255 RITES-OD RITES-BSRP-OD-LT-2018-300 17-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Submission of main works as per Schedule -H of Agreement
1256 RITES-OD RITES-BSRP-OD-LT-2018-300-A 17-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings GAD of Box Culvert at various locations
Team leader,RITES,NHAI-
1257 L&T LT-BSRP-OUT-18-19-497 17-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works Compliance report for AE's observation regarding Flyover
PIU,Balalasore
Team leader,RITES,NHAI- Submission of RA bill-03 for electrical utility shifting under jharpokharia and karanjia -||
1258 L&T LT-BSRP-OUT-18-19-507 17-Aug-18 M/s.L&T Ltd, Bangriposi Claims
PIU,Balalasore electrical section
Team leader,RITES,NHAI-
1259 L&T LT-BSRP-OUT-18-19-508 18-Aug-18 M/s.L&T Ltd, Bangriposi Claims Submission of RWSS RA bill-04.
PIU,Balalasore
Team leader,RITES,NHAI-
1260 L&T LT-BSRP-OUT-18-19-509 18-Aug-18 M/s.L&T Ltd, Bangriposi Slow Progress Slow progress of work
PIU,Balalasore
Team leader,RITES,NHAI-
1261 L&T LT-BSRP-OUT-18-19-510 18-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Request to continue construction activites at Flyover
PIU,Balalasore
Sri Himanshu kumar sathua range officer Authorized to issue T.T premit for transportation of
1262 OFDC OFDC 199 18-Aug-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees
passed material
Team leader,RITES,NHAI-
1264 L&T LT-BSRP-OUT-18-19-512 20-Aug-18 M/s.L&T Ltd, Bangriposi Miscellaneous Median opning for project Highway
PIU,Balalasore
Team leader,RITES,NHAI-
1266 L&T LT-BSRP-OUT-18-19-513 21-Aug-18 M/s.L&T Ltd, Bangriposi Trees Submission of tree felling RA bill-04
PIU,Balalasore
Team leader,RITES,NHAI-
1267 L&T LT-BSRP-OUT-18-19-514 21-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of culvert design & drawing at ch. 309+930
PIU,Balalasore
1268 RITES-OD RITES-BSRP-OD-LT-2018-301 22-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Median Opening for Project Highway

1269 RITES-OD RITES-BSRP-OD-LT-2018-302 22-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval for revised Plan and Profile from Km 269.000 to Km 283.000 (Rev-D)
Team leader,RITES,NHAI-
1270 L&T LT-BSRP-OUT-18-19-515 22-Aug-18 M/s.L&T Ltd, Bangriposi Claims Request to release of 90% of the amount claimed for SPS-04 as per clause 19.5.1
PIU,Balalasore
Team leader,RITES,NHAI-
1271 L&T LT-BSRP-OUT-18-19-516 22-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Layout of toll plaza ( Both option)
PIU,Balalasore
1272 RITES-QC RITES-BSRP-OD-LT-2018-103 23-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of 28 days strength test report of concrete Mix design - Approval.
Borrow Submission of Borrow area Soil test result for construction of Embankment / Sub-grade -
1273 RITES-QC RITES-BSRP-OD-LT-2018-104 23-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining
Approval
Approval
Submission of M-20 Grade concrete for kerb with Ultratech OPC43 G & Chryso Admixture
1274 RITES-QC RITES-BSRP-OD-LT-2018-105 23-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
approval
Submission of Concrete mix Desing of grade M15,M20, M25,M30, M35,(Rcc& pile ) with
1275 RITES-QC RITES-BSRP-OD-LT-2018-106 23-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
Uitratech OPC43 G Flyash with admixture
Team leader,RITES,NHAI- Submission of concrete mix design of grade M-15, M-20, M-25, M-35 (RCC & PILE) & M-40 with
1276 L&T LT-BSRP-OUT-18-19-517 23-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works
emami OPC 53G and SIKA admixture (Without fly ash).
PIU,Balalasore

Team leader,RITES,NHAI- Submission of concrete mix design of grade M-15, M-20, M-25, M-35 (RCC & PILE) & M-40 with
1277 L&T LT-BSRP-OUT-18-19-518 23-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works
PIU,Balalasore emami OPC 53G , fly ash (Adhunik power & natural resources limited )and SIKA admixture.

The Regional Officer,State Request to issue a CTE of HPM & WMM plant at Village :Kenjhara . Tahasil - Jashipur ,Dist :
1278 L&T LT-BSRP-OUT-18-19-519 23-Aug-18 M/s.L&T Ltd, Bangriposi Miscellaneous
pollution Board,Balasore,Odisha Mayurbhanj - 757036.
1283 RITES-OD RITES-BSRP-OD-LT-2018-303 24-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Submission of SPS-4 for main works as per Schedule -H of Agreement reg
1284 L&T LT-BSRP-OUT-18-19-520 24-Aug-18 M/s.L&T Ltd, Bangriposi The Project Director Payments Acknowledgement of receipt of payments for the period 01.03.2018 to 31.07.2018
1285 L&T LT-BSRP-OUT-18-19-521 24-Aug-18 M/s.L&T Ltd, Bangriposi To Whom it may concern 1
Team leader,RITES,NHAI-
1286 L&T LT-BSRP-OUT-18-19-522 24-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works Submission of DBM Grade-Imix design with IOCL source of Bitumen
PIU,Balalasore
1287 L&T LT-BSRP-OUT-18-19-523 24-Aug-18 M/s.L&T Ltd, Bangriposi The Project Director CIL Submission of GST Claim against change in Law
Submission of Concrete mix Desing of grade M15,M20, M25,M30, M35,(Rcc& pile ) with M40
1288 RITES-QC RITES-BSRP-OD-LT-2018-107 25-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
Emami OPC-53& SIKA Flyash with admixture
Submission of Concrete mix Desing of grade M15,M20, M25,M30, M35,(Rcc& pile ) with M40
1289 RITES-QC RITES-BSRP-OD-LT-2018-108 25-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
Emami OPC-53& SIKA Flyash with admixture
Team leader,RITES,NHAI-
1290 L&T LT-BSRP-OUT-18-19-524 25-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of test pile design & drawing for MJB 287+982
PIU,Balalasore
Team leader,RITES,NHAI-
1291 L&T LT-BSRP-OUT-18-19-525 25-Aug-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised Plan & Profile drawing from km 255 to km 269 for Approval
PIU,Balalasore
Team leader,RITES,NHAI-
1295 L&T LT-BSRP-OUT-18-19-527 27-Aug-18 M/s.L&T Ltd, Bangriposi Claims Submission of SPS -04 for main works as per schedule-H of agreement
PIU,Balalasore
Team leader,RITES,NHAI-
1296 L&T LT-BSRP-OUT-18-19-528 27-Aug-18 M/s.L&T Ltd, Bangriposi COS Withdrawal of (change of scope Notice) for the construction of 12 nos EUP
PIU,Balalasore
1297 RITES-QC RITES-BSRP-OD-LT-2018-109 28-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of DBM Grade-1 Mix Design with IOCL source bitumen -Approval
1298 RITES-OD RITES-BSRP-OD-LT-2018-304 28-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings GAD of Box Culvert@ Ch.309+930
1299 RITES-OD RITES-BSRP-OD-LT-2018-305 28-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Quality Issues /Comments
1300 RITES-OD RITES-BSRP-OD-LT-2018-309 28-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Bearing capacity for foundation of Fly over
Team leader,RITES,NHAI- Details of Obstruction along the project highway with in proposed ROW for Encroachment
1303 L&T LT-BSRP-OUT-18-19-529 29-Aug-18 M/s.L&T Ltd, Bangriposi Other Obstructions
PIU,Balalasore removal eviction drive
Borrow
Team leader,RITES,NHAI-
1304 L&T LT-BSRP-OUT-18-19-530 29-Aug-18 M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test result for Construction of Embankment & Subgrade
PIU,Balalasore Approval
Team leader,RITES,NHAI-
1305 L&T LT-BSRP-OUT-18-19-531 29-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works Submission of cut soil test result 299+000 to 308+000 LHS & RHS
PIU,Balalasore
Team leader,RITES,NHAI-
1306 L&T LT-BSRP-OUT-18-19-532 29-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 Days strength test report of concrete Mix Design
PIU,Balalasore
Team leader,RITES,NHAI-
1307 L&T LT-BSRP-OUT-18-19-533 29-Aug-18 M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 Days strength test report of concrete Mix Design
PIU,Balalasore
1308 OFDC OFDC 5705 29-Aug-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi EOT Extension of time permit for the balance passed converted maeerial to be obtained long the ROW
Team leader,RITES,NHAI-
1310 L&T LT-BSRP-OUT-18-19-535 30-Aug-18 M/s.L&T Ltd, Bangriposi Trees Difference in Girth of Tree under Bisoi and Gurgurira Forest Range
PIU,Balalasore
1311 RITES-OD RITES-BSRP-OD-LT-2018-306 31-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observations on pile Load Test Report of TP1 at MJB ch.210+885-reg

1312 RITES-OD RITES-BSRP-OD-LT-2018-307 31-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observation on design & Drawing of Piles Test of MJB at ch.287+982 /

1313 RITES-OD RITES-BSRP-OD-LT-2018-308 31-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Construction activity at Major Bridges

1314 RITES-OD RITES-BSRP-OD-LT-2018-310 31-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Revised Reinforcement Drawing of MJB at Ch 303+032 for Approval
1315 RITES-OD RITES-BSRP-OD-LT-2018-311 31-Aug-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submission of Montholy Progress Report
1318 OFDC OFDC 5829 31-Aug-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi EOT Extension of time permit for the balance passed converted maeerial to be obtained long the ROW
Authorization PASS converted Timber,Firewood etc.personally and properly obtained from the
1319 OFDC OFDC 211 31-Aug-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees 2497
NH6 of from singara to bahadagora coming under gurguria Range portion
Sri Batakrushna Padhi kajranjia is hereby authorized to material pass the timber and firewood
1320 OFDC OFDC 211 31-Aug-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees
personally and properly
1321 L&T LT-BSRP-OUT-18-19-537 1-Sep-18 M/s.L&T Ltd, Bangriposi Project Director,NHAI,Balasore Design & Drawings Request for removal of gantry sign board at ch. 310+570 RHS for construction of culvert
Team leader,RITES,NHAI- Submission of Design & drawing of dimensions & reinforcement details of precast RCC crash
1322 L&T LT-BSRP-OUT-18-19-539 1-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings
PIU,Balalasore barrier with friction Slab
Team leader,RITES,NHAI-
1323 L&T LT-BSRP-OUT-18-19-540 1-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design & drawing of PCC return wall/ retaining wall for box culvert
PIU,Balalasore
Team leader,RITES,NHAI-
1324 L&T LT-BSRP-OUT-18-19-541 1-Sep-18 M/s.L&T Ltd, Bangriposi Miscellaneous Request to approve authorized Signatories for verification of project work and signing of Rfis
PIU,Balalasore
Rehabilitation and Up gradation to Four laning of Baharagora-Singda Sectrion(KM 199.200 to
Team leader,RITES,NHAI-
1325 L&T LT-BSRP-OUT-18-19-542 3-Sep-18 M/s.L&T Ltd, Bangriposi Miscellaneous km 310.806)of NH6 in the State of odisha under NHDP Phase-IV,on EPC mode, request to
PIU,Balalasore stamping of Fuel Dispensing Pump
Team leader,RITES,NHAI- Submission of typical reinforcement Details of RCC Box culvert & typical design of box culvert
1326 L&T LT-BSRP-OUT-18-19-538 4-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings
PIU,Balalasore for approval
Sri Himanshu kumar sathua range officer Authorized to issue T.T premit for transportation of
1327 OFDC OFDC 216 4-Sep-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees passed material I.e nally and properly obtained from the NH6 of from singara to bahadagora
coming under gurguria Range portion
Borrow
Team leader,RITES,NHAI-
1328 L&T LT-BSRP-OUT-18-19-543 5-Sep-18 M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area Soil Test Result for Construction of embankment & Subgrade
PIU,Balalasore Approval
Borrow Submission of Borrow area sssoil test result for construction of Embankment / sub-grade-
1329 RITES-QC RITES-BSRP-OD-LT-2018-110 6-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining
approval
Approval
1330 RITES-QC RITES-BSRP-OD-LT-2018-111 6-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of cut soil test results Approval.
Team leader,RITES,NHAI-
1334 L&T LT-BSRP-OUT-18-19-545 7-Sep-18 M/s.L&T Ltd, Bangriposi Claims Submission of SPS-5 for Main works as per Schedule-H of Agreement
PIU,Balalasore
Team leader,RITES,NHAI-
1335 L&T LT-BSRP-OUT-18-19-546 7-Sep-18 M/s.L&T Ltd, Bangriposi Quality of Works Complince of Quality Issues/Comments
PIU,Balalasore
1336 RITES-OD RITES-BSRP-OD-LT-2018-112 9-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Approval of representative for verification project work ,test checks and closing of RFI
1337 RITES-OD RITES-BSRP-OD-LT-2018-313 11-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Typical Reinforcement details of RCC box Culvert

1338 RITES-OD RITES-BSRP-OD-LT-2018-314 11-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Drawing & reinforcement details of Precast RCC Crash Barrier with friction slab

1339 RITES-OD RITES-BSRP-OD-LT-2018-315 11-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous RTI Application of Sh. Sasee Bhoosan Pattanayek
Borrow
Team leader,RITES,NHAI-
1340 L&T LT-BSRP-OUT-18-19-547 11-Sep-18 M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow areas soil test results
PIU,Balalasore Approval
Team leader,RITES,NHAI-
1341 L&T LT-BSRP-OUT-18-19-548 11-Sep-18 M/s.L&T Ltd, Bangriposi Miscellaneous Notice for Suspension of work due to Bharat bandh on 10th sept 2018
PIU,Balalasore
Sri Himanshu kumar sathua range officer Authorization PASS converted Timber,Firewood
1342 OFDC OFDC 220 11-Sep-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees etc.personally and properly obtained from the NH6 of from singara to bahadagora coming under
gurguria Range portion
Sri Himanshu kumar sathua range officer Authorization PASS converted Timber,Firewood
1343 OFDC OFDC 220 11-Sep-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees etc.personally and properly obtained from the NH6 of from singara to bahadagora coming under
gurguria Range portion
1344 RITES-OD RITES-BSRP-OD-LT-2018-316 12-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Desing & Drawing of PCC return wall for Box Culverts
Team leader,RITES,NHAI-
1345 L&T LT-BSRP-OUT-18-19-549 12-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of General arrangement drawing of Box Culvert for approval
PIU,Balalasore
Team leader,RITES,NHAI-
1347 L&T LT-BSRP-OUT-18-19-551 12-Sep-18 M/s.L&T Ltd, Bangriposi MPR Submission of Monthly Progress Report for the Month of August 2018
PIU,Balalasore
Team leader,RITES,NHAI-
1348 L&T LT-BSRP-OUT-18-19-552 13-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of confirmatory Traffic survey report
PIU,Balalasore
Team leader,RITES,NHAI-
1349 L&T LT-BSRP-OUT-18-19-553 13-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of methodology for MNB widening with HILTI RE-10.
PIU,Balalasore
Team leader,RITES,NHAI-
1350 L&T LT-BSRP-OUT-18-19-554 13-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings Additional culverts to be constructed
PIU,Balalasore
Team leader,RITES,NHAI-
1351 L&T LT-BSRP-OUT-18-19-555 13-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings Observation on Desing 7 Drawing Of test pile of MJB at ch
PIU,Balalasore
Borrow
Team leader,RITES,NHAI-
1353 L&T LT-BSRP-OUT-18-19-556 14-Sep-18 M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area Soil Test Result for Construction of Embankment & Subgrade
PIU,Balalasore Approval

1354 RITES-OD RITES-BSRP-OD-LT-2018-317 15-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Apploval for plan and Profile from (KM 255.000 to Km 269.000 )
1355 RITES-OD RITES-BSRP-OD-LT-2018-318 15-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS 'Change of scope Order''
1357 RITES-OD RITES-BSRP-OD-LT-2018-319 17-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Delay in submission of mix design of DBM grading-2 and BC
1358 RITES-OD RITES-BSRP-OD-LT-2018-320 17-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Non submission of required Document for SPS-05
1359 RITES-OD RITES-BSRP-OD-LT-2018-321 17-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of proposal of Profile Corrective Course
Team leader,RITES,NHAI-
1360 L&T LT-BSRP-OUT-18-19-560 17-Sep-18 M/s.L&T Ltd, Bangriposi Miscellaneous Notice for Suspension of work across our Project site due to strike on 15th Sept 2018
PIU,Balalasore
Team leader,RITES,NHAI- Request for Change of Scope Proposal For Longitudinal Drain Under Clause 13.1.2 of Contract
1361 L&T LT-BSRP-OUT-18-19-561 17-Sep-18 M/s.L&T Ltd, Bangriposi COS
PIU,Balalasore Agreement
Team leader,RITES,NHAI-
1362 L&T LT-BSRP-OUT-18-19-557 18-Sep-18 M/s.L&T Ltd, Bangriposi Quality of Works Source approval of HT Strand - M/S Kataria Industries pvt. Limited
PIU,Balalasore
Team leader,RITES,NHAI-
1363 L&T LT-BSRP-OUT-18-19-558 18-Sep-18 M/s.L&T Ltd, Bangriposi Quality of Works Independet Laboratory Test Of Construction Materials
PIU,Balalasore
Team leader,RITES,NHAI-
1364 L&T LT-BSRP-OUT-18-19-562 18-Sep-18 M/s.L&T Ltd, Bangriposi Miscellaneous Withdrawal of works Pursuant to Sub-Clause 8.3.3 of the Agreement
PIU,Balalasore
1365 L&T LT-BSRP-OUT-18-19-563 18-Sep-18 M/s.L&T Ltd, Bangriposi 1
Borrow
Team leader,RITES,NHAI-
1366 L&T LT-BSRP-OUT-18-19-564 18-Sep-18 M/s.L&T Ltd, Bangriposi Area/Mining Delay notice for Mundabani Quarry & Crusher operations due to local Populace
PIU,Balalasore Approval
Team leader,RITES,NHAI- Workable Stretch/Unencumbered length available to carry out construction activities on Project
1367 L&T LT-BSRP-OUT-18-19-565 18-Sep-18 M/s.L&T Ltd, Bangriposi Hindrance list
PIU,Balalasore Highway
Team leader,RITES,NHAI-
1368 L&T LT-BSRP-OUT-18-19-566 18-Sep-18 M/s.L&T Ltd, Bangriposi Claims Submisson of SPS-5 for main works as per Schedule-H of Agreement
PIU,Balalasore
1369 RITES-QC RITES-BSRP-OD-LT-2018-112 19-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of construction materials
1370 RITES-OD RITES-BSRP-OD-LT-2018-322 19-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of GAD of Box Culverts

1371 RITES-QC RITES-BSRP-OD-LT-2018-113 19-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 Days compressive Strength test Report of concrete Mix Design Approval

1372 RITES-QC RITES-BSRP-OD-LT-2018-114 19-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 Days compressive Strength test Report of concrete Mix Design Approval

Borrow
1373 RITES-QC RITES-BSRP-OD-LT-2018-115 19-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test result for construction of Embankment / subgrade-Approval
Approval
Borrow
1374 RITES-QC RITES-BSRP-OD-LT-2018-116 19-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test result for construction of Embankment / subgrade-Approval
Approval
Borrow
1375 RITES-QC RITES-BSRP-OD-LT-2018-117 19-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test result for construction of Embankment / subgrade-Approval
Approval

1382 RITES-OD RITES-BSRP-OD-LT-2018-323 20-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Delay in submission of GAD of MJB at Ch.287+982 and initial test of piles

1383 RITES-OD RITES-BSRP-OD-LT-2018-324 20-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Change of scope Proposal for Longituedinal Drain Under clause 13.1.2 of Contract Agreement

1384 RITES-OD RITES-BSRP-OD-LT-2018-325 20-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress Slow Progress of work
1385 RITES-OD RITES-BSRP-OD-LT-2018-326 20-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of lay out of toll plaza

1386 RITES-OD RITES-BSRP-OD-LT-2018-323 20-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Delay in submission of GAD of MJB at Ch.287+982 and initial test of piles

1387 RITES-OD RITES-BSRP-OD-LT-2018-324 20-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Change of scope Proposal for Longituedinal Drain Under clause 13.1.2 of Contract Agreement
1388 RITES-OD RITES-BSRP-OD-LT-2018-325 20-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress Slow Progress of work
1389 RITES-OD RITES-BSRP-OD-LT-2018-326 20-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of lay out of toll plaza

1390 RITES-OD RITES-BSRP-OD-LT-2018-327 22-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Difference in girth of tree under Bisoi,manada, Gurguria Forest Range
Team leader,RITES,NHAI-
1391 L&T LT-BSRP-OUT-18-19-567 22-Sep-18 M/s.L&T Ltd, Bangriposi Claims Submission of RA Bill-03 for Maintenance of Existing Road
PIU,Balalasore
Team leader,RITES,NHAI-
1392 L&T LT-BSRP-OUT-18-19-568 22-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings submission of design & drawing for 23m girder of MNB
PIU,Balalasore
Team leader,RITES,NHAI-
1393 L&T LT-BSRP-OUT-18-19-569 22-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of design 7 drawing for MJB 287+982 for approval
PIU,Balalasore
Team leader,RITES,NHAI-
1396 L&T LT-BSRP-OUT-18-19-571 25-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Pier desing & drawing for MJB approval
PIU,Balalasore
Team leader,RITES,NHAI-
1397 L&T LT-BSRP-OUT-18-19-573 25-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of 2nd vertical initial (cyclic)pile load test report at MJB
PIU,Balalasore
Team leader,RITES,NHAI-
1398 L&T LT-BSRP-OUT-18-19-574 25-Sep-18 M/s.L&T Ltd, Bangriposi Miscellaneous RTI Application of Sh. Sasee Bhoosan Pattanayak
PIU,Balalasore
1399 RITES-QC RITES-BSRP-QC-OD-LT-2018-118 25-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of company credential of Independent Laboratory.
1400 RITES-OD RITES-BSRP-OD-LT-2018-328 25-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Statutory Notice for Suspension of work
1401 RITES-OD RITES-BSRP-OD-LT-2018-329 25-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR submission of monthly progress Report for the month of august
Borrow
1402 RITES-OD RITES-BSRP-OD-LT-2018-330 25-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining delay notice for mundabani quarry &Crusher operations due to local populace
Approval
Team leader,RITES,NHAI-
1403 L&T LT-BSRP-OUT-18-19-575 26-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of diversion plan for VUP construction at Km 227+229
PIU,Balalasore
Team leader,RITES,NHAI-
1404 L&T LT-BSRP-OUT-18-19-577 27-Sep-18 M/s.L&T Ltd, Bangriposi Design & Drawings submission of pier drawing for MJB for approval
PIU,Balalasore
1405 RITES-OD RITES-BSRP-OD-LT-2018-331 27-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of plan & profile Near Khairi Niwas

1406 RITES-OD RITES-BSRP-OD-LT-2018-332 27-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Diversion Plan for VUP Construction at Km 227+229 Approval

1407 RITES-OD RITES-BSRP-OD-LT-2018-333 27-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Methodology for widening of MNB with HILTI HIT -RE

1409 RITES-OD RITES-BSRP-OD-LT-2018-334 28-Sep-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of GAD of Girder of MNB

1411 RITES-OD RITES-BSRP-OD-LT-2018-335 1-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Proposal For the construction of Pedestrian underpass

1412 RITES-OD RITES-BSRP-OD-LT-2018-336 1-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Source approval of HT Strand - M/s Kataria Industries Pvt.Ltd

1413 RITES-OD RITES-BSRP-OD-LT-2018-337 1-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Delay in submission of soil test report of Flyover

Team leader,RITES,NHAI-
1414 L&T LT-BSRP-OUT-18-19-580 3-Oct-18 M/s.L&T Ltd, Bangriposi Miscellaneous Lanying of GSB From CH-253+900 TO 254+100 RHS
PIU,Balalasore
Team leader,RITES,NHAI-
1415 L&T LT-BSRP-OUT-18-19-581 3-Oct-18 M/s.L&T Ltd, Bangriposi Miscellaneous Lanying of GSB From CH- 207+700 TO 208+280 RHS
PIU,Balalasore
1416 RITES-OD RITES-BSRP-OD-LT-2018-338 3-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Delay in submission of Bituminous Mix Design and proposal for granular material
1417 RITES-OD RITES-BSRP-OD-LT-2018-339 3-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Inadequate Production of various construction materials at Crusher Plant
Team leader,RITES,NHAI-
1418 L&T LT-BSRP-OUT-18-19-582 4-Oct-18 M/s.L&T Ltd, Bangriposi Trees Notice under lause 9.9 @ 10.5 of pur Ca reg. Delay in RE tree Felling
PIU,Balalasore
Team leader,RITES,NHAI-
1419 L&T LT-BSRP-OUT-18-19-583 4-Oct-18 M/s.L&T Ltd, Bangriposi Claims Release of 10% of diff IPC
PIU,Balalasore
1420 RITES-OD RITES-BSRP-OD-LT-2018-340 4-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observations on Pile Load Test Report of TP-2 at MJB ch.210+885-reg

1421 RITES-OD RITES-BSRP-OD-LT-2018-342 5-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Release of 10% Hold Amount For Main Work
Team leader,RITES,NHAI-
1422 L&T LT-BSRP-OUT-18-19-584 5-Oct-18 M/s.L&T Ltd, Bangriposi Claims Submission of GST Claing against CIL
PIU,Balalasore
Team leader,RITES,NHAI-
1423 L&T LT-BSRP-OUT-18-19-585 5-Oct-18 M/s.L&T Ltd, Bangriposi Claims Invoicing & GST TDS
PIU,Balalasore
Team leader,RITES,NHAI-
1424 L&T LT-BSRP-OUT-18-19-586 5-Oct-18 M/s.L&T Ltd, Bangriposi Claims Rayment Acknewladgement
PIU,Balalasore
Team leader,RITES,NHAI-
1425 L&T LT-BSRP-OUT-18-19-587 5-Oct-18 M/s.L&T Ltd, Bangriposi 1
PIU,Balalasore
Borrow
Team leader,RITES,NHAI-
1426 L&T LT-BSRP-OUT-18-19-588 5-Oct-18 M/s.L&T Ltd, Bangriposi Area/Mining Barraw Area soil Sampling
PIU,Balalasore Approval
Team leader,RITES,NHAI-
1427 L&T LT-BSRP-OUT-18-19-589 5-Oct-18 M/s.L&T Ltd, Bangriposi Quality of Works Concrete mix Design
PIU,Balalasore
1428 RITES-OD RITES-BSRP-OD-LT-2018-341 5-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Change of Scope Oder for Strengthening of the Incident Management Services.
Notice under clause 9.4 &10.5 of Contract Agreement delay in Tree Felling Progress under
1429 RITES-OD RITES-BSRP-OD-LT-2018-343 6-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees
Reserve Forest Area
Team leader,RITES,NHAI-
1430 L&T LT-BSRP-OUT-18-19-590 6-Oct-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of RE -Panel Design and Drawing for approval.
PIU,Balalasore
1431 RITES-OD RITES-BSRP-OD-LT-2018-344 8-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Request for immediate submission of soil report

1432 RITES-OD RITES-BSRP-OD-LT-2018-345 8-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Authentic Copies of Detailed Calculations , drawings and designs

1433 RITES-OD RITES-BSRP-OD-LT-2018-346 8-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Drawing of MJB at Ch. 278+951 reg.

1435 RITES-OD RITES-BSRP-OD-LT-2018-347 9-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Repayment of the Advance Payment - reg
1436 RITES-OD RITES-BSRP-OD-LT-2018-348 9-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Setting Out - reg
1437 RITES-QC RITES-BSRP-QC-OD-LT-2018-119 9-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Steel -M/s Jindal Steel & Power Limited, Angul odisha-reg.

1438 RITES-QC RITES-BSRP-QC-OD-LT-2018-120 9-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Provision of Lateral Confinement of Aggregates (Laying of WMM) -reg.

Mislinking factor in Excel Sheet provided in circular No. 3.3.15 dated 04.10.2017 regarding
1439 RITES-OD RITES-BSRP-OD-LT-2018-349 10-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous
Standard Operating Procedure(SOP) on Implementation of GST Act ,2017-Reg.
1440 RITES-OD RITES-BSRP-OD-LT-2018-350 11-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Notice under clause 10.3.3 &11.14 of the Contract Agreement - Reg.
1441 RITES-OD RITES-BSRP-OD-LT-2018-351 11-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Construction of Foothpath /RCC Drain -Reg.

Sri Himanshu kumar sathua range officer Authorized to issue T.T premit for transportation of
1442 OFDC OFDC 242 11-Oct-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees passed material I.e nally and properly obtained from the NH6 of from singara to bahadagora
coming under gurguria Range portion
1443 RITES-QC RITES-BSRP-QC-OD-LT-2018-121 12-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of construction materials- Reg.
1444 RITES-QC RITES-BSRP-QC-OD-LT-2018-122 12-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of construction materials- Reg.
Borrow
1445 RITES-QC RITES-BSRP-QC-OD-LT-2018-123 12-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test result for construction of Embankment / subgrade-Approval
Approval
1446 RITES-QC RITES-BSRP-QC-OD-LT-2018-124 12-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 days strenght test report of concrete Mix design -Approval -Reg.
Borrow
1447 RITES-QC RITES-BSRP-QC-OD-LT-2018-125 12-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test result for construction of Embankment / subgrade-Approval
Approval
1448 RITES-QC RITES-BSRP-QC-OD-LT-2018-126 12-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 days strength test report of concrete Mix design - Approval.

1449 RITES-OD RITES-BSRP-OD-LT-2018-352 13-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Sumission of Authentic copy of detaitic copy of detailed calculations drawing & desing

Your Notice under Clause 9.4 &10.5 of CA regarding delay in Tree Felling Progress under
1450 RITES-OD RITES-BSRP-OD-LT-2018-353 15-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous
Reserve Forest Area
1451 RITES-OD RITES-BSRP-OD-LT-2018-354 15-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Width of Carriageway

1452 RITES-OD RITES-BSRP-OD-LT-2018-355 18-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Safety Measuresat site
Borrow
1453 RITES-QC RITES-BSRP-QC-OD-LT-2018-127 18-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test result for construction of Subgrade Approval
Approval
1454 RITES-QC RITES-BSRP-QC-OD-LT-2018-128 20-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Bearings
1455 RITES-OD RITES-BSRP-OD-LT-2018-356 20-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Delay in submission of Bituminous Mix Design and proposal for granular material
Submission of Plan & Profile near Khairi Niwas and Proposal for the relocation of Pedestrian
1456 RITES-OD RITES-BSRP-OD-LT-2018-357 22-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
Underpass
1457 RITES-OD RITES-BSRP-OD-LT-2018-358 22-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Change of scope order for Stengthening of the Incident Management services
1458 RITES-OD RITES-BSRP-OD-LT-2018-359 25-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Construction of Foothpath /RCC Drain -Reg.

1459 RITES-OD RITES-BSRP-OD-LT-2018-360 25-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submission of Monthly Pprogress Report for the Month of september2018
Borrow
1460 RITES-OD RITES-BSRP-OD-LT-2018-361 25-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Delay notice for mundabani quarry &Crusher operations due to local populace
Approval
Kentledge arrangement for initial pile load test of Pier P Of MJB At 303+032 and working piles of
1461 RITES-OD RITES-BSRP-OD-LT-2018-362 25-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
MJB at Ch 287+952
1462 RITES-OD RITES-BSRP-OD-LT-2018-363 25-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Median Opening for Project Highway

1463 RITES-OD RITES-BSRP-OD-LT-2018-364 25-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Delay in commencement for laying of Dence bituminous

1464 RITES-NHAI RITES-BSRP-OD-NHAI-2018-126 25-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Confirmatory traffic survey report (CTVC)

1465 OFDC OFDC 6748 26-Oct-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi EOT Extension of time for transportation of 8th phase passed materials
1466 RITES-OD RITES-BSRP-OD-LT-2018-365 27-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request for immediate submission of soil report

1467 RITES-OD RITES-BSRP-OD-LT-2018-366 29-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observation on test pile report of TP-1 and TP-2 of MJB210+885

1468 RITES-OD RITES-BSRP-OD-LT-2018-367 30-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenace and repair of Existing road

1469 RITES-OD RITES-BSRP-OD-LT-2018-368 30-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Authentic Copies of Detailed Calculations , drawings and designs

1470 RITES-QC RITES-BSRP-QC-OD-LT-2018-129 31-Oct-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of bearings and expansion joint
RITES/BSRP/OD/L&T/2018/354
1471 RITES-OD RITES-BSRP-OD-LT-2018-369 1-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Width of Carriageway LT/BSRP/OUT/18-19/628
1472 OFDC OFDC 208 12-Nov-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees felling and removed of maked trees Y

1473 RITES-OD RITES-BSRP-OD-L&T-2018-370 3-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings delay in Commencement of major bridge KM205+710

1474 RITES-OD RITES-BSRP-OD-L&T-2018-371 5-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Initial pile load test of MJB

Borrow LT/BSRP/OUT/18-19/627
1475 RITES-OD RITES-BSRP-OD-L&T-2018-372 5-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Observations on soil report of Flyover RITES/BSRP/OD/LT/2018/285
Approval

RITES/BSRP/OD/LT/2018/273,RITES/BSRP/OD/L
T/2018/263,RITES/BSRP/OD/LT/2018/211,RITE
S/BSRP/OD/LT/2018/204,RITES/BSRP/OD/LT/20
18/173,RITES/BSRP/OD/LT/2018/172,RITES/BS
1476 RITES-OD RITES-BSRP-OD-L&T-2018-373 8-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance and repair of Existing Road
RP/OD/LT/2018/146,RITES/BSRP/OD/LT/2018/
133,RITES/BSRP/OD/LT/2018/118,RITES/BSRP/
OD/LT/2018/293,RITES/BSRP/OD/LT/2018/367,
LT/BSRP/OUT/18-19/642

RITES/BSRP/OD/LT/2018/364
1477 RITES-OD RITES-BSRP-OD-L&T-2018-374 9-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Delay commencement for laying of Dence Bituminous Macadam
LT/BSRP/OUT/18-19/643

RITES/BSRP/OD/LT/2018/351
LT/BSRP/OUT/18-19/610
1478 RITES-OD RITES-BSRP-OD-L&T-2018-375 10-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Construction of Foothpath /RCC Drain -Reg.
RITES/BSRP/OD/LT/2018/610
LT/BSRP/OUT/18-19/644

1479 RITES-OD RITES-BSRP-OD-L&T-2018-376 10-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of template for GFC Drawing LT/BSRP/OUT/18-19/633

1480 RITES-OD RITES-BSRP-OD-L&T-2018-377 13-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observatio on soil report of flyover LT/BSRP/OUT/18-19/656
1481 RITES-OD RITES-BSRP-OD-L&T-2018-378 13-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Submission Electrical utility shifting RA-Bill-04
1482 RITES-OD RITES-BSRP-OD-L&T-2018-379 13-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Non submission of required Document for SPS-07 LT/BSRP/OUT/18-19/651
1483 RITES-QC RITES-BSRP-QC-OD-L&T-2018-134 13-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 days strength test report of concrete Mix design LT/BSRP/OUT/18-19/651
Borrow
1484 RITES-QC RITES-BSRP-QC-OD-L&T-2018-135 14-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test results for construction of Embankment/Sub-grade LT/BSRP/OUT/18-19/642
Approval
LT/BSRP/OUT/18-19/660
1485 RITES-OD RITES-BSRP-OD-L&T-2018-380 24-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Revised drawing of MJB
LT/BSRP/OUT/18-19/658
LT/BSRP/OUT/18-19/631
1486 RITES-OD RITES-BSRP-OD-L&T-2018-381 24-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observations on drawing LT/BSRP/OUT/18-19/636
LT/BSRP/OUT/18-19/664
LT/BSRP/OUT/18-19/659
1487 RITES-OD RITES-BSRP-OD-L&T-2018-382 24-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observations on drawing of bearings details of MJB
RITES/BSRP/OD/LT/287
Borrow
1488 RITES-QC RITES-BSRP-QC-OD-L&T-2018-136 26-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of borrow area soil test results for construction of Embankment LT/BSRP/OUT/18-19/661
Approval
Borrow
1489 RITES-QC RITES-BSRP-QC-OD-L&T-2018-137 26-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of borrow area soil test results for construction of Embankment LT/BSRP/OUT/18-19/663
Approval
1490 RITES-QC RITES-BSRP-QC-OD-L&T-2018-138 26-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Steel M/S JSW Steel limited LT/BSRP/OUT/18-19/680
1491 RITES-QC RITES-BSRP-QC-OD-L&T-2018-137 26-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of RWSS RA Bill-05 LT/BSRP/OUT/18-19/671
1492 L&T LT/BSRP/OUT/18-19/591 6-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Submission of Stage Payment Statement-06 for main works as per Schedule-H
Borrow
1493 L&T 6-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow area soil test results.
LT/BSRP/OUT/18-19/592 Approval
1495 L&T LT/BSRP/OUT/18-19/594-A 6-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Release of 10% Hold Amount for Main Work-reg.
The Regional Office,Orissa request to issue a CTE of Batching plan at Village : Asana ,Tahasil- Bisoi, Dist- Mayurbhanj-
1497 L&T 6-Oct-18 M/s.L&T Ltd, Bangriposi Miscellaneous
LT/BSRP/OUT/18-19/596-A Pollution Control Board 757036.
1498 L&T LT/BSRP/OUT/18-19/596 10-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Notice for suspension of work
Team leader,RITES,NHAI-
1499 L&T 10-Oct-18 M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Authentic copy of detailed calculations,drawing & design.
LT/BSRP/OUT/18-19/597 PIU,Balalasore
Notice under clause 9.4 & 10.5 of our contract agreementregarding delay in tree felling
1500 L&T 11-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees
progress under Reserve Forest Area
LT/BSRP/OUT/18-19/598
Borrow
1501 L&T 11-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow area soil test results.
LT/BSRP/OUT/18-19/599 Approval
1502 L&T LT/BSRP/OUT/18-19/600 11-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Construction Material Sample for Independent Laboratory Test.
1503 L&T LT/BSRP/OUT/18-19/601 12-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites COS Change of Scope Order '' for Strengthening of the Incident Management Services

1504 L&T 12-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites COS Withdrawal of ''Change of Scope Notice'' for the construction of 12 Nos .Elephant Underpasses.
LT/BSRP/OUT/18-19/602
1505 L&T LT/BSRP/OUT/18-19/603 12-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Source approval of Bearings
1506 L&T LT/BSRP/OUT/18-19/604 15-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites CIL Submission of GST Claim against change in Law
1507 L&T LT/BSRP/OUT/18-19/605 15-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites MPR Submission of Monthly Progress Report for the month of September 2018.
CRusher
1508 L&T 15-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites operations & Delay notice for Mundabani Quarry & Crusher operations due to local Populace
LT/BSRP/OUT/18-19/606 Crawings
Notice under clause 9.4 & 10.5 of our contract agreementregarding delay in tree felling
1509 L&T 16-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees
progress under Reserve Forest Area
LT/BSRP/OUT/18-19/607
1511 L&T LT/BSRP/OUT/18-19/609 22-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Safety measures at site
1512 L&T LT/BSRP/OUT/18-19/610 22-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Construction of footpath/RCC Drain
1513 L&T LT/BSRP/OUT/18-19/611 22-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of 28 Days strength test report of concrete Mix Design
Borrow
1514 L&T LT/BSRP/OUT/18-19/612 22-Jan-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow Area Soil Test Result for Construction of Embankment & Subgrade
Approval

1515 L&T LT/BSRP/OUT/18-19/613 22-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of proposal for the constrution of Pedestrian underpass

1516 L&T LT/BSRP/OUT/18-19/614 22-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Observation on test pile test report of TP-2 at MJB 210+885

1517 L&T LT/BSRP/OUT/18-19/615 22-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of SBC report of Flyover
Workable Stretch/Unencumbered length available to carry out construction activities on Project
1518 L&T LT/BSRP/OUT/18-19/616 23-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list
Highway
1519 L&T LT/BSRP/OUT/18-19/617 23-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Observation on test pile test report of TP-1 at MJB 210+885
Notice under clause 9.4 & 10.5 of our contract agreement regarding delay in tree felling
1520 L&T LT/BSRP/OUT/18-19/618 16-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees
progress under Reserve Forest Area
1521 L&T LT/BSRP/OUT/18-19/619 24-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Source approval of Bearings & Expansion joint
1523 L&T LT/BSRP/OUT/18-19/621 26-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of reconfirmed test result of different grade concrete mix desing
1524 L&T LT/BSRP/OUT/18-19/622 27-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of RE-panel layuout drawing at
1525 L&T LT/BSRP/OUT/18-19/623 27-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Time Extension Application NO.2 for Time Extension pursunt to Sub- Clause
1527 L&T LT/BSRP/OUT/18-19/625 29-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Routine Load test at MJB

1529 L&T LT/BSRP/OUT/18-19/627 29-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of SBC report of Flyover

1530 L&T LT/BSRP/OUT/18-19/628 29-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Width of Carriageway

1531 L&T LT/BSRP/OUT/18-19/629 29-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of credentials of agencies alternate to M/S s.S.M Consultant
Submission of Electrical Utility Shifting RA-bill as perApprved Estimate under sukruli Electrical
1532 L&T LT/BSRP/OUT/18-19/630 30-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims
Section
1533 L&T LT/BSRP/OUT/18-19/631 31-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Design &Drawing for PSc-1 girder of MNB

1534 L&T LT/BSRP/OUT/18-19/632 31-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Open Unlined Drainage Basis Report From

1535 L&T LT/BSRP/OUT/18-19/633 31-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of template for GFC Drawing .

1536 L&T LT/BSRP/OUT/18-19/634 31-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of vetted SBC report of flyover

1537 L&T LT/BSRP/OUT/18-19/635 31-Oct-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees Submisson of tree filling RA bill
1538 L&T LT/BSRP/OUT/18-19/640 2-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Construction Activities at MJB

1541 L&T LT/BSRP/OUT/18-19/651 6-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Submission of sps-07
1546 L&T LT/BSRP/OUT/18-19/656 10-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Observation of soil Report for Flyover
1547 L&T LT/BSRP/OUT/18-19/657 12-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites MPR MRP month of october
1548 L&T LT/BSRP/OUT/18-19/658 12-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of superstruce Desing of Drawing for MJB 210+885

1549 L&T LT/BSRP/OUT/18-19/659 12-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Bearing Desing of Drawing for MJB 210+885 to 303+032

1550 L&T LT/BSRP/OUT/18-19/660 12-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission Superstruce Design & Drawing for MJB 303+032

Borrow
1551 L&T LT/BSRP/OUT/18-19/661 13-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Barrow area soil test result for construction of Embankmant subgrade
Approval
1552 L&T LT/BSRP/OUT/18-19/662 14-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Reimbursement of tex liability incurred due to implementation of GST
Borrow
1553 L&T LT/BSRP/OUT/18-19/663 15-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow area soil test results
Approval

1554 L&T LT/BSRP/OUT/18-19/664 15-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of design &drawing of Minor Bridge

1555 L&T LT/BSRP/OUT/18-19/665 15-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Design of Chamber at Box Drain location & Drawings of PPE Culvert at cross road for approval

1556 L&T LT/BSRP/OUT/18-19/666 15-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of RE-panel layuout drawing of Flyover at ch.215+268 for your approval

1557 L&T LT/BSRP/OUT/18-19/667 16-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Road Furniture plan from km 199.00 to 229.00 for approval
1558 L&T LT/BSRP/OUT/18-19/668 16-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Road furniture plan from KM 237.00 to km 255.00 fort approval

1559 L&T LT/BSRP/OUT/18-19/669 16-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Road Furniture plan from 255.00 for 283.00 for approval

1560 L&T LT/BSRP/OUT/18-19/670 17-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of road Furniture plan from 283.00 for 311.00 for approval

1561 L&T LT/BSRP/OUT/18-19/671 17-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Submission of RWSS RA-Bill-05
1562 L&T LT/BSRP/OUT/18-19/672 20-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees Authorization for receive the of tree felling related Documents
1563 L&T LT/BSRP/OUT/18-19/673 19-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Submission of SPS-07 for main works as per Schedule-H of Agreement
1564 L&T LT/BSRP/OUT/18-19/674 20-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Request for reimbursement of amount already incurred in main works due to implementation of GST
1565 L&T LT/BSRP/OUT/18-19/675 21-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Request for amendment of stages mentioned in schedule-H of the Agreement as per circulars/clarifications issued by morth
1566 L&T LT/BSRP/OUT/18-19/676 22-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Submission of RA- Bill-02 for maintenance existing Road
1567 L&T LT/BSRP/OUT/18-19/677 22-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Reimbursement of tax liability incurred due to implementation of GST Act against works executed for felling of trees
1568 L&T LT/BSRP/OUT/18-19/678 22-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of borrow area soil test results
1569 L&T LT/BSRP/OUT/18-19/679 22-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Independent Laboratory test of Construction Materials
1570 L&T LT/BSRP/OUT/18-19/680 22-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Source approval of steel -M/S JSW steel Limited
Borrow
1571 L&T LT/BSRP/OUT/18-19/681 22-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow ares soil test results
Approval

1572 L&T LT/BSRP/OUT/18-19/682 23-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Construction of footpath/RCC Drain

1573 L&T LT/BSRP/OUT/18-19/683 27-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Construction of footpath/RCC Drain Received

1575 L&T LT/BSRP/OUT/18-19/685 27-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Repayment of 1st installment of Advance Payment(i.e 2% of Contract Price) Received

1576 L&T LT/BSRP/OUT/18-19/686 28-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Reimbursement of tax liability incurred due to implementation of GST Act against SPS-07 Received

RW/NH-39013/17/2015-NHDP-IVA
LT/BSRP/OUT/17-18/110
Request for amendment of stages mentioned in schedule-h of the Agreement AsPer LT/BSRP/OUT/18-19/045
1578 L&T 29-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Received
circulars/clarifications issued by Morth RITES/BSRP/OD/L&T/2018/83
LT/BSRP/OUT/18-19/045
LT/BSRP/OUT/18-19/688 RITES/BSRP/OD/L&T/2018/242
1579 RITES-NHAI RITES-BSRP-OD-NHAI-2018-137 26-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of RWSS RA Bill-05 LT/BSRP/OUT/18-19/671
Borrow
1580 RITES-QC RITES-BSRP-QC-OD-L&T-2018-139 26-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test results LT/BSRP/OUT/18-19/678
Approval
Borrow
1581 RITES-QC RITES-BSRP-QC-OD-L&T-2018-140 26-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test results LT/BSRP/OUT/18-19/681
Approval
RITES/BSRP/OD/LT/2018/379
1582 RITES-NHAI RITES-BSRP-OD-NHAI-2018-139 27-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of stage payment statement-07 for main works as per schedule-H Y LT/BSRP/OUT/18-19/651
LT/BSRP/OUT/18-19/673
Reimbursement of tex liability incurred due to implementation of GST Act as per Circular 3.3.15
1583 RITES-NHAI RITES-BSRP-OD-NHAI-2018-140 29-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Y LT/BSRP/OUT/18-19/686
dated 04.10.2017 against SPS-07
1584 RITES-QC RITES-BSRP-QC-OD-2018-141 30-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction Materials LT/BSRP/OUT/18-19/678
1585 RITES-QC RITES-BSRP-QC-OD-2018-142 30-Nov-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction Materials LT/BSRP/OUT/18-19/678
RITES/BSRP/OD/LT/2018/321
1586 RITES-OD RITES-BSRP-OD-L&T-2018-384 1-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Proposal of Profile Corrective Course
LT/BSRP/OUT/18-19/653
1587 RITES-OD RITES-BSRP-OD-L&T-2018-385 1-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Deletion of tack coat on primed granular surface NHAI/Policy guidelines/Tack Coat/2017
RITES/BSRP/OD/LT/2018/351
LT/BSRP/OUT/18-19/610
LT/BSRP/OUT/18-19/644
1588 RITES-OD RITES-BSRP-OD-L&T-2018-386 3-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Constrction of footpath /Rcc Drain LT/BSRP/OUT/18-19/682
LT/BSRP/OUT/18-19/683
RITES/BSRP/OD/LT/2018/359
RITES/BSRP/OUT/LT/2018/375
Borrow
1589 L&T LT/BSRP/OUT/18-19/689 30-Nov-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow Area Soil test Rsult for Construction of Embankment/subgrade Received
Approval
1591 L&T LT/BSRP/OUT/18-19/691 1-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Release of bank Guarantee ,deposited towards the 1st Installment advance Received
1594 L&T LT/BSRP/OUT/18-19/694 3-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Port Out of Corporate Mobile no Received
1595 L&T LT/BSRP/OUT/18-19/695 3-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Rehabilitation and Upgradation to four lanning of baharagora-Singda Section Received
1596 L&T LT/BSRP/OUT/18-19/696 3-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Undertaking towards the Payment of consultancy charges for estimation of bearing capacity and o Received

1597 L&T 4-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Bearing Design & drawing details of minor Bridge Received
LT/BSRP/OUT/18-19/697
LT/BSRP/OUT/18-19/631
1598 L&T 4-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Geotechnical report & Hydraulic report of Minor Bridge Received LT/BSRP/OUT/18-19/636
LT/BSRP/OUT/18-19/698 LT/BSRP/OUT/18-19/664
1599 L&T 4-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Repair & Rehabilitation Details of MNB Received
LT/BSRP/OUT/18-19/699
1600 L&T LT/BSRP/OUT/18-19/700 4-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Repair & Rehabilitation Details of MNB Received

Workable Stretch/Unencumbered length available to carry out construction activities on Project


1602 L&T 5-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list Received
LT/BSRP/OUT/18-19/702 Highway
1603 L&T LT/BSRP/OUT/18-19/703 5-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of DBM Design Mix (Grdae-1)Test Report Received
1604 L&T LT/BSRP/OUT/18-19/704 5-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of DBM Grade-II mix design Received
1605 L&T LT/BSRP/OUT/18-19/705 5-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of MAnufacture test certificate of construction materials Received
LT/BSRP/OUT/18-19/618
LT/BSRP/OUT/18-19/607
1606 L&T 5-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees Notice under clause 9.4 & 10.5 of our Contract Agreement regarding delay in tree felling progres Received RITES/BSRP/OD/LT/2018/353
LT/BSRP/OUT/18-19/598
LT/BSRP/OUT/18-19/706 RITES/BSRP/OD/L&T/2018/343
RITES/BSRP/OD/L&T/2018/386
LT/BSRP/OUT/17-18/683
LT/BSRP/OUT/18-19/682
RITES/BSRP/OD/L&T/2018/375
LT/BSRP/OUT/18-19/644
1607 L&T 6-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Construction of footpath/RCC Drain Received
RITES/BSRP/OD/L&T/2018/359
LT/BSRP/OUT/18-19/610
RITES/BSRP/OD/L&T/2018/351
RITES/BSRP/OD//L&T/2018/123
LT/BSRP/OUT/18-19/707 LT/BSRP/OUT/18-19/75

1608 L&T 6-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Submisssion of RA-Bill-04 for Elec. Utility Shifting Works as per Approved Estimate under Sukruli E Received LT/BSRP/OUT/18-19/630
LT/BSRP/OUT/18-19/708 RITES/BSRP/OD/L&T/2018/378
1609 L&T LT/BSRP/OUT/18-19/709 7-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1
1610 L&T LT/BSRP/OUT/18-19/710 7-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Trees Submission & Approval of Tree Felling Estimate for Jharkhand Section Received LT/BSRP/OUT/18-19/402
RW/NH-39013/23/2015-NHDP-IVA
LT/BSRP/OUT/17-18/675
1611 L&T 7-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Request for amendment of Schedule -J and stages mentioned in Schedule -H of the Agreement as p Received LT/BSRP/OUT/18-19/702
NHAI/11011/15/RITES/2018/PIU/BLS/1148
LT/BSRP/OUT/18-19/711
LT/BSRP/OUT/18-19/528
1612 L&T 7-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites EUP Confirmation on De-scoping of works falling under location of 12 nos Elephant Underpasses in Pro Received LT/BSRP/OUT/18-19/602
LT/BSRP/OUT/18-19/712 RITES/BSRP/OD/LT/2018/292
1613 L&T LT/BSRP/OUT/18-19/713 7-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Wor order intimation for Transportation Work for Aggregate stone dust,GSB,WMM,DBM, BC Received
1614 L&T LT/BSRP/OUT/18-19/714 10-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Rehabilition and upgradation to fowr laning of BSRP regust to Renewal of labour licenses Received
1615 L&T LT/BSRP/OUT/18-19/715 10-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1
1616 L&T LT/BSRP/OUT/18-19/716 11-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1
1617 L&T LT/BSRP/OUT/18-19/717 12-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Release of bank Guarantee ,deposited towards the 1st Installment advance Received
1618 L&T LT/BSRP/OUT/18-19/718 12-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Construction of Dbm Layer Received
1619 L&T LT/BSRP/OUT/18-19/719 12-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Concrete trial mix with Ramco brand cement Received RITES/BSRP/QC/OD/L&T/2018/133
1620 L&T LT/BSRP/OUT/18-19/720 12-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Source approval of granular material for Shoulder Received RITES/BSRP/OD/L&T/2018/389
1621 RITES-OD RITES-BSRP-OD-L&T-2018-387 4-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Delay in commencement of major bridge

1622 RITES-OD RITES-BSRP-OD-L&T-2018-388 4-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Median Opening for Project Highway

1623 RITES-OD RITES-BSRP-OD-L&T-2018-389 4-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings delay in submission of proposal for Granular materials

1624 RITES-OD RITES-BSRP-OD-L&T-2018-390 4-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Desin in chamber Box culvert ppe LT/BSRP/OUT/18-19/665

1625 RITES-OD RITES-BSRP-OD-L&T-2018-391 10-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Poor finish of cement concrete kerb

LT/BSRP/OUT/18-19/610
LT/BSRP/OUT/18-19/644
LT/BSRP/OUT/18-19/682
RITES/BSRP/OD/LT/2018/351
1626 RITES-OD RITES-BSRP-OD-L&T-2018-392 12-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Construction of Footpath /RCC Drain
RITES/BSRP/OD/LT/2018/359
RITES/BSRP/OD/LT/2018/375
RITES/BSRP/OD/LT/2018/386
LT/BSRP/OUT/18-19/683
LT/BSRP/OUT/18-19/707
RITES/BSRP/OD/LT/2017/27
LT/BSRP/OUT/18-19/114
1627 RITES-OD RITES-BSRP-OD-L&T-2018-393 12-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Program Submission of revised work program
LT/BSRP/OUT/18-19/623
NHAI/NHDP-IV/OR/01/2010/127391
1628 RITES-QC RITES-BSRP-QC-OD-2018-143 1-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of manufacture test Report (MTC)
1629 RITES-QC RITES-BSRP-QC-OD-2018-144 7-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of DBMGrade-1 Mix with HPCL, Vizag source bitumen approval LT/BSRP/OUT/18-19/703
CRusher
It is demarcation of the lease quarry areamat mundhabani & kumbharmundhakata from
1630 OTBM OTBM-1568 29-May-18 Tahasildar,Bangriposi M/s.L&T Ltd, Bangriposi operations &
Crawings 18/6/18 to 2/.06/18
CRusher
Regarding deposition of royalty and other Gov. dues for Mundhabani stone Quarry-II for the
1631 OTBM OTBM-2241 10-Jul-18 Tahasildar,Bangriposi M/s.L&T Ltd, Bangriposi operations &
Crawings year 2018-19

1632 RITES-OD RITES-BSRP-OD-L&T-2018-394 14-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of typical Minor junction Details & connect to MCW & Service Road LT/BSRP/OUT/18-19/637
1633 RITES-OD RITES-BSRP-OD-L&T-2018-395 15-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Approval of representative for verification project work signing of RFI LT/BSRP/OUT/18-19/729

LT/BSRP/OUT/18-19/653
1634 RITES-OD RITES-BSRP-OD-L&T-2018-396 17-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submission of Proposal of Profile Corrective Course (PPC) RITES/BSRP/OD/LT/2018/321
RITES/BSRP/OD/LT/2018/384

1635 RITES-OD RITES-BSRP-OD-L&T-2018-397 17-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submmission of proposal for construction of Pedestrian Underpass LT/BSRP/OUT/18-19/646
1636 RITES-OD RITES-BSRP-OD-L&T-2018-398 19-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Non Submission of required document for SPS-8 LT/BSRP/OUT/18-19/709

1637 RITES-OD RITES-BSRP-OD-L&T-2018-399 19-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Joint inspection for repair and rehabilitation of MNB & MJB LT/BSRP/OUT/18-19/699
LT/BSRP/OUT/18-19/700

LT/BSRP/OUT/18-19/697
1638 RITES-OD RITES-BSRP-OD-L&T-2018-400 19-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observation on Drawing of Bearing details of MNB RITES/BSRP/OD/LT/2018/287
RITES/BSRP/OD/LT/2018/382

RITES/BSRP/OD/LT/2017/728
LT/BSRP/OUT/18-19/385
1639 RITES-OD RITES-BSRP-OD-L&T-2018-401 19-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Deletion of Tack Cote on Primed Granular surface
NHAI/Policy Guidelines/Tack
Coad/2017/No.13.22/2017

RITES/BSRP/OD/LT/2018/334
1640 RITES-OD RITES-BSRP-OD-L&T-2018-402 19-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Geotechnical/SBC report for MNB At Location
RITES/BSRP/OD/LT/2018/281
LT/BSRP/OUT/18-19/636
1641 RITES-OD RITES-BSRP-OD-L&T-2018-403 21-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Desing & Drawing of MNB LT/BSRP/OUT/18-19/664
LT/BSRP/OUT/18-19/698
RITES/BSRP/OD/LT/2018/381
1643 RITES-QC RITES-BSRP-QC-OD-2018-145 11-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of DBM Grade-II Mix Desing with HPCL Vizag soure Bitumem N LT/BSRP/OUT/18-19/704
1644 RITES-QC RITES-BSRP-QC-OD-2018-146 14-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Concrete trial mix Ramco Brand OPC 53 gradev N LT/BSRP/OUT/18-19/719
1645 RITES-QC RITES-BSRP-QC-OD-2018-147 18-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Soure approval of Bearing Details of MNB N LT/BSRP/OUT/18-19/720
1646 RITES-NHAI RITES-BSRP-OD-NHAI-2018-149 13-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Release of Bank Guarantee no.0009 BGR0068117 N
NHAI/11011/15/RITES/2018/PIU/BLS/1148
LT/BSRP/OUT/18-19/702
Amendment of stages Mentioned in Schedule-H of the Agreement as per Circulars/ clarification
1647 RITES-NHAI RITES-BSRP-OD-NHAI-2018-150 17-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments N LT/BSRP/OUT/18-19/675
Issued by
LT/BSRP/OUT/18-19/711
LT/BSRP/OUT/18-19/616
Reimbursement of tex liability incurred due to implementation of GST Act againt works executed NHAI/11011/8/LT/2017/PIU/BLS/918
1648 RITES-NHAI RITES-BSRP-OD-NHAI-2018-151 17-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims N
for felling of trees LT/BSRP/OUT/18-19/677
1651 L&T LT/BSRP/OUT/18-19/721 12-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of Cement Treated Sub-base Mix Design N
1652 L&T LT/BSRP/OUT/18-19/722 13-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Soure pproval of Hydrated lime N
1658 L&T LT/BSRP/OUT/18-19/728 15-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Deletion of Tack coat on primed Granular surfaces N

1659 L&T LT/BSRP/OUT/18-19/729 15-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Request to approve authorized signatories for verification of project work and signing of RFIs. N

1663 L&T LT/BSRP/OUT/18-19/733 19-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims Release of 10% Hold Amount for Main Works. N
1664 L&T LT/BSRP/OUT/18-19/734 19-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1 N

1665 L&T LT/BSRP/OUT/18-19/735 19-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Methodology of High Strain Dynamic Load Test on piles N

Reimbursement of tax liability incurred due to implementation of GST Act as per circular 3.3.15
1666 L&T LT/BSRP/OUT/18-19/736 19-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims dated 04.10.2017& NHAI/F&A/GST-2017/SM dated 01.08.2018 against IPC-01 to IPC-06 & SPS- N
08
1667 L&T LT/BSRP/OUT/18-19/737 20-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Regarding Back filling For WMM RAMP by Mooram at camp-02 N
1668 L&T LT/BSRP/OUT/18-19/738 20-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Submission of SPS-08 for main works as per schedule-H of Agreement N
1669 L&T LT/BSRP/OUT/18-19/739 21-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Submission of DBM Design MIx (Grdae-2)Test Report N

1670 L&T LT/BSRP/OUT/18-19/740 21-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Layout for Toll Plaza & Administration Building for approval N

1671 L&T LT/BSRP/OUT/18-19/741 21-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Source approval of Bearings and expansion joints N
1673 L&T LT/BSRP/OUT/18-19/743 22-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments Release of SPS-08 for main works N
1674 L&T LT/BSRP/OUT/18-19/744 22-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Approval of cement treated Sub base mix design N
Repayment of 2nd installment of Advance payment (i.e 3% of Contract price) and request to
1675 L&T LT/BSRP/OUT/18-19/745 22-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Payments N
release coorresponding Bank gurantee
1676 L&T LT/BSRP/OUT/18-19/746 22-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1 N
1677 L&T LT/BSRP/OUT/18-19/747 24-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1 N
1678 L&T LT/BSRP/OUT/18-19/748 24-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Statutory Notice for suspension of works pursuant to Article 21 of Contract Agreement N
1679 L&T LT/BSRP/OUT/18-19/749 24-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Opoor finish of cement concrete Kerb N
1680 L&T LT/BSRP/OUT/18-19/750 24-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Source approval of Granular material for shoulder N
1681 L&T LT/BSRP/OUT/18-19/751 24-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Source Approval of GGBS-M/S JSW cement Limited N
Borrow
1682 L&T LT/BSRP/OUT/18-19/752 24-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Area/Mining Submission of Borrow area soil test result N
Approval
Reimbursement of tax liability incurred due to implementation of GST Act as per circular 3.3.15
1683 L&T LT/BSRP/OUT/18-19/753 24-Dec-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Claims dated 04.10.2017& NHAI/F&A/GST-2017/SM dated 01.08.2018 against IPC-01 to IPC-06 & SPS- N
08
Borrow
1684 RITES-QC RITES-BSRP-QC-OD-2018-151 22-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area soil test results for construction of Embankment/ Sub Grade-Approval N
Approval
1685 RITES-OD RITES-BSRP-OD-L&T-2018-404 22-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Median Opening for Project Highway N
Borrow
1686 RITES-QC RITES-BSRP-QC-OD-2018-152 22-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrw area soil test results for construction of Embankment/sub grade approval N
Approval
1687 RITES-QC RITES-BSRP-QC-OD-2018-153 27-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of M/s.Soja cement works pvt.Ltd, and Rishab industries Ajmir,Rajastan N
1688 RITES-QC RITES-BSRP-QC-OD-2018-154 27-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Approval of Cement treated Sub-Base mix design N
1689 RITES-QC RITES-BSRP-QC-OD-2018-155 27-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of GGBS-M/s. JSW Cement Limited N

1690 RITES-OD RITES-BSRP-OD-L&T-2018-405 31-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of layout for Toll plaza &Administrative Building

1691 RITES-OD RITES-BSRP-OD-L&T-2018-406 1-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request for Submission of Piles for Pile Cop of Pile-1 MJB-303+032

1692 RITES-OD RITES-BSRP-OD-L&T-2018-407 2-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Amendment of stages Mentioned in Schedule-H of the Agreement as per Circulars/ clarification Issued by
1693 RITES-OD RITES-BSRP-OD-L&T-2018-408 2-Jan-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Submission of revised work Programme
1694 RITES-OD RITES-BSRP-OD-L&T-2018-409 3-Jan-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Non avalilability of Approval Drawing at site

1695 RITES-OD RITES-BSRP-OD-L&T-2018-410 7-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Submission SPS-9 for MAIN WORK
1696 RITES-OD RITES-BSRP-OD-L&T-2018-411 10-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments MAINTENANCE OF EXISING ROAD
1697 RITES-OD RITES-BSRP-OD-L&T-2018-412 11-Jan-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Plane & profile Khairi Niwas Area

Borrow
1698 RITES-QC RITES-BSRP-QC-OD-2018-156 31-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Sumbmission of Borrw Area Soil test Result for contruction of Embankment Approval
Approval

1699 RITES-QC RITES-BSRP-QC-OD-2018-157 1-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Approval of Cement treated Sub-Base mix design

1700 RITES-QC RITES-BSRP-QC-OD-2018-157-1 26-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Reimabursemet of tex liability incurred due to implementution of GST

1701 RITES-NHAI RITES-BSRP-OD-NHAI-2018-152 21-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Interim Payment certification Y

1702 RITES-NHAI RITES-BSRP-OD-NHAI-2018-153 21-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Submission of RA-Bill-02 maintenance of existing road Y

Reimbursement of tax liability incurred due to im plementation of GST act.


1703 RITES-NHAI RITES-BSRP-OD-NHAI-2018-155 22-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Y
Towards work executed for tree felling of GST
1704 RITES-NHAI RITES-BSRP-OD-NHAI-2018-157 22-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of stage payment statement -08 for main work as per sehedule Y
1705 RITES-NHAI RITES-BSRP-OD-NHAI-2018-158 29-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Repayment of 2nd intalment of Advance payment(3% of contract price) Y

1706 RITES-NHAI RITES-BSRP-OD-NHAI-2018-160 31-Dec-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Compline of Audit observation for the period form 1-4-18 - 30-9-18 Y

RITES/BSRP/OD/LT/2018/321
RITES/BSRP/OD/LT/2018/384
1709 RITES-OD RITES-BSRP-OD-L&T-2018-413 12-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submisssion of Proposal of profile Corrective Course (PCC)
RITES/BSRP/OD/LT/2018/653
LT/BSRP/OUT/18-19/396
1710 RITES-OD RITES-BSRP-OD-L&T-2018-414 16-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Curing of Concrete Structures. RITES/BSRP/OD/LT/2018/266

1711 RITES-OD RITES-BSRP-OD-L&T-2018-415 17-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of BM Grade-II mix Desingn LT/BSRP/OUT/18-19/776

RITES/BSRP/OD/LT/2018/301
RITES/BSRP/OD/LT/2018/363
1712 RITES-OD RITES-BSRP-OD-L&T-2018-416 19-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Median Opening for Project Highway
RITES/BSRP/OD/LT/2018/388
RITES/BSRP/OD/LT/2018/404
LT/BSRP/OUT/18-19/5
1713 RITES-OD RITES-BSRP-OD-L&T-2018-417 19-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Repayment of 2nd intalment of Advance payment
1714 RITES-OD RITES-BSRP-OD-L&T-2018-418 21-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Maintenance of site records like Level Book Material Register, Log Book of Machineries, highway( NHs) and under various Central Road Sector Scheme
1715 RITES-OD RITES-BSRP-OD-L&T-2018-420 21-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments MAINTENANCE OF EXISING ROAD
1716 RITES-OD RITES-BSRP-OD-L&T-2018-421 21-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Safety Measures at site
1717 RITES-OD RITES-BSRP-OD-L&T-2018-422 21-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design/Drawing of suspended approach Slab And RE panel

1718 RITES-OD RITES-BSRP-OD-L&T-2018-423 22-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submisson of Geotechnical / SBC Report

LT/BSRP/OUT/18-19/437
LT/BSRP/OUT/18-19/659
1719 RITES-OD RITES-BSRP-OD-L&T-2018-424 23-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Drawing & Bearing Detais LT/BSRP/OUT/18-19/697
RITES/BSRP/OD/LT/2019/422
LT/BSRP/OUT/18-19/771
RITES/BSRP/OD/LT/2019/377
LT/BSRP/OUT/18-19/656
1720 RITES-OD RITES-BSRP-OD-L&T-2018-425 24-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design/Drawing of flayover LT/BSRP/OUT/18-19/792
LT/BSRP/OUT/18-19/813
RITES/BSRP/OD/LT/2019/422
1721 RITES-OD RITES-BSRP-OD-L&T-2018-426 24-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submisssion of Monthly Progress Report for the Month of December LT/BSRP/OUT/18-19/779
1722 RITES-OD RITES-BSRP-OD-L&T-2018-427 29-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Road Furnitures Plan from 199+000 to 229+000 km
LT/BSRP/OUT/18-19/667
1723 RITES-OD RITES-BSRP-OD-L&T-2018-428 30-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request for Submission of Re-Design of Pile for Pile cap of Pier-1 MJB-303+032
LT/BSRP/OUT/18-19/406
LT/BSRP/OUT/18-19/808
LT/BSRP/OUT/18-19/824
1724 RITES-OD RITES-BSRP-OD-L&T-2018-429 30-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Authentic Copy of Authentic Cpy of Confirmatory SBC Report of MNB
LT/BSRP/OUT/18-19/828
LT/BSRP/OUT/18-19/829
RITES/BSRP/OD/LT/2018/381
LT/BSRP/OUT/18-19/636
LT/BSRP/OUT/18-19/664
1725 RITES-OD RITES-BSRP-OD-L&T-2018-430 30-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observations on Bearing Design & Drawing of MNB
LT/BSRP/OUT/1819/698
LT/BSRP/OUT/18-19/825
RITES/BSRP/OD/LT/2018/403
LT/BSRP/OUT/1819/831
1726 RITES-OD RITES-BSRP-OD-L&T-2018-431 31-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submisssion Authentic copy of Confirmatory SBC Report of MNB
LT/BSRP/OUT/18-19/832
RITES/BSRP/OD/LT/2018/321
RITES/BSRP/OD/LT/2018/384
RITES/BSRP/OD/LT/2018/396
1727 RITES-OD RITES-BSRP-OD-L&T-2018-432 1-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Statutory Submission of Proposal of Profile Corrective Course
RITES/BSRP/OD/LT/2018/413
LT/BSRP/OUT/18-19/653
LT/BSRP/OUT/18-19/821
RITES/BSRP/OD/LT/2018/167
1728 RITES-QC RITES-BSRP-QC-OD-2018-168 16-Jan-19 The Team Leader, AE - RITES OMEGA Consultant Sevices Quality of Works independent Laboratory test of Construction Material
LT/BSRP/OUT/18-19/787
RITES/BSRP/OD/LT/2018/164
1729 RITES-QC RITES-BSRP-QC-OD-2018-169 16-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Granular Material for Shoulder LT/BSRP/OUT/18-19/763
LT/BSRP/OUT/18-19/795
1730 RITES-QC RITES-BSRP-QC-OD-2018-170 22-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of CTSB Mix Design Test report
1731 RITES-QC RITES-BSRP-QC-OD-2018-171 22-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approvals of Rcc Hume pipe -M/s- Precon Engineers Pvt. Ltd. Jamshedpur
1732 RITES-QC RITES-BSRP-QC-OD-2018-172 22-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approvals of Bitumen (VG-40)-M/s- hindustan colas limited LT/BSRP/OUT/18-19/777
RITES/BSRP/QC/OD/LT/2018/133
LT/BSRP/OUT/18-19/648
1733 RITES-QC RITES-BSRP-QC-OD-2018-173 28-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Ramco Brand OPC 53 Grade Cement
LT/BSRP/OUT/18-19/719
RITES/BSRP/QC/OD/LT/2018/146
LT/BSRP/OUT/18-19/777
1734 RITES-QC RITES-BSRP-QC-OD-2018-174 28-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Bitumen (VG-40) M/S- Hindustan coais Limited and approval of Independent testing Laborato
LT/BSRP/OUT/18-19/786
1735 RITES-QC RITES-BSRP-QC-OD-2018-175 29-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval Of Granular Material for Shoulder
LT/BSRP/OUT/18-19/184

1736 RITES-QC RITES-BSRP-QC-OD-2018-176 30-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test of Geogrid
LT/BSRP/OUT/18-19/796
1737 RITES-NHAI RITES-BSRP-OD-NHAI-2018-171 18-Jan-19 The Team Leader, AE - RITES The Project Director NHAI Payments Rescheduling of Projrct Milestone Y
1743 L&T LT/BSRP/OUT/18-19/759 29-Dec-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Apploval of cement treated subbase mix Desing Received
1748 L&T LT/BSRP/OUT/18-19/764 4-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites start of Construction activities of MNB Received
1749 L&T LT/BSRP/OUT/18-19/765 4-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of Plan & profile at Khairi niwas Area Received
1751 L&T LT/BSRP/OUT/18-19/767 4-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Released of 10% amount SPS-8 Main works Received
1752 L&T LT/BSRP/OUT/18-19/768 4-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1
1753 L&T LT/BSRP/OUT/18-19/769 7-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1
1754 L&T LT/BSRP/OUT/18-19/770 9-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1
1755 L&T LT/BSRP/OUT/18-19/771 9-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1
1756 L&T LT/BSRP/OUT/18-19/772 10-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1
1758 L&T LT/BSRP/OUT/18-19/764 4-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Start of Construction Activities of Minor Bridge irrigation canal over NH-6 Received LT/BSRP/OUT/18-19/417
LT/BSRP/OUT/18-19/646
1759 L&T LT/BSRP/OUT/18-19/765 4-Jan-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of Plan & profile at Khairi niwas Area Received
RITES/BSRP/OD/LT/2018/397
LT/BSRP/OUT/18-19/646
1761 L&T LT/BSRP/OUT/18-19/767 4-Jan-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Release of 10% Hold Amount for Main Works. Received
RITES/BSRP/OD/NHAI/18-19/157
1762 L&T LT/BSRP/OUT/18-19/768 5-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of sps-09 for main works as per schedule-H areement Received
RITES/BSRP/OD/LT/2018/393
1763 L&T LT/BSRP/OUT/18-19/769 7-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Extension of time and Submission of revised work programme Received
RITES/BSRP/OD/NHAI/18-19/408
1764 L&T LT/BSRP/OUT/18-19/770 9-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Non-payment of land acquired under Jharkhand section Received NHAI/11011/8/LT/2018/PIU/BLS/1212
LT/BSRP/OUT/18-19/437
1765 L&T LT/BSRP/OUT/18-19/771 10-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Compliance against observation on Drawing of Bearing Details of minor bridge Received LT/BSRP/OUT/18-19/487
RITES/BSRP/OD/NHAI/18-19/287
1766 L&T LT/BSRP/OUT/18-19/772 10-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submisssion of a Report intrgrity test (PET) ON Pile Of MJB Received
1767 L&T LT/BSRP/OUT/18-19/773 10-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of a Report on Load Capacity on Piles using High Strain Dynamic Losd Testing Received
RITES/BSRP/OD/L&T/2018/392
LT/BSRP/OUT/17-18/610
LT/BSRP/OUT/18-19/644
RITES/BSRP/OD/NHAI/2018/158
LT/BSRP/OUT/18-19/682
RITES/BSRP/OD/L&T/2018/375
1768 L&T LT/BSRP/OUT/18-19/774 10-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Repayment of 2nd installment of Advance payment Received
LT/BSRP/OUT/18-19/683
RITES/BSRP/OD/L&T/2018/123
RITES/BSRP/OD//L&T/2018/389
LT/BSRP/OUT/18-19/707
LT/BSRP/OUT/18-19/75

1771 L&T LT/BSRP/OUT/18-19/777 11-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Source approval of bitumen Received
LT/BSRP/OUT/18-19/565
Workable Stretch/Unencumbered length available to carry out construction activities on Project
1772 L&T LT/BSRP/OUT/18-19/778 11-Jan-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list Received LT/BSRP/OUT/18-19/616
Highway
LT/BSRP/OUT/18-19/702
1773 L&T LT/BSRP/OUT/18-19/779 12-Jan-18 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of monthly Progress Report for the Month of Decembar Received
1774 L&T LT/BSRP/OUT/18-19/780 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1
1775 L&T LT/BSRP/OUT/18-19/781 M/s.L&T Ltd, Bangriposi The Team Leader, Rites 1
1776 L&T LT/BSRP/OUT/18-19/782 15-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of a Report on Integrity Test on Pile of MJB 303+092 Received LT/BSRP/OUT/18-19/772
1779 L&T LT/BSRP/OUT/18-19/785 15-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Notice for suspension of works on 8th january 2019 Pursuant to Article 21 of contract agreement Received

1780 L&T LT/BSRP/OUT/18-19/786 15-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Approval of Independent testing laboratory Received
1781 L&T LT/BSRP/OUT/18-19/787 15-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory test of RE fill material Received LT/BSRP/QC/OD/2018/167
1782 L&T LT/BSRP/OUT/18-19/788 15-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Source approval of Rcc hume pipe -M/S precon Engineers pvt. Ltd. Jamshedpur Received
1783 L&T LT/BSRP/OUT/18-19/789 15-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Proposal for Drainage Bay for RE Wall Received
1784 L&T LT/BSRP/OUT/18-19/790 15-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Mix Design of DBM grade-II Received
RITES/BSRP/OD/L&T/2018/377
1786 L&T LT/BSRP/OUT/18-19/792 15-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of Estimation of Bearing capacity & settlement for flyover Received
LT/BSRP/OUT/17-18/656
1787 L&T LT/BSRP/OUT/18-19/793 17-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Rehabilition and upgradation to four laning of BSRP Allocation of water Resouce. Received
1788 L&T LT/BSRP/OUT/18-19/794 17-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Proposal Regarding Engaging of dewatering Pump by CDS Received
1793 L&T LT/BSRP/OUT/18-19/799 18-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Work order intimation for Dewatering activity Received
RITES/BSRP/OD/LT/2018/409
1825 RITES-OD RITES-BSRP-OD-L&T-2018-433 31-Jan-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Non Availlablity of Approved Drawing at site
LT/BSRP/OUT/18-19/783
LT/BSRP/OUT/18-19/656
LT/BSRP/OUT/18-19/792
LT/BSRP/OUT/18-19/682
RITES/BSRP/OD/LT/2018/377
1826 RITES-OD RITES-BSRP-OD-L&T-2018-434 1-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of revised Desing/Drawing of flyover 215+264
RITES/BSRP/OD/LT/2018/422
RITES/BSRP/OD/LT/2018/425
LT/BSRP/OUT/18-19/813
LT/BSRP/OUT/18-19/834
LT/BSRP/OUT/18-19/141
LT/BSRP/OUT/18-19/146
1827 RITES-OD RITES-BSRP-OD-L&T-2018-435 4-Feb-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Typical Reinforcement Details of Box Culvert
LT/BSRP/OUT/18-19/826
RITES/BSRP/OD/LT/2018/131
LT/BSRP/OUT/18-19/114
LT/BSRP/OUT/18-19/623
LT/BSRP/OUT/18-19/800
1828 RITES-OD RITES-BSRP-OD-L&T-2018-436 5-Feb-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised work Programme
RITES/BSRP/OD/LT/2017/27
RITES/BSRP/OD/LT/2018/393
RITES/BSRP/OD/LT/2018/408
LT/BSRP/OUT/18-19/827
1829 RITES-OD RITES-BSRP-OD-L&T-2018-437 5-Feb-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Drawings of Superstructure and Bearings of MJB
LT/BSRP/OUT/18-19/830
LT/BSRP/OUT/18-19/092
LT/BSRP/OUT/18-19/446
LT/BSRP/OUT/18-19/765
RITES/BSRP/OD/LT/2018/164
1830 RITES-OD RITES-BSRP-OD-L&T-2018-438 5-Feb-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised Plan and Profile Approval
RITES/BSRP/OD/LT/2018/296
RITES/BSRP/OD/LT/2018/331
RITES/BSRP/OD/LT/2018/412
LT/BSRP/OUT/18-19/812
1831 RITES-OD RITES-BSRP-OD-L&T-2018-439 7-Feb-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Geotechnical/SBC report RITES-BSRP-OD-L&T-2018-423
1832 RITES-OD RITES-BSRP-OD-L&T-2018-440 8-Feb-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Compaction on edge of paved shoulder RITES-BSRP-OD-L&T-2018-389
LT/BSRP/OUT/18-19/092
LT/BSRP/OUT/18-19/446
LT/BSRP/OUT/18-19/765
RITES/BSRP/OD/LT/2018/164
1833 RITES-OD RITES-BSRP-OD-L&T-2018-441 11-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Revised Plan and Profile (288.000 to 290.000)E Approval RITES/BSRP/OD/LT/2018/296
RITES/BSRP/OD/LT/2018/331
RITES/BSRP/OD/LT/2018/412
RITES/BSRP/OD/LT/2018/438
LT/BSRP/OUT/18-19/812
LT/BSRP/OUT/18-19/656
LT/BSRP/OUT/18-19/792
LT/BSRP/OUT/18-19/813
RITES/BSRP/OD/LT/2018/377
1834 RITES-OD RITES-BSRP-OD-L&T-2018-442 12-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Safety Audit report of revised Design/Drawings of Flyover (215+264)
RITES/BSRP/OD/LT/2018/422
RITES/BSRP/OD/LT/2018/425
RITES/BSRP/OD/LT/2018/434
LT/BSRP/OUT/18-19/834
1835 RITES-OD RITES-BSRP-OD-L&T-2018-443 13-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Safety measures at site
Status of Working on Forest land of the Road Projects After Expiry of one year Working
1836 RITES-OD RITES-BSRP-OD-L&T-2018-444 15-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees NHAI/11011/5/Forest/2019/PIU/BLS/127
permission
1837 RITES-QC RITES-BSRP-QC-OD-2018-177 2-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction material LT/BSRP/OUT/18-19/833
RITES/BSRP/OD/LT/2018/142
1838 RITES-QC RITES-BSRP-QC-OD-2018-178 2-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction material
LT/BSRP/OUT/18-19/378
Borrow
1839 RITES-QC RITES-BSRP-QC-OD-2018-179 2-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test result for construction of Embankment / sub-grade- approval LT/BSRP/OUT/18-19/823
Approval
Borrow
1840 RITES-QC RITES-BSRP-QC-OD-2018-180 2-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test result for construction of Embankment / sub-grade- approval LT/BSRP/OUT/18-19/822
Approval
1841 RITES-QC RITES-BSRP-QC-OD-2019-181 5-Feb-18 The Team Leader, AE - RITES M/S. SM Consultants Quality of Works Independent Laboratory test of Construction Materials LT/BSRP/OUT/18-19/842
The Professor,Department of
1842 RITES-QC RITES-BSRP-QC-OD-2019-182 9-Feb-19 The Team Leader, AE - RITES Civil Engineering,IIT Quality of Works Independent Laboratory test of Construction Materials LT/BSRP/OUT/18-19/848
Madras,Chennai-600016,India
LT/BSRP/OUT/18-19/705
The Professor,Department of
LT/BSRP/OUT/18-19/797
1843 RITES-QC RITES-BSRP-QC-OD-2019-183 9-Feb-19 The Team Leader, AE - RITES Civil Engineering,IIT Quality of Works Submission of MTC for Construction Materials
RITES/BSRP/QC/OD/LT/2018/143
Madras,Chennai-600016,India
RITES/BSRP/QC/OD/LT/2018/148
RITES/BSRP/QC/OD/LT/2018/142
1844 RITES-QC RITES-BSRP-QC-OD-2019-184 11-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction Materials
LT/BSRP/OUT/18-19/679
1845 RITES-QC RITES-BSRP-QC-OD-2019-185 13-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Removal of Unprocessed/ un-reclaimed Bituminous materials laid at Site
1846 RITES-QC RITES-BSRP-QC-OD-2019-186 15-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Approval of JMF for Drainage Bay -Reinforced Soil Structure LT/BSRP/OUT/18-19/843
TC-OCSK/19/01P-0000031-01
1847 RITES-QC RITES-BSRP-QC-OD-2019-187 15-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Approval of JMF for Drainage Bay -Reinforced Soil Structure
TC-OCSK/19/01P-0000031-02
TC-OCSK/19/01P-0000030-01 (Chemical)
TC-OCSK/19/01P-0000030-01(Physical)
TC-OCSK/19/01P-0000030-02 (Chemical)
TC-OCSK/19/01P-0000030-02(Physical)
TC-OCSK/19/01P-0000030-03 (Chemical)
TC-OCSK/19/01P-0000030-03(Physical)
TC-OCSK/19/01P-0000030-04
TC-OCSK/19/01P-0000030-05
TC-OCSK/19/01P-0000031-06 (Chemical)
1848 RITES-QC RITES-BSRP-QC-OD-2019-188 15-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third patry test reports
TC-OCSK/19/01P-0000031-06(Physical)
TC-OCSK/19/01P-0000031-07
TC-OCSK/19/01P-0000031-08
TC-OCSK/19/01P-0000031-09
TC-OCSK/19/01P-0000031-10
TC-OCSK/19/01P-0000031-11
TC-OCSK/19/01P-0000031-12
TC-OCSK/19/01P-0000031-13 (Chemical)
TC-OCSK/19/01P-0000031-13(Physical
1852 L&T LT/BSRP/OUT/18-19/802 19-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites submission of CTSB mix Desing TEST Report Received
Rehabilition and upgradation to fowr laning of BSRP - Regarding Approval for Lifting of Wastage
1856 L&T 21-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Received
LT/BSRP/OUT/18-19/805-A Soil.
1860 L&T LT/BSRP/OUT/18-19/809 23-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Rehabilition and upgradation to four laning of BSRP Regarding Stamping of weigh Bridge Received
1873 L&T LT/BSRP/OUT/18-19/822 29-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of Cut soil Test result ( from Km 271+000 LHS & RHS Received
1874 L&T LT/BSRP/OUT/18-19/823 28-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow Area soil Test Result for Construction of Embankment /Sub grade Received
RITES/BSRP/OD//L&T/2018/281
RITES/BSRP/OD/L&T/2018/423
1882 L&T 30-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of confirmatory SBC Report of Minor Bridge Received
LT/BSRP/OUT/18-19/398
LT/BSRP/OUT/18-19/831 LT/BSRP/OUT/18-19/453
RITES/BSRP/OD/L&T/2018/158
1883 L&T 30-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of confirmatory SBC Report of Minor Bridge Received
LT/BSRP/OUT/18-19/832 LT/BSRP/OUT/18-19/163
RITES/BSRP/OD/L&T/2018/377
RITES/BSRP/QC/OD/L&T/2018/422
RITES/BSRP/OD/L&T/2018/425
1885 L&T 31-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design / Drawings of Suspended approach Slab and RE panel Received
LT/BSRP/OUT/18-19/656
LT/BSRP/OUT/18-19/792
LT/BSRP/OUT/18-19/834 LT/BSRP/OUT/18-19/813
RITES/BSRP/OD/L&T/2018/266
1886 L&T 31-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Curing of Concrete Structures Received
LT/BSRP/OUT/18-19/835 RITES/BSRP/QC/OD/L&T/2018/414
RITES/BSRP/OD/NHAI/2019/175
Reimbursement of tax Liability incurred due to implementation of GST Act. As per Circular 3.3.15 RITES/BSRP/OD/L&T/2018/
1888 L&T 31-Jan-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Received
date 4.10.17 and NHAI F&A GST 2017-18 SM Date 1.08.18 against IPC --08 & SPS-09 LT/BSRP/OUT/18-19/767
LT/BSRP/OUT/18-19/837 RITES/BSRP/OD/NHAI/2019/163
1889 L&T LT/BSRP/OUT/18-19/838 1-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Safety measures at site Received RITES/BSRP/OD/L&T/2018/421
1890 L&T LT/BSRP/OUT/18-19/839 2-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of SPS-10 for SPS-10 for Main works as per Schedule -H of Agreement. Received
1891 L&T LT/BSRP/OUT/18-19/840 2-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Resubmission of Authentic Copy of Confirmatory SBC Report of MNB Received
1893 L&T LT/BSRP/OUT/18-19/842 2-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory Test of Construction Materials Received
1894 L&T LT/BSRP/OUT/18-19/843 2-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Approval of MJF for Drainage Bay-Reinforcement Soil Structure Received LT/BSRP/OUT/18-19/789
1895 L&T LT/BSRP/OUT/18-19/844 4-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Release BG for the Advance for 2nd Installment Received
1897 L&T LT/BSRP/OUT/18-19/846 8-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of borrow area Soil test Results Received
1901 L&T LT/BSRP/OUT/18-19/850 11-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow area soil Test Result for Construction of Embankment/ Subgrade Received
1902 L&T LT/BSRP/OUT/18-19/851 13-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow area soil Test Result for Construction of Embankment/ Subgrade Received
1903 L&T LT/BSRP/OUT/18-19/852 12-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites EPT MODE Received
LT/BSRP/OUT/18-19/853
1904 L&T 13-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of Proposal of Profile Corrective Course (PCC) Received
LT/BSRP/OUT/18-19/853 RITES/BSRP/OD/L&T/2018/432
RITES/BSRP/OD/NHAI/L&T/2018/182
1905 L&T 14-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Reimbursement of tax Liability incurrred due to Implementation of GST Received
LT/BSRP/OUT/18-19/854 RITES/BSRP/OD/NHAI/L&T/2018/184
1907 L&T LT/BSRP/OUT/18-19/856 16-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Indepent Laboratory Test of HDPE Corrugated Sheathing Pipe Received RITES/BSRP/OD/NHAI/L&T/2018/184
1915 L&T LT/BSRP/OUT/18-19/864 18-Feb-19 M/s.L&T Ltd, Bangriposi The Team Leader, Rites Submission of Concrete Mix Design with Cement Ramco opc 53 grade and chryso Admixture Received
Borrow
1933 RITES-QC RITES-BSRP-QC-OD-2019-189 15-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area Soil Test Result For Construction of Sub grade Approval LT/BSRP/OUT/18-19/846
Approval
Borrow
Submission of Borrow Area Soil test Results For Construction of Embankment-Subgrade
1934 RITES-QC RITES-BSRP-QC-OD-2019-190 15-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining LT/BSRP/OUT/18-19/850
Approval
Borrow approval
1935 RITES-QC RITES-BSRP-QC-OD-2019-191 15-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area Soil test Results For Construction of Subgrade approval LT/BSRP/OUT/18-19/851
Approval
1936 RITES-QC RITES-BSRP-QC-OD-2019-192 15-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Approval of Rishab Industries Ajmer (Rajasthan) TC-OCSK-19-0E-0000009
CENTRAL INSTITUTE OF
1937 RITES-QC RITES-BSRP-QC-OD-2019-193 16-Feb-19 The Team Leader, AE - RITES PLASTICS ENGG. & Quality of Works Independent Laboratory Test of HDPE Corrugated Sheathing pipe LT/BSRP/OUT/18-19/856
TECHNOLIGY
TC-OCSK/19/01P-0000009-01 (Chemical)
1938 RITES-QC RITES-BSRP-QC-OD-2019-194 20-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Approval of Ramco Cement Limited
TC-OCSK/19/01P-0000009-01(Physical)

Submission of Concrete mix Desing M-15,M20, (Kerb & PCC) M-45 Grade with Ramco PPC53
1940 RITES-QC RITES-BSRP-QC-OD-2019-195 25-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
Cement & Chryso Admixture Approval

Proposal for Using Geo-composite Drainage System instead of wall - Graded Aggregates for
1941 RITES-QC RITES-BSRP-QC-OD-2019-196 25-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works LT/BSRP/OUT/18-19/852
Drainage Bay of Reinforced Soil Structure

1942 RITES-QC RITES-BSRP-QC-OD-2019-197 25-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test of Construction Material LT/BSRP/OUT/18-19/877

LT/BSRP/OUT/18-19/853
LT/BSRP/OUT/18-19/512
1943 RITES-OD RITES-BSRP-OD-L&T-2018-445 15-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Proposal of Profile Corrective Course (PCC)
RITES/BSRP/OD/LT/2018/441
LT/BSRP/OUT/18-19/819
RITES/BSRP/OD/LT/2018/301
1944 RITES-OD RITES-BSRP-OD-L&T-2018-446 15-Feb-19 The Team Leader, AE - RITES sss Design & Drawings Median Opening for Project Highway RITES/BSRP/OD/LT/2018/363
RITES/BSRP/OD/LT/2018/388
1945 RITES-OD RITES-BSRP-OD-L&T-2018-447 16-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Program Submission of Revised Work Pogram RITES/BSRP/OD/LT/2018/404
LT/BSRP/OUT/18-19/847
RITES/BSRP/OD/LT/2018/416
LT/BSRP/OUT/18-19/855
1946 RITES-OD RITES-BSRP-OD-L&T-2018-448 16-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Geotechnical /SBC Report RITES/BSRP/OD/LT/2018/423
RITES/BSRP/OD/LT/2018/439
LT/BSRP/OUT/18-19/776
LT/BSRP/OUT/18-19/821
1947 RITES-OD RITES-BSRP-OD-L&T-2018-449 16-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Using Bituminous Macadam in Profile Corrective Course(PCC) LT/BSRP/OUT/18-19/853
RITES/BSRP/OD/LT/2018/415
LT/BSRP/OUT/18-19/849
RITES/BSRP/OD/LT/2018/370
1948 RITES-OD RITES-BSRP-OD-L&T-2018-450 18-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Delay in Commencement of Major Bridge Km 205+710
RITES/BSRP/OD/LT/2018/387

1949 RITES-OD RITES-BSRP-OD-L&T-2018-451 25-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Reconstruction on Exisiting Carriageway Side Due to Poor Condition of Existing road

1950 RITES-OD RITES-BSRP-OD-L&T-2018-452 25-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Proposal for Profile Corrective Course ( PCC )

Submission of Open unlined Drainage Design Basis Report From 269+000 to 310+839 for
1951 RITES-OD RITES-BSRP-OD-L&T-2018-453 25-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings LT/BSRP/OUT/18-19/811
Approval
Reimbursement of Tax liabillity incurred due to implementation of GST Act. as per Circular
1952 RITES-NHAI RITES-BSRP-OD-NHAI-2019-190 25-Feb-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Y
aginest IPC-09 and SPS-10
1953 RITES-QC RITES-BSRP-QC-OD-2019-198 27-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of 28 day Compressive Strength test Results of Concrete mix M15,M20 grade LT/BSRP/OUT/18-19/872
Borrow
1954 RITES-QC RITES-BSRP-QC-OD-2019-199 27-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area Soil Test Results LT/BSRP/OUT/18-19/873
Approval
LT/BSRP/OUT/18-19/848
1955 RITES-QC RITES-BSRP-QC-OD-2019-200 27-Feb-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Testing High Tension Strands RITES/BSRP/OD/LT/2018/178
RITES/BSRP/OD/LT/2018/182
LT/BSRP/OUT/18-19/882
1956 RITES-QC RITES-BSRP-QC-OD-2019-201 27-Feb-19 The Team Leader, AE - RITES OMEGA Consultant Sevices Quality of Works Confirmatory SBC Report of RE Wall Locations LT/BSRP/OUT/18-19/883
LT/BSRP/OUT/18-19/884
1957 RITES-QC RITES-BSRP-QC-OD-2019-202 1-Mar-19 The Team Leader, AE - RITES ANULAB Quality of Works Independent Laboratory Test of Construction Material LT/BSRP/OUT/18-19/887
1958 RITES-QC RITES-BSRP-QC-OD-2019-203 1-Mar-19 The Team Leader, AE - RITES ANULAB Quality of Works Independent Laboratory Test of Construction Material LT/BSRP/OUT/18-19/887
1959 RITES-QC RITES-BSRP-QC-OD-2019-204 1-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test of Construction Material LT/BSRP/OUT/18-19/901
LT/BSRP/OUT/18-19/705
LT/BSRP/OUT/18-19/797
1960 RITES-QC RITES-BSRP-QC-OD-2019-205 2-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of MTC for Construction Material RITES/BSRP/OD/LT/2018/143
RITES/BSRP/OD/LT/2018/148
RITES/BSRP/OD/LT/2018/183
1961 RITES-QC RITES-BSRP-QC-OD-2019-206 2-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Revised Mix Design of DBM grade-II LT/BSRP/OUT/18-19/206
LT/BSRP/OUT/18-19/886
1962 RITES-QC RITES-BSRP-QC-OD-2019-207 4-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Method Statement for MIxing of RE fill materials in Proportion at stack yard
RITES/BSRP/OD/LT/2018/187
1963 RITES-QC RITES-BSRP-QC-OD-2019-208 5-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Surface Regularity of Pavement Courses
1964 RITES-QC RITES-BSRP-QC-OD-2019-209 5-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works ASource Approval of Portland Pozzolana Cement (PCC) LT/BSRP/OUT/18-19/888
1965 RITES-QC RITES-BSRP-QC-OD-2019-210 5-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test of Construction Materials LT/BSRP/OUT/18-19/905
1966 RITES-QC RITES-BSRP-QC-OD-2019-211 7-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of WMM mix design Blending with milling matrrial test report LT/BSRP/OUT/18-19/911
LT/BSRP/OUT/18-19/623
1967 RITES-NHAI RITES-BSRP-OD-NHAI-2019-192 28-Feb-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Time Extension Extension of time for Project Milestone and Schedule Completion Date Y
LT/BSRP/OUT/18-19/875
LT/BSRP/OUT/18-19/903
1968 RITES-OD RITES-BSRP-OD-L&T-2018-455 5-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Revised GAD pier (P1) Drawing and Design of MJB at 303+032
RITES/BSRP/OD/LT/2018/428
RITES/BSRP/OD/LT/2018/450
1969 RITES-OD RITES-BSRP-OD-L&T-2018-456 5-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of RFIs For Construction of Test Pile of Abutment A1 of MJB RITES/BSRP/OD/LT/2018/370
RITES/BSRP/OD/LT/2018/387
1970 RITES-OD RITES-BSRP-OD-L&T-2018-457 6-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Revised GAD with Abutment ( A1 & A2) & (P1 & P2 ) Drawing of MNB 212+586 LT/BSRP/OUT/18-19/906

RITES/BSRP/OD/LT/2018/301
RITES/BSRP/OD/LT/2018/363
RITES/BSRP/OD/LT/2018/388
RITES/BSRP/OD/LT/2018/404
1971 RITES-OD RITES-BSRP-OD-L&T-2018-458 6-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Median opening for Project Highway RITES/BSRP/OD/LT/2018/416
RITES/BSRP/OD/LT/2018/446
LT/BSRP/OUT/18-19/879
LT/BSRP/OUT/18-19/819
LT/BSRP/OUT/18-19/512
Forest range officer,Bangriposi The Divisional Forest Felling of trees existing within the right way of way (ROW) in non forest land of NH-6 of baripada
1973 OFDC OFDC 245 20-Mar-18 range Officer,Baripada Division Forest Division portion and disposal of Forest materials reg.

Sri Nabin Chandra


Forest range officer,Rairangpur Naik,Asst.Conservator of Authorization for converted Timber,Firewood etc.obtained from enumerated trees of NH-6
1974 OFDC OFDC 510 17-Feb-18 range Forests (Enf.),Rairangpur Manada (1st phase) Range portion
Division

Sri Nabin Chandra


Forest range officer,Rairangpur Naik,Asst.Conservator of Authorization for converted Timber,Firewood etc.obtained from enumerated trees of NH-6
1975 OFDC OFDC 513 17-Feb-18 range Forests (Enf.),Rairangpur Manada (5th phase) Bisoi Range portion
Division

Sri Nabin Chandra


Forest range officer,Rairangpur Naik,Asst.Conservator of Authorization for converted Timber,Firewood etc.obtained from enumerated trees of NH-6
1976 OFDC OFDC 731 7-Mar-18 range Forests (Enf.),Rairangpur Manada (7th phase) Bisoi Range portion
Division

Sri Nabin Chandra


Forest range officer,Rairangpur Naik,Asst.Conservator of Authorization for converted Timber,Firewood etc.obtained from enumerated trees of NH-6
1977 OFDC OFDC 734 7-Mar-18 range Forests (Enf.),Rairangpur Manada (8th phase) Bisoi Range portion
Division

Sri Nabin Chandra


Forest range officer,Rairangpur Naik,Asst.Conservator of Authorization for converted Timber,Firewood etc.obtained from enumerated trees of NH-6
1978 OFDC OFDC 1252 6-Apr-18 range Forests (Enf.),Rairangpur Manada (9th phase) Bisoi Range portion
Division
Authorization for passing of converted timber ,firewood and poles to be obtained from
Forest range officer,Rairangpur The Range officer ,Bangriposi
1979 OFDC OFDC 3871 8-May-18 range forest range enumerated trees along the ROW (Right of way) of NH-6OF Bangriposi forest range portion and
issues of T.T.Permit for passed materials.
Authorization for passing of converted timber ,firewood and poles to be obtained from
Forest range officer,Rairangpur The Range officer ,Bangriposi
1980 OFDC OFDC 4307 31-May-18 range forest range enumerated trees along the ROW (Right of way) of NH-6OF Bangriposi forest range portion and
issues of T.T.Permit for passed materials.
1981 OFDC OFDC 4958 30-Nov-17 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Field Inspection of Divisional Manager ,Baripada Division ,OFDC Ltd Baripada
Submission of Monthly progress report on felling and removal of marked trees along NH-06 from
1982 OFDC OFDC 4983 30-Nov-17 Divisional manager,Baripada DGM (Tech),PDNHAI,Balasore
Baharagora-Singara Section

1983 OFDC OFDC 5024 4-Dec-17 Divisional manager,Baripada DGM (Tech),PDNHAI,Balasore Field Inspection of Divisional Manager ,Baripada Division ,OFDC Ltd Baripada

1984 OFDC OFDC 5052 4-Dec-17 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Disposal of felled trees in Bisoi at the OFDC Dept at Baripada
Sri Dilip kumar behera DY.ranger I/C Dudhiani Range is hereby authorized to issue T.T Prermit
1985 OFDC OFDC 130 25-May-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi
for transportation of passed material
Authorization for passing of converted timber ,firewood and poles to be obtained from
Forest range officer,Gurguria
1986 OFDC OFDC 52 2-Mar-19 Divisional manager,Baripada
range enumerated trees along the ROW (Right of way) of NH-6OF Gurguria forest range portion and
issues of T.T.Permit for passed materials.
RITES/BSRP/QC/OD/LT/2019/201
LT/BSRP/OUT/18-19/882
2009 RITES-QC RITES-BSRP-QC-OD-2019-212 9-Mar-18 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Confirmatory SBC Report of RE Wall Locations LT/BSRP/OUT/18-19/883
LT/BSRP/OUT/18-19/884
LT/BSRP/OUT/18-19/923
2010 RITES-QC RITES-BSRP-QC-OD-2019-213 11-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Borrrow Area soil test results LT/BSRP/OUT/18-19/913
2011 RITES-QC RITES-BSRP-QC-OD-2019-214 11-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Cut Soil Test results (KM 282+620 to 283+000 RHS ) approval LT/BSRP/OUT/18-19/912
2012 RITES-QC RITES-BSRP-QC-OD-2019-215 12-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Dumping of unapproved material at site RITES/BSRP/QC/OD/LT/2018/45
2013 RITES-QC RITES-BSRP-QC-OD-2019-216 13-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction material for Source approvals LT/BSRP/OUT/18-19/216
2014 RITES-QC RITES-BSRP-QC-OD-2019-217 18-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Concrete mix design LT/BSRP/OUT/18-19/866
Borrow
2015 RITES-QC RITES-BSRP-QC-OD-2019-218 18-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area Soil test Results for Construction of Embankment Approval LT/BSRP/OUT/18-19/930
Approval
2016 RITES-QC RITES-BSRP-QC-OD-2019-219 18-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Dealy in Submission of Third party report of various Construction materials LT/BSRP/OUT/18-19/743
RITES/BSRP/QC/OD/LT/2019/210
2017 RITES-QC RITES-BSRP-QC-OD-2019-220 18-Mar-19 The Team Leader, AE - RITES OMEGA Consultant Sevices Quality of Works Independent Laboratory test of Construction Materials LT/BSRP/OUT/18-19/905
LT/BSRP/OUT/18-19/917
2018 RITES-QC RITES-BSRP-QC-OD-2019-221 18-Mar-19 The Team Leader, AE - RITES OMEGA Consultant Sevices Quality of Works Independent Laboratory Test of Construction Materials LT/BSRP/OUT/18-19/927
2019 RITES-QC RITES-BSRP-QC-OD-2019-222 19-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of WMM Mix Design blending with milling material and Crushed Aggregate LT/BSRP/OUT/18-19/938
2020 RITES-QC RITES-BSRP-QC-OD-2019-223 21-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Concrete mix Design M20 (Kerb) LT/BSRP/OUT/18-19/926
RITES/BSRP/QC/OD/LT/2019/201
RITES/BSRP/QC/OD/LT/2019/212
LT/BSRP/OUT/18-19/882
2021 RITES-QC RITES-BSRP-QC-OD-2019-224 23-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Confirmatory SBC Repot of RE wall Locations LT/BSRP/OUT/18-19/883
LT/BSRP/OUT/18-19/884
LT/BSRP/OUT/18-19/923
LT/BSRP/OUT/18-19/952
2022 RITES-QC RITES-BSRP-QC-OD-2019-225 25-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of revised mix Design of DBM grade-II Approvels LT/BSRP/OUT/18-19/951
2023 RITES-QC RITES-BSRP-QC-OD-2019-226 28-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction Materials LT/BSRP/OUT/18-19/967
2024 RITES-QC RITES-BSRP-QC-OD-2019-227 30-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of mineral Admixture LT/BSRP/OUT/18-19/965
2025 RITES-QC RITES-BSRP-QC-OD-2019-228 31-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of mineral Admixture LT/BSRP/OUT/18-19/966
Borrow
2026 RITES-QC RITES-BSRP-QC-OD-2019-229 1-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area Soil test result for Construction of Subgrade Approval LT/BSRP/OUT/18-19/953
Approval
Borrow
2027 RITES-QC RITES-BSRP-QC-OD-2019-230 1-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area Soil test result Approval LT/BSRP/OUT/18-19/957
Approval
RITES/BSRP/QC/OD/LT/2019/201
RITES/BSRP/QC/OD/LT/2019/212
LT/BSRP/OUT/18-19/882
LT/BSRP/OUT/18-19/883
2028 RITES-QC RITES-BSRP-QC-OD-2019-231 1-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Confirmatory SBC Report of RE Wall Locations LT/BSRP/OUT/18-19/884
LT/BSRP/OUT/18-19/923
LT/BSRP/OUT/18-19/952
RITES/BSRP/QC/OD/LT/2019/224
LT/BSRP/OUT/18-19/970
Borrow
2029 RITES-QC RITES-BSRP-QC-OD-LT-2019-232 1-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area soil test Approval LT/BSRP/OUT/18-19/945
Approval
2030 RITES-OD RITES-BSRP-OD-L&T-2019-459 8-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Less Thickness od DBM on Widening Portion of Existing Road At 224+230 LHS
2031 RITES-OD RITES-BSRP-OD-L&T-2019-460 9-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Utilities Slow Progress of utillity Shifting
furnishing of statistics' Returns and Information of electical accidents of PSU for the year 2017-
2032 RITES-OD RITES-BSRP-OD-L&T-2018-461 9-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Statutory NHAI/11011/15/RITES/2019/PIU/BLS/189
18
RITES/BSRP/OD/LT/2018/370
RITES/BSRP/OD/LT/2018/387
2033 RITES-OD RITES-BSRP-OD-L&T-2018-462 13-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Delay in Commencement of Major Bridge km 205+710
RITES/BSRP/OD/LT/2018/450
RITES/BSRP/OD/LT/2018/456
2034 RITES-OD RITES-BSRP-OD-L&T-2018-463 13-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Change of Scope notice Excluding locations of EUP between KM 229+000 and 236+600
RITES/BSRP/OD/LT/2018/403
2035 RITES-OD RITES-BSRP-OD-L&T-2018-464 15-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observetions on MNB @266+758
LT/BSRP/OUT/18-19/885
2036 RITES-OD RITES-BSRP-OD-L&T-2018-465 15-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Plan and Profile and Detailed Cross Section

2037 RITES-OD RITES-BSRP-OD-L&T-2018-466 15-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Revised GAD of Box Culvert at Km 285+828 ( Rev- C) LT/BSRP/OUT/18-19/919
2038 RITES-OD RITES-BSRP-OD-L&T-2018-467 18-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submission of Compliance for Road safety issues NHAI/13011/29/RITES/2019/PIU/BLS/267
RITES/BSRP/OD/LT/2019/399
2039 RITES-OD RITES-BSRP-OD-L&T-2018-468 18-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Repair and rehabilitation of MNB and MJB LT/BSRP/OUT/18-19/699
LT/BSRP/OUT/18-19/700
2040 RITES-OD RITES-BSRP-OD-L&T-2018-469 18-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Construction of Earth Shoulder
NHAI/11011/15/RITES/2019/PIU/BLS/54
LT/BSRP/OUT/17-18/076
2041 RITES-OD RITES-BSRP-OD-L&T-2018-470 21-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Testing and Trial of High Modulus Asphslt ( HiMA) mixes for IIT Kharagpur Research Purpose
LT/BSRP/OUT/17-18/804

LT/BSRP/OUT/18-19/932
2042 RITES-OD RITES-BSRP-OD-L&T-2018-471 21-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Design and Drawing of Abutments A1 and A2 MJB 205+710 LT/BSRP/OUT/18-19/936
LT/BSRP/OUT/18-19/940
2043 RITES-OD RITES-BSRP-OD-L&T-2018-472 21-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of RE Panel Layout Drawings At 296+144 LT/BSRP/OUT/18-19/921

2044 RITES-OD RITES-BSRP-OD-L&T-2018-473 21-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Revised GAD of RE Wall for Flyover 215+268 @VUP 227+229 @ VUP 285+706 LT/BSRP/OUT/18-19/920
2045 RITES-OD RITES-BSRP-OD-L&T-2018-474 21-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Non Submission of Required Document for IPC -11 LT/BSRP/OUT/18-19/937
RITES/BSRP/OD/NHAI/2017/10
RITES/BSRP/OD/NHAI/2019/186
2046 RITES-OD RITES-BSRP-OD-L&T-2018-475 21-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Release of Bank Guarantee 2nd installment
LT/BSRP/OUT/18-19/844
LT/BSRP/OUT/18-19/943
RITES/BSRP/OD/LT/2018/399
RITES/BSRP/OD/LT/2018/468
2047 RITES-OD RITES-BSRP-OD-L&T-2018-476 25-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Repair and Rehabilitation of MNB And MJB LT/BSRP/OUT/18-19/699
LT/BSRP/OUT/18-19/700
LT/BSRP/OUT/18-19/942
2048 RITES-OD RITES-BSRP-OD-L&T-2018-477 25-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised Plan & Profile of Service Road Drawing 285+320 to 286+ 180 LT/BSRP/OUT/18-19/869
RITES/BSRP/OD/LT/2018/411
2049 RITES-OD RITES-BSRP-OD-L&T-2018-478 25-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Maintenance of Existing Road
RITES/BSRP/OD/LT/2018/420
RITES/BSRP/OD/LT/2018/463
2050 RITES-OD RITES-BSRP-OD-L&T-2018-479 27-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Plan and Profile and Detailed Cross Section RITES/BSRP/OD/LT/2018/465
LT/BSRP/OUT/18-19/959
2051 RITES-OD RITES-BSRP-OD-L&T-2018-480 27-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Typical minor junction Details Approval LT/BSRP/OUT/18-19/862
RITES/BSRP/OD/LT/2018/464
2052 RITES-OD RITES-BSRP-OD-L&T-2018-481 28-Mar-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of GAD of MNB Ch. 226+758 LT/BSRP/OUT/18-19/885
LT/BSRP/OUT/18-19/939
Submission of tree Filling RA-bill 06 for Bisoi Range RA Bill-05 For Bangriposi Rangae and RA
2053 RITES-NHAI RITES-BSRP-OD-NHAI-2019-194 2-Mar-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Maintenance/DLP Y LT/BSRP/OUT/18-19/900
Bill-04 for Gurguriya Range

2054 RITES-NHAI RITES-BSRP-OD-NHAI-2019-198 5-Mar-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Submission of Stage Payment Statement -11 for main works as per Schedule -H Y

NHAI/11011/15/RITES/2019/PIU/BLS/180
Reimbursement of Tax Liability incurred due to implementation of GST Act As Per Circular 3.3.15
2055 RITES-NHAI RITES-BSRP-OD-NHAI-2019-199 6-Mar-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Y LT/BSRP/OUT/17-18/907
IPC-10
LT/BSRP/OUT/17-18/956
RITES/BSRP/OD/NHAI/2018/20
2056 RITES-NHAI RITES-BSRP-OD-NHAI-2019-204 23-Mar-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Design & Drawings Construction of 2 Nos of Underpasses at Tangabilla Chhak for Crossing the NH Y
LT/BSRP/OUT/18-19/944
UM-06/2019-03/CM
RW/NH-12027/7/2019/ORS/ZONE-II
2057 RITES-NHAI RITES-BSRP-OD-NHAI-2019-203 23-Mar-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Release of Bank Guarantee 3rd installment Y NHAI-Odisha/VIP/2018/131419
NHAI/13011/7/RO/OD/605/2019
NHAI/13011/5/Grievance/2019/PIU/BLS/340
VIP Reference Received from Shri Naveen Patanik Hon'ble Chif minister of odisha improvement
2058 RITES-NHAI RITES-BSRP-OD-NHAI-2019-207 27-Mar-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Miscellaneous Y LT/BSRP/OUT/18-19/904
new Proposal fo NH in mayurbhanj

2059 RITES-NHAI RITES-BSRP-OD-NHAI-2019-212 2-Apr-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Miscellaneous Confirmation on withdrawal of Roadside draain from 285+190 to km 286+310 on both Sides Y LT/BSRP/OUT/18-19/909

2060 RITES-NHAI RITES-BSRP-OD-NHAI-2019-214 2-Apr-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Submission Approval of Tree felling Estimate for Jharkhand Section Y

2094 L&T LT/BSRP/OUT/18-19/934 15-Mar-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
LT/BSRP/OUT/18-19/554
LT/BSRP/OUT/18-19/322
2106 L&T 19-Mar-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Additional Culverts to be Constructed which are not LIsted in Schedule-B Contract Agreement
LT/BSRP/OUT/18-19/310
LT/BSRP/OUT/18-19/946 RITES/BSRP/OD//NHAI/2018/63
Borrow
2137 Crusher Tahasildar-1974 12-Jun-18 Tahasildar,Bangriposi M/s.L&T Ltd, Bangriposi Area/Mining Deposition of Royalty and other Govt.dues for mundabani stone Quarry -II for the year 2018-19 Y
Approval
2138 FOREST OFDC 208 1-Dec-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees felling and removed of maked trees
Forest range officer,Bangriposi The Divisional Forest Felling of trees existing within the right way of way (ROW) in non forest land of NH-6 of baripada
2139 FOREST OFDC 245 20-Mar-18 Trees
range Officer,Baripada Division Forest Division portion and disposal of Forest materials reg.

Sri Nabin Chandra


Forest range officer,Rairangpur Naik,Asst.Conservator of Authorization for converted Timber,Firewood etc.obtained from enumerated trees of NH-6
2140 FOREST OFDC 510 17-Feb-18 Trees
range Forests (Enf.),Rairangpur Manada (1st phase) Range portion
Division

Sri Nabin Chandra


Forest range officer,Rairangpur Naik,Asst.Conservator of Authorization for converted Timber,Firewood etc.obtained from enumerated trees of NH-6
2141 FOREST OFDC 513 17-Feb-18 Trees
range Forests (Enf.),Rairangpur Manada (5th phase) Bisoi Range portion
Division

Sri Nabin Chandra


Forest range officer,Rairangpur Naik,Asst.Conservator of Authorization for converted Timber,Firewood etc.obtained from enumerated trees of NH-6
2142 FOREST OFDC 731 7-Mar-18 Trees
range Forests (Enf.),Rairangpur Manada (7th phase) Bisoi Range portion
Division

Sri Nabin Chandra


Forest range officer,Rairangpur Naik,Asst.Conservator of Authorization for converted Timber,Firewood etc.obtained from enumerated trees of NH-6
2143 FOREST OFDC 734 7-Mar-18 Trees
range Forests (Enf.),Rairangpur Manada (8th phase) Bisoi Range portion
Division

Sri Nabin Chandra


Forest range officer,Rairangpur Naik,Asst.Conservator of Authorization for converted Timber,Firewood etc.obtained from enumerated trees of NH-6
2144 FOREST OFDC 1252 6-Apr-18 Trees
range Forests (Enf.),Rairangpur Manada (9th phase) Bisoi Range portion
Division
Authorization for passing of converted timber ,firewood and poles to be obtained from
Forest range officer,Rairangpur The Range officer ,Bangriposi
2145 FOREST OFDC 3871 8-May-18 range forest range Trees enumerated trees along the ROW (Right of way) of NH-6OF Bangriposi forest range portion and
issues of T.T.Permit for passed materials.
Authorization for passing of converted timber ,firewood and poles to be obtained from
Forest range officer,Rairangpur The Range officer ,Bangriposi
2146 FOREST OFDC 4307 31-May-18 range forest range Trees enumerated trees along the ROW (Right of way) of NH-6OF Bangriposi forest range portion and
issues of T.T.Permit for passed materials.
2147 FOREST OFDC 4958 30-Nov-17 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees Field Inspection of Divisional Manager ,Baripada Division ,OFDC Ltd Baripada
Submission of Monthly progress report on felling and removal of marked trees along NH-06 from
2148 FOREST OFDC 4983 30-Nov-17 Divisional manager,Baripada DGM (Tech),PDNHAI,Balasore Trees
Baharagora-Singara Section

2149 FOREST OFDC 5024 4-Dec-17 Divisional manager,Baripada DGM (Tech),PDNHAI,Balasore Trees Field Inspection of Divisional Manager ,Baripada Division ,OFDC Ltd Baripada

2150 FOREST OFDC 5052 4-Dec-17 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees Disposal of felled trees in Bisoi at the OFDC Dept at Baripada
Sri Dilip kumar behera DY.ranger I/C Dudhiani Range is hereby authorized to issue T.T Prermit
2151 FOREST OFDC 130 25-May-18 Divisional manager,Baripada M/s.L&T Ltd, Bangriposi Trees
for transportation of passed material
Authorization for passing of converted timber ,firewood and poles to be obtained from
Forest range officer,Gurguria
2152 FOREST OFDC 52 2-Mar-19 Divisional manager,Baripada range Trees enumerated trees along the ROW (Right of way) of NH-6OF Gurguria forest range portion and
issues of T.T.Permit for passed materials.
RITES/BSRP/QC/OD/LT/2018/196
2153 RITES-QC RITES-BSRP-QC-OD-LT-2019-233 10-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approval of Tech FAB (INDIA) industries ltd GEO-Composite material
LT/BSRP/OUT/18-19/852
Test report-016-4201-88061
2154 RITES-QC RITES-BSRP-QC-OD-LT-2019-234 10-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Test report for polished Stone value for Coarse Aggregate
Test report-016-4201-88062
2155 RITES-QC RITES-BSRP-QC-OD-LT-2019-235 10-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of mix Design of DBM grade-1 Approvals LT/BSRP/OUT/19-20/006
2156 RITES-QC RITES-BSRP-QC-OD-LT-2019-236 10-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of mix Design of DBM grade-II Approvals LT/BSRP/OUT/19-20/008
2157 RITES-QC RITES-BSRP-QC-OD-LT-2019-237 11-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Test Result of RE fill Materials LT/BSRP/OUT/19-20/005
LT/BSRP/OUT/18-19/882
LT/BSRP/OUT/18-19/883
LT/BSRP/OUT/18-19/884
LT/BSRP/OUT/18-19/923
LT/BSRP/OUT/18-19/952
2158 RITES-QC RITES-BSRP-QC-OD-LT-2019-238 12-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Confirmatory SBC Report at RE Wall Locations
LT/BSRP/OUT/18-19/970
RITES/BSRP/QC/OD/LT/2018/201
RITES/BSRP/QC/OD/LT/2018/212
RITES/BSRP/QC/OD/LT/2018/224
RITES/BSRP/QC/OD/LT/2018/231
2159 RITES-QC RITES-BSRP-QC-OD-LT-2019-239 15-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test of Construction Materials LT/BSRP/OUT/19-20/13
2160 RITES-QC RITES-BSRP-QC-OD-LT-2019-240 16-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test of Construction Materials LT/BSRP/OUT/19-20/25
2161 RITES-QC RITES-BSRP-QC-OD-LT-2019-241 16-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent laboratory test of Geo-composide material LT/BSRP/OUT/19-20/14
2162 RITES-QC RITES-BSRP-QC-OD-LT-2019-242 16-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Grout mix for prestressed tendon Approval LT/BSRP/OUT/19-20/31
Submission of Concrete mix design with Ultratech OPC-43 G and Admixture of (Chryso siks )
2163 RITES-QC RITES-BSRP-QC-OD-LT-2019-243 20-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works LT/BSRP/OUT/19-20/35
Approvals
Submission of Concrete mix Design with Emami OPC-53G AND Admixture( Chryso And Sika)
2164 RITES-QC RITES-BSRP-QC-OD-LT-2019-244 20-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works LT/BSRP/OUT/19-20/34
Approval
Borrow
2165 RITES-QC RITES-BSRP-QC-OD-LT-2019-245 20-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area soil test Result for Construction of Subgrade Approval LT/BSRP/OUT/19-20/10
Approval
Borrow
2166 RITES-QC RITES-BSRP-QC-OD-LT-2019-246 20-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area Soil Test Result For Construction of Sub-grade Approval LT/BSRP/OUT/19-20/36
Approval
2167 RITES-QC RITES-BSRP-QC-OD-LT-2019-247 24-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of test Results of RE fill Material EMAIL
2168 RITES-QC RITES-BSRP-QC-OD-LT-2019-248 24-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Trird party test report Email
Source Approval of RCC Hume PIPe -M/S- MAA Santoshi Concrete Products Sakhipara Sambal
2169 RITES-QC RITES-BSRP-QC-OD-LT-2019-249 24-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works LT/BSRP/OUT/19-20/47
pur
LT/BSRP/OUT/19-20/37
2170 RITES-QC RITES-BSRP-QC-OD-LT-2019-250 24-Apr-19 The Team Leader, AE - RITES To Omega Consultant Quality of Works Independent Laboratory Test of Construction Materials LT/BSRP/OUT/19-20/42
LT/BSRP/OUT/19-20/48
2171 RITES-QC RITES-BSRP-QC-OD-LT-2019-251 26-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Dry Lean Cement Concrete Subbase MIX Design Approvals LT/BSRP/OUT/18-19/52
RITES/BSRP/OD/LT/2019/128
LT/BSRP/OUT/17-18/603
RITES/BSRP/OD/LT/2019/129
2172 RITES-QC RITES-BSRP-QC-OD-LT-2019-252 26-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Factory inspection of elastomeric Bearings approval
LT/BSRP/OUT/18-19/619
RITES/BSRP/OD/LT/2019/158
LT/BSRP/OUT/18-19/639
Submission of 28 days Cubes Compressive Strrength test result with Cement Ramco OPC 53
2173 RITES-QC RITES-BSRP-QC-OD-LT-2019-253 29-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works LT/BSRP/OUT/19-20/60
Grade and Chryso Admixture Approval
Submission of Concrete mix Design G-45 (PSC) with Cement Ramco OPC 53 Grade and Chryso
2174 RITES-QC RITES-BSRP-QC-OD-LT-2019-254 29-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works LT/BSRP/OUT/19-20/61
Admixture Approval
2175 RITES-QC RITES-BSRP-QC-OD-LT-2019-255 29-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test of Construction Materials test report Email
2176 RITES-QC RITES-BSRP-QC-OD-LT-2019-256 3-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test of Construction Materials test report Email
2177 RITES-QC RITES-BSRP-QC-OD-LT-2019-257 3-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test of Construction Materials test report Email
RITES/BSRP/OD/LT/2019/176
2178 RITES-QC RITES-BSRP-QC-OD-LT-2019-258 3-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test of Construction Materials test report
LT/BSRP/OUT/19-20/766
2179 RITES-QC RITES-BSRP-QC-OD-LT-2019-259 7-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Improper Gradation of GSB Mix -Test Reports
2180 RITES-QC RITES-BSRP-QC-OD-LT-2019-260 13-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approval of RCC Hume PIPe -M/S- MAA Santoshi Concrete Products Sakhipara Sambal pur RITES/BSRP/QC/OD/LT/2019/249
2181 RITES-QC RITES-BSRP-QC-OD-LT-2019-261 23-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approval of Spherical Bearing LT/BSRP/OUT/19-20/90
LT/BSRP/OUT/19-20/99
2182 RITES-QC RITES-BSRP-QC-OD-LT-2019-262 1-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submisssion of 28 day strength test results of Grout Mix for Prestressed tendon approval
RITES/BSRP/OD/LT/2019/242
2183 RITES-QC RITES-BSRP-QC-OD-LT-2019-263 1-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of different material reuired for PQC work LT/BSRP/OUT/18-19/102
2184 RITES-QC RITES-BSRP-QC-OD-LT-2019-264 1-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test results of Geo-composite material approval BTL/TR/1901943/TTG/1/2019
2185 RITES-QC RITES-BSRP-QC-OD-LT-2019-265 1-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test results of HDPE Corrugated Sheathing pipe approval
2186 RITES-QC RITES-BSRP-QC-OD-LT-2019-266 3-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of various Construction materials for PQC LT/BSRP/OUT/18-19/123
RITES/BSRP/QC/OD/LT/2018/72
2187 RITES-QC RITES-BSRP-QC-OD-LT-2019-267 4-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval processed steel slag of tata steel limited for WMM Construction
LT/BSRP/OUT/18-19/124
2188 RITES-QC RITES-BSRP-QC-OD-LT-2019-269 15-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction materials LT/BSRP/OUT/19-20/150
2189 RITES-QC RITES-BSRP-QC-OD-LT-2019-270 15-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test ofAnti Stropping Agent for Source approval LT/BSRP/OUT/19-20/159
2190 RITES-QC RITES-BSRP-QC-OD-LT-2019-271 15-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Bituminous Concrete Mix Grade-II LT/BSRP/OUT/19-20/160
2191 RITES-QC RITES-BSRP-QC-OD-LT-2019-272 15-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Filling of Core cut Holes
2192 RITES-QC RITES-BSRP-QC-OD-LT-2019-273 22-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test results Approval
2193 RITES-QC RITES-BSRP-QC-OD-LT-2019-274 22-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent laboratory Test of Construction Materials LT/BSRP/OUT/19-20/170
Borrow
LT/BSRP/OUT/19-20/169
2194 RITES-QC RITES-BSRP-QC-OD-LT-2019-275 26-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area Soil test results
Approval LT/BSRP/OUT/19-20/164
Submission of Concrete mix Design of M50 G with Ramco OPC 53 G & Chryso Admixture ( with
2195 RITES-QC RITES-BSRP-QC-OD-LT-2019-276 26-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works
silica fume ) Approval LT/BSRP/OUT/19-20/177
2196 RITES-QC RITES-BSRP-QC-OD-LT-2019-277 27-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Bituminos Concrete (BC) Design Mix G-2 test report approval
LT/BSRP/OUT/19-20/181
2197 RITES-QC RITES-BSRP-QC-OD-LT-2019-278 29-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction materials
LT/BSRP/OUT/19-20/182
2198 RITES-QC RITES-BSRP-QC-OD-LT-2019-279 5-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Profile Corrective Course with GSB And WMM material
2199 RITES-QC RITES-BSRP-QC-OD-LT-2019-280 8-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent laboratory test of OPC Cement LT/BSRP/OUT/19-20/203
2200 RITES-QC RITES-BSRP-QC-OD-LT-2019-281 8-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Bituminous Concrete Mix Grade-II LT/BSRP/OUT/19-20/203
NHAI-13011-29-Road safty-2019-PIU-BLS-267
2201 RITES-OD RITES-BSRP-OD-L&T-2019-482 1-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submission of Compliance for Safety issues
RITES-BSRP-OD-LT-2019-467
Reimbuesement orf tex liability incurred due to implementation of GST Act towards Works
2202 RITES-OD RITES-BSRP-OD-L&T-2019-483 2-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims LT/BSRP/OUT/18-19/915
Executed work executed for felling of trees in odhisa Section
2203 RITES-OD RITES-BSRP-OD-L&T-2019-484 8-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Submission of required Document for SPS 12 for the Month of march 2019 LT/BSRP/OUT/19-20/02
2204 RITES-OD RITES-BSRP-OD-L&T-2019-485 11-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Requirement of Additional Right of way at major Bridge Approach LT/BSRP/OUT/19-20/011
Notification of hume pipe Culvert within Row on NH-220 Adjacent to VUP 285+706 which is not
2205 RITES-OD RITES-BSRP-OD-L&T-2019-486 12-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
part Scope of the project LT/BSRP/OUT/18-19/973
LT/BSRP/OUT/18-19/959
LT/BSRP/OUT/18-19/976
2206 RITES-OD RITES-BSRP-OD-L&T-2019-487 13-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Plan and Profile and Detailed Cross Section RITES/BSRP/OD/LT/2018/463
RITES/BSRP/OD/LT/2018/465
RITES/BSRP/OD/LT/2018/479
2207 RITES-OD RITES-BSRP-OD-L&T-2019-488 16-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Utilities Slow progresssm of utility Shifting RITES/BSRP/OD/LT/2018/460
2208 RITES-OD RITES-BSRP-OD-L&T-2019-489 16-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Elastomeric Bearing Drawing for MJB And MNB Bridges LT/BSRP/OUT/19-20/23

2209 RITES-OD RITES-BSRP-OD-L&T-2019-490 16-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Confirmatory Geotechnical investigation report for MJB LT/BSRP/OUT/19-20/32

2210 RITES-OD RITES-BSRP-OD-L&T-2019-491 23-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings submission of Soil Slab Design and drawing of MJB 303+032 and 287+950 for approval

2211 RITES-QC RITES-BSRP-QC-OD-LT-2019-482 24-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works submission of test Result of RE fill Materials
LT/BSRP/OUT/1-20/055
LT/BSRP/OUT/1-20/045
Submission of Design And Drawing of All the Structural Component of Whole Bridge and RITES/BSRP/OD/LT/2019/471
2212 RITES-OD RITES-BSRP-OD-L&T-2019-492 24-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
Conducting initial Load test LT/BSRP/OUT/18-19/932
LT/BSRP/OUT/18-19/936
LT/BSRP/OUT/18-19/940
RITES/BSRP/OD/LT/2019/469
2213 RITES-OD RITES-BSRP-OD-L&T-2019-493 26-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Construction of Earthen Shoulder
RITES/BSRP/OD/LT/2019/471
LT/BSRP/OUT/1-20/12
2214 RITES-OD RITES-BSRP-OD-L&T-2019-494 27-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of typical major junction Destails approval RITES/BSRP/OD/LT/2019/480
LT/BSRP/OUT/18-19/862
RITES/BSRP/OD/LT/2019/128
LT/BSRP/OUT/17-18/603
RITES/BSRP/OD/LT/2019/129
LT/BSRP/OUT/18-19/619
2215 RITES-OD RITES-BSRP-OD-L&T-2019-495 27-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous safety measures at site
RITES/BSRP/OD/LT/2019/149
LT/BSRP/OUT/18-19/639
RITES/BSRP/OD/LT/2019/158
LT/BSRP/OUT/18-19/741
2216 RITES-OD RITES-BSRP-OD-L&T-2019-496 29-Apr-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality Submission of Quantity of bitumen cement And Steel LT/BSRP/OUT/19-20/58
RITES/BSRP/OD/LT/2019/463
2217 RITES-OD RITES-BSRP-OD-L&T-2019-497 3-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Regarding Guideline for discouraging Change of Scope COS Reduction in Scope
RITES/BSRP/OD/LT/2019/460
2218 RITES-OD RITES-BSRP-OD-L&T-2019-498 6-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Utilities SLOW Progress of utility Shifting
RITES/BSRP/OD/LT/2019/488
RITES/BSRP/OD/LT/2018/411
2219 RITES-OD RITES-BSRP-OD-L&T-2019-499 6-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments MAINTENANCE OF EXISING ROAD RITES/BSRP/OD/LT/2018/420
RITES/BSRP/OD/LT/2019/478
RITES/BSRP/OD/LT/2019/480
RITES/BSRP/OD/LT/2019/494
2220 RITES-OD RITES-BSRP-OD-L&T-2019-500 7-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Typical Major Junction Details Approval LT/BSRP/OUT/18-19/862
LT/BSRP/OUT/19-20/12
LT/BSRP/OUT/19-20/69
2221 RITES-OD RITES-BSRP-OD-L&T-2019-501 7-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submisssion of revised Design and Drawing for PSC-I Girder of MNB 266+753 LT/BSRP/OUT/19-20/49

2222 RITES-OD RITES-BSRP-OD-L&T-2019-502 7-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Test pile Design And Drawing of Pier P1 of MJB 205+710 LT/BSRP/OUT/19-20/063

LT/BSRP/OUT/19-20/70
LT/BSRP/OUT/19-20/940
LT/BSRP/OUT/19-20/029
LT/BSRP/OUT/19-20/45
Submission of Design And Drawing of All the Structural Component of Whole Bridge and LT/BSRP/OUT/19-20/55
2223 RITES-OD RITES-BSRP-OD-L&T-2019-503 7-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Conducting LT/BSRP/OUT/19-20/62
initial pile Load Test LT/BSRP/OUT/18-19/936
LT/BSRP/OUT/18-19/932
RITES/BSRP/OD/LT/2019/471
RITES/BSRP/OD/LT/2019/492

RITES/BSRP/OD/LT/2019/469
2224 RITES-OD RITES-BSRP-OD-L&T-2019-504 10-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Construction of Earthen Shoulder
RITES/BSRP/OD/LT/2019/493
2225 RITES-OD RITES-BSRP-OD-L&T-2019-505 10-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Non Submission of required Document for SPS-13-for Month of April 2019 LT/BSRP/OUT/19-20/77
2226 RITES-OD RITES-BSRP-OD-L&T-2019-506 14-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Highways Miscellaneous Drawing for Approval LT/BSRP/OUT/19-20/38
2227 RITES-OD RITES-BSRP-OD-L&T-2019-507 15-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of Ra Bill-04 for MAintenance of Existing Road LT/BSRP/OUT/19-20/82
LT/BSRP/OUT/19-20/63
2228 RITES-OD RITES-BSRP-OD-L&T-2019-508 16-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Test pile Design And Drawing of Pier P1 of MJB 205+710 LT/BSRP/OUT/19-20/92
RITES/BSRP/OD/LT/2018/502
RITES/BSRP/OD/LT/2019/480
RITES/BSRP/OD/LT/2019/494
RITES/BSRP/OD/LT/2019/500
RITES/BSRP/OD/NHAI/2019/235
2229 RITES-OD RITES-BSRP-OD-L&T-2019-509 17-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submisssion of typical major junction Detaills-Approval
LT/BSRP/OUT/19-20/862
LT/BSRP/OUT/19-20/012
LT/BSRP/OUT/18-19/69
LT/BSRP/OUT/19-20/98
LT/BSRP/OUT/18-19/932
LT/BSRP/OUT/18-19/936
LT/BSRP/OUT/18-19/940
LT/BSRP/OUT/19-20/29
LT/BSRP/OUT/19-20/45
LT/BSRP/OUT/19-20/55
2230 RITES-OD RITES-BSRP-OD-L&T-2019-510 20-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing of all The Structural Component of whole Bridge LT/BSRP/OUT/19-20/62
LT/BSRP/OUT/19-20/70
LT/BSRP/OUT/19-20/81
LT/BSRP/OUT/19-20/91
RITES/BSRP/OD/LT/2019/471
RITES/BSRP/OD/LT/2019/492
RITES/BSRP/OD/LT/2019/503

2231 RITES-OD RITES-BSRP-OD-L&T-2019-511 20-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request to retain the existing bus stop and Construction of rest Shed at 220+400 LT/BSRP/OUT/19-20/97

2232 RITES-OD RITES-BSRP-OD-L&T-2019-512 22-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Supreme Court Committee on Road Safety-inmplementation of the Supreme Court Committee's NHAI-13011/5/Safety/RO-OD/1058/2019
2233 RITES-OD RITES-BSRP-OD-L&T-2019-513 22-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submission of Monthly Progress Report for the month of April 2019 LT/BSRP/OUT/19-20/86
NHAI/11011/5/Forest/2019/PIU/BLS/127
Status of working on Forest land of the road projects after expiry of one year working
2234 RITES-OD RITES-BSRP-OD-L&T-2019-514 24-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees NHAI/11011/5/RITES/2019/PIU/BLS/614
permission
RITES/BSRP/OD/LT/2019/444
LT/BSRP/OUT/18-19/932
LT/BSRP/OUT/18-19/936
LT/BSRP/OUT/18-19/940
LT/BSRP/OUT/19-20/29
LT/BSRP/OUT/19-20/45
LT/BSRP/OUT/19-20/55
LT/BSRP/OUT/19-20/62
2235 RITES-OD RITES-BSRP-OD-L&T-2019-515 25-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Calculation for revised Socker length of piles for P2 and P3 of MJB 205+710
LT/BSRP/OUT/19-20/70
LT/BSRP/OUT/19-20/81
LT/BSRP/OUT/19-20/91
RITES/BSRP/OD/LT/2019/471
RITES/BSRP/OD/LT/2019/492
RITES/BSRP/OD/LT/2019/503
RITES/BSRP/OD/LT/2019/510
RITES/BSRP/OD/LT/2018/339
RITES/BSRP/OD/LT/2018/325
RITES/BSRP/OD/LT/2018/269
Inadequate production of various Construction materials at Crusher plant ( Slow progress of work RITES/BSRP/OD/LT/2018/245
2236 RITES-OD RITES-BSRP-OD-L&T-2019-516 27-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress
) RITES/BSRP/OD/LT/2018/195
RITES/BSRP/OD/LT/2018/150
RITES/BSRP/OD/LT/2018/145
RITES/BSRP/OD/LT/2018/124
LT/BSRP/OUT/19-20/463
LT/BSRP/OUT/19-20/465
2237 RITES-OD RITES-BSRP-OD-L&T-2019-517 28-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Change of Scope notice excluding proposed locations of EUP between LT/BSRP/OUT/19-20/479
LT/BSRP/OUT/19-20/487
LT/BSRP/OUT/19-20/497
LT/BSRP/OUT/19-20/469
2238 RITES-OD RITES-BSRP-OD-L&T-2019-518 29-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Construction of Earthen Shoulder LT/BSRP/OUT/19-20/493
LT/BSRP/OUT/19-20/504
LT/BSRP/OUT/18-19/932
LT/BSRP/OUT/18-19/936
LT/BSRP/OUT/18-19/940
LT/BSRP/OUT/19-20/29
LT/BSRP/OUT/19-20/45
LT/BSRP/OUT/19-20/55
LT/BSRP/OUT/19-20/62
Request for Confirmation of Calculation of PPR as Per Boring Details not Matching with Design
2239 RITES-OD RITES-BSRP-OD-L&T-2019-519 29-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings LT/BSRP/OUT/19-20/70
requirement
LT/BSRP/OUT/19-20/81
LT/BSRP/OUT/19-20/91
RITES/BSRP/OD/LT/2019/471
RITES/BSRP/OD/LT/2019/492
RITES/BSRP/OD/LT/2019/503
RITES/BSRP/OD/LT/2019/510
RITES/BSRP/OD/LT/2019/515
RITES/BSRP/OD/LT/2019/460
2240 RITES-OD RITES-BSRP-OD-L&T-2019-520 30-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Utilities Slow progress of utility Shifting RITES/BSRP/OD/LT/2019/488
RITES/BSRP/OD/LT/2019/498
Supreme Court Committee on Road safety- implementation of the Supreme Court Committee's NHAI-13011/5/Safety/RO-OD/1058/2019
2241 RITES-OD RITES-BSRP-OD-L&T-2019-521 31-May-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous
Additional Direction RITES/BSRP/OD/LT/2019/512
LT/BSRP/OUT/18-19/053
LT/BSRP/OUT/18-19/44
2242 RITES-OD RITES-BSRP-OD-L&T-2019-522 3-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submission of Revised Safety Certificate of Revision-C LT/BSRP/OUT/19-20/117
RITES/BSRP/OD/LT/2019/174
RITES/BSRP/OD/LT/2019/298
Deposit of amont towards salvage value of old dismantled ,material resulted due to Shifting of
2243 RITES-OD RITES-BSRP-OD-L&T-2019-523 3-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Program NHAI/11011/2/Elect/2019/PIU/BLS/613
lines and Substations
RITES/BSRP/OD/LT/2018/317
RITES/BSRP/OD/LT/2018/167
LT/BSRP/OUT/18-19/114
2244 RITES-OD RITES-BSRP-OD-L&T-2019-524 3-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submission of revised safety certificate of Revision-D for approval
LT/BSRP/OUT/18-19/459
LT/BSRP/OUT/18-19/525
LT/BSRP/OUT/18-19/317
RITES/BSRP/OD/LT/2018/79
RITES/BSRP/OD/LT/2018/141
RITES/BSRP/OD/LT/2018/161
RITES/BSRP/OD/LT/2018/302
2245 RITES-OD RITES-BSRP-OD-L&T-2019-525 3-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submission of revised safety certificate of Revision-D for approval LT/BSRP/OUT/18-19/41
LT/BSRP/OUT/18-19/114
LT/BSRP/OUT/18-19/209
LT/BSRP/OUT/18-19/458
LT/BSRP/OUT/18-19/119
RITES/BSRP/OD/LT/2018/154
RITES/BSRP/OD/LT/2018/297
RITES/BSRP/OD/LT/2019/447
2246 RITES-OD RITES-BSRP-OD-L&T-2019-526 3-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submission of Revised Safety Certificate Revision-D For Approval
LT/BSRP/OUT/18-19/23
LT/BSRP/OUT/18-19/447
LT/BSRP/OUT/19-20/121
RITES/BSRP/OD/LT/2018/164
RITES/BSRP/OD/LT/2018/296
2247 RITES-OD RITES-BSRP-OD-L&T-2019-527 4-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Submission of Revised Safety Certificate of Revision-C LT/BSRP/OUT/18-19/92
LT/BSRP/OUT/18-19/446
LT/BSRP/OUT/19-20/120
RITES/BSRP/OD/NHAI/2019/212
2248 RITES-OD RITES-BSRP-OD-L&T-2019-528 6-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Construction of Roadside Drain
LT/BSRP/OUT/18-19/904
LT/BSRP/OUT/18-19/932
LT/BSRP/OUT/18-19/936
LT/BSRP/OUT/18-19/940
LT/BSRP/OUT/19-20/029
LT/BSRP/OUT/19-20/45
LT/BSRP/OUT/19-20/55
LT/BSRP/OUT/19-20/62
LT/BSRP/OUT/19-20/70
LT/BSRP/OUT/19-20/81
LT/BSRP/OUT/19-20/91
2249 RITES-OD RITES-BSRP-OD-L&T-2019-529 10-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Drawing of MJB at Ch.205+711 reg.
LT/BSRP/OUT/19-20/115
LT/BSRP/OUT/19-20/128
LT/BSRP/OUT/19-20/136
LT/BSRP/OUT/19-20/149
RITES/BSRP/OD/LT/2019/471
RITES/BSRP/OD/LT/2019/492
RITES/BSRP/OD/LT/2019/503
RITES/BSRP/OD/LT/2019/510
RITES/BSRP/OD/LT/2019/515
RITES/BSRP/OD/LT/2019/519
RITES/BSRP/OD/LT/2019/523
Deposit of amount towareds salvage value of old dismantled material resulted due to Shifting of
2250 RITES-OD RITES-BSRP-OD-L&T-2019-530 12-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Program NESCO UTILITY-7049
lines and Substations
NHAI-613
LT/BSRP/OUT/18-19/960
LT/BSRP/OUT/18-19/942
LT/BSRP/OUT/18-19/700
2251 RITES-OD RITES-BSRP-OD-L&T-2019-531 12-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Repair and rehabilitation of existing MNB and MJB LT/BSRP/OUT/18-19/699
RITES/BSRP/OD/LT/2019/476
RITES/BSRP/OD/LT/2019/468
RITES/BSRP/OD/LT/2018/399
Resistance from local populance fromkm 212+000 to 212+250 RHS and demanding to Construct
2252 RITES-OD RITES-BSRP-OD-L&T-2019-532 12-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings LT/BSRP/OUT/19-20/127
road Side Drain
2253 RITES-OD RITES-BSRP-OD-L&T-2019-533 13-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Submission of Tree Felling RA Bill LT/BSRP/OUT/19-20/144
LT/BSRP/OUT/18-19/459
LT/BSRP/OUT/18-19/525
LT/BSRP/OUT/19-20/188
LT/BSRP/OUT/19-20/155
2254 RITES-OD RITES-BSRP-OD-L&T-2019-534 17-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of revised Plan & Profile from 255+000 to 257+000 for Approval
RITES/BSRP/OD/LT/2018/167
RITES/BSRP/OD/LT/2018/317
RITES/BSRP/OD/LT/2018/337-A
RITES/BSRP/OD/LT/2019/524
2255 RITES-OD RITES-BSRP-OD-L&T-2019-535 18-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Tranplantation of Trees and Compensatory afforestation in jharkhand section
LT/BSRP/OUT/19-20/43
CIL, GST Reimbursement of tax liability incurred due to im plementation of GST act. Towards work LT/BSRP/OUT/19-20/59
2256 RITES-OD RITES-BSRP-OD-L&T-2019-536 18-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi
Payments executed for tree felling of GST LT/BSRP/OUT/19-20/141
LT/BSRP/OUT/19-20/161
RITES/BSRP/OD/LT/2019/512
Supreme Court Committee on Road Safety implementation of the supreme Court Commitee's
2257 RITES-OD RITES-BSRP-OD-L&T-2019-537 19-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous RITES/BSRP/OD/LT/2019/521
Additional
NHAI/13011/5/Safety/RO-OD/1058/2019
2258 RITES-OD RITES-BSRP-OD-L&T-2019-538 19-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality Linkege of VTS (Vehicle Tracking System ) Available at RO-PIU CCM at NHAI-HQ
2259 RITES-OD RITES-BSRP-OD-L&T-2019-539 19-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality Linkege of VTS (Vehicle Tracking System ) Available at RO-PIU CCM at NHAI-HQ
Inadequate Production of various Construction materials at Crusher Plant (Slow Progress of LT/BSRP/OUT/19-20/142
2260 RITES-OD RITES-BSRP-OD-L&T-2019-540 19-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress
work) RITES/BSRP/OD/LT/2019/516
RITES/BSRP/OD/LT/2019/499
2261 RITES-OD RITES-BSRP-OD-L&T-2019-541 26-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Maintenance of Existing road
NHAI/13011/5/MISC/2019/BLS/272
NESCO UTILITY-7049
NHAI/11012/2/ELECT/2019/PIU/BLS/613
Descrepancy for Electrical Utillity Shifting between Estimate Approved & Communicated by
2262 RITES-OD RITES-BSRP-OD-L&T-2019-542 29-Jun-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Utilities LT/BSRP/OUT/19-20/183
owning entity and Approval & Communicated by Authority Arbitrarily for the Executed works
RITES/BSRP/OD/LT/2019/523
RITES/BSRP/OD/LT/2019/530
RITES/BSRP/OD/LT/2019/536
LT/BSRP/OUT/19-20/43
CIL, GST
2263 RITES-OD RITES-BSRP-OD-L&T-2019-543 2-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Reimbursement of tax liability incurred due to implementation of GST IPC-14 LT/BSRP/OUT/19-20/59
Payments
LT/BSRP/OUT/19-20/141
LT/BSRP/OUT/19-20/161
RITES/BSRP/OD/LT/2019/532
Resistance from local populance fromkm 212+000 to 212+250 RHS and demanding to Construct
2264 RITES-OD RITES-BSRP-OD-L&T-2019-544 2-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings LT/BSRP/OUT/19-20/127
road Side Drain
LT/BSRP/OUT/19-20/175
2265 RITES-OD RITES-BSRP-OD-L&T-2019-545 2-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of list retaning walls LT/BSRP/OUT/19-20/154

2266 RITES-OD RITES-BSRP-OD-L&T-2019-546 3-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Details of RCC Railings for Bridges with footpath LT/BSRP/OUT/19-20/198
Request to Continue with the Suggested investingation for repair'rehabilitation ,strengthening of
2267 RITES-OD RITES-BSRP-OD-L&T-2019-547 3-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings LT/BSRP/OUT/19-20/173
all the existing bridges reg
2268 RITES-OD RITES-BSRP-OD-L&T-2019-548 3-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Design and Drawing of Spherical bearing of MJB 287+951 LT/BSRP/OUT/19-20/157

2269 RITES-OD RITES-BSRP-OD-L&T-2019-549 3-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of design and Drawing of POT/PTFE bearing ,205+711 for Approval LT/BSRP/OUT/19-20/139
2270 RITES-OD RITES-BSRP-OD-L&T-2019-550 3-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Tranplantation of Trees by Means of Machine Email, RITES/BSRP/OD/LT/2019/535
2271 RITES-OD RITES-BSRP-OD-L&T-2019-551 5-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Pavement Design Report for BUS Bays LT/BSRP/OUT/19-20/187
RITES/BSRP/OD/LT/2018/405
2272 RITES-NHAI RITES-BSRP-OD-NHAI-2019-216 4-Apr-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Design & Drawings Submission of revised Layout of toll Plaza, Administrative bulilding and other amenities for Y
LT/BSRP/OUT/18-19/740
Approval LT/BSRP/OUT/18-19/891
LT/BSRP/OUT/18-19/948

2273 RITES-NHAI RITES-BSRP-OD-NHAI-2019-223 23-Apr-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims IPC-12 Y

LT/BSRP/OUT/19-20/040
Submission of Bank Guarantee Against the Refund of Retention Money upto SPS-12 upto
2274 RITES-NHAI RITES-BSRP-OD-NHAI-2019-225 2-May-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Y NHAI/12011/6/0BG/2019/PIUBLS/503
March 2019
NHAI/12011/6/0BG/2019/PIUBLS/491
LT/BSRP/OUT/18-19/455
LT/BSRP/OUT/18-19/535
2275 RITES-NHAI RITES-BSRP-OD-NHAI-2019-233 2-May-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Trees Difference in girth of tree under Bisoi manda and Gurguria forest Range Y
LT/BSRP/OUT/19-20/056
RITES/BSRP/OD/LT/2018/327

2276 RITES-NHAI RITES-BSRP-OD-NHAI-2019-235 17-May-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Design & Drawings Providing details for Major Junction Y LT/BSRP/OUT/19-20/98

LT/BSRP/OUT/19-20/040
LT/BSRP/OUT/19-20/105
2277 RITES-NHAI RITES-BSRP-OD-NHAI-2019-238 21-May-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Submission of Bank Guarantee Against the Refund of Retention Money upto SPS-12 RITES-BSRP-OD-NHAI-2019-225
NHAI-11011/6/BG/2019/PIU/BLS/503
NHAI-12011/6/BG/2019/PIU/BLS/491
LT/BSRP/OUT/19-20/148
LT/BSRP/OUT/19-20/116
LT/BSRP/OUT/19-20/77
2278 RITES-NHAI RITES-BSRP-OD-NHAI-2019-247 4-Apr-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Interim Payment Certificate -13 Y
RITES/BSRP/OD/LT/2019/505
RITES/BSRP/OD/NHAI/2019/242

2279 RITES-NHAI RITES-BSRP-OD-NHAI-2019-248 12-Jun-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Submission of stage Payment Statement-14 for Main works as per Schedule-H Y LT/BSRP/OUT/19-20/140

Executive Engineer,RWS &S Resubmission of estimate for affected PWS Schemes and Spot sources of different blocks under
2280 RWSR OOTEERWS&SDR/3331 22-Jul-16 Division,Rairangpur Project Director,NHAI,Balasore
RWS &S Division,Rairangpur due to widening of NH-6
2281 OLAO&CA OLAO&CA-78 OLAO&CA M/s.L&T Ltd, Bangriposi Rwgarding Construction work over and Above the Acquisition area

Regional officer,NHAI,Regional
2282 RADHEE RDEF-GHMP-2019-/20-017 1-May-19 Radhee disaster foundation
office,Bhubaneswar Ambulances Provided by NHAI to Odisha state

2283 L&T LT/BSRP/OUT/19-20/01 2-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Port out of Corporate Mobile Number
2284 L&T LT/BSRP/OUT/19-20/02 2-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of SPS-12 for Main Works as Per Schedule-H of Agreement
2285 L&T LT/BSRP/OUT/19-20/03 2-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Grout MIX For Prestressed temdon
2286 L&T LT/BSRP/OUT/19-20/04 3-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Acknowledgement of receipt of Payment for the period 1.3.19-31-3-19
2287 L&T LT/BSRP/OUT/19-20/05 3-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Test Result of RE Fill materials
2288 L&T LT/BSRP/OUT/19-20/06 3-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of DBM Design Mix G-1 Test Report
2289 L&T LT/BSRP/OUT/19-20/07 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2290 L&T LT/BSRP/OUT/19-20/08 3-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of DBM Design Mix G-2 test report
2291 L&T LT/BSRP/OUT/19-20/09 3-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Compliance of Road Safety issues RITES/BSRP/OD/LT/2019/489
2292 L&T LT/BSRP/OUT/19-20/10 4-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Cut Soil test result
LT/BSRP/OUT/18-19/616
2293 L&T 5-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Requirement of Additional Right of way at major Bridge LT/BSRP/OUT/18-19/702
LT/BSRP/OUT/19-20/11 LT/BSRP/OUT/18-19/778
2294 L&T LT/BSRP/OUT/19-20/12 5-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submisssion of Typical major junction Details Approval RITES/BSRP/OD/LT/2019/480
2295 L&T LT/BSRP/OUT/19-20/13 6-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory test of Construction Materials
RITES/BSRP/QC/OD/LT/2018/196
2296 L&T 6-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory test of Construction Materials
LT/BSRP/OUT/19-20/14 LT/BSRP/OUT/18-19/852
2297 L&T LT/BSRP/OUT/19-20/15 6-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission Third Party test Report RITES/BSRP/QC/OD/LT/2018/165
2298 L&T LT/BSRP/OUT/19-20/16 8-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request to Issue an Approval for lifting of Sand Qyarry At Sivaligothani Village
LT/BSRP/OUT/18-19/955
2299 L&T 9-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request from local populace for Construction of underpass 226+730 LT/BSRP/OUT/18-19/956
LT/BSRP/OUT/19-20/17 RITES/BSRP/OD/NHAI/2019/204
2300 L&T LT/BSRP/OUT/19-20/18 9-Apr-19 M/s. L&T Ltd, Bangriposi DC Labour Commissioner Complince of Inspection Report LN-42(2)/2019-BBL
2301 L&T LT/BSRP/OUT/19-20/19 9-Apr-19 M/s. L&T Ltd, Bangriposi DC Labour Commissioner Complince of Inspection Report LN-34(7)/2019-BBL
2302 L&T LT/BSRP/OUT/19-20/20 9-Apr-19 M/s. L&T Ltd, Bangriposi DC Labour Commissioner Complince of Inspection Report LN-26(10)/2019-BBL
LT/BSRP/OUT/18-19/903
LT/BSRP/OUT/18-19/660
LT/BSRP/OUT/18-19/659
2303 L&T 10-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Soild Slab Desing and Drawing of MJB At Ch-303+032 for Approval
RITES/BSRP/OD/L&T/2018/455
RITES/BSRP/OD/L&T/2018/424
LT/BSRP/OUT/19-20/21 RITES/BSRP/OD/L&T/2018/380
LT/BSRP/OUT/18-19/830
LT/BSRP/OUT/18-19/827
LT/BSRP/OUT/18-19/577
RITES/BSRP/OD/L&T/2019/437
2304 L&T 10-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission ofg Soild Design & Drawing of MJB 287+950
LT/BSRP/OUT/18-19/571
LT/BSRP/OUT/18-19/569
LT/BSRP/OUT/18-19/555
LT/BSRP/OUT/19-20/22 RITES/BSRP/OD/L&T/2018/346
2305 L&T LT/BSRP/OUT/19-20/23 10-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Elastomeric Drawing for MJB & MNB
2306 L&T LT/BSRP/OUT/19-20/24 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2307 L&T LT/BSRP/OUT/19-20/25 10-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory test of Construction Materials RITES/BSRP/QC/OD/LT/2018/227
2308 L&T LT/BSRP/OUT/19-20/26 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2309 L&T LT/BSRP/OUT/19-20/27 10-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Proposal Regarding Detention Change of Bitumen Transportation
2310 L&T LT/BSRP/OUT/19-20/28 10-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Monthly Progress Report For the Month of March
2311 L&T LT/BSRP/OUT/19-20/29 11-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Revised GAD with pier (P1) Design & Drawing of MJB At Ch 205+710
LT/BSRP/OUT/18-19/616
Workable Stretch /Unencumbered length Available As on 31.3.19 to Carry out Construction
2312 L&T 11-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list LT/BSRP/OUT/18-19/702
Activities on Project Highway
LT/BSRP/OUT/19-20/30 LT/BSRP/OUT/18-19/778
2313 L&T LT/BSRP/OUT/19-20/31 11-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Grout MIX For Prestressed tendon LT/BSRP/OUT/19-20/03
LT/BSRP/OUT/19-20/02
2314 L&T 11-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of required Documents for SPS-12 for the Month of March 2019
LT/BSRP/OUT/19-20/31A RITES/BSRP/OD/L&T/2019/484
LT/BSRP/OUT/19-20/29
LT/BSRP/OUT/18-19/936
2315 L&T 12-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Confirmatory Geotechnical Investigation Report For MJB
LT/BSRP/OUT/18-19/932
LT/BSRP/OUT/19-20/32 RITES/BSRP/OD/L&T/2019/471
2316 L&T LT/BSRP/OUT/19-20/33 12-Apr-19 M/s. L&T Ltd, Bangriposi Dispatch Department Regarding Authorization Letter for Collecting Material
Submission of Concrete mix Design With Emami OPC 53 Grade With Chryso & Sika Brand of
2317 L&T 12-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
LT/BSRP/OUT/19-20/34 Admixture
Submission of Concrete mix Desingn with Ultratech opc 43 Grade 43 with Chryso & sika Brand of
2318 L&T 12-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
LT/BSRP/OUT/19-20/35 Admixture
2319 L&T LT/BSRP/OUT/19-20/36 15-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Cut soil test result
2320 L&T LT/BSRP/OUT/19-20/37 16-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory test of Construction Materials
2321 L&T LT/BSRP/OUT/19-20/38 16-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Highway Miscellaneous Drawing for Approval
2322 L&T LT/BSRP/OUT/19-20/39 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2323 L&T LT/BSRP/OUT/19-20/40 16-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Bank Guarantee Against the refund of Retention money upto SPS-12
2324 L&T LT/BSRP/OUT/19-20/41 16-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Slow Progress of Electrial utility Shifting
2325 L&T LT/BSRP/OUT/19-20/42 16-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory test of Construction Materials
Reimbursement of tex liability incurred due to implementation of GST Act as per Circular 3.315
2326 L&T 17-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites RITES/BSRP/OD/NHAI/2019/218
LT/BSRP/OUT/19-20/43 date 04.10.2017 and SPS-12
2327 L&T LT/BSRP/OUT/19-20/44 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
LT/BSRP/OUT/18-19/029
2328 L&T 19-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design & Drawing of pipe( p3, p4 ,p5) of MJB LT/BSRP/OUT/18-19/936
LT/BSRP/OUT/19-20/45 LT/BSRP/OUT/18-19/932
2329 L&T LT/BSRP/OUT/19-20/46 19-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of revised design & Drawing forPSC-I gider of MNB LT/BSRP/OUT/18-19/631
2330 L&T LT/BSRP/OUT/19-20/47 20-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source approval of Rcc hume pipe -M/S Santoshi Concrete Products ,Sakhipara ,sambalpur
2331 L&T LT/BSRP/OUT/19-20/48 20-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory test of Consruction materials
LT/BSRP/OUT/18-19/031A
2332 L&T 20-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Release of 10% Balance amount for IPC-12
LT/BSRP/OUT/19-20/49 RITES/BSRP/OD/NHAI/2019/218
2333 L&T LT/BSRP/OUT/19-20/50 20-Apr-19 M/s. L&T Ltd, Bangriposi The Chief Engineer Rrgarding Correction in Allocation of Water Resource .
2334 L&T M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Original Bank Guarantee Against the refound of Retention Money upto SPS-12
LT/BSRP/OUT/19-20/51
2335 L&T LT/BSRP/OUT/19-20/52 22-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Dry lean Cement Concrete Sub Base Mix Design
2336 L&T LT/BSRP/OUT/19-20/53 23-Apr-19 M/s. L&T Ltd, Bangriposi The Despatch deparment Rrgarding Authorization letter for Collecting material
2337 L&T LT/BSRP/OUT/19-20/54 23-Apr-19 M/s. L&T Ltd, Bangriposi The Despatch deparment Rrgarding Authorization letter for Collecting material
2338 L&T LT/BSRP/OUT/19-20/55 24-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design and Drawing of pier P2 of MJB
LT/BSRP/OUT/18-19/455
2339 L&T 24-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request for recommendation of reimbursement of Amount difference in girth of tree
LT/BSRP/OUT/19-20/56 LT/BSRP/OUT/18-19/535
2340 L&T LT/BSRP/OUT/19-20/57 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2341 L&T LT/BSRP/OUT/19-20/58 25-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of CA certified revised GST CIL claim template
2342 L&T LT/BSRP/OUT/19-20/59 25-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Implementation of GST IPC -12
Submisssion of Concrete mix Design Of Grade M-45 (PSC) with Ramco OPC 53G and Chryso
2344 L&T 26-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
LT/BSRP/OUT/19-20/61 Admixture
LT/BSRP/OUT/19-20/255
LT/BSRP/OUT/19-20/045
2346 L&T 26-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Test Pile Design and Drawing of pipe( p1) of MJB LT/BSRP/OUT/19-20/029
LT/BSRP/OUT/18-19/936
LT/BSRP/OUT/19-20/63 LT/BSRP/OUT/18-19/932
2347 L&T LT/BSRP/OUT/19-20/64 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2348 L&T LT/BSRP/OUT/19-20/65 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2349 L&T LT/BSRP/OUT/19-20/66 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
Time Extension,
2350 L&T 26-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Notification for Unprecedented Rainfall under Clause 10.5.2 of the Contract Agreement
Force Majeure LT/BSRP/OUT/18-19/941
LT/BSRP/OUT/19-20/67
LT/BSRP/OUT/19-20/255
LT/BSRP/OUT/19-20/045
2353 L&T 30-Apr-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Dessign Drawing of Pier (A2) of MJB 205+710 LT/BSRP/OUT/19-20/029
LT/BSRP/OUT/18-19/936
LT/BSRP/OUT/19-20/70 LT/BSRP/OUT/18-19/932
2354 L&T LT/BSRP/OUT/19-20/71 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
RITES/BSRP/OD/L&T/2019/411
2355 L&T 2-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Maintenance of Existing Road RITES/BSRP/OD/L&T/2019/420
LT/BSRP/OUT/19-20/72 RITES/BSRP/OD/L&T/2019/478
2356 L&T LT/BSRP/OUT/19-20/73 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
Submission of RA Bill-05 for Elec. Utility Shifting Works as per Approved Estimate Under Bisoi
2357 L&T 3-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites LT/BSRP/OUT/19-20/68
LT/BSRP/OUT/19-20/74 Electrical Section
2358 L&T LT/BSRP/OUT/19-20/75 4-May-19 M/s. L&T Ltd, Bangriposi The Chief Engineer Regarding Approval of Temporary water Allocation query from Go Swift
2359 L&T LT/BSRP/OUT/19-20/76 6-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Safety Measures at Site RITES/BSRP/OD/L&T/2019/495
2360 L&T LT/BSRP/OUT/19-20/77 7-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of SPS-13 for Main works as per Schedule-H of Agreement
RITES/BSRP/OD/L&T/2019/496
2361 L&T 8-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Quantity of Bitumen , Cement and Steel
LT/BSRP/OUT/19-20/78 LT/BSRP/OUT/19-20/58
LT/BSRP/OUT/19-20/616
Workable Stretch/Unencumbered length available as on 30.04.19 carry out construction LT/BSRP/OUT/19-20/702
2362 L&T 9-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list
activities on Project Highway LT/BSRP/OUT/19-20/778
LT/BSRP/OUT/19-20/79 LT/BSRP/OUT/18-19/030
LT/BSRP/OUT/19-20/941
2363 L&T 9-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Notification for occurrence of extremely severe Cyclone FANI and its Consequences
LT/BSRP/OUT/19-20/80 LT/BSRP/OUT/19-20/067
LT/BSRP/OUT/19-20/70
LT/BSRP/OUT/19-20/55
LT/BSRP/OUT/19-20/45
2364 L&T 10-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submisssion of Design and Drawing of Pier (P6) of MJB
LT/BSRP/OUT/19-20/29
LT/BSRP/OUT/18-19/936
LT/BSRP/OUT/19-20/81 LT/BSRP/OUT/18-19/932
2365 L&T LT/BSRP/OUT/19-20/82 10-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submisssion of RA-Bill-04 for Maintenance of Existing road
2366 L&T LT/BSRP/OUT/19-20/83 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2367 L&T LT/BSRP/OUT/19-20/84 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2368 L&T LT/BSRP/OUT/19-20/85 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2369 L&T LT/BSRP/OUT/19-20/86 11-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Monthly Progress Report for the month of April 2019
LT/BSRP/OUT/18-19/890
LT/BSRP/OUT/18-19/955
LT/BSRP/OUT/18-19/907
2370 L&T 13-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Cost for Construction of Additional underpass near Km-226+840 to 296+730
LT/BSRP/OUT/18-19/956
RITES/BSRP/OD/NHAI/2019/204
LT/BSRP/OUT/19-20/87 RITES/BSRP/OD/NHAI/2019/205
LT/BSRP/OUT/18-19/072
2371 L&T 14-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Maintenance of Existing road LT/BSRP/OUT/18-19/80
LT/BSRP/OUT/19-20/88 RITES/BSRP/OD/L&T/2019/499
RITES/BSRP/OD/L&T/2019/498
2372 L&T 14-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Slow progress of utility Shifting RITES/BSRP/OD/L&T/2019/488
LT/BSRP/OUT/19-20/89 RITES/BSRP/OD/L&T/2019/460
2373 L&T LT/BSRP/OUT/19-20/90 14-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Soure Approval of Spherical Bearing LT/BSRP/OUT/18-19/827
RITES/BSRP/OD/L&T/2019/502
2375 L&T 14-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of test pile Design and Drawing of Pier of MJB 205+710
LT/BSRP/OUT/19-20/92 LT/BSRP/OUT/19-20/63
RITES/BSRP/OD/L&T/2019/458
LT/BSRP/OUT/18-19/879
2376 L&T M/s. L&T Ltd, Bangriposi The Team Leader, Rites Median Opening for project Highway
RITES/BSRP/OD/L&T/2019/446
LT/BSRP/OUT/19-20/93 LT/BSRP/OUT/18-19/819
RITES/BSRP/OD/L&T/2018/394
2378 L&T 15-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Change of Scope for Additionala 47 no of MNB
LT/BSRP/OUT/19-20/95 LT/BSRP/OUT/18-19/637
LT/BSRP/OUT/19-20/69
LT/BSRP/OUT/19-20/12
LT/BSRP/OUT/18-19/862
2381 L&T 16-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Typical Major junction details for Approval
RITES/BSRP/OD/L&T/2019/500
RITES/BSRP/OD/L&T/2019/494
LT/BSRP/OUT/19-20/98 RITES/BSRP/OD/L&T/2019/480
LT/BSRP/OUT/18-19/31
2382 L&T 18-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of 28 days Compressive Strength test result of Grout mix for preestressed tendon
LT/BSRP/OUT/19-20/99 RITES/BSRP/OD/L&T/2019/242
2383 L&T LT/BSRP/OUT/19-20/100 18-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Regarding guideline for Discouraging Change of Scope COS Reduction in Scope RIS RITES/BSRP/OD/L&T/2019/497
2384 L&T LT/BSRP/OUT/19-20/101 18-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites intimation for Delegation of Authorized Singnatory from 20th may to 22nd may 2019
2385 L&T LT/BSRP/OUT/19-20/102 18-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source Approval of Different materials required for PQC work
2386 L&T LT/BSRP/OUT/19-20/103 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2387 L&T LT/BSRP/OUT/19-20/104 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2388 L&T LT/BSRP/OUT/19-20/105 21-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Amended Bank Guarantee for withdrawal of retention Money
2389 L&T LT/BSRP/OUT/19-20/106 21-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Resubmission of SPS-13 of main works as per Schedule-H of Agreement
2390 L&T LT/BSRP/OUT/19-20/107 21-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Road furniture plane frome
2392 L&T LT/BSRP/OUT/19-20/109 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
LT/BSRP/OUT/18-19/666
LT/BSRP/OUT/18-19/622
LT/BSRP/OUT/18-19/921
LT/BSRP/OUT/18-19/590
2393 L&T 21-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Omission of Perforated pipes at RE wall location RITES/BSRP/OD/L&T/2019/383/2
RITES/BSRP/OD/L&T/2019/383/1
RITES/BSRP/OD/L&T/2019/472
RITES/BSRP/OD/L&T/2019/358/A
LT/BSRP/OUT/19-20/110
RITES/BSRP/OD/L&T/2019/479
RITES/BSRP/OD/L&T/2019/465
2394 L&T 21-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Plan and Profile from KM229+000 to km 237+000 for Approval RITES/BSRP/OD/L&T/2019/463
LT/BSRP/OUT/18-19/976
LT/BSRP/OUT/19-20/111 LT/BSRP/OUT/18-19/959.
RITES/BSRP/OD/L&T/2019/463
RITES/BSRP/OD/L&T/2019/465
LT/BSRP/OUT/19-20/111
2395 L&T 21-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Plane and Profile 4lane
LT/BSRP/OUT/18-19/976
RITES/BSRP/OD/L&T/2019/479
LT/BSRP/OUT/19-20/112 LT/BSRP/OUT/18-19/959
2396 L&T LT/BSRP/OUT/19-20/113 1
2397 L&T LT/BSRP/OUT/19-20/114 1
2398 L&T LT/BSRP/OUT/19-20/115 24-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of TCS for Bridge Deck with footpath for built up Areas
2399 L&T LT/BSRP/OUT/19-20/116 1
RITES/BSRP/OD/L&T/2019/174
RITES/BSRP/OD/L&T/2019/444
2400 L&T 25-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Sumission of Revised Safety Certificate Revision -C
LT/BSRP/OUT/18-19/298
LT/BSRP/OUT/19-20/117 LT/BSRP/OUT/18-19/53
RITES/BSRP/OD/L&T/2019/167
RITES/BSRP/OD/L&T/2019/317
2401 L&T 25-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Revised Safety Certificate Revision -D
LT/BSRP/OUT/18-19/459
LT/BSRP/OUT/19-20/118 LT/BSRP/OUT/18-19/94
RITES/BSRP/OD/L&T/2019/301
RITES/BSRP/OD/L&T/2019/161
2402 L&T 25-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Revised Safety Certificate Revision -D
LT/BSRP/OUT/18-19/458
LT/BSRP/OUT/19-20/119 LT/BSRP/OUT/18-19/41
RITES/BSRP/OD/L&T/2019/296
RITES/BSRP/OD/L&T/2019/164
2403 L&T 25-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Revised safety Certificate Revision -D
LT/BSRP/OUT/18-19/92
LT/BSRP/OUT/19-20/120 LT/BSRP/OUT/18-19/446
RITES/BSRP/OD/L&T/2019/154
RITES/BSRP/OD/L&T/2019/297
2404 L&T 25-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Sumission of Revised Safety Certificate Revision -C
LT/BSRP/OUT/18-19/23
LT/BSRP/OUT/19-20/121 LT/BSRP/OUT/18-19/297
2405 L&T LT/BSRP/OUT/19-20/122 25-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request to Renewal of Bocw licence
2406 L&T LT/BSRP/OUT/19-20/123 25-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source Approval of Construction material required for PQC work STP Limited
2407 L&T LT/BSRP/OUT/19-20/124 27-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source Approval of Processed Steel Slag of TATA Steel Limited for WMM Consrtuction
2408 L&T LT/BSRP/OUT/19-20/125 27-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Intimation for Delegation of Authorized signatory
2409 L&T LT/BSRP/OUT/19-20/126 28-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Resubmission of RA Bill-04 for Maintenance of Existing Road
2410 L&T LT/BSRP/OUT/19-20/127 29-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Resistance from local Populace and Demanding to Construct road Side Drain
2413 L&T LT/BSRP/OUT/19-20/130 1
2414 L&T LT/BSRP/OUT/19-20/131 1
LT/BSRP/OUT/19-20/81
LT/BSRP/OUT/19-20/70
2419 L&T 1-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design and Drawing of Superdtructure precast PSC Girder ch. 205+711 LT/BSRP/OUT/19-20/55
LT/BSRP/OUT/19-20/45
LT/BSRP/OUT/19-20/136 LT/BSRP/OUT/19-20/29
LT/BSRP/OUT/18-19/941
Time Extension,
2420 L&T 1-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Notification for underecedented Rainfall under Clause of the Contract Agreement LT/BSRP/OUT/19-20/80
Force Majeure
LT/BSRP/OUT/19-20/137 LT/BSRP/OUT/19-20/67
RITES/BSRP/OD/L&T/2019/444
RITES/BSRP/OD/L&T/2019/514
2421 L&T 1-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Status of working on forest land of the Road Projects After expiry of one year working permission LT/BSRP/OUT/18-19/895
LT/BSRP/OUT/18-19/947
LT/BSRP/OUT/19-20/138 NHAI-614
LT/BSRP/OUT/19-20/136
LT/BSRP/OUT/19-20/81
LT/BSRP/OUT/19-20/70
2422 L&T 3-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design and Drawing of POT-PTTEF bearings of MJB
LT/BSRP/OUT/19-20/55
LT/BSRP/OUT/19-20/45
LT/BSRP/OUT/19-20/139 LT/BSRP/OUT/19-20/29
2423 L&T LT/BSRP/OUT/19-20/140 3-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of SPS-14 main for works as per Schedule-H A of Agreement
Reimbursement of tex liability incurred due to implementation of GST Act as per Circular 3.315
2424 L&T 3-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
LT/BSRP/OUT/19-20/141 date 04.10.2017 and SPS-13
RITES/BSRP/OD/L&T/2018/245
RITES/BSRP/OD/L&T/2018/195
RITES/BSRP/OD/L&T/2018/150
RITES/BSRP/OD/L&T/2018/145
RITES/BSRP/OD/L&T/2018/124
Indequate Production of various Construction Materials At Crusher Plant ( Slow Progress of RITES/BSRP/OD/L&T/2018/269
2425 L&T 3-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
Work ) RITES/BSRP/OD/L&T/2018/325
RITES/BSRP/OD/L&T/2018/339
RITES/BSRP/OD/L&T/2018/516
LT/BSRP/OUT/18-19/606
LT/BSRP/OUT/18-19/564
LT/BSRP/OUT/19-20/142 LT/BSRP/OUT/18-19/318
2427 L&T LT/BSRP/OUT/19-20/144 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
LT/BSRP/OUT/19-20/77
LT/BSRP/OUT/19-20/106
2431 L&T 6-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Release of 10% Hold Amount for main works
RITES/BSRP/OD/L&T/2019/505
LT/BSRP/OUT/19-20/148 RITES/BSRP/OD/NHAI/2019/242
2437 L&T LT/BSRP/OUT/19-20/154 11-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites submission of list of retaining walls along with Cross-sectional Detail
2441 L&T LT/BSRP/OUT/19-20/158 13-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Dahisahi Gravel Quarry -IV
2447 L&T LT/BSRP/OUT/19-20/163 1
LT/BSRP/OUT/18-19/932
LT/BSRP/OUT/19-20/29
LT/BSRP/OUT/19-20/81
2449 L&T 19-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design and Drawing of Suparstructure precast RCC Girder 205+711
RITES/BSRP/OD/L&T/2019/529
RITES/BSRP/OD/L&T/2018/471
LT/BSRP/OUT/19-20/165
2451 L&T LT/BSRP/OUT/19-20/167 19-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow Area Soil test Result for Construction of Embankment subgrade
RITES/BSRP/OD/NHAI/2019/248
2452 L&T 19-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Rrlease of 10% balance amount of IPC-14 May'19
LT/BSRP/OUT/19-20/168 LT/BSRP/OUT/19-20/140
2453 L&T LT/BSRP/OUT/19-20/169 19-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Ssubmission of Borrow Area soil test result
2454 L&T LT/BSRP/OUT/19-20/170 20-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent laboratory test of HT strand
LT/BSRP/OUT/18-19/699
LT/BSRP/OUT/18-19/700
LT/BSRP/OUT/18-19/942
LT/BSRP/OUT/18-19/960
2457 L&T 21-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of report on repair rehabilitation,Strengthening of Bridges on NH6
RITES/BSRP/OD/L&T/2018/399
RITES/BSRP/OD/L&T/2019/531
RITES/BSRP/OD/L&T/2019/476
LT/BSRP/OUT/19-20/173 RITES/BSRP/OD/L&T/2019/468
LT/BSRP/OUT/18-19/961
LT/BSRP/OUT/18-19/812
LT/BSRP/OUT/18-19/765
LT/BSRP/OUT/18-19/646
LT/BSRP/OUT/18-19/613
2458 L&T 22-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Revised plan and Profile(288+000 to 290+000) RITES/BSRP/OD/L&T/2018/357
RITES/BSRP/OD/L&T/2018/335
RITES/BSRP/OD/L&T/2018/331
RITES/BSRP/OD/L&T/2019/441
RITES/BSRP/OD/L&T/2019/438
LT/BSRP/OUT/19-20/174 RITES/BSRP/OD/L&T/2019/412
Resistance from local populace from 212+000 to 212+250 RHS and Demand to Construct road LT/BSRP/OUT/19-20/127
2459 L&T 22-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
LT/BSRP/OUT/19-20/175 Side Drain RITES/BSRP/OD/L&T/2019/532
LT/BSRP/OUT/19-20/080
Time Extension, LT/BSRP/OUT/19-20/137
2460 L&T 22-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Notification for unprecedented Rainfall under clause the Contract Agreement
Force Majeure LT/BSRP/OUT/18-19/941
LT/BSRP/OUT/19-20/176 LT/BSRP/OUT/18-19/067
Submission of concrete MIx Design of M50 G with Ramco OPC 53G and Chryso Admixture ( with
2461 L&T 22-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
LT/BSRP/OUT/19-20/177 Silica fume )
2465 L&T LT/BSRP/OUT/19-20/181 26-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of BC Design Mix g-2 test Report
2466 L&T LT/BSRP/OUT/19-20/182 26-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent laboratory test of Construction marerials
Discrepancy for Electrical utility Shifting between Estimate Approved & Communicated by
2467 L&T 26-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites owning entity and Approval Accorded by Authority and Amount hold by Authority Arbitrarity for NHAI-11011-8-LT-2017-PIU-BLS-918
LT/BSRP/OUT/19-20/183 the executed works
2468 L&T LT/BSRP/OUT/19-20/184 27-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Regarding Depositing Demand Draft no.012471
2469 L&T LT/BSRP/OUT/19-20/185 27-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow Area soil test results
LT/BSRP/OUT/18-19/149
LT/BSRP/OUT/18-19/184
LT/BSRP/OUT/19-20/506
2471 L&T 29-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Pavement Report for Bus Bays
LT/BSRP/OUT/19-20/38
LT/BSRP/OUT/18-19/216
LT/BSRP/OUT/19-20/187 LT/BSRP/OUT/18-19/172
2472 L&T LT/BSRP/OUT/19-20/188 29-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Details of median plantation
2473 L&T 29-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Reimbursement of tax liability incurred Due to Implementation of GST
LT/BSRP/OUT/19-20/189 RITES/BSRP/OD/L&T/2019/251
2474 L&T LT/BSRP/OUT/19-20/190 29-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Resistance faced by Contractor Sides due to presence of police station boundary wall
2477 L&T 29-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Compliance of Improper Gradation of GSB Mix
LT/BSRP/OUT/19-20/193 RITES/BSRP/QC/OD/L&T/2019/259
2478 L&T LT/BSRP/OUT/19-20/194 29-Jun-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Soure Approval of Supreme Bituchem India pvt.ltd. For Different Construcion materials
2482 L&T LT/BSRP/OUT/19-20/198 2-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Details of RCC Railings for Bridges with foothpath
2486 L&T LT/BSRP/OUT/19-20/202 4-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of SPS-15 for main works as per Schedule-H of Agreement
2487 L&T LT/BSRP/OUT/19-20/203 5-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory TEST of OPC Bituminous Concrete mix G-II
LT/BSRP/OUT/19-20/38
2488 L&T 5-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design and Drawing of Bus Sheltel
LT/BSRP/OUT/19-20/204 RITES/BSRP/OD/L&T/2019/506
LT/BSRP/OUT/19-20/38
2489 L&T 5-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design & Drawing of toilet block in truck laybay
LT/BSRP/OUT/19-20/205 RITES/BSRP/OD/L&T/2019/506
LT/BSRP/OUT/19-20/38
2490 L&T 5-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission o f Design and Drawing of over head gantry ( cantilever and simply Supported
LT/BSRP/OUT/19-20/206 RITES/BSRP/OD/L&T/2019/506
2491 L&T LT/BSRP/OUT/19-20/207 5-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of unlined Drain Design Basis Report CA,SC
LT/BSRP/OUT/19-20/38
2492 L&T 5-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites submission of Location of Details of W-Beam Crash barrier
LT/BSRP/OUT/19-20/208 RITES/BSRP/OD/L&T/2019/506
LT/BSRP/OUT/18-19/080
LT/BSRP/OUT/17-18/088
2493 L&T 5-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Maintenance of existing roaad RITES/BSRP/OD/L&T/2019/499
RITES/BSRP/OD/L&T/2019/541
LT/BSRP/OUT/19-20/209 NHAI/13011/14/MISC/2019/BLS/727
2494 L&T LT/BSRP/OUT/19-20/210 5-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Construction of earthen shoulder
LT/BSRP/OUT/18-19/174
LT/BSRP/OUT/18-19/961
LT/BSRP/OUT/18-19/812
LT/BSRP/OUT/18-19/765
LT/BSRP/OUT/18-19/646
LT/BSRP/OUT/18-19/613
2495 L&T 6-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Revised Plan and Profile (288+000 TO 290+000 )
RITES/BSRP/OD/L&T/2019/441
RITES/BSRP/OD/L&T/2019/438
RITES/BSRP/OD/L&T/2019/412
RITES/BSRP/OD/L&T/2018/335
RITES/BSRP/OD/L&T/2018/331
LT/BSRP/OUT/19-20/211 RITES/BSRP/OD/L&T/2018/357
2496 L&T LT/BSRP/OUT/19-20/212 6-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent laboratory test of Constructuion material's
LT/BSRP/OUT/18-19/204
LT/BSRP/OUT/18-19/205
2497 L&T 8-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Highway miscellaneous Drawing LT/BSRP/OUT/18-19/204
LT/BSRP/OUT/18-19/038
LT/BSRP/OUT/19-20/213 RITES/BSRP/OD/L&T/2019/038
2498 L&T LT/BSRP/OUT/19-20/214 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2499 L&T LT/BSRP/OUT/19-20/215 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2500 L&T LT/BSRP/OUT/19-20/216 8-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Modification required in viw of TDS on the Amount Paid or payable 23/2017
2501 L&T LT/BSRP/OUT/19-20/217 10-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Monthly Progress Report for the Month of June 2019 )
RITES/BSRP/OD/L&T/2019/424
RITES/BSRP/OD/L&T/2018/380
RITES/BSRP/OD/L&T/2018/334
RITES/BSRP/OD/L&T/2018/288A
2502 L&T 11-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design and Drawing of U-trough RITES/BSRP/OD/L&T/2018/280
RITES/BSRP/OD/L&T/2018/231
RITES/BSRP/OD/L&T/2018/230
RITES/BSRP/OD/L&T/2018/134
LT/BSRP/OUT/19-20/218
2503 L&T LT/BSRP/OUT/19-20/219 11-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Reimbursement of Tax liability incurred due to implementation of GST act as per SPS-15 RITES/BSRP/OD/NHAI/2019/255
Submission of Lined Drain Details in bisoi from 243.490 TO 243.830 on LHS KM 243.490 TO
2504 L&T 12-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites RITES/BSRP/OD/L&T/2019/528
LT/BSRP/OUT/19-20/220 243.870
LT/BSRP/OUT/18-19/203
2505 L&T 12-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent laboratory test of Bituminous Concrete Mix Grade-II
LT/BSRP/OUT/19-20/221 RITES/BSRP/OD/L&T/2019/281
RITES/BSRP/OD/L&T/2019/535
2509 L&T 15-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Cost Estimate for Transplantation of Trees in jharkhand section RITES/BSRP/OD/L&T/2019/550
LT/BSRP/OUT/19-20/225 NHAI-11011-8-LT-2017-PIU-BLS-84
RITES/BSRP/OD/L&T/2019/535
2510 L&T 15-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Compensatory Afforestation in JHarkhand Section RITES/BSRP/OD/L&T/2019/550
LT/BSRP/OUT/19-20/226 NHAI-11011-8-LT-2017-PIU-BLS-84
Submission of DLC Design Mix with Cement Ultratech OPC 43 Grade and Murgapat Crusher
2511 L&T 15-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
LT/BSRP/OUT/19-20/227 Aggregates
LT/BSRP/OUT/18-19/859
LT/BSRP/OUT/18-19/778
LT/BSRP/OUT/18-19/702
Workable Stretch unencumbered length available as on to carry out Construction Activitles on LT/BSRP/OUT/18-19/616
2512 L&T 15-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list
Project highway LT/BSRP/OUT/18-19/565
LT/BSRP/OUT/19-20/079
LT/BSRP/OUT/19-20/030
LT/BSRP/OUT/19-20/228 LT/BSRP/OUT/19-20/145
RITES/BSRP/OD/NHAI/2019/252
2513 L&T 16-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Withdrawal of the Project Stetches affected by the Construction of Proposed 12 nos of EUP
LT/BSRP/OUT/19-20/229 RITES/BSRP/OD/L&T/2019/553
LT/BSRP/OUT/18-19/84
2515 L&T LT/BSRP/OUT/19-20/231 18-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Reques to Approve Authorized signatories for verification of project works and Singning of RFI LT/BSRP/OUT/18-19/541
LT/BSRP/OUT/18-19/729
LT/BSRP/OUT/18-19/154
2516 L&T LT/BSRP/OUT/19-20/232 18-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of list of retaining walls
RITES/BSRP/OD/L&T/2019/545
LT/BSRP/OUT/18-19/876
LT/BSRP/OUT/18-19/804
2517 L&T LT/BSRP/OUT/19-20/233 18-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Research work using High modulus asphalt (Hima) mixes by IIT Kharagpur
LT/BSRP/OUT/17-18/076
NHAI/11011/15/SAI/2019/PIU/BLS/54
LT/BSRP/OUT/18-19/202
2519 L&T LT/BSRP/OUT/19-20/235 19-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Release of 10% hold Amount for main works
RITES/BSRP/OD/L&T/2019/255
2520 L&T LT/BSRP/OUT/19-20/236 22-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request to Cancellation of demand order LT/BSRP/OUT/2019
RITES/BSRP/OD/L&T/2019/547
RITES/BSRP/OD/L&T/2019/531
RITES/BSRP/OD/L&T/2019/476
RITES/BSRP/OD/L&T/2019/468
RITES/BSRP/OD/L&T/2018/399
2524 L&T LT/BSRP/OUT/19-20/240 22-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Company profile of m/s ADO ADDITIVES MFG PVT. LTD
LT/BSRP/OUT/19-20/173
LT/BSRP/OUT/18-19/960
LT/BSRP/OUT/18-19/942
LT/BSRP/OUT/18-19/700
LT/BSRP/OUT/18-19/699
LT/BSRP/OUT/18-19/202
RITES/BSRP/OD/L&T/2019/255
2526 L&T LT/BSRP/OUT/19-20/242 26-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Interim payment of PRICE Adjustment as per NHAI policy no.9.2.25 /2019
NHAI-11013-9-RO-OD-598-2019
NHAI-11011-8-LT-2017-PIU-BLS-231
Time Extension,
2528 RITES-OD RITES-BSRP-OD-L&T-2019-552 8-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi NOTIFICATION FOR UNDERECEDENTED RAINFALL UNDER CLAUSE 10.5.2 OF CA LT/BSRP/OUT/19-20/201
Force Majeure
Withdrawal (de-scoping ) of the Project Stretches affected by the Construction of proposed 12 RITES/BSRP/OD/NHAI/2019/252
2529 RITES-OD RITES-BSRP-OD-L&T-2019-553 8-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
nos of EUP NHAI/13011/5/L&T/2019/BLS/764
LT/BSRP/OUT/19-20/205
2530 RITES-OD RITES-BSRP-OD-L&T-2019-555 12-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing of Bus Shelter and toiler Block in truck laybye LT/BSRP/OUT/19-20/204
RITES/BSRP/OD/LT/2019/549
RITES/BSRP/OD/LT/2019/469
RITES/BSRP/OD/LT/2019/493
2531 RITES-OD RITES-BSRP-OD-L&T-2019-556 12-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Construction of Earthen Shoulder RITES/BSRP/OD/LT/2019/504
RITES/BSRP/OD/LT/2019/518
LT/BSRP/OUT/19-20/210
RITES/BSRP/OD/LT/2019/499
RITES/BSRP/OD/LT/2019/541
2532 RITES-OD RITES-BSRP-OD-L&T-2019-557 13-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Maintenance of Existing Road
LT/BSRP/OUT/19-20/209
NHAI/13011/5/MISC/2019/BLS/727
RITES/BSRP/OD/LT/2019/535
RITES/BSRP/OD/LT/2019/550
2533 RITES-OD RITES-BSRP-OD-L&T-2019-558 15-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Tranplantation of Trees by Means of Machine
E-MAIL-17.6.19

2534 RITES-OD RITES-BSRP-OD-L&T-2019-559 15-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Modification required in viw of TDS on the Amount paid or Payable LT/BSRP/OUT/19-20/216
LT/BSRP/OUT/19-20/220.
2535 RITES-OD RITES-BSRP-OD-L&T-2019-560 18-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of Lined Drain Details in Bisoi RITES/BSRP/OD/NHAI/2019/212
RITES/BSRP/OD/LT/2019/528
RITES/BSRP/QC/OD/LT/2019/281
Withdrawal De-scoping) of the Project Stretches affected by the Construction of Proposed 12 LT/BSRP/OUT/19-20/221
2536 RITES-OD RITES-BSRP-OD-L&T-2019-561 19-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
Nos. EUP LT/BSRP/OUT/19-20/203

RITES/BSRP/OD/LT/2018/405
RITES/BSRP/OD/LT/2019/891
RITES/BSRP/OD/NHAI/2019/216
LT/BSRP/OUT/18-19/740
2537 RITES-OD RITES-BSRP-OD-L&T-2019-562 20-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised Drawing of Tollplaza for Approval LT/BSRP/OUT/18-19/948
LT/BSRP/OUT/19-20/096
LT/BSRP/OUT/19-20/108
LT/BSRP/OUT/19-20/199

2538 RITES-OD RITES-BSRP-OD-L&T-2019-563 20-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing of U-Trough LT/BSRP/OUT/19-20/218
2539 RITES-OD RITES-BSRP-OD-L&T-2019-564 21-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Submission of Cost estimate for Transplantation of trees in Jharkhand Section LT/BSRP/OUT/19-20/218
2540 RITES-OD RITES-BSRP-OD-L&T-2019-565 22-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous safety measures at site
2541 RITES-OD RITES-BSRP-OD-L&T-2019-566 22-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Unlined Drain Design Basic Report 237+000 to 269+000 (Rev-B) Approval LT/BSRP/OUT/19-20/207

2542 RITES-OD RITES-BSRP-OD-L&T-2019-567 22-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing o f overhead gantry ( Cantilever and Simply Suppoted LT/BSRP/OUT/19-20/207
2543 RITES-OD RITES-BSRP-OD-L&T-2019-568 23-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Approval of Representative for verification of Project work and Signing of RFIs
LT/BSRP/OUT/19-20/142
Regarding inadequate Production of Various Construction materials at Crusher plant ( Slow LT/BSRP/OUT/19-20/191
2544 RITES-OD RITES-BSRP-OD-L&T-2019-569 22-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress
Progressn of works) RITES/BSRP/OD/LT/2019/516
RITES/BSRP/OD/LT/2019/540
LT/BSRP/OUT/19-20/208
LT/BSRP/OUT/19-20/038
2545 RITES-OD RITES-BSRP-OD-L&T-2019-570 24-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Locations of Details of W-Beam
RITES/BSRP/OD/LT/2019/506

2546 RITES-OD RITES-BSRP-OD-L&T-2019-571 25-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submission of Monthly Progress Report for the Month of June 2019 LT/BSRP/OUT/18-19/217
2547 RITES-OD RITES-BSRP-OD-L&T-2019-572 25-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Compensatory afforestation in Jharkhand Section LT/BSRP/OUT/18-19/226
2548 RITES-OD RITES-BSRP-OD-L&T-2019-573 27-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Plan and profile 4lane from Km LT/BSRP/OUT/18-19/112
LT/BSRP/OUT/19-20/154
LT/BSRP/OUT/19-20/232
2549 RITES-OD RITES-BSRP-OD-L&T-2019-574 27-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of list of retaining walls
RITES/BSRP/OD/LT/2019/545

2550 RITES-OD RITES-BSRP-OD-L&T-2019-575 27-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of vertical initial ( Cyclic) pile load t est report of MJB LT/BSRP/OUT/19-20/237
Submission of Report on load Capacity of piles using high strain Dynamic load testing
2551 RITES-OD RITES-BSRP-OD-L&T-2019-576 27-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings LT/BSRP/OUT/19-20/239
method for MJB
Inerim payment of 90 parsent price Adjustment as per NHAI policy no 9.2.25 2019
2552 RITES-OD RITES-BSRP-OD-L&T-2019-577 27-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings LT/BSRP/OUT/19-20/240
date the july 24,2019
2553 RITES-OD RITES-BSRP-OD-L&T-2019-578 29-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval for Design and Drawing of UTROUGH LT/BSRP/OUT/19-20/241
Time Extension,
2554 RITES-OD RITES-BSRP-OD-L&T-2019-579 29-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Notification for unprecedented Rainfall under Clause 10.5.2 of CA LT/BSRP/OUT/19-20/241
Force Majeure
2555 RITES-QC RITES-BSRP-QC-OD-LT-2019-282 8-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction meterials LT/BSRP/OUT/19-20/212
RITES/BSRP/QC/OD/LT/2019/266
2556 RITES-QC RITES-BSRP-QC-OD-LT-2019-283 11-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of M/S supreme Bituchem india PVT limited for Different Construction meterials RITES/BSRP/QC/OD/LT/2019/270
LT/BSRP/OUT/19-20/270
2557 RITES-QC RITES-BSRP-QC-OD-LT-2019-284 11-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Construction Submission of Borow area Soil test results for Construction Embankment/SG approval LT/BSRP/OUT/19-20/167
Borrow
2558 RITES-QC RITES-BSRP-QC-OD-LT-2019-285 12-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area Soil test result for Construction Sub-grade approval LT/BSRP/OUT/19-20/185
Approval
2559 RITES-QC RITES-BSRP-QC-OD-LT-2019-287 24-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Research work using High modulus Asphalt ( Hima ) mixes by IIT Kharagpur LT/BSRP/OUT/18-19/233
Submisssion of DLC Design mix with Cement ultratech OPC 43 grade and Murgapat crusher
2560 RITES-QC RITES-BSRP-QC-OD-LT-2019-288 24-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works LT/BSRP/OUT/18-19/227
Aggragate (p-2
LT/BSRP/OUT/19-20/212
2562 RITES-QC RITES-BSRP-QC-OD-LT-2019-289 27-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test results Approval
RITES/BSRP/QC/OD/LT/2019/282
LT/BSRP/OUT/19-20/760
2563 RITES-QC RITES-BSRP-QC-OD-LT-2019-290 27-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test results Approval
RITES/BSRP/QC/OD/LT/2019/166
LT/BSRP/OUT/19-20/13
2564 RITES-QC RITES-BSRP-QC-OD-LT-2019-291 27-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test results Approval
RITES/BSRP/QC/OD/LT/2019/239
RITES/BSRP/QC/OD/2019/250
LT/BSRP/OUT/18-19/37
2565 RITES-QC RITES-BSRP-QC-OD-LT-2019-292 27-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test results Approval
LT/BSRP/OUT/18-19/42
LT/BSRP/OUT/19-20/48
RITES/BSRP/QC/OD/2019/220
2566 RITES-QC RITES-BSRP-QC-OD-LT-2019-293 28-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test results Approval
LT/BSRP/OUT/18-19/917
RITES/BSRP/QC/OD/2019/268
RITES/BSRP/QC/OD/2019/271
RITES/BSRP/QC/OD/2019/277
RITES/BSRP/QC/OD/2019/281
RITES/BSRP/QC/OD/2019/286
2567 RITES-QC RITES-BSRP-QC-OD-LT-2019-294 29-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Bituminous Concrete mix Design Gr-II
LT/BSRP/OUT/19-20/152
LT/BSRP/OUT/19-20/160
LT/BSRP/OUT/19-20/182
LT/BSRP/OUT/19-20/203
LT/BSRP/OUT/19-20/221

2568 RITES-NHAI RITES-BSRP-OD-NHAI-2019-255 2-Aug-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Submission of Stage payment Statement -15 for main works as per Scheduole-H Y LT/BSRP/OUT/19-20/202

2569 RITES-NHAI RITES-BSRP-OD-NHAI-2019-259 2-Aug-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Interim payment Certificate no-15 Y LT/BSRP/OUT/18-19/226

RITES/BSRP/OD/NHAI/2019/192
2570 RITES-NHAI RITES-BSRP-OD-NHAI-2019-259 2-Aug-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Interim payment of 90% of price Adjustmrnt as per NHAI policy no.9.2.25 2019 july Y RITES/BSRP/OD/2019/577
LT/BSRP/OUT/19-20/242
RITES/BSRP/QC/OD/L&T/2019/238
Submission of Geotechnical Investigation work for RE Wall Structure at VUP Ch: 227+229 fo
2574 L&T 30-Jul-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites RITES/BSRP/OD/L&T/2019/231
Baharagora Singhara Road Project in Odisha
LT/BSRP/OUT/19-20/247 LT/BSRP/OUT/18-19/970
2575 L&T 3-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request from local populance for construction of underpass near Km 226+840 and Km 296+730 RITES-BSRP-OD-NHAI-2019-204-25-03-2019
LT/BSRP/OUT/19-20/248
Reimbursement of Tax liability incurred due to implementation of GST Act as per circular 3.3.15
2576 L&T 3-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites RITES-BSRP-OD-NHAI-2019-259-25-07-2019
LT/BSRP/OUT/19-20/249 dated 04-10-2019 and NHAI-FA-GST-2017-18-SM dated 01.08-2019 against IPC 15
2577 L&T LT/BSRP/OUT/19-20/250 3-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites SUBMISSION OF SPS-16 for main works as per schedule-H of Agreement
2578 L&T LT/BSRP/OUT/19-20/251 5-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Tree Felling RA Bill
2579 L&T LT/BSRP/OUT/19-20/252 8-May-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of revised layout toll plaza drawing for Approval RITES-BSRP-OD-LT-2018-194-07-05-2019
Proceedings of the meeting on Road safety held on 19-07-2019 under the chairmanship of chief
NHAI-13011-29-Road safety -2017-piu-bls-834-
2582 L&T 7-Aug-19 M/s. L&T Ltd, Bangriposi The project Director secretary ,odisha in the 2nd floor conference hall of secretariat for information and necessary
29-07-2019
LT/BSRP/OUT/19-20/255 action
The Assistant Labour
2584 L&T 7-Aug-19 M/s. L&T Ltd, Bangriposi Labour License
LT/BSRP/OUT/19-20/257 commissioner
2585 L&T LT/BSRP/OUT/19-20/258 10-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Safety measures at site RITES-BSRP-OD-LT-2019-265-22-07-2019
2587 L&T LT/BSRP/OUT/19-20/260 10-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites GT Investigation report for RE Wall Work RITES-BSRP-OD-LT-2019-582-07-08-2019
Workable stretch /Unencumbered length available as on 31-07-2019 to carry out construction
2588 L&T 10-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list
LT/BSRP/OUT/19-20/261 activities on project highway
2589 L&T LT/BSRP/OUT/19-20/262 10-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Monthly progress report for the month of July 2019 RITES-BSRP-OD-LT-2019-571-25-07-2019
Interim payment of 90% of Price adjustment as per NHAIPolicy No.9.2.25/2019 dated 24-07-
2590 L&T 10-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites RITES-BSRP-OD-NHAI-2019-263-02-08-2019
LT/BSRP/OUT/19-20/263 2019
Submission of concrete mix design of pavement quality concrete (PQC) with ultratech opc 43 &
2591 L&T 10-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
LT/BSRP/OUT/19-20/264 Sika brand Admixture
2594 L&T LT/BSRP/OUT/19-20/267 16-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submissio of Design and Drawing of road side Box Drain RITES-BSRP-OD-LT-2019-212-02-04-2019
2595 L&T 17-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Inadequte production of various construction materials at crusher plant (Slow progress of work) RITES-BSRP-OD-LT-2019-569-22-07-2019
LT/BSRP/OUT/19-20/268
2598 L&T LT/BSRP/OUT/19-20/271 16-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of company Profile of M/s.ADO Additive MFG.PVT.LTD RITES-BSRP-OD-LT-2019-295-27-07-2019
2599 L&T LT/BSRP/OUT/19-20/272 16-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of vertical initial (cyclic) pile load test report of MJB at Ch:205+710 RITES-BSRP-OD-LT-2019-575-27-07-2019
2600 L&T LT/BSRP/OUT/19-20/273 16-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of list of retaining walls RITES-BSRP-OD-LT-2019-545-22-07-2019
2601 L&T LT/BSRP/OUT/19-20/274 16-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of design & Drawing of Bus shelter and toilet in truck laybye RITES/BSRP/OD/LT/2019/566-03-07-2019
2602 L&T LT/BSRP/OUT/19-20/275 16-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of unlined drain deign basic report Km 237+000 to 269+000 (Rev B) approval RITES/BSRP/OD/LT/2019/566-22-07-2019
2603 L&T LT/BSRP/OUT/19-20/276 16-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design of POT-PTFE bearings of Major Bridge at Ch:205+711 for approval RITES/BSRP/OD/LT/2019/549-03-07-2019
2604 L&T LT/BSRP/OUT/19-20/277 17-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submisssion of cost estimate for transportation of trees in Jharkhand Section RITES/BSRP/OD/LT/2019/564-22.07.2019
2605 L&T LT/BSRP/OUT/19-20/278 17-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of company Credentials of M/s. The India Cement Limited for Source Approval RITES/BSRP/QC/OD/LT/2019/296-29.07.2019
2607 L&T LT/BSRP/OUT/19-20/280 17-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Bituminous Concrete Mix Design Grade-II RITES/BSRP/QC/OD/LT/2019/294-29.07.2019
2608 L&T LT/BSRP/OUT/19-20/281 21-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites GT Investigation report for RE Wall Work RITES/BSRP/QC/OD/LT/2019/300-17.08.2019
RITES/BSRP/OD/LT/2019/553
RITES/BSRP/OD/LT/2019/561
2609 L&T LT/BSRP/OUT/19-20/282 22-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Confirmation on Withdrawal of EUP and Ghat Section of length RITES/BSRP/OD/LT/2019/574
RITES/BSRP/OD/LT/2019/580
RITES/BSRP/OD/LT/2019/590
Reimbursement of Tax liability incurred due to Implementation of GST act as per circular sps-
2610 L&T LT/BSRP/OUT/19-20/283 23-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites RITES/BSRP/OD/LT/2019/272
16 )
Reimbursement of Tax liability incurred due to Implementation of GST act towards work
2611 L&T LT/BSRP/OUT/19-20/284 23-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites RITES/BSRP/OD/LT/2019/273
executed for felling of trees in Odisha
2612 L&T LT/BSRP/OUT/19-20/285 23-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of RWSS estimate Received for Shifting of Utilities at Bisoi Bypass under Bisoi Block

RITES/BSRP/OD/LT/2019/587
RITES/BSRP/OD/LT/2019/557
RITES/BSRP/OD/LT/2019/541
2613 L&T LT/BSRP/OUT/19-20/286 23-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Maintenance of Existing road RITES/BSRP/OD/LT/2019/499
LT/BSRP/OUT/18-19/080
LT/BSRP/OUT/18-19/088209
NHAI-13011-14-MISC-19-BLS/727
RITES/BSRP/OD/NHAI/2019/22272
2614 L&T LT/BSRP/OUT/19-20/287 26-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Release of 10% Balance Amount for IPC -16
LT/BSRP/OUT/18-19/269
LT/BSRP/OUT/18-19/199
LT/BSRP/OUT/18-19/108
LT/BSRP/OUT/18-19/96
LT/BSRP/OUT/18-19/948
LT/BSRP/OUT/18-19/891
2616 L&T LT/BSRP/OUT/19-20/289 26-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of TOLL Plaza Details LT/BSRP/OUT/18-19/470
LT/BSRP/OUT/18-19/645
LT/BSRP/OUT/18-19/516
LT/BSRP/OUT/18-19/278
LT/BSRP/OUT/18-19/101

RITES/BSRP/OD/LT/2019/553
RITES/BSRP/OD/LT/2019/561
RITES/BSRP/OD/LT/2019/574
RITES/BSRP/OD/LT/2019/580
RITES/BSRP/OD/LT/2019/590
RITES/BSRP/OD/LT/2019/593
LT/BSRP/OUT/18-19/282
2618 L&T LT/BSRP/OUT/19-20/291 30-Aug-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Withdrawal of Stretches falling under Ghat Section and EUP
LT/BSRP/OUT/18-19/132
LT/BSRP/OUT/18-19/229
RITES/BSRP/OD/LT/2018/586
RITES/BSRP/OD/LT/2019/405
RITES/BSRP/OD/LT/2019/326
RITES/BSRP/OD/LT/2019/194
RITES/BSRP/OD/NHAI/2019/83
LT/BSRP/OUT/18-19/127
2619 L&T LT/BSRP/OUT/19-20/292 2-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites ( Resistance from local populace and Demand to Construct road side Drain LT/BSRP/OUT/18-19/175
LT/BSRP/OUT/18-19/200
RITES/BSRP/OD/LT/2018/586
2620 L&T LT/BSRP/OUT/19-20/293 2-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of REPORT ON TOLL management System LT/BSRP/OUT/18-19/289
LT/BSRP/OUT/18-19/199
RITES/BSRP/OD/LT/2019/452
RITES/BSRP/OD/LT/2019/445
2621 L&T 2-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of proposal of Profile Corrective Course (PCC
RITES/BSRP/OD/LT/2019/432
LT/BSRP/OUT/19-20/294 LT/BSRP/OUT/18-19/889
LT/BSRP/OUT/18-19/616
LT/BSRP/OUT/18-19/702
2622 L&T LT/BSRP/OUT/19-20/295 2-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Requirement of Additional Right of way at Major Brige Appoch Road
LT/BSRP/OUT/18-19/778
LT/BSRP/OUT/19-20/011
RITES/BSRP/OD/LT/2019/592
2623 L&T LT/BSRP/OUT/19-20/296 2-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of free POT-PTFE Bearing Design and Drawing ( receive from vendor) of MJB
LT/BSRP/OUT/18-19/276
RITES/BSRP/OD/LT/2019/601
2624 L&T LT/BSRP/OUT/19-20/297 2-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submisssion of RWSS Estimate received for shifting of untilities at bioi bypass under bisoi block
LT/BSRP/OUT/19-20/285
2625 L&T LT/BSRP/OUT/19-20/298 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submiision of SPS-17 of main works as per Schedule -H of agreement
2626 L&T LT/BSRP/OUT/19-20/299 3-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Intimation for electric pole erection by OPTCL within Row
2627 L&T LT/BSRP/OUT/19-20/300 3-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Resistance from local populance

RITES/BSRP/OD/LT/2019/452
RITES/BSRP/OD/LT/2019/445
2629 L&T 3-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of proposal of profile corrective course (PCC RITES/BSRP/OD/LT/2019/432
LT/BSRP/OUT/19-20/294
LT/BSRP/OUT/18-19/889
LT/BSRP/OUT/19-20/302
2630 L&T LT/BSRP/OUT/19-20/303 5-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites INDEPENDENT LABORATORY TEST OF CONSTRUCTION MATERIALS
2631 L&T LT/BSRP/OUT/19-20/304 6-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Concreting of Raft (A1) of MNB 266+758 email 3rd sept
RITES/BSRP/OD/LT/2019/578
2632 L&T 6-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design and Drawing of U-Trough LT/BSRP/OUT/19-20/241
LT/BSRP/OUT/19-20/305 LT/BSRP/OUT/19-20/218
RITES/BSRP/OD/LT/2019/551
2633 L&T 6-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Pavement report for Truck by byes RITES/BSRP/OD/LT/2019/506
LT/BSRP/OUT/18-19/038
LT/BSRP/OUT/19-20/306
RITES/BSRP/OD/LT/2019/611
2635 L&T 7-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of SPS-17 for main Works as per Schedule-H of Agreement
LT/BSRP/OUT/19-20/308 LT/BSRP/OUT/19-20/298
LT/BSRP/OUT/19-20/217,RITES-BSRP-OD-LT-
2636 L&T LT/BSRP/OUT/19-20/309 11-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Monthly progress Report for The month of aug 19 2019-571
2637 L&T LT/BSRP/OUT/19-20/310 10-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request to release the hold amount for the Works executed for electrical utility shifting LT/BSRP/OUT/19-20/183
2638 L&T LT/BSRP/OUT/19-20/311 12-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Expansion joint Drawing ( PC approved) for your Approval
2639 L&T LT/BSRP/OUT/19-20/312 13-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Finalization of revised location for pedestrain LT-BSRP-OUT-19-20-174
2640 L&T LT/BSRP/OUT/19-20/313 14-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Collection and reuse of plastic:Swachhta Hi Sewa campaign NHAI-13011-39-sbm-2017-PIU-BLS-1043
workable stretch/unencumbered length available as on 31.08.2019 to carry out construction LT-BSRP-OD-LT-18-19-565,616,702,778,859,19-
2641 L&T LT/BSRP/OUT/19-20/314 16-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list
activities on project Highway 20,030,079,145

RITES-BSRP-OD-LT-2019-613,LT-BSRP-OUT-19-
20-305,RITES-BSRP-OD-LT-2019-579,LT-BSRP-
2645 L&T LT/BSRP/OUT/19-20/318 18-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of design and drwing of U-Trough retaing wall OUT-19-20-241,RITES-BSRP-OD-LT-2019-
563,LT-BSRP-OUT-19-20-218
2646 L&T LT/BSRP/OUT/19-20/319 M/s. L&T Ltd, Bangriposi 1
2647 L&T LT/BSRP/OUT/19-20/320 18-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of report on Highway Traffic Management system
2660 RITES-QC RITES-BSRP-QC-OD-LT-2019-295 29-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Company profile of M/s- Ado Additive MFG PVT LTD Y LT/BSRP/OUT/19-20/240
2661 RITES-QC RITES-BSRP-QC-OD-LT-2019-296 2-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Company credentials of M/s the india Cement limited for Source Approval Y LT/BSRP/OUT/19-20/243
Mr.Omega Consutant
2662 RITES-QC RITES-BSRP-QC-OD-LT-2019-297 8-Aug-19 Services
M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test Y LT-BSRP-OUT-19-20-254-06-08-2019

2663 RITES-QC RITES-BSRP-QC-OD-LT-2019-298 13-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test results -Approval Y LT-BSRP-OUT-19-20-203-05-07-2019
2664 RITES-QC RITES-BSRP-QC-OD-LT-2019-299 17-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test results -Approval Y LT-BSRP-OUT-19-20-182-26-06-2019
2665 RITES-QC RITES-BSRP-QC-OD-LT-2019-300 17-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works GT Investigation report for RE wall work Y LT-BSRP-OUT-19-20-260-10-08-2019
2666 RITES-QC RITES-BSRP-QC-OD-LT-2019-301 17-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Bituminous Concrete Mix Grade-II Y LT-BSRP-OUT-19-20-221-12-07-2019
Submission of concrete Mix design of pavement Qulaity concrete (PQC) with ultratch
2667 RITES-QC RITES-BSRP-QC-OD-LT-2019-302 20-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Y LT-BSRP-OUT-19-20-264-12-08-2019
OPC 43G & Sika Brand Admixture
Submission of Company Credentialof M/s.Sika india pvt Ltd for source approvalls
2668 RITES-QC RITES-BSRP-QC-OD-LT-2019-303 21-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Y LT-BSRP-OUT-19-20-303-21-08-2019
of App membranes for bridge deck waterproofing
LT/BSRP/OUT/19-20/240
2669 RITES-QC RITES-BSRP-QC-OD-LT-2019-304 21-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Company Profile of M/s ADO ADDITIVE MFG PVT.LTD Y RITES/BSRP/QC/OD/2019/295
LT/BSRP/OUT/19-20/271
2670 RITES-QC RITES-BSRP-QC-OD-LT-2019-305 22-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Sunmission of Company Credentials of M/s the Indian Cement Limited for Source Approval Y LT-BSRP-OUT-19-20-278-17-8-19
2673 RITES-OD RITES-BSRP-OD-L&T-2019-613 11-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing of U-Trough Y

LT-BSRP-OUT-19-20-173,
2675 RITES-OD RITES-BSRP-OD-L&T-2019-614 12-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Repair,Rehabilitation & strengthening of all existing bridges Y
RITES-BSRP-OD-LT-2019-547
2676 RITES-OD RITES-BSRP-OD-L&T-2019-615 16-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Free POT-PTFE bearing design &drawing of MJB 205+710 Y LT-BSRP-OUT-19-20-296
RITES/BSRP/QC/OD/2019/545
RITES/BSRP/QC/OD/2019/561
Withdrawal ( De-Scoping ) of the project Stretches Affecteed by the Construction of
2679 RITES-OD RITES-BSRP-OD-L&T-2019-580 1-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Y RITES/BSRP/QC/OD/2019/574
Proposed 12 nos of EUP
LT/BSRP/OUT/19-20/154
LT/BSRP/OUT/19-20/232
2680 RITES-OD RITES-BSRP-OD-L&T-2019-581 5-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of highways Miscellaneous Drawing for Approval Y

2681 RITES-OD RITES-BSRP-OD-L&T-2019-582 8-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality GT Investigation report for RE wall work Y LT-BSRP-OUT-19-20-247-30-07-2019
Reimbursement of Tax liability incurred due to implementation of GST Act as per circular 3.3.15
CIL, GST
2682 RITES-OD RITES-BSRP-OD-L&T-2019-583 8-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi dated 04-10-2019 and NHAI-FA-GST-2017-18-SM Y LT-BSRP-OUT-19-20-249-03-08-2019
Payments
dated 01.08-2019 against IPC 15
2683 RITES-OD RITES-BSRP-OD-L&T-2019-584 8-Jul-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Pending Stressing since last two months Y

2684 RITES-OD RITES-BSRP-OD-L&T-2019-585 8-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Non submission of required document for SPS-16 for the month of july 2019 Y LT-BSRP-OD-LT-19-20-250

2685 RITES-OD RITES-BSRP-OD-L&T-2019-586 8-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of revised Drawing of Toll Plaza Y LT-BSRP-OD-LT-19-20-252-05-08-2019

2686 RITES-OD RITES-BSRP-OD-L&T-2019-587 13-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance of Existing road Y LT-BSRP-OD-LT-19-20-209-05-07-2019

2687 RITES-OD RITES-BSRP-OD-L&T-2019-588 16-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of drawing of PUP @ Ch.226+840 & 295+730 Y LT-BSRP-OD-LT-19-20-248-16-08-2019

2688 RITES-OD RITES-BSRP-OD-L&T-2019-589 18-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Concreting of Raft (A1) of MNB @ Ch.266+758 Y

Interim payment of 90% of price adjustment as per NHAI Policy No.9.2.25/2019 dated 24-07-
2689 RITES-OD RITES-BSRP-OD-L&T-2019-590 18-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Y LT-BSRP-OUT-19-20-263-12-08-2019
2019
2690 RITES-OD RITES-BSRP-OD-L&T-2019-591 21-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing of roa side Box Drain Y LT-BSRP-OUT-19-20-267-16-08-2019

2691 RITES-OD RITES-BSRP-OD-L&T-2019-592 22-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval Drawing of POT-PTEE Bearings of MJB 205+711 Y LT-BSRP-OUT-19-20-276
RITES/BSRP/QC/OD/2019/580
2692 RITES-OD RITES-BSRP-OD-L&T-2019-593 22-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Confirmation on Withdrawal of length due to 12 nos EUP Ghat Section of Length Y RITES/BSRP/QC/OD/2019/590
LT-BSRP-OUT-19-20-282
RITES/BSRP/QC/OD/2019/154
RITES/BSRP/QC/OD/2019/273
RITES/BSRP/QC/OD/2019/232
2693 RITES-OD RITES-BSRP-OD-L&T-2019-594 23-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of list of retaining walls Y
LT/BSRP/OUT/19-20/545
LT/BSRP/OUT/19-20/574
LT/BSRP/OUT/19-20/580
RITES/BSRP/OD/LT/2019/ 583
RITES/BSRP/OD/LT/2019/554
RITES/BSRP/OD/LT/2019/ 543
CIL, GST Reimbursement of tax liability incurred due to Implementation of GST Act As per Circular 3.3.15 RITES/BSRP/OD/LT/2019/536
2694 RITES-OD RITES-BSRP-OD-L&T-2019-596 24-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Y
Payments dated 04-10-2019 and NHAI-FA-GST-2017-18-SM dated 01.08-2019 against IPC 16 LT/BSRP/OUT/19-20/189
LT/BSRP/OUT/19-20/219
LT/BSRP/OUT/19-20/249
LT/BSRP/OUT/19-20/283
RITES/BSRP/OD/LT/2019/566
2695 RITES-OD RITES-BSRP-OD-L&T-2019-597 24-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of unlined Drain Design Basic Report REV-B Approval Y LT/BSRP/OUT/19-20/207
LT/BSRP/OUT/19-20/275
inadequate production of various Construction materials at Crusher plant ( Slow progress of work
2696 RITES-OD RITES-BSRP-OD-L&T-2019-598 26-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress Y LT/BSRP/OUT/19-20/268
)
CIL, GST
2697 RITES-OD RITES-BSRP-OD-L&T-2019-599 27-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Submission of Documents/ information Desired by the Auditor for GST Special Audit Y NHAI/F&A/IA/2019-20/SPL/GST AUDIT/137348
Payments
CIL, GST Reimbursement of tax liability incurred due to implementation of GST Act towards work LT/BSRP/OUT/19-20/284
2698 RITES-OD RITES-BSRP-OD-L&T-2019-600 28-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Y
Payments executed for felling of trees in odisha section NHAI-11011-15-RITES-2019-PIU-BLS-619
2699 RITES-OD RITES-BSRP-OD-L&T-2019-601 29-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Submission of RWSS Estimate received for Shifting of utilites at bisoi bypass under Bisoi Block Y LT/BSRP/OUT/19-20/285
Minutes of reviw meeting held on 16.08.2019 under the Chairmanship of Chairman NHAI
2700 RITES-OD RITES-BSRP-OD-L&T-2019-602 30-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous projects Y NHAI-11011-15-RITES-2019-PIU-BLS-973
In Odhisha as well as inspection note
RITES/BSRP/OD/LT/2019/582
2701 RITES-OD RITES-BSRP-OD-L&T-2019-603 30-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality GT Investigation report for RE wall work Y LT/BSRP/OUT/19-20/247
LT/BSRP/OUT/19-20/247
2702 RITES-OD RITES-BSRP-OD-L&T-2019-604 30-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance of existing Road Y LT/BSRP/OUT/19-20/286
2703 RITES-OD RITES-BSRP-OD-L&T-2019-605 31-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous uploading of Dital records in NHAI Command Control centre Y NHAI-IT-29-2019- 121
RITES/BSRP/OD/LT/2019/264
2704 RITES-OD RITES-BSRP-OD-L&T-2019-606 2-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Video recording for status and progress of works. Y
NHAI-110111-8-LT-2019-PIU-BLS-983
RITES/BSRP/OD/LT/2019/394
2705 RITES-OD RITES-BSRP-OD-L&T-2019-607 2-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submisssion of Design and Drawing of Minor junction Y
LT/BSRP/OUT/19-20/637
2706 RITES-OD RITES-BSRP-OD-L&T-2019-608 3-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submission of monthly Progress report for the month of july 2019 Y LT/BSRP/OUT/19-20/262
RITES/BSRP/OD/LT/2019/580
RITES/BSRP/OD/LT/2019/593
2707 RITES-OD RITES-BSRP-OD-L&T-2019-609 4-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Proposal of Withdrawal ( Descoping Y
RITES/BSRP/OD/LT/2019/602
NHAI-11011-8-LT-2019-602
RITES/BSRP/OD/LT/2019/586
2708 RITES-OD RITES-BSRP-OD-L&T-2019-610 4-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of revised Drawing of TOLL Plaza Y
LT/BSRP/OUT/19-20/286
2709 RITES-OD RITES-BSRP-OD-L&T-2019-611 6-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Non Submisssion of required Document for SPS-17 for the month of August Y LT/BSRP/OUT/19-20/298
RITES/BSRP/OD/LT/2019/609
RITES/BSRP/OD/LT/2019/602
RITES/BSRP/OD/LT/2019/593
2710 RITES-OD RITES-BSRP-OD-L&T-2019-612 9-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of proposal of withdrawal ( Descoping ) Y
RITES/BSRP/OD/LT/2019/580
LT/BSRP/OUT/19-20/291
NHAI-11011-8-LT-2019-PIU-BLS-983
RITES-BSRP-OD-LT-2019-567,
2711 RITES-OD RITES-BSRP-OD-L&T-2019-616 21-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance of Existing road Y
RITES-BSRP-OD-LT-2019-604

CIL, GST Reimbursement of Tax liability incurred due to implementation of GST Act as per circular 3.3.15
2712 RITES-OD RITES-BSRP-OD-L&T-2019-617 21-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Y RITES-BSRP-OD-LT-2019-596
Payments dated 04.10.2017 and NHAI-F&A-GST-2017-18-SM

2713 RITES-OD RITES-BSRP-OD-L&T-2019-618 26-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of drawing for Expansion Joint Y LT-BSRP-OUT-19-20-311

2714 RITES-OD RITES-BSRP-OD-L&T-2019-619 26-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance of Existing Road Y LT-BSRP-OUT-19-20-616,604
2715 RITES-OD RITES-BSRP-OD-L&T-2019-620 26-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Slow Progress Improper working Turfing Y
NHAI-PG-DP-2019-NO.9.2.27/2019
2716 RITES-OD RITES-BSRP-OD-L&T-2019-621 28-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of revised Drawing of Tollplaza Y
LT/BSRP/OUT/19-20/325
RITES/BSRP/OD/LT/2019/603
RITES/BSRP/OD/LT/2019/582
2717 RITES-OD RITES-BSRP-OD-L&T-2019-622 28-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality GT Investigation report for RE wall work-Undertaking Y LT/BSRP/OUT/19-20/321
LT/BSRP/OUT/19-20/281
LT/BSRP/OUT/19-20/247
RITES/BSRP/OD/LT/2019/427
LT/BSRP/OUT/19-20/667,668,669,669
2718 RITES-OD RITES-BSRP-OD-L&T-2019-623 3-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of sefety certificate of road furniture approval Y
LT/BSRP/OUT/19-20/107
LT/BSRP/OUT/19-20/324
NHAI-13011-39-SBM-2017-PIU-BLS-1108
NHAI-13011/65/RO/OD/2005/2019
2719 RITES-OD RITES-BSRP-OD-L&T-2019-624 3-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Construction of Toilets for Disabled persons at both Sides of Tollplaza Y
NHAI/GM(T)HO/SBM/MICS/2017/112060

2720 RITES-OD RITES-BSRP-OD-L&T-2019-628 7-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Submission of amended performance Bank Guarantee Y LT/BSRP/OUT/19-20/333
2721 RITES-OD RITES-BSRP-OD-L&T-2019-629 9-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Observation on laying of Bituminous Concrete Y
2722 RITES-OD RITES-BSRP-OD-L&T-2019-630 9-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submission of Monthly Progress Report for the Month of August Y LT/BSRP/OUT/19-20/309
RITES/BSRP/OD/LT/2019/580
RITES/BSRP/OD/LT/2019/593
RITES/BSRP/OD/LT/2019/602
2723 RITES-OD RITES-BSRP-OD-L&T-2019-631 9-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Proposal for Withdrawal ( Descoping) and EOT Y
RITES/BSRP/OD/LT/2019/609
RITES/BSRP/OD/LT/2019/612
NHAI-11011/8/LT/2019/PIU/BLS/983
RITES/BSRP/OD/LT/2018/264
2724 RITES-OD RITES-BSRP-OD-L&T-2019-632 10-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance Video recording for status and progress of works. Y RITES/BSRP/OD/LT/2019/606
NHAI-11011/8/LT/2019/PIU/BLS/983
RITES/BSRP/OD/LT/2018/295
2725 RITES-OD RITES-BSRP-OD-L&T-2019-633 10-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Defective Stretches of wmm Y RITES/BSRP/OD/LT/2018/364
RITES/BSRP/OD/LT/201/374
2726 RITES-OD RITES-BSRP-OD-L&T-2019-634 11-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Non Submission of Required Document for SPS-18 for the Month of September Y LT/BSRP/OUT/19-20/338
2727 RITES-OD RITES-BSRP-OD-L&T-2019-635 11-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Pin Bearing Design and Drawing PC Approval ( Received from vender ) for 168 MT Y LT/BSRP/OUT/19-20/326
RITES/BSRP/OD/NHAI/2019/192
2728 RITES-NHAI RITES-BSRP-OD-NHAI-2019-263 2-Aug-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Interim payment of 90% of price Adjustmrnt as per NHAI policy no.9.2.25 2019 july Y RITES/BSRP/OD/2019/577
LT/BSRP/OUT/19-20/242
LT/BSRP/OUT/19-20/297
2729 RITES-NHAI RITES-BSRP-OD-NHAI-2019-277 9-Sep-19 The Team Leader, AE - RITES Project Director,NHAI,Balasore Claims Submission of RWSS Estimate received for Shifting of utilites at bisoi bypass under Bisoi Block Y LT/BSRP/OUT/19-20/285
RITES/BSRP/OD/LT/2019/601
LT-BSRP-OUT-19-20-277,255,
2730 RITES-NHAI RITES-BSRP-OD-NHAI-2019-279 12-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees Cost Estimate for Transplantation of trees in Jharkhand Section Y
RITES-BSRP-OD-LT-2019-564
2731 RITES-NHAI RITES-BSRP-OD-NHAI-2019-280 20-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Collection and reuse of waste plastic :Swachhta HI Sewa campgain Y NHAI-13011-39-SBM-2017-PIU-BLS-1043
Mr.Kapil prasad, Team leader Mr.P. Nageswara rao, lt-bsrp-out-19-20-298,308,327,
2732 RITES-NHAI RITES-BSRP-OD-NHAI-2019-283 27-Sep-19 Claims Interim payment Certificate Y
Sr.Highway Engg. DGM (Tech),PD RITES-BSRP-OD-LT-2019-611,282
2733 L&T LT/BSRP/OUT/19-20/333 28-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Amended performance of Bank Guarantee
2735 L&T LT/BSRP/OUT/19-20/335 30-Sep-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Reimbursement of tax liability incurred due to implementation of GST act as per IPC-17 RITES/BSRP/OD/NHAI/2019/591

RITES/BSRP/OD/LT/2019/622
LT/BSRP/OUT/19-20/321
RITES/BSRP/OD/LT/2019/603
2736 L&T 1-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites GT Investigation report for RE Wall Work LT/BSRP/OUT/19-20/281
RITES/BSRP/OD/LT/2019/582
LT/BSRP/OUT/19-20/247
LT/BSRP/OUT/19-20/336
RITES/BSRP/OD/LT/2019/621
2737 L&T 1-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Revised Drawing of Toll Plaza LT/BSRP/OUT/19-20/325
RITES/BSRP/OD/LT/2019/610
LT/BSRP/OUT/19-20/337
2738 L&T LT/BSRP/OUT/19-20/338 3-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of SPS-18 of main Works as per Schedule-H of Agreement

2739 L&T 4-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Revised mix Design of BC RITES/BSRP/QC/OD/LT/2019/310
LT/BSRP/OUT/19-20/338 A
2740 L&T LT/BSRP/OUT/19-20/339 5-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission on of Company Credentials of M/s KATALINE for Road marking works
2743 L&T LT/BSRP/OUT/19-20/342 9-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Loboratoy test of Construction Materials
RITES/BSRP/OD/LT/2019/628
2744 L&T 9-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Amended performance of Bank Guarantee LT/BSRP/OUT/19-20/333
LT/BSRP/OUT/19-20/343
RITES/BSRP/OD/LT/2019/630
2745 L&T 10-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of monthly Progress Report for the Month of Septembe LT/BSRP/OUT/19-20/630
LT/BSRP/OUT/19-20/344

LT/BSRP/OUT/18-19/565
LT/BSRP/OUT/18-19/616
LT/BSRP/OUT/18-19/702
LT/BSRP/OUT/18-19/778
LT/BSRP/OUT/18-19/859
Workable Stretch / unencumbered length Available as on 30.9.2019 to Carry out Construction
2746 L&T 12-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list LT-BSRP-OUT-19-20-030
Activities on Project Highway LT-BSRP-OUT-19-20-079
LT-BSRP-OUT-19-20-145
LT-BSRP-OUT-19-20-228
LT-BSRP-OUT-19-20-261
LT-BSRP-OUT-19-20-314
LT/BSRP/OUT/19-20/345
2747 L&T 12-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of pin bearing design and Drawing PC Approved ( receive from vendor) for 168 MT RITES/BSRP/OD/LT/2019/635
LT/BSRP/OUT/19-20/346
RITES/BSRP/OD/LT/2019/606
2748 L&T 14-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of video recording for Status of works till Sept'19 RITES/BSRP/OD/LT/2019/632
LT/BSRP/OUT/19-20/347
2751 L&T LT/BSRP/OUT/19-20/350 15-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Rectification of www Stretches RITES/BSRP/OD/LT/2019/633
2755 L&T LT/BSRP/OUT/19-20/354 17-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Soure approval of POT-PTEE pin and Metallic Guided Bearing LT-BSRP-OUT-19-20-346
2756 L&T LT/BSRP/OUT/19-20/355 17-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Soure approval ofslope erosion protection
2757 L&T LT/BSRP/OUT/19-20/355A M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
Non Deduction of GST TDS and Refund of GST TDS Deducted in Jharkhand section bills till IPC-
2758 L&T 18-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
LT/BSRP/OUT/19-20/356 17
RITES/BSRP/OD/LT/2019/628
2759 L&T LT/BSRP/OUT/19-20/357 18-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of undertaking for Performance Bank Guarantee LT/BSRP/OUT/19-20//333
LT/BSRP/OUT/19-20/343
RITES/BSRP/OD/LT/2019/634
2760 L&T 18-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of required Document for SPS-18 for the month of September 2019 LT/BSRP/OUT/19-20//338
LT/BSRP/OUT/19-20/358
2761 L&T LT/BSRP/OUT/19-20/359 22-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Reimbursement of Tax liability incurred due to Implementation of GST act SPS-18 RITES/BSRP/OD/LT/2019/289
2762 L&T LT/BSRP/OUT/19-20/360 22-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of TBM list (199-200 to 310+806 )
RITES/BSRP/OD/LT/2019/634
LT/BSRP/OUT/19-20/338
2763 L&T 22-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Release of 10% hold Amount for Main Works RITES/BSRP/OD/NHAI/2019/289
LT/BSRP/OUT/19-20/358
LT/BSRP/OUT/19-20/361
RITES/BSRP/OD/NHAI/2019/126
2764 L&T 22-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Implementation of highway Traffic management System as per IRC:SP LT/BSRP/OUT/19-20/552
LT/BSRP/OUT/19-20/362
NO. of lanes at till plaza Considering hybrid ETC lanes AS per NHAI policy Guideline no.10.1.20
2766 L&T LT/BSRP/OUT/19-20/364 23-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites NHAI-13011-14-MISC/2019/PIU-BLS-1166
date-18-10-19
2767 L&T LT/BSRP/OUT/19-20/365 25-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Reimbursement of tax liability incurred due to implementation of GST Act IPC-18 RITES/BSRP/OD/NHAI/2019/293
2771 L&T LT/BSRP/OUT/19-20/369 25-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design and Drawing of Box type tunnel for tollplaza LT/BSRP/OUT/19-20/289
Submission of Design and Drawing of pc Approved toilet Building maintenance Workshop and LT
2772 L&T LT/BSRP/OUT/19-20/370 25-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites LT/BSRP/OUT/19-20/289
panel and Medical Building
2773 L&T LT/BSRP/OUT/19-20/371 25-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design & Drawing of box Drain for Toll plaza LT/BSRP/OUT/19-20/289
RITES/BSRP/OD/LT/2019/645
2774 L&T LT/BSRP/OUT/19-20/372 25-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Reimbursement of tax liability incurred due to implementation of GST Act SPS-18 LT/BSRP/OUT/19-20/359
2775 L&T LT/BSRP/OUT/19-20/373 25-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Road safety measures to curb Accidents at Bangriposi Ghat Section RITES/BSRP/OD/LT/2019/646
RITES/BSRP/OD/LT/2019/506
2776 L&T LT/BSRP/OUT/19-20/374 26-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Drawing of Pedestraian MS Railing LT/BSRP/OUT/19-20/038
RITES/BSRP/OD/LT/2019/506
2777 L&T LT/BSRP/OUT/19-20/375 26-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Drawing of Pedestraian MS Railing LT/BSRP/OUT/19-20/038
RITES/BSRP/OD/LT/2019/581
2778 L&T LT/BSRP/OUT/19-20/376 26-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Drawing of Typical Details of Road Marking LT/BSRP/OUT/19-20/213
Submission of Typical median Drain Datails at Super Elevated Section / Differential Carriageway RITES/BSRP/OD/LT/2019/581
2779 L&T LT/BSRP/OUT/19-20/377 26-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
locations LT/BSRP/OUT/19-20/213
RITES/BSRP/OD/LT/2019/506
2781 L&T LT/BSRP/OUT/19-20/378/A 26-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Drawing of Typical Detials of Bus Shelter LT/BSRP/OUT/19-20/038
2786 L&T LT/BSRP/OUT/19-20/383 29-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Soure Approval of Slope Erosion protection works RITES/BSRP/OD/LT/2019/641

LT/BSRP/OUT/18-19/941
LT/BSRP/OUT/18-19/067
Time Extension, LT/BSRP/OUT/19-20/080
2787 L&T LT/BSRP/OUT/19-20/384 29-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Notification for underecedented Rainfall under Clause of the Contract Agreement
Force Majeure LT/BSRP/OUT/19-20/137
LT/BSRP/OUT/19-20/176
LT/BSRP/OUT/19-20/201

2788 L&T LT/BSRP/OUT/19-20/385 29-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Demand for junction to Access NH from Budhamara village
RITES/BSRP/OD/LT/2019/641
2790 L&T LT/BSRP/OUT/19-20/387 31-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Soure Approval of Slope Erosion protection works LT/BSRP/OUT/19-20/383
Submission of PQC Design mix with Cement Emami OPC 53 Grade and Murgapat Crusher
2791 L&T LT/BSRP/OUT/19-20/388 31-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
Aggregates (P-2)
2792 L&T LT/BSRP/OUT/19-20/389 31-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Improper Work of Turfing RITES/BSRP/OD/LT/2019/620
2793 L&T LT/BSRP/OUT/19-20/390 31-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Observations on laying of Bituminous Concrete RITES/BSRP/OD/LT/2019/629
2794 L&T LT/BSRP/OUT/19-20/391 31-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Defective works of Dense Bitumious macadam RITES/BSRP/QC/OD/LT/2019/309
2795 L&T LT/BSRP/OUT/19-20/392 31-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow Area Soil test Result for Construction of Emb/Subgrade

LT/BSRP/OUT/19-20/132
LT/BSRP/OUT/19-20/229
LT/BSRP/OUT/19-20/282
LT/BSRP/OUT/19-20/291
RITES/BSRP/OD/LT/2019/553
RITES/BSRP/OD/LT/2019/574
RITES/BSRP/OD/LT/2019/580
2796 L&T LT/BSRP/OUT/19-20/393 31-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Proposal of Descoping and Time Extension RITES/BSRP/OD/LT/2019/590
RITES/BSRP/OD/LT/2019/593
RITES/BSRP/OD/LT/2019/609
RITES/BSRP/OD/LT/2019/612
RITES/BSRP/OD/LT/2019/631
RITES/BSRP/OD/LT/2019/636
RITES/BSRP/OD/LT/2019/650
RITES/BSRP/OD/LT/2019/561

LT/BSRP/OUT/19-20/637
2797 L&T LT/BSRP/OUT/19-20/394 31-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Drawing of Typical minor junction RITES/BSRP/OD/LT/2019/394
RITES/BSRP/OD/LT/2019/607
LT/BSRP/OUT/19-20/644
2798 L&T LT/BSRP/OUT/19-20/395 31-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites GT Investigation report for RE Wall Work-undertaking RITES/BSRP/OD/LT/2019/336
2799 L&T LT/BSRP/OUT/19-20/396 31-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Drawing of Road Sing plan for Tollplaza at 216+360 and 277+000 LT/BSRP/OUT/19-20/289
LT/BSRP/OUT/19-20/213
Submission of Drawing of Typical median Drain Details at super elevated Section Differential RITES/BSRP/OD/LT/2019/581
2801 L&T LT/BSRP/OUT/19-20/398 31-Oct-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
Carriageway location (case-1 ) LT/BSRP/OUT/19-20/377
RITES/BSRP/OD/LT/2019/653
notification of work Stoppage by mayurbhanj Government Contractor Association under Clause
2802 L&T LT/BSRP/OUT/19-20/399 2-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
10.5.2

RITES/BSRP/OD/LT/2019/545
RITES/BSRP/OD/LT/2019/574
RITES/BSRP/OD/LT/2019/580
2805 L&T 6-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of list Retaining Walls RITES/BSRP/OD/LT/2019/594
LT/BSRP/OUT/19-20/232
LT/BSRP/OUT/19-20/273
LT/BSRP/OUT/19-20/154
LT/BSRP/OUT/19-20/402
2806 L&T LT/BSRP/OUT/19-20/403 6-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Loboratoy test of Construction Materials
2807 L&T LT/BSRP/OUT/19-20/404 1
2808 L&T LT/BSRP/OUT/19-20/405 7-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Manhandling to our Emgineer and Labours on Tollplaza near Bombay Chowk
Requiring Support to Discontinue the Strike being Called by Mayurbhanj Government Contractors
2809 L&T LT/BSRP/OUT/19-20/406 7-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
Association

RITES/BSRP/OD/LT/2019/621
RITES/BSRP/OD/LT/2019/610
2812 L&T LT/BSRP/OUT/19-20/409 9-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Revised Drawing of Toll Plaza LT/BSRP/OUT/19-20/396
LT/BSRP/OUT/19-20/337
LT/BSRP/OUT/19-20/325

RITES/BSRP/OD/LT/2019/651
Submission of Design and of Revised Pc Approved Toilet building workshop and LT panel and
2813 L&T LT/BSRP/OUT/19-20/410 9-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites LT/BSRP/OUT/19-20/289
Medical Building LT/BSRP/OUT/19-20/370
2814 L&T LT/BSRP/OUT/19-20/411 9-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Drawing of typical sing for tollplaza Sing for TollPlaza LT/BSRP/OUT/19-20/289
2815 L&T LT/BSRP/OUT/19-20/412 9-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Monthly progress report for the month of october RITES/BSRP/OD/LT/2019/648
2816 L&T LT/BSRP/OUT/19-20/413 9-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Drawing of Typical Arrangement for utility Crossings at Toll plaza location LT/BSRP/OUT/19-20/289
2817 L&T LT/BSRP/OUT/19-20/414 9-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source approval of vendor for Road Sing Studs Gentry etc
2818 L&T LT/BSRP/OUT/19-20/415 9-Nov-19 M/s. L&T Ltd, Bangriposi BIPL Rejection of Defective material Production
LT/BSRP/OUT/19-20/623
Application-III for Time Extension ( for the delays up to 31TH oct'19 pursuant to Sub-clause 10.5
2819 L&T LT/BSRP/OUT/19-20/416 9-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites LT/BSRP/OUT/19-20/875
of the Agreement LT/BSRP/OUT/19-20/393

RITES/BSRP/OD/LT/2019/657
RITES/BSRP/OD/NHAI/2019/273
2820 L&T LT/BSRP/OUT/19-20/417 11-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Tree felling RA bill LT/BSRP/OUT/19-20/251
RITES/BSRP/OD/NHAI/2019/204
RITES/BSRP/OD/NHAI/2019/205
RITES/BSRP/OD/NHAI/2019/213
2821 L&T LT/BSRP/OUT/19-20/418 12-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Non receipt of Change of Scope order for Six Additional Culvert and Two Underpasses RITES/BSRP/OD/LT/2019/497
RITES/BSRP/OD/LT/2019/647
LT/BSRP/OUT/19-20/100
LT/BSRP/OUT/19-20/332

2822 L&T LT/BSRP/OUT/19-20/419 12-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Comlianace report of Non-comfimatory Notification ( NCN-03).
LT/BSRP/OUT/19-20/312
2824 L&T LT/BSRP/OUT/19-20/421 13-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Finalization of revised location for pedestrain 289+100 LT/BSRP/OUT/19-20/174
2826 L&T LT/BSRP/OUT/19-20/423 13-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source Approval of Bricks for MAA AMBIKA ENTERPRISES

LT/BSRP/OUT/19-20/038
LT/BSRP/OUT/19-20/306
2828 L&T LT/BSRP/OUT/19-20/425 14-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Pavemrnt Design Report for junction RITES/BSRP/OD/LT/2019/637
RITES/BSRP/OD/LT/2019/551
RITES/BSRP/OD/LT/2019/506

2829 L&T LT/BSRP/OUT/19-20/426 14-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source Approval of Vendor for integrated Solar Street Light
2830 L&T LT/BSRP/OUT/19-20/427 16-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Shoulder test reports with Granular materials and Crusherd Aggregates
2831 L&T LT/BSRP/OUT/19-20/428 18-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source approval of Granular material for shoulder
2833 L&T LT/BSRP/OUT/19-20/430 1
LT/BSRP/OUT/19-20/289
2834 L&T LT/BSRP/OUT/19-20/431 20-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of lined Drain plan profile for tolplaza LT/BSRP/OUT/19-20/371
RITES/BSRP/OD/LT/2019/671
2838 L&T LT/BSRP/OUT/19-20/435 22-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source approval of Bricks for tollplaza RITES/BSRP/OD/LT/2019/320
Work order intimation for materials loading and Transportation engaging one unit of Excavator
2839 L&T LT/BSRP/OUT/19-20/436 22-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
and six units of hyva
RITES/BSRP/OD/LT/2018/580
RITES/BSRP/OD/LT/2018/593
RITES/BSRP/OD/LT/2018/602
2852 RITES-OD RITES-BSRP-OD-L&T-2019-636 16-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Proposal for Withdrawall ( Descoping ) and EOT RITES/BSRP/OD/LT/2018/609
RITES/BSRP/OD/LT/2018/612
RITES/BSRP/OD/LT/2018/931
NHAI/11011/8/LT/2019/PIU/BLS/983
2853 RITES-OD RITES-BSRP-OD-L&T-2019-637 16-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission o pavement Design report for truck lay byes-approval LT/BSRP/OUT/19-20-306
RITES/BSRP/OD/LT/2019/621
2854 RITES-OD RITES-BSRP-OD-L&T-2019-638 19-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of revised Drawing of TOLL Plaza LT/BSRP/OUT/19-20/325
LT/BSRP/OUT/19-20/337
2855 RITES-OD RITES-BSRP-OD-L&T-2019-639 19-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Slope protrction Work

2856 RITES-OD RITES-BSRP-OD-L&T-2019-640 19-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request for examination of required Design parameters of PSC Girder of MJB 210+880

2857 RITES-OD RITES-BSRP-OD-L&T-2019-641 21-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality Source approval of Slope erosion Protection LT/BSRP/OUT/19-20/355
LT/BSRP/OUT/19-20/293
2858 RITES-OD RITES-BSRP-OD-L&T-2019-642 21-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of report on toll management System
NHAI-PG-CIVIL WORKS-2019 NO10.1.20/2019
2859 RITES-OD RITES-BSRP-OD-L&T-2019-643 21-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Claims Applicable Permits
2860 RITES-OD RITES-BSRP-OD-L&T-2019-644 22-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality GT inestigation report for RE wall work- undertaking LT/BSRP/OUT/19-20/356
CIL, GST LT/BSRP/OUT/19-20/359
2861 RITES-OD RITES-BSRP-OD-L&T-2019-645 23-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Reimbursement of tax liability incurred due to implementation of GST sps-18
Payments NHAI-F&A-IA-2019-20/spl GST Audit -137348
NHAI-13011-5-SEFTY-RO-OD-2310-2019
2862 RITES-OD RITES-BSRP-OD-L&T-2019-646 25-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Road Sefety Measures TO Curb Accidents At Bangriposi Ghat Section
NHAI-11011-8-L&T-2019-PIU-BLS-1198
RITES/BSRP/OD/LT/2019/463
LT/BSRP/OUT/19-20/100
RITES/BSRP/OD/LT/2019/497
2863 RITES-OD RITES-BSRP-OD-L&T-2019-647 25-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Change of Scope for various items
LT/BSRP/OUT/19-20/332
NHAI-policy Guidelines-COS-2019-no-9.2.24-
2019
2864 RITES-OD RITES-BSRP-OD-L&T-2019-648 25-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Submission of Monthly Progress Report for The month of Sptember 2019 LT/BSRP/OUT/19-20/344
LT/BSRP/OUT/19-20/115
2865 RITES-OD RITES-BSRP-OD-L&T-2019-533/1 28-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Revised Design and Drawing for PSC-I gider of MNB 266+753 for approval LT/BSRP/OUT/19-20/158A
RITES/BSRP/OD/LT/2019/529
LT/BSRP/OUT/19-20/346
2866 RITES-OD RITES-BSRP-OD-L&T-2019-649 25-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Source approval of POT-PTFE ,Pin and Metallic Guided Bearing LT/BSRP/OUT/19-20/354
RITES/BSRP/OD/LT/2019/635
RITES/BSRP/OD/LT/2019/580
RITES/BSRP/OD/LT/2019/593
RITES/BSRP/OD/LT/2019/602
RITES/BSRP/OD/LT/2019/609
2867 RITES-OD RITES-BSRP-OD-L&T-2019-650 28-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Susbmission of Proposal for Withdrawal ( Descoping ) and EOT
RITES/BSRP/OD/LT/2019/612
RITES/BSRP/OD/LT/2019/631
RITES/BSRP/OD/LT/2019/636

2868 RITES-OD RITES-BSRP-OD-L&T-2019-651 28-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing of PC Approved toilet Buiding Maintenance LT/BSRP/OUT/19-20/370

RITES/BSRP/OD/LT/2019/469
RITES/BSRP/OD/LT/2019/493
RITES/BSRP/OD/LT/2019/504
2869 RITES-OD RITES-BSRP-OD-L&T-2019-652 29-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Construction of Earthen Shoulder RITES/BSRP/OD/LT/2019/518
RITES/BSRP/OD/LT/2019/556
LT/BSRP/OUT/19-20/210

RITES/BSRP/OD/LT/2019/581
Submission of Drawing of Typical Median Drain Details at Super Elevated Section / Differential
2870 RITES-OD RITES-BSRP-OD-L&T-2019-653 29-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings LT/BSRP/OUT/19-20/377
Carriageway Locations ( case-1)
LT/BSRP/OUT/19-20/213
2871 RITES-OD RITES-BSRP-OD-L&T-2019-654 5-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Source approval of Slope erosion Protection work LT/BSRP/OUT/19-20/387
LT/BSRP/OUT/19-20/213
LT/BSRP/OUT/19-20/377
Submission of Drawing of Typical Median Drain Details at Super Elevated Section / Differential
2872 RITES-OD RITES-BSRP-OD-L&T-2019-655 7-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings LT/BSRP/OUT/19-20/398
Carriageway Locations ( case-1)
RITES/BSRP/OD/LT/2019/581
RITES/BSRP/OD/LT/2019/653
2873 RITES-OD RITES-BSRP-OD-L&T-2019-656 7-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Construction of U Trough retaining wall LT/BSRP/OUT/19-20/318
Submission of Tree felling Bill-07 for Bisoi Range RA bill-06 for Bangriposi range RA Bill-05 for
2874 RITES-OD RITES-BSRP-OD-L&T-2019-657 8-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Trees LT/BSRP/OUT/19-20/251
Gurguriya Range
2875 RITES-OD RITES-BSRP-OD-L&T-2019-658 8-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Time Extension Proposal of De-scoping and Time Extension LT/BSRP/OUT/19-20/393
LT/BSRP/OUT/19-20/378-A
2876 RITES-OD RITES-BSRP-OD-L&T-2019-659 9-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Typical Details of Bus Shelter
RITES/BSRP/OD/LT/2019/506
2877 RITES-OD RITES-BSRP-OD-L&T-2019-660 9-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Typical Details of Road marking LT/BSRP/OUT/19-20/376
LT/BSRP/OUT/19-20/375
2878 RITES-OD RITES-BSRP-OD-L&T-2019-661 9-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Pedestrian MS Railing
RITES/BSRP/OD/LT/2019/506
LT/BSRP/OUT/19-20/374
2879 RITES-OD RITES-BSRP-OD-L&T-2019-662 9-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Pedestrian MS Railing
RITES/BSRP/OD/LT/2019/506
2880 RITES-OD RITES-BSRP-OD-L&T-2019-663 12-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Non Submission of Required Document for SPS-19 for the Month of October LT/BSRP/OUT/19-20/404
CIL, GST
2881 RITES-OD RITES-BSRP-OD-L&T-2019-665 12-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Reimbursement of Tax liability incurred Due to Implementation of GST Act as per circular IPC-18 LT/BSRP/OUT/19-20/405
Payments
2882 RITES-OD RITES-BSRP-OD-L&T-2019-666 13-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Road Sefety Measures TO Curb Accidents At Bangriposi Ghat Section LT/BSRP/OUT/19-20/373
RITES/BSRP/OD/LT/2019/394
RITES/BSRP/OD/LT/2019/607
2883 RITES-OD RITES-BSRP-OD-L&T-2019-664 12-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of MNJ
LT/BSRP/OUT/18-19/637
LT/BSRP/OUT/19-20/394
LT/BSRP/OUT/19-20/396
2884 RITES-OD RITES-BSRP-OD-L&T-2019-667 14-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Tollplaza layout at ch.216+360 to 277+000
LT/BSRP/OUT/19-20/409
2885 RITES-OD RITES-BSRP-OD-L&T-2019-668 16-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Typical Arrangement for Utility Crossing at toll plaza LT/BSRP/OUT/19-20/413

2886 RITES-OD RITES-BSRP-OD-L&T-2019-669 18-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Typical sing for tollplaza LT/BSRP/OUT/19-20/411
NHAI-13011-14-MISC-2019-PIU-BLS-1166
2887 RITES-OD RITES-BSRP-OD-L&T-2019-670 18-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings No of lanes at toll plaza Considenring hybrid ETC lanes as per Nhai Policy guideline no.10.1.20 RITES/BSRP/OD/LT/2019/299
LT/BSRP/OUT/19-20/364
LT/BSRP/OUT/19-20/371
2888 RITES-OD RITES-BSRP-OD-L&T-2019-671 19-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing of Box Drain for Toll Plaza
LT/BSRP/OUT/19-20/409
LT/BSRP/OUT/19-20/369
2889 RITES-OD RITES-BSRP-OD-L&T-2019-672 19-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing of Box Type tunnel for Tollplaza
LT/BSRP/OUT/19-20/409
LT/BSRP/OUT/19-20/425
2890 RITES-OD RITES-BSRP-OD-L&T-2019-673 19-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Pavement Design report for Junction

LT/BSRP/OUT/19-20/414
2891 RITES-OD RITES-BSRP-OD-L&T-2019-674 20-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Soure approval of vendor for Road sing,studs, gantry etc

LT/BSRP/OUT/19-20/421
2892 RITES-OD RITES-BSRP-OD-L&T-2019-676 20-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings FINALIZATION OF REVISED LOCATION FOR Pedestrian underpass
LT/BSRP/OUT/19-20/174
2893 RITES-OD RITES-BSRP-OD-L&T-2019-677 21-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Source Approval of vendor for intrgrated solar Street light LT/BSRP/OUT/19-20/426
Minutes of review meeting held on 16.08.2019 under the chairmanship of chairman ,NHAI AT NHAI-11011-8-LT-2019-PIU-BLS-973
2894 RITES-OD RITES-BSRP-OD-L&T-2019-678 22-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Bhubaneswaron NHAI PROJECT in odisha as well RITES/BSRP/OD/LT/2019/602
as inspection note dated 18.08.2019 of chairman
LT/BSRP/OUT/19-20/373
2895 RITES-OD RITES-BSRP-OD-L&T-2019-679 22-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous safety measures at site
RITES/BSRP/OD/LT/2019/666
RITES/BSRP/OD/LT/2019/619
2896 RITES-OD RITES-BSRP-OD-L&T-2019-680 22-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance of Existing Road RITES/BSRP/OD/LT/2019/616
RITES/BSRP/OD/LT/2019/604
RITES/BSRP/OD/LT/2019/634
Mr.P. Nageswara rao,
2897 RITES-NHAI RITES-BSRP-OD-NHAI-2019-289 21-Oct-19 The Team Leader, AE - RITES DGM (Tech),PD Claims Submission of SPS-18 LT/BSRP/OUT/19-20/338
LT/BSRP/OUT/19-20/358
RITES/BSRP/OD/LT/2019/628
Mr.P. Nageswara rao,
2898 RITES-NHAI RITES-BSRP-OD-NHAI-2019-290 21-Oct-19 The Team Leader, AE - RITES DGM (Tech),PD CIL Submission of amended performance Bank Guarantee LT/BSRP/OUT/19-20/343
LT/BSRP/OUT/19-20/357
RITES/BSRP/OD/LT/2019/634
Mr.P. Nageswara rao, LT/BSRP/OUT/19-20/338
2899 RITES-NHAI RITES-BSRP-OD-NHAI-2019-293 24-Oct-19 The Team Leader, AE - RITES Claims IPC-18
DGM (Tech),PD RITES/BSRP/OD/LT/2019/289
LT/BSRP/OUT/19-20/358
Mr.P. Nageswara rao,
2900 RITES-NHAI RITES-BSRP-OD-NHAI-2019-298 4-Nov-19 The Team Leader, AE - RITES DGM (Tech),PD Program Road Crossing passage near the college on 265+450 lhs NHAI-13011-5-PG-2019-PIU-BLS-1206

LT/BSRP/OUT/18-19/740
LT/BSRP/OUT/18-19/891
Mr.P. Nageswara rao, LT/BSRP/OUT/18-19/948
2901 RITES-NHAI RITES-BSRP-OD-NHAI-2019-299 5-Nov-19 The Team Leader, AE - RITES Program No.of lanes at tollplaza Considering hybrid ETC lanes as per NHAI policy Guideline
DGM (Tech),PD RITES/BSRP/OD/LT/2018/405
LT/BSRP/OUT/19-20/364
RITES/BSRP/OD/NHAI/2019/216
Mr.P. Nageswara rao,
2902 RITES-NHAI RITES-BSRP-OD-NHAI-2019-304 14-Nov-19 The Team Leader, AE - RITES DGM (Tech),PD Claims Submission of RA Bill-06 for Electrical utility Shifting under Sukruli Electrical Section LT/BSRP/OUT/19-20/379

NHAI-11011-15-RITES-2019-PIU-BLS-1210
Mr.P. Nageswara rao, Submission of Treefelling RA Bill-07 for Bisoi Range RA bill-06 for Bangriposi Range and RA bill-
2903 RITES-NHAI RITES-BSRP-OD-NHAI-2019-305 18-Nov-19 The Team Leader, AE - RITES Claims RITES/BSRP/OD/LT/2019/657
DGM (Tech),PD 05 for Gurguriya Range
LT/BSRP/OUT/19-20/417
Mr.P. Nageswara rao,
2904 RITES-NHAI RITES-BSRP-OD-NHAI-2019-306 18-Nov-19 The Team Leader, AE - RITES DGM (Tech),PD Land Issues Demand for Junction to Access NH from Budhamara village Road LT/BSRP/OUT/19-20/385

2905 L&T LT/BSRP/OUT/19-20/437 25-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Amendment performance Bank guarantee
2907 L&T LT/BSRP/OUT/19-20/439 27-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of bc design Mix g-2 test JMF-06 Report
2908 L&T LT/BSRP/OUT/19-20/440 29-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design and Drawing of Pot Bearing and metellic Guide Bearing
LT/BSRP/OUT/18-19/289
2909 L&T LT/BSRP/OUT/19-20/441 29-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Drawing of Tollplaza - toll Booth LT/BSRP/OUT/18-19/396
LT/BSRP/OUT/18-19/337
2910 L&T LT/BSRP/OUT/19-20/442 29-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Desing/ Drawing of typical numeration of Septic tank for Toll plaza Truck laybay LT/BSRP/OUT/19-20/410
RITES/BSRP/OD/LT/2019/236
Workable Stretch / Unencumbered length Available as on 31.10.2019 to Carry out Construction
2911 L&T LT/BSRP/OUT/19-20/443 29-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list LT/BSRP/OUT/18-19/345
Activities on Project Highway
2912 L&T LT/BSRP/OUT/19-20/444 30-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent laboratory Test of Raasi Gold Cement Opc 53 Grade RITES/BSRP/QC/OD/LT/2019/305
2913 L&T LT/BSRP/OUT/19-20/445 30-Nov-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Issuse Regarding Quality Control RITES/BSRP/QC/OD/LT/2019/318
Submission of Action Report of MOM date 16.08.2019 under ChairmanShip of Chairman NHAI LT/BSRP/OUT/19-20/602
2914 L&T LT/BSRP/OUT/19-20/446 2-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
Held At Bhubaneswar LT/BSRP/OUT/19-20/678
2915 L&T LT/BSRP/OUT/19-20/447 2-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Inspection and Test Plan of POT ,PIN and Guide Bearing -M/S mageba
2916 L&T LT/BSRP/OUT/19-20/448 2-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source approval of Flyash Bricks RITES/BSRP/QC/OD/LT/2019/321
2917 L&T LT/BSRP/OUT/19-20/449 3-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites issuse Regarding money receipt
2918 L&T LT/BSRP/OUT/19-20/450 3-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request to from R against Dahisaahi IV
2921 L&T LT/BSRP/OUT/19-20/453 3-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of TBM list (199-200 to 310+806 )
LT/BSRP/OUT/19-20/433
2923 L&T LT/BSRP/OUT/19-20/455 4-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Complinefor observationsof Submissionof Minor Junction Drawing RITES/BSRP/OD/LT/2019/681
LT/BSRP/OUT/19-20/439
2924 L&T LT/BSRP/OUT/19-20/456 5-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites submission of BC Designmix (gr-2) JMF-06 Test LT/BSRP/OUT/19-20/325
2925 L&T LT/BSRP/OUT/19-20/457 5-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Safety measures at site
2926 L&T LT/BSRP/OUT/19-20/458 5-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Safety measures at site RITES/BSRP/OD/LT/2019/679
2927 L&T LT/BSRP/OUT/19-20/459 5-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory test of fly ash Bricks for Source approval RITES/BSRP/QC/OD/LT/2019/326
2928 L&T LT/BSRP/OUT/19-20/460 5-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source approval of Bricks for tollplaza
2930 L&T LT/BSRP/OUT/19-20/462 6-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of USPV test report of Girderof MJB 210+885
2931 L&T LT/BSRP/OUT/19-20/463 6-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2933 L&T LT/BSRP/OUT/19-20/465 9-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Monthly Progress Report for the Month ofNovember
2935 L&T LT/BSRP/OUT/19-20/467 10-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source approval ofmetal beam Crash Barrier
2936 L&T LT/BSRP/OUT/19-20/468 10-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory test of Construction materials
2937 L&T LT/BSRP/OUT/19-20/469 11-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Location of MBCB for BSRP
2938 L&T LT/BSRP/OUT/19-20/470 12-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2939 L&T LT/BSRP/OUT/19-20/471 13-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2943 L&T LT/BSRP/OUT/19-20/475 13-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2944 L&T LT/BSRP/OUT/19-20/476 14-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Sumission of Retaining walllocations
2945 L&T LT/BSRP/OUT/19-20/477 16-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites submission of bank Guarantee Against the refund of Retention money to SPS-20
2946 L&T LT/BSRP/OUT/19-20/478 16-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2947 L&T LT/BSRP/OUT/19-20/479 17-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
2948 L&T LT/BSRP/OUT/19-20/480 17-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
RITES/BSRP/OD/LT/2019/681
RITES/BSRP/OD/LT/2019/686
2950 L&T LT/BSRP/OUT/19-20/482 18-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Complince of Minor junctions LT/BSRP/OUT/19-20/433
LT/BSRP/OUT/19-20/455

RITES/BSRP/OD/LT/2019/331
2952 L&T 20-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Source Approval of Metal Beam Crash Barrier (MBCB) LT/BSRP/OUT/19-20/467
LT/BSRP/OUT/19-20/484
RITES/BSRP/OD/LT/2019/690
2956 L&T LT/BSRP/OUT/19-20/488 20-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Reimbursement of taxliability incurred due to Implementation of GST Act as per Circular IPC-20 LT/BSRP/OUT/19-20/478
2966 L&T LT/BSRP/OUT/19-20/498 30-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of List of Retaing walls LT-BSRP-OUT-19-20-402,Your mail dated-26-12-2019
Submission of updated delay analysis for Eot application -III considering delays accrued upto LT-BSRP-OUT-19-20-416,RITES-BSRP-OD-LT-
2967 L&T LT/BSRP/OUT/19-20/499 30-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
30th nov 2019 2019-682,LT-BSRP-OUT-19-20-470
2968 L&T LT/BSRP/OUT/19-20/500 30-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Demand for populance for construction of PUP and Drain in Bisoi Bypass
2970 L&T LT/BSRP/OUT/19-20/502 30-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Options Minor junction construction at Km 310+525
2971 L&T LT/BSRP/OUT/19-20/503 30-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Options for Minor junction construction at Km 310+525
2974 L&T LT/BSRP/OUT/19-20/506 30-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Change of Scope Order '' for Strengthening of the Incident Management Services RITES-BSRP-OD-LT-2018-318-15-09-2019
LT-BSRP-OUT-19-20-478-16.12.2019,RITES-
Reimbursement of tax liability incurred due to implementation of GST Act as per circular 3.3.15 BSRP-OD-LT-2019-690,LT-BSRP-OUT-19-20-488-
2975 L&T LT/BSRP/OUT/19-20/507 30-Dec-19 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
dated 04.10.2017 and NHAI/F&A/GST-2017-18/SM dated 01.08.2019 against SPS-20 20-12-2019,RITES-BSRP-OD-LT-2019-691-18-12-
2019
LT-BSRP-19-20-430-19-11-2019,RITES-BSRP-
OD-LT-2019-676-20-11-2019,LT-BSRP-19-20-
2976 L&T LT/BSRP/OUT/19-20/508 4-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Finalization of revised location for pedestrain Underpass at 289+100
421,13-11-2019,LT-BSRP-OUT-19-20-312,13-
09-2019,LT-BSRP-OUT-19-20-174-22-06-2019
Submission of Revised Design & Drawings of Administration Building of Toll Plaza at location
2977 L&T LT/BSRP/OUT/19-20/509 4-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
216+360 and 277+000
2978 L&T LT/BSRP/OUT/19-20/510 6-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites NO CLAIM CERTIFICATE
2979 L&T LT/BSRP/OUT/19-20/511 6-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission o SPS-21 of Main works as per Sahedule -H of AGREEMENR
Submission of RA Bill-07 for Ele.utility Shifting works asper Approved Estimate under Jashipur
2980 L&T LT/BSRP/OUT/19-20/512 6-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
Electrical Section
2981 L&T LT/BSRP/OUT/19-20/513 6-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Resistance from local populance in Asana MANADA VILLAGE
2982 L&T LT/BSRP/OUT/19-20/514 6-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent Laboratory Test of CONSTRUCTION MATERIALS
Notice for suspension of work unde clause 10.5.2 due to Bharat Bandh called by Trade Unions on
2983 L&T LT/BSRP/OUT/19-20/515 9-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
08-01-2020
Submission of Architecture Drawing of Medical Building plan & Sections ,Elevations and Toilet
2984 L&T LT/BSRP/OUT/19-20/516 9-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
Details
2986 L&T LT/BSRP/OUT/19-20/518 9-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Pavement design report forJUNCTIONS

Time Extension,
2987 L&T LT/BSRP/OUT/19-20/519 9-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites notification for Unprecedented Rainfall under Clause 10.5.2 of the Contract Agreement
Force Majeure
2990 L&T LT/BSRP/OUT/19-20/522 10-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Finalization of revised location for pedestrain underpass at 289+750
2992 L&T LT/BSRP/OUT/19-20/524 10-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of RWSS estimate received for shifting of utilities at Asana village under Bisoi Block
SUBMISSION OF Revised PC approval Design of TOILET Building ,LT Panel & Maintenece
2993 L&T LT/BSRP/OUT/19-20/525 10-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
workshop and Medical Building
2994 L&T LT/BSRP/OUT/19-20/526 10-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Monthly progress Repoprt for the month of DECEMBER-2019
Demand for construction of two nos. of PUP & VUP at Nimsahi crossing road,Goudgaon village
2995 L&T LT/BSRP/OUT/19-20/527 12-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
crossing road & VUP at Raruan crossing road
2997 L&T LT/BSRP/OUT/19-20/529 13-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Right of Way (ROW) issue at Bombay chawk Flyover location
Additional two culverts to be constructed which are not listed in Schedule-B of Contract
2998 L&T LT/BSRP/OUT/19-20/530 13-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
Agreement.
Request for construction of Bus stand both side near BENEIKALA VILLAGE AND MEDIAN
2999 L&T LT/BSRP/OUT/19-20/531 13-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
OPENING FOR ROAD CROSSING
3000 L&T LT/BSRP/OUT/19-20/532 13-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request for release of amount withheld towards price Escalation
3001 L&T LT/BSRP/OUT/19-20/533 14-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites maintenance of Existing road
Resubmission of Architecture Drawing of Medical Building plan & sections,Elevations and Toilet
3002 L&T LT/BSRP/OUT/19-20/534 16-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
Details
3003 L&T LT/BSRP/OUT/19-20/535 16-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Non-receipt of Change of scope order for six additional culverts and two underpasses.
3005 L&T LT/BSRP/OUT/19-20/537 16-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of RWSS RA Bill-07
3006 L&T LT/BSRP/OUT/19-20/538 16-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Revised Design of Administration Building of Toll Plaza at Location 277+000
3008 L&T LT/BSRP/OUT/19-20/540 18-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of borrow area soil test result for construction of Embankment / Subgrade
3009 L&T LT/BSRP/OUT/19-20/541 20-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of revised/modified schedule-H as per clause 19.3.3 the Agreement
3010 L&T LT/BSRP/OUT/19-20/542 21-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submissson of required documents for SPS-21 for the month of December 2019
3011 L&T LT/BSRP/OUT/19-20/543 21-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Demand from local populance for construction of PUP and Drain in Bisoi Bypass
Workable stretch /unencumbered length available as on 31-12-2019 to carry out construction
3012 L&T LT/BSRP/OUT/19-20/544 21-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list
activities on project highway
3013 L&T LT/BSRP/OUT/19-20/545 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
3015 L&T LT/BSRP/OUT/19-20/547 21-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Change of Scope Order '' for Strengthening of the Incident Management Services
Request for release of tree felling payment for RA Bill-07 for Bisoi Range,RA Bill-06 for
3016 L&T LT/BSRP/OUT/19-20/548 21-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
BANGRIPOSI Range & RA Bill-05 for Gurguriya Range
3017 L&T LT/BSRP/OUT/19-20/549 22-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of revised design & drawing of pier P4 MJB 205+710
3018 L&T LT/BSRP/OUT/19-20/550 22-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites SUBMISSION OF PPR value calculationof pier P5 mjb 205+710
Submission of Revised Design & Drawing of Cash Pick up Room for both the Toll Plaza 216+360
3023 L&T LT/BSRP/OUT/19-20/555 27-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
and 277+000
Submission of revised Design & drawing of Box Type Tunnel for both the Toll plaza at 216+360
3024 L&T LT/BSRP/OUT/19-20/556 27-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
and 277+0000
3025 L&T LT/BSRP/OUT/19-20/557 27-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of rvised Drawing of General Arrangement for strip steel Expansion Joint
Submission of Safety Certificate of Toll Plaza layout,Admin Building,LT panel room & Work
3027 L&T LT/BSRP/OUT/19-20/559 27-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
shop,Medical Building ,Toilet Building and Road Sign Plan for both Toll Plaza
3028 L&T LT/BSRP/OUT/19-20/560 27-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Drawing of typical details of Traffic Island & Bull Nose
3029 L&T LT/BSRP/OUT/19-20/561 27-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow Area soil Test Result for Construction of Embankment /Sub grade
3030 L&T LT/BSRP/OUT/19-20/561A 27-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow Area soil Test Result for Construction of Embankment /Sub grade
3031 L&T LT/BSRP/OUT/19-20/562 27-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of RWSS RA Bill -07

Reimbursement of tax liability incurred due to implementation of GST Act as per circular 3.3.15
3032 L&T LT/BSRP/OUT/19-20/563 27-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites
dated 04.10.2017 and NHAI/F&A/GST-2017-18/SM dated 01.08.2019 against SPS-21 & IPC-20

LT-BSRP-OUT-19-20-511,
3033 L&T LT/BSRP/OUT/19-20/564 27-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Release of 10% Hold Amount for main works
RITES-BSRP-OD-NHAI-2019-336

LT-BSRP-OUT-19-20-416,RITES-BSRP-OD-NHAI-
3034 L&T LT/BSRP/OUT/19-20/565 28-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Requet for release of amount withheld towards price Escalation
2020-238,NHAI-11016-28-RO-OD-164-2020
RITES/BSRP/OD/LT/2019-706,702,676,
3037 L&T LT/BSRP/OUT/19-20/568 27-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Typical cross section of revised location for pedestrain Underpass at 289+750 LT-BSRP-OUT-19-
20/522,508,430,421,312,174
RITES-BSRP-OD-LT-2019-642:
3042 L&T LT/BSRP/OUT/19-20/573 30-Jan-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request/Confirmation for Conveying necessary change of scope approvals
LT-BSRP-OUT-19-20-502,527
LT/BSRP/OUT/19-20/549 :
3043 L&T LT/BSRP/OUT/19-20/574 1-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Compliance report on revised design & drawing of piles & pile cap of Pier P-4 of MJB 205+711
RITES/BSRP/OD/LT/2019/714
3044 L&T LT/BSRP/OUT/19-20/575 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
3050 L&T LT/BSRP/OUT/19-20/581 3-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow Area soil Test Result for Construction of Embankment /Sub grade
3055 L&T LT/BSRP/OUT/19-20/586 6-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent laboratory test of Construction materials
3060 L&T LT/BSRP/OUT/19-20/591 6-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request Confirmation for Conveying necessary change of Scope Approval
3061 L&T LT/BSRP/OUT/19-20/592 6-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites submission of pile cap layout and Revised GAD for pier P4 of mjb 205+710

Time Extension,
3062 L&T LT/BSRP/OUT/19-20/593 6-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Notification for underecedented Rainfall under Clause of the Contract Agreement
Force Majeure
3063 L&T LT/BSRP/OUT/19-20/594 6-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of SPS-22 of main Works as per Schedule -H of Agreement
3064 L&T LT/BSRP/OUT/19-20/595 6-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Additional Culvert to be Constructed under Change of Scope
3066 L&T LT/BSRP/OUT/19-20/597 7-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request to approve authorized Signatories for verification of project work and signing of Rfis
3068 L&T LT/BSRP/OUT/19-20/599 8-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Resistance faced from local populace 203+320 lhs
3069 L&T LT/BSRP/OUT/19-20/600 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
3070 L&T LT/BSRP/OUT/19-20/601 10-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Compulsory Afforestation in jharkhand Section
3071 L&T LT/BSRP/OUT/19-20/602 10-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Resisitance from local populance from Demanding the Consrtruction of Road Side Drain
3072 L&T LT/BSRP/OUT/19-20/603 10-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Change of Scope order for Strengthening of the incident management Services
3073 L&T LT/BSRP/OUT/19-20/604 11-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of PC Approved Revised P&P Approved Revised P and MCW PUP
3074 L&T LT/BSRP/OUT/19-20/605 11-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of PC Approved Revised P&P for Service Road Rev-A PUP 288+290 to 283+000
3076 L&T LT/BSRP/OUT/19-20/607 11-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of proposal Drawing of Major junction at 199+180
3078 L&T LT/BSRP/OUT/19-20/609 12-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow Area Soil test Result for Construction of EMB/SG
3079 L&T LT/BSRP/OUT/19-20/610 12-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Royalty payment
3081 L&T LT/BSRP/OUT/19-20/612 13-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow Area soil test Results
3082 L&T LT/BSRP/OUT/19-20/613 14-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Compliance for non-conformance Notification no.7 form 280+490 to 280+640
3083 L&T LT/BSRP/OUT/19-20/614 14-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Locations of MBCB FOR BSRP Project
3084 L&T LT/BSRP/OUT/19-20/615 15-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of typical details of W-Beam Crash Barrier
3085 L&T LT/BSRP/OUT/19-20/616 15-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Reimbursement of Tax liability incurred Due to implementation of GST Act as per against-IPC-21
3086 L&T LT/BSRP/OUT/19-20/617 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1 RITES-BSRP-OD-NHAI-2019-344
LT/BSRP/OUT/19-20/543
3087 L&T LT/BSRP/OUT/19-20/618 15-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of GAD for Foot Over Bridge at 243+660
RITES/BSRP/OD/LT/2019/726
3090 L&T LT/BSRP/OUT/19-20/621 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
3091 L&T LT/BSRP/OUT/19-20/622 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
3092 L&T LT/BSRP/OUT/19-20/623 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
3093 L&T LT/BSRP/OUT/19-20/624 17-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent laboratory test of Geocall for Slope protection RITES/BSRP/QC/OD/LT/2018-83
3094 L&T LT/BSRP/OUT/19-20/625 17-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent laboratory test of Geocall for Slope protection RITES/BSRP/QC/OD/LT/2019-654
3095 L&T LT/BSRP/OUT/19-20/626 18-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request to issue money Receipt
RITES/BSRP/OD/LT/2019/
3096 RITES-OD RITES-BSRP-OD-L&T-2019-681 25-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Minor Junctions RITES/BSRP/OD/LT/2019/
RITES/BSRP/OD/LT/2019/
Application-III for Time Extension ( For the Delays up to 31st oct persuant to Sub-clause 10.5 of
NHAI/Policy Guidelines/ Civil works/2019
3097 RITES-OD RITES-BSRP-OD-L&T-2019-682 25-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Time Extension the
NO.9.2.25/2019
Contract Agreement
LT-BSRP-OUT-19-20-431
3098 RITES-OD RITES-BSRP-OD-L&T-2019-683 26-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of drawing of lined Drain Plan And profile for Toll Plaza 216+360 to 277+000
LT-BSRP-OUT-19-20-409
3099 RITES-OD RITES-BSRP-OD-L&T-2019-685 10-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Inspection and Test plan of POT PIN and Guide Bearings LT/BSRP/OUT/19-20/447

RITES/BSRP/OD/LT/2019/394
RITES/BSRP/OD/LT/2019/607
RITES/BSRP/OD/LT/2019/664
RITES/BSRP/OD/LT/2019/681
3100 RITES-OD RITES-BSRP-OD-L&T-2019-686 11-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Minor Junctions
LT/BSRP/OUT/18-19/637
LT/BSRP/OUT/19-20/394
LT/BSRP/OUT/19-20/433
LT/BSRP/OUT/19-20/455
3101 RITES-OD RITES-BSRP-OD-L&T-2019-687 12-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Request for Submission of Bearing load Details Group wise LT/BSRP/OUT/19-20/440
3102 RITES-OD RITES-BSRP-OD-L&T-2019-688 12-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Non submission of Required Document for SPS-20 for the month November2019 LT/BSRP/OUT/19-20/463
3103 RITES-OD RITES-BSRP-OD-L&T-2019-689 12-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi MPR Susbmission of monthly Progress Report for the Month of October LT/BSRP/OUT/19-20/412

CIL, GST Reimburdement of tax liability incurred Due to Implementation of GST Act As per 3.3.15 Against NHAI-F&A/IA/2019-20-SPL-GST AUDIT-137348
3104 RITES-OD RITES-BSRP-OD-L&T-2019-690 16-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi
Payments SPS-19 LT/BSRP/OUT/19-20/452

CIL, GST Reimburdement of tax liability incurred Due to Implementation of GST Act As per 3.3.15 Against NHAI-F&A/IA/2019-20-SPL-GST AUDIT-137348
3105 RITES-OD RITES-BSRP-OD-L&T-2019-691 18-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi
Payments SPS-20 LT/BSRP/OUT/19-20/478
3106 RITES-OD RITES-BSRP-OD-L&T-2019-692 21-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Construction of Earthen shoulder

3107 RITES-OD RITES-BSRP-OD-L&T-2019-693 21-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance of Existing road

3108 RITES-OD RITES-BSRP-OD-L&T-2019-694 23-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Utilities Utility shifting and tree felling on locations of proposed descoping stretch
3109 RITES-OD RITES-BSRP-OD-L&T-2019-695 28-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of vendors & drawing of Pot Bearings ,Pin Bearing & Metallic Guide Bearing

3110 RITES-OD RITES-BSRP-OD-L&T-2019-696 27-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Locations of MBCB for BSRP Project

Submission of RA bill-07 for Elec.Utility Shifting Works as per Approved Estimate under Jashipur
3111 RITES-OD RITES-BSRP-OD-L&T-2019-698 30-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Utilities
Electrical Section
3112 RITES-OD RITES-BSRP-OD-L&T-2019-699 30-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Observations on drawings of Toll Plaza at Ch.216+360 and 277+000

3113 RITES-OD RITES-BSRP-OD-L&T-2019-700 3-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality Change of scope order for strengthening of the incident Management Services
3114 RITES-OD RITES-BSRP-OD-L&T-2019-701 3-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Demand from local populance for construction of PUP and Drain in Bisoi Bypass

3115 RITES-OD RITES-BSRP-OD-L&T-2019-702 6-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Finalization of revised location for Pedestrain Underpass at 289+100

3116 RITES-OD RITES-BSRP-OD-L&T-2019-703 6-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of list of retaing walls

3117 RITES-OD RITES-BSRP-OD-L&T-2019-704 11-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of drawings of Admin building of TollPlaza at Ch.216+360

Observations on Architecture drawing of Medical Building Plan & section ,Elevations and Toilet
3118 RITES-OD RITES-BSRP-OD-L&T-2019-705 11-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
Details
3119 RITES-OD RITES-BSRP-OD-L&T-2019-706 11-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Finalization of revised location for Pedestrain Underpass at 288+750

Observations on design & drawing of Toilet Building,Work shop &LT panel and Medical Building
3120 RITES-OD RITES-BSRP-OD-L&T-2019-707 15-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
of Toll Plaza
3121 RITES-OD RITES-BSRP-OD-L&T-2019-708 17-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Demand from local populance of Bisoi for construction of FOB & PUP

3122 RITES-OD RITES-BSRP-OD-L&T-2019-709 17-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Architecture drawing of medical Building Plan & section,Elevation and Toilet details

3123 RITES-OD RITES-BSRP-OD-L&T-2019-710 18-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Architecture drawing of medical Building Plan & section,Elevation and Toilet details

3124 RITES-OD RITES-BSRP-OD-L&T-2019-711 20-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of RWSS RA Bill-07
3125 RITES-OD RITES-BSRP-OD-L&T-2019-712 20-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Non submission of required document for SPS-21 for the month of Dec 2019
3126 RITES-OD RITES-BSRP-OD-L&T-2019-713 27-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Admin Building of Toll plaza at ch.277+000

3127 RITES-OD RITES-BSRP-OD-L&T-2019-714 27-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Comments on Revised Design & Drawing of Piles & Pile cap of Pier P4 of MJB 205+710

3128 RITES-OD RITES-BSRP-OD-L&T-2019-715 29-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Construction of Earthen shoulder

3129 RITES-OD RITES-BSRP-OD-L&T-2019-716 29-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing for Pedestarin Underpass at 288+750

3130 RITES-OD RITES-BSRP-OD-L&T-2019-717 29-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of GTINVESTIGATION REPORT FOR VUP and RE wall locations

3131 RITES-OD RITES-BSRP-OD-L&T-2019-718 3-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Maintenance of Existing Road

3132 RITES-OD RITES-BSRP-OD-L&T-2019-719 3-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Non Submission of required document for IPC-21 for the month of Dec 2019
Reimbursement of tax liability incurred due to implementation of GST Act as per circular 3.3.15
CIL, GST
3133 RITES-OD RITES-BSRP-OD-L&T-2019-720 3-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi dated 04.10.2017 and NHAI-F&A-GST-2017-18-
Payments
SM dated 01.08.2018 against IPC -20 & SPS-21
3134 RITES-OD RITES-BSRP-OD-L&T-2019-721 4-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing for pedestrain underpass at 288+750

Request for construction of Bus stand both side near Baneikala village and median opening for
3135 RITES-OD RITES-BSRP-OD-L&T-2019-722 4-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
road crossing
3136 RITES-OD RITES-BSRP-OD-L&T-2019-723 4-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Land Issues Right of way (ROW) issue at BOMBAY CHAWK FLYOVER LOCATION
3137 RITES-OD RITES-BSRP-OD-L&T-2019-724 4-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Confirmation for additional structures to be constructed under change of scope
3138 RITES-OD RITES-BSRP-OD-L&T-2019-725 5-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Construction of Minor junction at Km 310+525

3139 RITES-OD RITES-BSRP-OD-L&T-2019-726 5-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Submission of proposal for Foot Over Bridge under change of scope
Withdrawal De-scoping) of the Project Stretches affected by the Construction of Proposed 12
3140 RITES-OD RITES-BSRP-OD-L&T-2019-727 7-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
Nos. EUP
3141 RITES-OD RITES-BSRP-OD-L&T-2019-728 7-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Video recording for status and progress of works.
3142 RITES-OD RITES-BSRP-OD-L&T-2019-729 8-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of revised Design and Drawing of Cash pick up room of Tollplaza

3143 RITES-OD RITES-BSRP-OD-L&T-2019-730 8-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of revised Design and Drawing od Box type tunnel of Tollplaza

3144 RITES-OD RITES-BSRP-OD-L&T-2019-731 8-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Drawing of water kiosk for toll plaza and truck laybay

3145 RITES-OD RITES-BSRP-OD-L&T-2019-732 8-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of revised Drawing and pile and pile cap layout of pier p-4 mjb 205+711

3146 RITES-OD RITES-BSRP-OD-L&T-2019-733 8-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of revised GAD of strip seal expansion joint

3147 RITES-OD RITES-BSRP-OD-L&T-2019-734 8-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of PC approved Revised P and P for MCW REV-F FOR PUP & SR

3148 RITES-OD RITES-BSRP-OD-L&T-2019-735 8-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Sumission of Drawing of Major junction at 215+270

3149 RITES-OD RITES-BSRP-OD-L&T-2019-736 10-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Locations of MBCB for BSRP Project

3150 RITES-OD RITES-BSRP-OD-L&T-2019-737 10-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous Embossing BHARATMALA logo on facia panal of RE wall
3151 RITES-OD RITES-BSRP-OD-L&T-2019-738 10-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Approval of Representstive for verification of Project work and singning of RFIs
3152 RITES-OD RITES-BSRP-OD-L&T-2019-739 10-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Improper Construction of Granular shoulder
3153 RITES-OD RITES-BSRP-OD-L&T-2019-740 12-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Change of scope order for strengthening of the incident Management Services
3154 RITES-OD RITES-BSRP-OD-L&T-2019-741 12-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings observations on boring of Piles of pier p-4 of MJB

3155 RITES-OD RITES-BSRP-OD-L&T-2019-742 13-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of PC approved Revised P and P for MCW REV-F FOR PUP & SR

3156 RITES-OD RITES-BSRP-OD-L&T-2019-743 13-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of PC approved Revised P and P for MCW REV-F FOR PUP & SR

3157 RITES-OD RITES-BSRP-OD-L&T-2019-744 13-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Footpath cum Drain Arrangement at Service Road Structure location

Time Extension,
3158 RITES-OD RITES-BSRP-OD-L&T-2019-745 13-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Notification for unprecedented Rainfall under Clause 10.5.2 of CA
Force Majeure
observations of Drawing of Toilet Building lt panel and Maintenance workshop and medical
3159 RITES-OD RITES-BSRP-OD-L&T-2019-746 13-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings
building
Comments on GT investigation report and on Bearing Capacity Calculations at approaches of
3160 RITES-OD RITES-BSRP-OD-L&T-2019-747 13-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality
Flyover
3161 RITES-OD RITES-BSRP-OD-L&T-2019-748 17-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments MAINTENANCE OF EXISING Road / Diversions
3162 RITES-OD RITES-BSRP-OD-L&T-2019-749 17-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of Drawing for pedestrain underpass at 288+750
3163 RITES-OD RITES-BSRP-OD-L&T-2019-750 17-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Inspection and test plan of free POT PIN and GUIDE Bearings

NHAI-F&A-IA-2019-20-SPL GST AUDIT-137348


CIL, GST
3164 RITES-OD RITES-BSRP-OD-L&T-2019-752 19-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi IPC-21 GST LT-BSRP-OUT-19-20-616
Payments

3165 RITES-OD RITES-BSRP-OD-L&T-2019-753 19-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Non submission of Reuired Document for SPS-22 for the month of January -2020 LT-BSRP-OUT-19-20-594
NHAI-11012/8/LT/2020/PIU/BLS/30
RITES-BSRP-OD-NHAI-2020-326
3166 RITES-OD RITES-BSRP-OD-L&T-2019-754 19-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Submission of Revised/modified schedule-H as per CA
LT-BSRP-OUT-19-20-541
RITES-BSRP-OD-LT-2020-727
RITES/BSRP/OD/LT/2019/143
RITES/BSRP/OD/LT/2019/148
RITES/BSRP/OD/LT/2019/183
3167 RITES-QC RITES-BSRP-QC-OD-LT-2019-306 26-Aug-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Construction Submission of MTC for Construction materials
RITES/BSRP/OD/LT/2019/205
LT/BSRP/OUT/19-20/705
LT/BSRP/OUT/19-20/797
RITES/BSRP/OD/LT/2019/281
RITES/BSRP/OD/LT/2019/286
3168 RITES-QC RITES-BSRP-QC-OD-LT-2019-307 9-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Bituminous Concrete mix Design Gr-II ( independent testing )
RITES/BSRP/OD/LT/2019/281
LT/BSRP/OUT/19-20/280
3169 RITES-OD RITES-BSRP-OD-L&T-2019-613 11-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Design and Drawing of U-Trough

3170 RITES-QC RITES-BSRP-QC-OD-LT-2019-308 11-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory Test of Construction Material LT-BSRP-OUT-19-20-303
3171 RITES-OD RITES-BSRP-OD-L&T-2019-614 12-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Repair,Rehabilitation & strengthening of all existing bridges LT-BSRP-OUT-19-20-173,RITES-BSRP-OD-LT-2019-547

3172 RITES-OD RITES-BSRP-OD-L&T-2019-615 16-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Approval of Free POT-PTFE bearing design &drawing of MJB 205+710 LT-BSRP-OUT-19-20-296
3173 RITES-QC RITES-BSRP-QC-OD-L&T-2019-309 18-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Defetive work of Dence Bituminous Macadam
3174 RITES-QC RITES-BSRP-QC-OD-L&T-2019-309/1 24-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Quality Assurance plan inspection plan of Spherical Bearing LT/BSRP/OUT/19-20/323A
RITES-BSRP-QC-OD-LT-2019-
3175 RITES-QC RITES-BSRP-QC-OD-LT-2019-310 27-Sep-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Review of Design mix for DBM and BC 309,277,268,236,235,225,150,146/1,145,144,1
09,92
3176 RITES-QC RITES-BSRP-QC-OD-LT-2019-310/1 9-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of revised mix Design of BC LT/BSRP/OUT/19-20/338A
3177 RITES-QC RITES-BSRP-QC-OD-LT-2019-311 11-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent laboratory test of Construction materials LT/BSRP/OUT/19-20/342
3178 RITES-QC RITES-BSRP-QC-OD-LT-2019-312 17-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Company Credentials of M/S KATALINE for Road Marking works LT/BSRP/OUT/19-20-339
RITES/BSRP/QC/OD/LT/2019/309/1
3179 RITES-QC RITES-BSRP-QC-OD-LT-2019-313 17-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Regarding inspection testing of Spherical bearing at Sanfield ( india) Ltd
LT/BSRP/OUT/19-20/323A
3180 RITES-QC RITES-BSRP-QC-OD-LT-2019-314 29-Oct-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test Reports
LT/BSRP/OUT/19-20/309
3181 RITES-QC RITES-BSRP-QC-OD-LT-2019-315 7-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Defective work of Dence bituminous macadam
RITES/BSRP/QC-OD/2019/306
3182 RITES-QC RITES-BSRP-QC-OD-LT-2019-316 11-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of PQC Design mix with Cement OPC 53 G and Murgapat Crusher Aggregate (P-2) LT/BSRP/OUT/19-20/388
3183 RITES-QC RITES-BSRP-QC-OD-LT-2019-317 11-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works independent Laboratory test of Construction materials LT/BSRP/OUT/19-20/403
RITES/BSRP/OD/LT/2018-40
RITES/BSRP/OD/LT/2019/639
3184 RITES-QC RITES-BSRP-QC-OD-LT-2019-318 12-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Issuse regarding quality Control
RITES/BSRP/QC/OD/LT/2019/310
RITES/BSRP/QC/OD/LT/2018/132
Borrow
Submission of borrow Area Soil test Results For Construction of Embankment-Subgrade
3185 RITES-QC RITES-BSRP-QC-OD-LT-2019-319 15-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining LT/BSRP/OUT/19-20/392
Approval approval
LT/BSRP/OUT/19-20/423
3186 RITES-QC RITES-BSRP-QC-OD-LT-2019-320 20-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Soure approval of Bricks M/S- Maa ambika Enterprises nuashi

LT/BSRP/OUT/19-20/423
3187 RITES-QC RITES-BSRP-QC-OD-LT-2019-321 23-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approval of Bricks for Tollplaza RITES/BSRP/QC/LT/2019/320
LT/BSRP/OUT/19-20/435
3188 RITES-QC RITES-BSRP-QC-OD-LT-2019-322 28-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approval of Granular material for Shoulders LT/BSRP/OUT/19-20/428
3189 RITES-QC RITES-BSRP-QC-OD-LT-2019-323 28-Nov-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of Shoulder test Reports with Granular materials and Crushed Aggregates LT-BSRPOUT-19-20-427
3190 RITES-QC RITES-BSRP-QC-OD-LT-2019-324 4-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent laboratory test of Raasi Gold OPC 53 Grade LT-BSRPOUT-19-20-444
3191 RITES-QC RITES-BSRP-QC-OD-LT-2019-325 4-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of BC Design Mix ( Gr-2 ) JMF -06 test Report LT-BSRPOUT-19-20-439
3192 RITES-QC RITES-BSRP-QC-OD-LT-2019-326 5-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approval of Flyash Bricks LT-BSRPOUT-19-20-448
RITES/BSRP/QC/OD/LT/2019/320
RITES/BSRP/QC/OD/LT/2019/321
3193 RITES-QC RITES-BSRP-QC-OD-LT-2019-327 10-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approval of Bricks for Toll plaza LT/BSRP/OUT/19-20/423
LT/BSRP/OUT/19-20/435
LT/BSRP/OUT/18-19/460
3194 RITES-QC RITES-BSRP-QC-OD-LT-2019-328 13-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction materials LT/BSRP/OUT/19-20/468
3195 RITES-QC RITES-BSRP-QC-OD-LT-2019-329 15-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Fly ash Bricks for Source Approvals LT/BSRP/OUT/19-20/459
3196 RITES-QC RITES-BSRP-QC-OD-LT-2019-330 15-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Issue regarding quality control LT/BSRP/OUT/19-20/445
3197 RITES-QC RITES-BSRP-QC-OD-LT-2019-331 19-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source Approval of Metel Beam Cresh Barrier (MBCB) M/S-Jindal (india) Limited LT/BSRP/OUT/19-20/467
3198 RITES-QC RITES-BSRP-QC-OD-LT-2019-332 20-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Submission of BC Design Mix ( Gr-2 ) JMF -06 test Report LT/BSRP/OUT/19-20/456
3199 RITES-QC RITES-BSRP-QC-OD-LT-2019-333 23-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of bricks for Toll Plaza
3200 RITES-QC RITES-BSRP-QC-OD-LT-2019-334 24-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Water proofing PVC membranes -M/s.Chryso india Private Limited
3201 RITES-QC RITES-BSRP-QC-OD-LT-2019-335 24-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Metal Beam Crash barrier (MBCB)-m/s.jindal (india) Limited
3202 RITES-QC RITES-BSRP-QC-OD-LT-2019-336 25-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Thermoplastic Road Marking-M/s-Asphalt Lineolux PVT Ltd
3203 RITES-QC RITES-BSRP-QC-OD-LT-2019-337 28-Dec-19 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works independent laboratory test of construction materials
3204 RITES-QC RITES-BSRP-QC-OD-LT-2019-338 10-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works independent laboratory test of construction materials
3205 RITES-QC RITES-BSRP-QC-OD-LT-2019-339 21-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Inspection & test of POT ,PIN & guide Bearings
3206 RITES-QC RITES-BSRP-QC-OD-LT-2019-340 21-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Metal Beam Crash barrier (MBCB)-m/s.jindal (india) Limited
3207 RITES-QC RITES-BSRP-QC-OD-LT-2019-341 29-Jan-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Construction Submission of borow area soil test result for construction of embankment /Sub Grade
3208 RITES-QC RITES-BSRP-QC-OD-LT-2019-342 10-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Source approval of Thermoplastic Road Marking-M/s-Asphalt Lineolux PVT Ltd
3209 RITES-QC RITES-BSRP-QC-OD-LT-2019-343 11-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent laboratory test of Construction materials
3210 RITES-QC RITES-BSRP-QC-OD-LT-2019-344 13-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Delay in Submission of Tird party report of various Construction materials
Borrow
3211 RITES-QC RITES-BSRP-QC-OD-LT-2019-345 14-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow Area Soil test Results
Approval
Borrow
3212 RITES-QC RITES-BSRP-QC-OD-LT-2019-346 14-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area test Result for Construction of Emb/subgrade
Approval
Borrow
3213 RITES-QC RITES-BSRP-QC-OD-LT-2019-347 14-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area test Result for Construction of Emb/subgrade
Approval
Borrow
3214 RITES-QC RITES-BSRP-QC-OD-LT-2019-348 14-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test Result
Approval
Borrow
3215 RITES-QC RITES-BSRP-QC-OD-LT-2019-349 17-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test result for construction of Embankment / subgrade-Approval
Approval
Borrow
3216 RITES-QC RITES-BSRP-QC-OD-LT-2019-350 17-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test Result
Approval
Borrow
3217 RITES-QC RITES-BSRP-QC-OD-LT-2019-351 17-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Area/Mining Submission of Borrow area soil test Result
Approval
Mr.P. Nageswara rao,
3218 RITES-NHAI RITES-BSRP-OD-NHAI-2019-314 5-Dec-19 The Team Leader, AE - RITES DGM (Tech),PD Miscellaneous safety measures at site LT-BSRPOUT-19-20-457

Mr.P. Nageswara rao,


3219 RITES-NHAI RITES-BSRP-OD-NHAI-2019-323 23-Dec-19 The Team Leader, AE - RITES DGM (Tech),PD Land Issues Additional ROW for Minor Junction

Reimbursement of tax liability incurred due to implementation of GST Act as per circular 3.3.15
Mr.P. Nageswara rao,
3220 RITES-NHAI RITES-BSRP-OD-NHAI-2019-325 6-Jan-20 The Team Leader, AE - RITES DGM (Tech),PD CIL dated 04.10.2017 and NHAI-F&A-GST-2017-18-
SM dated 01.08.2018
Mr.P. Nageswara rao,
3221 RITES-NHAI RITES-BSRP-OD-NHAI-2019-326 9-Jan-20 The Team Leader, AE - RITES DGM (Tech),PD COS Proposal for Withdrawal (de-scoping) of the Projct stretches/works

Mr.P. Nageswara rao,


3222 RITES-NHAI RITES-BSRP-OD-NHAI-2019-325 11-Jan-20 The Team Leader, AE - RITES DGM (Tech),PD Time Extension Extension of time for Project milestone and Schedule completion date

Mr.P. Nageswara rao,


3223 RITES-NHAI RITES-BSRP-OD-NHAI-2019-331 15-Jan-20 The Team Leader, AE - RITES DGM (Tech),PD Claims Interim Payment Certificate No20

Mr.P. Nageswara rao, Submission of RA Bill-07 for Elec.Utility Shifting Works as per Approved Estimate under Jashipur
3224 RITES-NHAI RITES-BSRP-OD-NHAI-2019-335 21-01-20020 The Team Leader, AE - RITES Claims
DGM (Tech),PD Electrical Section
Mr.P. Nageswara rao,
3225 RITES-NHAI RITES-BSRP-OD-NHAI-2019-336 22-Jan-20 The Team Leader, AE - RITES DGM (Tech),PD Claims Submission of Stagepayment Statement-21 for main works as per schedule-H

Mr.P. Nageswara rao,


3226 RITES-NHAI RITES-BSRP-OD-NHAI-2019-338 5-Feb-20 The Team Leader, AE - RITES DGM (Tech),PD Claims Submission of Rwss RA Bill-07

3227 L&T LT/BSRP/OUT/19-20/627 18-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Compliance on boring of piles of pier P-4 MJB 205711
3228 L&T LT/BSRP/OUT/19-20/628 19-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Borrow Area Soil test Result for Construction of Emb/sg
3229 L&T LT/BSRP/OUT/19-20/629 19-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Rescheduling of project milestones and Extension of time for Schedule Completion NHAI-11016-RO-OD-164-2020
LT/BSRP/OUT/19-20/594
3231 L&T LT/BSRP/OUT/19-20/631 20-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of required Document for SPS-22 for the month of September 2020
RITES/BSRP/OD/LT/2019/753
3233 L&T LT/BSRP/OUT/19-20/633 22-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Resistance from local populace from RHS Demendingthe Construction of Road side Drain
3234 L&T LT/BSRP/OUT/19-20/634 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 1
3235 L&T LT/BSRP/OUT/19-20/635 22-Feb-20 M/s. L&T Ltd, Bangriposi The project Director Providing information to Sheri Akshaya kumar Pattanayak under RTI Act 2005
3237 L&T LT/BSRP/OUT/19-20/637 22-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request for Providing Support necessary permission for Complection of Project Highway

Time Extension, LT/BSRP/OUT/19-20/593


3238 L&T LT/BSRP/OUT/19-20/638 22-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites notification for Unprecedented Rainfall under Clause 10.5.2 of the Contract Agreement
Force Majeure RITES/BSRP/OD/LT/2019/754
LT/BSRP/OUT/19-20/572
3239 L&T LT/BSRP/OUT/19-20/639 24-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Drawining of footpath cum Drain Arrangement at SR structure location
RITES/BSRP/OD/LT/2019/744
3240 L&T LT/BSRP/OUT/19-20/640 24-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request to Modifications in Schedule-H Stage Payment for Josipur Bypass LT/BSRP/OUT/19-20/541
3242 L&T LT/BSRP/OUT/19-20/642 26-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Rrequest to Cancellation of Temporart permit
3244 L&T LT/BSRP/OUT/19-20/644 26-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Bombay Chawk police Station wall Dismantaling and reconstruction issue
letter from begunia village people dated 26-02-
3245 L&T LT/BSRP/OUT/19-20/645 27-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request from local populace of begunia village demanding bus stop and median opening
2020

RITES/BSRP/OD/LT/2019/394 dated 14-12-2018


3247 L&T LT/BSRP/OUT/19-20/647 27-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of road furniture plan for typical minor junction layout (REV-B) with safety certificate
RITES/BSRP/OD/LT/2019/607 dated 02-09-2019

RITES/BSRP/OD/NHAI/2020/347 dated 25-02-


3248 L&T LT/BSRP/OUT/19-20/648 27-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Release of 10% hold amount for main works against IPC-22 2020
LT/BSRP/OUT/19-20/594 dated 06-02-2020
RITES/BSRP/OD/NHAI/2020/347 dated 25-02-
3249 L&T LT/BSRP/OUT/19-20/649 27-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Reimbursement of tax liability incurred due to implementation of GST Act against SPS-22 2020
LT/BSRP/OUT/19-20/594 dated 06-02-2020
3250 L&T LT/BSRP/OUT/19-20/650 28-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request for median opening at 239+560 near Bus stand, Deopata (Khadambeda Chawk) None
3251 L&T LT/BSRP/OUT/19-20/651 29-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Design and Drawing for pedestrian underpass at 288+750 LT/BSRP/OUT/19-20/651 dated 22-06-2019
3253 L&T LT/BSRP/OUT/19-20/653 29-Feb-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of design and drawing for RCC retaining wall without LL surcharge with flat backfill
LT/BSRP/OUT/19-20/347 dated 14-10-2019
3258 L&T LT/BSRP/OUT/19-20/658 2-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of video recording for status and progress of Works till Feb'20 RITES/BSRP/OD/L&T2020/728 dated 07-02-
2020
LT/BSRP/OUT/19-20/819 dated 24-01-2020
3262 L&T LT/BSRP/OUT/19-20/662 5-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of revised median opening drawing along with safety certificate RITES/BSRP/OD/L&T/2019/446 dated 15-02-
2019
RITES/BSRP/OD/L&T/2019/623 dated 03-10-
2019
3263 L&T LT/BSRP/OUT/19-20/663 5-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of revised road furniture drawing along with safety certificate
LT/BSRP/OUT/18-19/324 dated 16-09-2018
LT/BSRP/OUT/18-19/670 dated 16-10-2018
RITES/BSRP/QC/OD/L&T/2020/356 dated 04-
3266 L&T LT/BSRP/OUT/19-20/666 6-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites ource approval of Thermoplastic Road marking Kataline infra Products Pvt. Ltd 03-2020
3267 L&T LT/BSRP/OUT/19-20/667 1
3269 L&T LT/BSRP/OUT/19-20/669 9-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Monthly progress report for Feb'20
3270 L&T LT/BSRP/OUT/19-20/670 13-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent laboratory test of HT strand
3271 L&T LT/BSRP/OUT/19-20/671 13-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Shop drawing of Pedestrian guard rail for built up section and Bus bay locations
LT/BSRP/OUT/19-20/594 dated 06-02-2020
3272 L&T LT/BSRP/OUT/19-20/672 13-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Reimbursement of GST tax against IPC-22 Dt. 13-03-2020 RITES/BSRP/OD/NHAI2020/355 dated 06-03-
2020

The Block Development Officer,


3273 L&T LT/BSRP/OUT/19-20/673 13-Mar-20 M/s. L&T Ltd, Bangriposi Request for providing rainfall dat
Bijatala Block, Mayurbhanj
RITES/BSRP/QC/OD/L&T/2020/717 dated 29-
3274 L&T LT/BSRP/OUT/19-20/674 16-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of Geotechnical investigation report at VUP 285+706
01-2020
3275 L&T LT/BSRP/OUT/19-20/674-A 13-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of TBM List
3276 L&T LT/BSRP/OUT/19-20/675 16-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of revised plan & profile Km 266+000 to Km 268+000 LT/BSRP/OUT/18-19/118 dated 09-05-2019
RITES/BSRP/QC/OD/L&T/2020/772 dated 11-
3277 L&T LT/BSRP/OUT/19-20/676 16-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of SPS-23 for main works as per Sch-H of agreement 03-2020
LT/BSRP/OUT/19-20/667 dated 06-03-2020
3278 L&T LT/BSRP/OUT/19-20/677 16-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request for construction of bus stop in Asana at Km 257+170 LHS and 257+350 RHS Gram panchayat letter Asana
3279 L&T LT/BSRP/OUT/19-20/678 17-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Change of Scope for RCC drain construction LT/BSRP/OUT/19-20/622 dated 17-02-2020
3280 L&T LT/BSRP/OUT/19-20/679 17-Mar-20 M/s. L&T Ltd, Bangriposi The project Director Non-receipt of Change of Scope order
3281 L&T LT/BSRP/OUT/19-20/680 1
RITES/BSRP/OD/L&T/2020/748 dated 17-02-
3282 L&T LT/BSRP/OUT/19-20/681 17-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Maintenance of Existing Road Diversions
2020
3283 L&T LT/BSRP/OUT/19-20/682 17-Mar-20 M/s. L&T Ltd, Bangriposi 1
3286 L&T LT/BSRP/OUT/19-20/684 M/s. L&T Ltd, Bangriposi The Team Leader, Rites COVID-19 Notification for occurrence of Force Majeure Notification event under Article-21 for COVID-19
3288 L&T LT/BSRP/OUT/19-20/686 M/s. L&T Ltd, Bangriposi 1
1. E-mail from PIU-Balasore, NHAI office
dated 27th January 2020.
2. NHAI/11016/RO-OD/164/2020 dated 22nd
January 2020
3. Our letter no. LT/BSRP/OUT/19-20/629
dated 19th February 2020
3289 L&T LT/BSRP/OUT/19-20/687 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submissoin of Final EOT 4. Your letter no.
RITES/BSRP/OD/L&T/2020/761 dated 29-02-
2020
5. Your letter no.
RITES/BSRP/OD/L&T/2020/783 dated 20-03-
2020
The Collector & District Request for providing support / necessary permission for continuing the emergency services on
3296 L&T LT/BSRP/OUT/19-20/694 23-Mar-20 M/s. L&T Ltd, Bangriposi
Magistrate, Baripada project highway
The Collector &District
3297 L&T LT/BSRP/OUT/19-20/695 24-Mar-20 M/s. L&T Ltd, Bangriposi
Magistrate, Baripada Vehicle permission for emergency service during lockdown period

The Collector & District


3298 L&T LT/BSRP/OUT/19-20/696 24-Mar-20 M/s. L&T Ltd, Bangriposi Vehicle permission for emergency service during lockdown period
Magistrate, Baripada
LT/BSRP/OUT/18-19/596 dated 7th February
2020
3300 L&T LT/BSRP/OUT/19-20/698 27-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Compensation towards losses suffered /cost incurred due to delay in the works mayank
RITES/BSRP/OD/L&T/2020/768 dated 3rd March
2020
The Collector & District Request for providing support / necessary permission for continuing the emergency services on
3301 L&T LT/BSRP/OUT/19-20/699 28-Mar-20 M/s. L&T Ltd, Bangriposi
Magistrate, Baripada mayank
project highway
3303 L&T LT/BSRP/OUT/19-20/701 31-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites submission of SPS-24 of main works as per Schedule-H of Agreement kaushal
3304 L&T LT/BSRP/OUT/19-20/702 31-Mar-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites submission of IPC-23 kausal
The executive Engineer,
3305 L&T LT/BSRP/OUT/20-21/001 1-Apr-20 M/s. L&T Ltd, Bangriposi COVID-19 Request for waving off the bill for lockdown period due to COVID-19
Irrigation Division, Baripada
3306 L&T LT/BSRP/OUT/20-21/002 1-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of renewed Insurance policy mayank
1. Our letter no. LT/BSRP/OUT/19-20/640
dated 24th February 2020
2. Your letter no.
RITES/BSRP/OD/L&T/2020/767 dated 03-03-
3307 L&T LT/BSRP/OUT/20-21/003 1-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Request for modifications in Schedule-H stage payment for Jashipur Bypass mayank
2020
3. MoRTH circular no. RW/NH-
39013/23//2015/NHDP-IVA dated 16th Aug
2017
Looking after wage payment and extending welfare measures to contract workers/casual
The Labour Enforcement
3308 L&T LT/BSRP/OUT/20-21/004 3-Apr-20 M/s. L&T Ltd, Bangriposi COVID-19 workers/ISMW workers COVID-19, Appeal thereto by CLC and secretary (Labour and Tushar
Officer, Barbil, Keonjhar
employment)
3309 L&T LT/BSRP/OUT/20-21/005 3-Apr-20 1 kaushal
3310 L&T LT/BSRP/OUT/20-21/006 10-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites submission of March'2020 MPR rajdeep
1. Our letter no. LT/BSRP/OUT/19-20/684
Request for providing necessary approval for essential / emergency works to be taken up during dated 20-03-2020
3311 L&T LT/BSRP/OUT/20-21/007 11-Apr-20 M/s. L&T Ltd, Bangriposi The project Director COVID-19 mayank
lock down period in view of COVID-19 2. Our letter no. LT/BSRP/OUT/19-20/697
dated 26-03-2020
Undertaking for carrying out work by complying with all necessary precautions to
3312 L&T LT/BSRP/OUT/20-21/008 11-Apr-20 M/s. L&T Ltd, Bangriposi The project Director COVID-19 LT/BSRP/OUT/20-21/007 dated 11th April 2020 mayank
prevent spreading of COVID-19
3313 L&T LT/BSRP/OUT/20-21/009 13-Apr-20 M/s. L&T Ltd, Bangriposi The Tahsildar, Saraskana Request to unload the steel at camp site VNC
3314 L&T LT/BSRP/OUT/20-21/010 14-Apr-20 M/s. L&T Ltd, Bangriposi The Tahsildar, Saraskana Request to carry out piling concrete work at Subarnarekha Bridge MP
1) Contract Agreement dated 03rd September
2015
2) Our letter no. LT/BSRP/OUT/19-20/416 dated
09th November 2019
3) Your letter no.
RITES/BSRP/OD/NHAI/2020/328 dated 11-01-
2020
Application-IV for Interim Time Extension (for the delays up to 29 th February 2020) pursuant to 4) Your letter no.
3315 L&T LT/BSRP/OUT/20-21/011 14-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites mayank
Sub-Clause 10.5 of the Agreement RITES/BSRP/OD/L&T/2020/761 dated 29-02-
2020
5) Your letter no.
RITES/BSRP/OD/L&T/2020/783 dated 20-03-
2020
6) Your letter no.
RITES/BSRP/OD/L&T/2020/785 dated 23-03-
2020
1. Our letter no. LT-BSRP-OUT-19-20-684
dated 20-03-2020
2. Our letter no. LT-BSRP-OUT-19-20-697
dated 27-03-2020
3316 L&T LT/BSRP/OUT/20-21/012 14-Apr-20 M/s. L&T Ltd, Bangriposi The project Director COVID-19 Availability of Resources till 14-04-2020 at site during lockdown period in view of COVID-19 mayank
3. E-mail dated 11-04-2020 regarding Daily
Resources Availability Report
4. E-mail dated 14-04-2020 regarding Daily
Resources Availability Report
3317 L&T LT/BSRP/OUT/20-21/013 15-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites submission of SPS-24 of main works as per Schedule-H of Agreement kausal
1. Your letter no.
RITES/BSRP/OD/NHAI/2020/326 dated 09th Jan
2020
2. Your letter no.
RITES/BSRP/OD/L&T/2020/727 dated 07th Feb
2020
3. Your letter no.
RITES/BSRP/OD/L&T/2020/754 dated 19th Feb
Submission of cross section at 10m interval for the stretches falling under descoped or
3318 L&T LT/BSRP/OUT/20-21/014 17-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 2020 received on 20-02-2020 Gairick
withdrawn length of 17.52km
4. Your letter no.
RITES/BSRP/OD/L&T/2020/762 dated 29th Feb
2020
5. Our letter no. LT/BSRP/OUT/19-20/655
dated 02nd March 2020
6. Your letter no.
RITES/BSRP/OD/L&T/2020/770 dated 04th
March 2020

1. Our letter no. LT/BSRP/OUT/19-20/433


dated 20.11.2019
2. Your letter no.
RITES/BSRP/OD/L&T/2019/681 dated
25.11.2019
3. Our letter no. LT/BSRP/OUT/19-20/455
dated 4th December 2019
3319 L&T LT/BSRP/OUT/20-21/015 17-Apr-20 M/s. L&T Ltd, Bangriposi The project Director Confirmation on additional ROW for Minor Junction Gairick
4. Our letter no. LT/BSRP/OUT/19-20/482
dated 18th December 2019
5. Your letter no.
RITES/BSRP/OD/NHAI/2019/323 dated
23.12.2019
6. Our letter no. LT/BSRP/OUT/19-20/585
dated 05th February 2020
1) Our letter no. LT-BSRP-OUT-19-20/684
dated 20-03-2020
Outbreak of COVID-19 and subsequent lockdown across the country- Extension up to 03rd May 2) Our letter no. LT-BSRP-OUT-19-20/697
3320 L&T LT/BSRP/OUT/20-21/016 17-Apr-20 M/s. L&T Ltd, Bangriposi The project Director COVID-19 mayank
2020 dated 26-03-2020
3) Our letter no LT/BSRP/OUT/20-21/007
dated 11-04-2020
1. Our letter no. LT/BSRP/OUT/19-20/684
dated 20-03-2020
2. Our letter no. LT/BSRP/OUT/19-20/697
dated 26-03-2020
Request for providing necessary approval to carry out construction activities to during lock down
3321 L&T LT/BSRP/OUT/20-21/017 20-Apr-20 M/s. L&T Ltd, Bangriposi The project Director COVID-19 3. Our letter no. LT/BSRP/OUT/20-21/007 mayank
period in view of COVID-19 in Jharkhand Section
dated 11-04-2020
4. Your letter no.
NHAI/11011/8/L&T/2020/PIU/BLS/WFH/28
dated 17-04-2020
3322 L&T LT/BSRP/OUT/20-21/018 20-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Independent laboratory test of Construction materials Rameswar

1. AE letter no.
RITES/BSRP/OD/NHAI/2019/204 dated
23.03.2019
2. AE letter no.
RITES/BSRP/OD/NHAI/2019/205 dated
25.03.2019
3. AE letter no.
RITES/BSRP/OD/NHAI/2019/213 dated
03.04.2019
4. AE letter no.
RITES/BSRP/OD/L&T/2019/497 dated
3323 L&T LT/BSRP/OUT/20-21/019 20-Apr-20 M/s. L&T Ltd, Bangriposi The project Director COS Non - receipt of Change of Scope Order mayank
03.05.2019 received on 06.05.2019
5. Our letter no. LT/BSRP/OUT/19-20/100
dated 18th May 2019
6. Our letter no. LT/BSRP/OUT/19-20/332
dated 28th September 2019
7. Our letter no. LT/BSRP/OUT/19-20/418
dated 12th November 2019
8. Our letter no. LT/BSRP/OUT/19-20/535
dated 16th January 2020
9. Our letter no. LT/BSRP/OUT/19-20/680
dated 17th March 2020

LT/BSRP/OUT/18-19/540, Dated 01.09.2019


3324 L&T LT/BSRP/OUT/20-21/020 22-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites design & Drawings Submission of Design and Drawing for RCC Retaining Wall RITES/BSRP/OD/L&T/2018/316 Dated GD
12.09.2018
Submission of Details Electrical Drawing, and External Sewage Routing Drawing of Both Toll
3325 L&T LT/BSRP/OUT/20-21/021 22-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites design & Drawings GD
Plaza

1.Our letter no. LT/BSRP/OUT/19-20/432 dated


20th November 2019
Submission of Instrumentation Details and PHE Drawing of Administration Building of Both Toll 2.Your letter no RITES/BSRP/OD/L&T/2020/704
3326 L&T LT/BSRP/OUT/20-21/022 22-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites design & Drawings GD
Plaza dated 11th January 2020
3. Your letter no RITES/BSRP/OD/L&T/2020/713
dated 27th January 2020

3327 L&T LT/BSRP/OUT/20-21/023 22-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites design & Drawings Submission of Details PHE Drawing of Medical Building of Both Toll Plaza LT/BSRP/OUT/19-20/410 dated 9th November 20 GD

3328 L&T LT/BSRP/OUT/20-21/024 22-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites design & Drawings Submission of Details PHE Drawing of Toilet Building of Both Toll Plaza LT/BSRP/OUT/19-20/410 dated 9th November 20 GD
Workable Stretch/Unencumbered length for the month of Feb’20 and Mar’20 to carry out
3329 L&T LT/BSRP/OUT/20-21/025 23-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list Mayank
construction activities on Project Highway

1. Our letter no. LT/BSRP/OUT/18-19/941 dated


18th Mar 2019
2. Our letter no. LT/BSRP/OUT/18-19/067 dated
26th April 2019
3. Our letter no. LT/BSRP/OUT/19-20/080 dated
09th May 2019
4. Our letter no. LT/BSRP/OUT/19-20/137 dated
01st June 2019
5. Our letter no. LT/BSRP/OUT/19-20/176 dated
22nd June 2019
6. Our letter no. LT/BSRP/OUT/19-20/201 dated
Time Extension, Notification for Unprecedented Rainfall in March’2020 under Clause 10.5.2 of the Contract
3330 L&T LT/BSRP/OUT/20-21/026 23-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites 03rd July 2019 mayank
Force Majeure Agreement
7. Authority’s letter no.
NHAI/13011/14/MISC/2019/PIU/BLS/1188
dated 23rd Oct 2019
8. Our letter no. LT/BSRP/OUT/19-20/384 dated
29th Oct 2019
9. Our letter no. LT/BSRP/OUT/19-20/519 dated
09th Jan 2020
10. Our letter no. LT/BSRP/OUT/19-20/593
dated 06th Feb 2020
11. Our letter no. LT/BSRP/OUT/19-20/660
dated 02nd March 2020
3331 L&T LT/BSRP/OUT/20-21/027 23-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites COS Change of Scope for RCC Drain construction
LT/BSRP/OUT/19-20/573, Dated 30.01.2020
3332 L&T LT/BSRP/OUT/20-21/028 23-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites COS Submission of COS cost for Toll Management System RITES/BSRP/OD/L&T/2019/642 Dated GD
21.10.2019
RITES-BSRP-OD-NHAI-2020-355
RITES-BSRP-OD-NHAI-2020-358
3333 L&T LT/BSRP/OUT/20-21/029 23-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites CIL, Payments Submission of GST CIL against SPS 24 kausal
RITES-BSRP-OD-NHAI-2020-361
RITES-BSRP-OD-NHAI-2020-362
LT/BSRP/OUT/19-20/701
3334 L&T LT/BSRP/OUT/20-21/030 23-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Payments Submission of IPC 24 kausal
RITES/BSRP/OD/L&T/2019/362
Request for conveying Change of Scope Notice for VUP with service road at Singhada Chawk (Km
3335 L&T LT/BSRP/OUT/20-21/031 25-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites COS mayank
310+510), PUP at Tangabilla Chawk (Km 295+470) and PUP at Bisoi (Km 243+290)

LT-BSRP-OUT-19-20-411
3336 RITES-OD RITES-BSRP-OD-L&T-2020-755 19-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Typical sing for Toll plaza LT-BSRP-OUT-19-20-552
RITES-BSRP-OD-LT-2019-552
LT-BSRP-OUT-19-20-588
3337 RITES-OD RITES-BSRP-OD-L&T-2020-756 20-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Construction of Earthen Shoulder
RITES-BSRP-OD-LT-2020-739
RITES-BSRP-OD-NHAI-2019-323
LT-BSRP-OUT-18-19-637
LT-BSRP-OUT-19-20-394
LT-BSRP-OUT-19-20-433
LT-BSRP-OUT-19-20-455
LT-BSRP-OUT-19-20-482
3338 RITES-OD RITES-BSRP-OD-L&T-2020-757 20-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Minor junctions
LT-BSRP-OUT-19-20-585
RITES-BSRP-OD-LT-2019-686
RITES-BSRP-OD-LT-2019-681
RITES-BSRP-OD-LT-2019-664
RITES-BSRP-OD-LT-2019-607
RITES-BSRP-OD-LT-2018-394
LT-BSRP-OUT-19-20-38
3339 RITES-OD RITES-BSRP-OD-L&T-2020-758 20-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Typical Details of W-Beam Crash Barrier (rev-B) LT-BSRP-OUT-19-20-615
RITES-BSRP-OD-LT-2019-506
LT-BSRP-OUT-19-20-469
LT-BSRP-OUT-19-20-517
LT-BSRP-OUT-19-20-614
3340 RITES-OD RITES-BSRP-OD-L&T-2020-759 22-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Locations of MBCB for BSRP Project
RITES-BSRP-OD-LT-2019-696
RITES-BSRP-OD-LT-2019-736

RITES-BSRP-OD-LT-2019-502
LT-BSRP-OUT-19-20-595
LT-BSRP-OUT-19-20-573
3341 RITES-OD RITES-BSRP-OD-L&T-2020-760 24-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi COS Confirmation for additional structures to be constructed under change of scope
LT-BSRP-OUT-19-20-430
LT-BSRP-OUT-19-20-527
LT-BSRP-OUT-19-20-502
3342 RITES-OD RITES-BSRP-OD-L&T-2020-761 24-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Time Extension Submission of final EoT LT-BSRP-OUT-19-20-629
RITES-BSRP-OD-NHAI-2020-326
Withdrawal (De-scoping) of the Project Stretches affected by the Construction of Proposed 12
3343 RITES-OD RITES-BSRP-OD-L&T-2020-762 29-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings RITES-BSRP-OD-LT-2020-727
Nos. EUP and nono -clearance of Stretches in Buffer Zone
NHAI-11012-8-LT-2020-PIU-BLS-30
RITES-BSRP-OD-LT-2019-509
3344 RITES-OD RITES-BSRP-OD-L&T-2020-763 29-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings Submission of Proposal Drawing of Major junction at Ch.199+180
LT-BSRP-OUT-19-20-607
Submission of safety certificate of toll plaza lay out admin Building ,LT panel Room and RITES-BSRP-OD-LT-2019-667
3345 RITES-OD RITES-BSRP-OD-L&T-2020-764 29-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous
Workshop, Medical Building, toilet Building and Road Sng plan for both toll plaza LT-BSRP-OUT-19-20-559
RITES-BSRP-OD-LT-2018-394
Submission of Road Furnitures Plan for Typical junction layout (Rev-B) with safety certificate LT-BSRP-OUT-18-19-637
3346 RITES-OD RITES-BSRP-OD-L&T-2020-765 3-Mar-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Miscellaneous
from 199+000 to 229+000 km RITES-BSRP-OD-LT-2019-607
LT-BSRP-OUT-19-20-647
LT-BSRP-OUT-19-20-593
Time Extension,
3347 RITES-OD RITES-BSRP-OD-L&T-2020-766 3-Mar-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi notification of underecedented Rainfall under Clause 10.5.2 of the CA RITES-BSRP-OD-LT-2020-745
Force Majeure
LT-BSRP-OUT-19-20-638
3348 RITES-OD RITES-BSRP-OD-L&T-2020-767 3-Mar-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Payments Request for Modifications in Schedule-H Stage payment for jasipur bypass LT-BSRP-OUT-19-20-640
RITES-BSRP-OD-LT-2019-598
RITES-BSRP-OD-LT-2019-516
RITES-BSRP-OD-LT-2019-460
RITES-BSRP-OD-LT-2018-350
RITES-BSRP-OD-LT-2018-325
RITES-BSRP-OD-LT-2018-269
RITES-BSRP-OD-LT-2018-258
3349 RITES-OD RITES-BSRP-OD-L&T-2020-768 3-Mar-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Maintenance/DLP Compensation towards lossess suffered cost incurred due to delay in the works RITES-BSRP-OD-LT-2018-245
RITES-BSRP-OD-LT-2018-219
RITES-BSRP-OD-LT-2018-195
RITES-BSRP-OD-LT-2018-145
RITES-BSRP-OD-LT-2017-026
LT-BSRP-OUT-19-20-596
LT-BSRP-OUT-19-20-510
LT-BSRP-OUT-17-18-031

3350 RITES-OD RITES-BSRP-OD-L&T-2020-769 4-Mar-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings approval of drawing of PUP at Ch 288+750 RITES-BSRP-OD-LT-2019-676 dated 20.11.2019
Withdrawal or descoping of project strteches affected by the construction of EUPs and non-
3351 RITES-OD RITES-BSRP-OD-L&T-2020-770 4-Mar-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Design & Drawings LT-BSRP-OUT-19-20-655 dated 02.03.2020
clearance of stretches in buffer zone
Time Extension,
3352 RITES-OD RITES-BSRP-OD-L&T-2020-771 9-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Notification for Underecedented Rainfall under Clause 10.5.2 of the Contract Agreement LT-BSRP-OUT-19-20-593 dated 06.02.2020
Force Majeure
3353 RITES-OD RITES-BSRP-OD-L&T-2020-772 11-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Payments Non submission of required document for SPS-23 for the Month of Feb'2020 LT-BSRP-OUT-19-20-667 dated 06.03.2020
3354 RITES-QC RITES-BSRP-QC-OD-LT-2020-357 13-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Independent Laboratory test of Construction materials LT-BSRP-OUT-19-20-668 dated 06.03.2020
RITES-BSRP-QC-OD-LT-2019-309 dated
18.09.2019
RITES-BSRP-QC-OD-LT-2019-315 dated
3355 RITES-QC RITES-BSRP-QC-OD-LT-2020-357A 16-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Rectification of defective work of DBM or laying of BC
07.11.2019
RITES-BSRP-QC-OD-LT-2020-354 dated
02.03.2020
Borrow
3356 RITES-QC RITES-BSRP-QC-OD-LT-2020-358 14-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Area/Mining Submisson of Borrow Area Soil test results for Construction of EMB LT-BSRP-OUT-19-20-620 dated 19.02.2020
Approval
3357 RITES-QC RITES-BSRP-QC-OD-LT-2020-359 17-Mar-20 The Team Leader, AE - RITES Dr. G. Appa Rao, IIT Chennai Quality of Works Independent Laboratory test of HT Strand LT-BSRP-OUT-19-20-670 dated 13.03.2020
LT-BSRP-OUT-19-20-649 dated 27.02.2020
3358 RITES-OD RITES-BSRP-OD-L&T-2020-773 16-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi CIL, Payments Reimbursement of tax liability incurred due to implementation of GST against SPS-22 and IPC-22
LT-BSRP-OUT-19-20-672 dated 13.03.2020
3359 RITES-OD RITES-BSRP-OD-L&T-2020-774 16-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Typical Details of Traffic island and Bull nose LT-BSRP-OUT-19-20-560 dated 27.01.2020

3360 RITES-OD RITES-BSRP-OD-L&T-2020-775 16-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Approval of Revised Road Furniture Drawing LT-BSRP-OUT-19-20-663 dated 05.03.2020

RITES-BSRP-OD-LT-2020-748 dated 17.02.2020


3361 RITES-OD RITES-BSRP-OD-L&T-2020-776 17-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Maintenance/ DLP Poor safety Provision and Road Maintenance in Ghat Section
LT-BSRP-OUT-19-20-590 dated 06.02.2020

3362 RITES-OD RITES-BSRP-OD-L&T-2020-777 17-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings RCC Retaining wall without LL surcharge with flat backfill Approval LT-BSRP-OUT-19-20-653 dated 29.02.2020

3363 RITES-OD RITES-BSRP-OD-L&T-2020-778 17-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Constructionn of Earthen Shoulder median Filling RITES-BSRP-OD-LT-2020-748 dated 17.02.2020
3364 RITES-QC RITES-BSRP-QC-OD-LT-2020-360 17-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Source Approval of the Thermoplastic Road marking kataline infra Products PVT Ltd
3365 RITES-QC RITES-BSRP-QC-OD-LT-2020-361 18-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Third party test reports
3366 RITES-OD RITES-BSRP-OD-L&T-2020-779 19-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Statutory Supply Required information under RTI act Authority's letter no. 247 dated 18-03-2020
3367 RITES-OD RITES-BSRP-OD-L&T-2020-780 19-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Statutory Providing Required information under RTI act Authority's letter no. 248 dated 18-03-2020
3368 RITES-OD RITES-BSRP-OD-L&T-2020-781 19-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Statutory Providing Required information under RTI act Authority's letter no. 250 dated 18-03-2020
3369 RITES-OD RITES-BSRP-OD-L&T-2020-782 19-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Footpath cum Drain arrangement at Service Road/ Structure location yes LT-BSRP-OUT-19-20-639 dated 24.02.2020

LT-BSRP-OUT-19-20-629 dated 19.02.2020


3370 RITES-OD RITES-BSRP-OD-L&T-2020-783 19-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Time Extension Submission of application of EOT yes
RITES-BSRP-OD-LT-2020-761 dated 29.02.2020

3371 RITES-OD RITES-BSRP-OD-L&T-2020-784 23-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Submission of pavement design report for junctions

LT-BSRP-OUT-19-20-629 dated 19.02.2020


RITES-BSRP-OD-LT-2020-761 dated 29.02.2020
3372 RITES-OD RITES-BSRP-OD-L&T-2020-785 23-Mar-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Time Extension Submission of application of EOT yes
RITES-BSRP-OD-LT-2020-783 dated 20.03.2020
LT-BSRP-OUT-19-20-687 dated 20.03.2020

3373 RITES-OD RITES-BSRP-OD-L&T-2020-786 7-Apr-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Time Extension Submission of Application for interim EOT yes LT/BSRP/OUT/20-21/011 Dt. 14-04-2020
Details of local or migrant workers in the project site during lockdown period (daily resources
3374 RITES-OD RITES-BSRP-OD-L&T-2020-787 17-Apr-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Force Majeure
available at site)
3375 RITES-OD RITES-BSRP-OD-L&T-2020-789 20-Apr-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Miscellaneous Poor safety provision and road maintenance in Ghat section
3376 RITES-QC RITES-BSRP-QC-OD-LT-2020-352 22-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent laboraty test of Geocell for Slope protection M/S-Strata LT-BSRP-OUT-19-20-625
3377 RITES-QC RITES-BSRP-QC-OD-LT-2020-353 25-Feb-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Independent laboraty test of Asphaltoseal- M/S-tiki tar
RITES-BSRP-QC-OD-LT-2019-309
3378 RITES-QC RITES-BSRP-QC-OD-LT-2020-354 2-Mar-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Defective work of Dence bituminous macadam
RITES-BSRP-QC-OD-LT-2019-315
3412 RITES-OD RITES-BSRP-OD-L&T-2020-790 23-Apr-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Miscellaneous Submission of renewed insurance policy
3413 RITES-OD RITES-BSRP-OD-L&T-2020-791 23-Apr-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Maintenance/ DLP Notification for maintenance of existing road

3414 RITES-OD RITES-BSRP-OD-L&T-2020-792 27-Apr-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Claims Compensetion towards losses suffered- cost incurred due to delay in the work yes LT/BSRP/OUT/20-21/055 Dt. 11-05-2020
3415 RITES-OD RITES-BSRP-OD-L&T-2020-793 27-Apr-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Payments Pouring of concreting slab of MJB 265+754 yes LT/BSRP/OUT/20-21/035 Dt. 28-04-2020
3416 RITES-OD RITES-BSRP-OD-L&T-2020-794 30-Apr-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Construction of earthen shoulder or median filling yes not yet
Time Extension,
3417 RITES-OD RITES-BSRP-OD-L&T-2020-795 30-Apr-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi notification for unprecedented rainfall under clause 10.5.2 of CA yes LT/BSRP/OUT/20-21/049 Dt. 05-05-2020
Force Majeure
3418 RITES-OD RITES-BSRP-OD-L&T-2020-796 1-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Payments Release of 10% hold amount for main works of IPC-24 yes LT/BSRP/OUT/20-21/040 Dt. 02-05-2020
Miscellaneous,
3419 RITES-OD RITES-BSRP-OD-L&T-2020-797 1-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi land issues Invitation for meeting through Microsoft teams to discuss various issues yes LT/BSRP/OUT/20-21/041 Dt. 02-05-2020

3420 RITES-OD RITES-BSRP-OD-L&T-2020-798 1-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings submission of plan and profile from 266 to 268

3421 RITES-OD RITES-BSRP-OD-L&T-2020-799 1-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi CIL, Payments GST reimbursement special audit documents required
3422 RITES-OD RITES-BSRP-OD-L&T-2020-800 4-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Statutory Supply of required information under RTI Act yes not yet, pending with IR dept.
3423 RITES-OD RITES-BSRP-OD-L&T-2020-801 4-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings submission of drawing of Major Junction 199+200 yes LT/BSRP/OUT/20-21/056 Dt. 11-05-2020

3424 RITES-OD RITES-BSRP-OD-L&T-2020-802 4-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Approval of PHE details drawings of Toilet Building of both toll plaza

3425 RITES-OD RITES-BSRP-OD-L&T-2020-803 4-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Approval of PHE details drawings of Medical Buildings of Both Toll Plaz

Approval of Instrumentation details and PHE details drawing of Administrative Building of Both
3426 RITES-OD RITES-BSRP-OD-L&T-2020-804 4-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings
Toll Plaza
3427 RITES-OD RITES-BSRP-OD-L&T-2020-805 4-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Approval of details Electrical drawing & external sewage routing drawing of Both Toll Plaza

3428 RITES-OD RITES-BSRP-OD-L&T-2020-806 5-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Compliance of pouring of concrete of Slab of MNB 265+754
3429 RITES-OD RITES-BSRP-OD-L&T-2020-807 6-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi COS, Payments submission of RA BILL 01 against COS Incident Management Services
Payments, Submission of RA Bill 08, 07, 06 for Elect utility shifting works as per approved estimate under
3430 RITES-OD RITES-BSRP-OD-L&T-2020-808 7-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi
Utilities Jashipur, Bisoi & Jharpokharia
3431 RITES-OD RITES-BSRP-OD-L&T-2020-809 7-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Observation on Drawing of Foot Over Bridge

3432 RITES-OD RITES-BSRP-OD-L&T-2020-810 8-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Design & Drawing of RCC Retaining Wall-Approval

3433 RITES-OD RITES-BSRP-OD-L&T-2020-811 8-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Submission fo draft drawing for Change of Scope

3434 RITES-OD RITES-BSRP-OD-L&T-2020-812 9-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi COS Change of Scope for Drain RCC Construction
Design &
3435 L&T LT/BSRP/OUT/20-21/032 25-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Drawings, COS Submission of Draft Drawing for Change of Scope GD
RITES-BSRP-OD-LT-2020-747
3436 L&T LT/BSRP/OUT/20-21/033 27-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Compliance on GT Investigation Report of VUP LT-BSRP-OUT-19-20-674 GD
RITES-BSRP-OD-LT-2020-788
RITES-BSRP-OD-LT-2020-726
3437 L&T LT/BSRP/OUT/20-21/034 27-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Detail Drawingwith GAD for Foot over Bridge at KM 243+660 LT-BSRP-OUT-19-20-543 GD
LT-BSRP-OUT-19-20-618
3438 L&T LT/BSRP/OUT/20-21/035 28-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Compliance for pouring of concrete of Slab at MNB 265+754 RITES-BSRP-OD-LT-2020-793
Payments,
3439 L&T LT/BSRP/OUT/20-21/036 30-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Utility RA Bill-8,7,6 KR
Utilities
RITES-BSRP-OD-LT-2018-318
3440 L&T LT/BSRP/OUT/20-21/037 30-Apr-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Payments, COS Incident management Bill Submission of RA Bill-01 KR
LT-BSRP-OUT-19-20-547
3442 L&T LT/BSRP/OUT/20-21/039 1-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Invitation for Meeting through VC on Microsoft teams to Discuss various Issues MMK
RITES-BSRP-OD-LT-2018-316
3443 L&T LT/BSRP/OUT/20-21/040 2-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Payments IPC-24 LT-BSRP-OUT-20-21-020 KR

RITES-BSRP-OD-LT-2018-797
3444 L&T LT/BSRP/OUT/20-21/041 2-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Miscellaneous Invitation for Meeting through VC on Microsoft teams to Discuss various Issues LT-BSRP-OUT-20-21-037 MMK

RITES-BSRP-OD-LT-2018-796
3445 L&T LT/BSRP/OUT/20-21/042 4-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of GT Investigation report of PUP 288+750 LT-BSRP-OUT-20-21-030 GD

3446 L&T LT/BSRP/OUT/20-21/043 4-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Detail Design and Drawing of Canopy for both the toll plazas RITES-BSRP-OD-LT-2019-667 GD
RITES-BSRP-OD-LT-2018-769
3447 L&T LT/BSRP/OUT/20-21/044 4-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Design and Drawing for Rcc Retaining Wall LT-BSRP-OUT-19-20-651 GD

3448 L&T LT/BSRP/OUT/20-21/045 4-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Submission of SPS-25 KR
3449 L&T LT/BSRP/OUT/20-21/046 4-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Company profile for Toll management system of toll plaza canopy PK(qa/qc)

3450 L&T LT/BSRP/OUT/20-21/047 4-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Company profile for design,Supply and Erection of toll plaza canopy PK(qa/qc)
LT-BSRP-OUT-19-20-684
outbreak of COVIND-19 and Subsequent lockdown across the Country further extension of two LT-BSRP-OUT-19-20-697
3451 L&T LT/BSRP/OUT/20-21/048 5-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Force Majeure MMK
weeks wef LT-BSRP-OUT-20-21-007
LT-BSRP-OUT-20-21-016

Time Extension, RITES-BSRP-OD-LT-2018-795


3452 L&T LT/BSRP/OUT/20-21/049 5-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Regarding rainfall notification MMK
Force Majeure LT-BSRP-OUT-20-21026
workable Stretch unencumbered length for the month carry out construction Activities on Project LT-BSRP-OUT-20-21-025
3453 L&T LT/BSRP/OUT/20-21/050 8-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list Mayank
highway
Maintenance LT-BSRP-OUT-19-20-789
3454 L&T LT/BSRP/OUT/20-21/051 8-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Poor Safety provision and road maintenance in Ghat Section MMK
/DLP
RITES-BSRP-OD-LT-2020-766
LT-BSRP-OUT-20-21-026
3455 L&T LT/BSRP/OUT/20-21/052 8-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Quality of Works Independent laboratory test of Construction materials MMK
LT-BSRP-OUT-19-20-664
RITES-BSRP-OD-LT-2020-795
3456 L&T LT/BSRP/OUT/20-21/053 9-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites MPR Submission of MPR for the month of April'2020 Subrat
Maintenance RITES-BSRP-OD-LT-2020-791
3457 L&T LT/BSRP/OUT/20-21/054 9-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Notification for maintenance of existing road mayank
/DLP LT-BSRP-OUT-20-21-051
RITES-BSRP-OD-LT-2020-768
LT-BSRP-OUT-19-20-596
3458 L&T LT/BSRP/OUT/20-21/055 11-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Claims Compensation towards losses suffered /cost incurred due to delay in the Works mayank
LT-BSRP-OUT-19-20-698
RITES-BSRP-OD-LT-2020-792
3459 RITES-OD RITES-BSRP-OD-L&T-2020-813 11-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Design & Drawing of RCC Retaining Wall Approval

3460 RITES-OD RITES-BSRP-OD-L&T-2020-814 11-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi COS Non-receipt of Change of Scope Order
3461 L&T LT/BSRP/OUT/20-21/056 11-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Compliance upon commets on 199+180 Major junction layout Gairick
Construction of additional structures at various locations of project highway under Change of
3462 L&T LT/BSRP/OUT/20-21/057 12-May-20 M/s. L&T Ltd, Bangriposi The project Director COS NHAI-11011-8-LT-2020-PIU-BLS-313 mayank
Scope
Mr.R. Venkateswaralu,
3463 NHAI NHAI-11011-8-LT-2020-PIU-BLS-313 5-May-20 GM (Tech), PD M/s.L&T Ltd, Bangriposi COS COS for various additonal structures (CCIE) yes LT-BSRP-OUT-20-21-057 dated 12-05-2020 mayank

Mr. Aditya Prakash, CGM (Tech.),


3464 NHAI NHAI-NHDP-IV-OR-01-2010-151986 1-May-20 OD/JH, NHAI HQ, Delhi
M/s.L&T Ltd, TIIC, Mumbai Claims Introduction of provisions of Dispute review board DRB in ongoing EPC projects yes LT/BSRP/OUT/20-21/063

in reply to our letter no. 684 dated 20-03-2020


for COVID-19 notification
3465 RITES-OD RITES-BSRP-OD-L&T-2020-815 12-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Force Majeure Notification for occurrence of Force Majeure Event Under Article-21 of Agreement yes
Replied vide LT/BSRP/OUT/20-21/060 dated 19-
05-2020
3466 RITES-OD RITES-BSRP-OD-L&T-2020-816 12-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Comments on Compliance on GT Report of VUP@ 285+706 in reply to our letter no. 033 dated 27-04-2020
Time Extension, Notification for unprecedented rainfall in April'20 under clause 10.5.2 of CA and submission of
3467 RITES-OD RITES-BSRP-OD-L&T-2020-817 13-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi no in reply to our letter no. 049 dated 05-05-2020
Force Majeure rainfall data collected from Bijatala block
3468 RITES-OD RITES-BSRP-OD-L&T-2020-818 14-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Payments submission of SPS-25 for main works (April'2020) yes LT/BSRP/OUT/20-21/061 dated 19-05-2020
RITES-BSRP-OD-LT-2018-318
3469 L&T LT/BSRP/OUT/20-21/058 12-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites COS Incident management LT-BSRP-OUT-19-20-547 kausal
RITES-BSRP-OD-LT-2018-807
3470 L&T LT/BSRP/OUT/20-21/059 11-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites COS, Payments submission of RA Bill-01against COS for strengthening of incident management services in reply to AE letter no. 807 dated 06-05-2020 kausal
Maintenance/
3471 RITES-OD RITES-BSRP-OD-L&T-2020-819 14-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi DLP, Repair, rehabilitation, strengthening of all existing bridges yes
Quality of Works
3472 RITES-OD RITES-BSRP-OD-L&T-2020-820 14-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Drawing of pedestrian guard rail for built up section and Bus bay location no

3473 RITES-OD RITES-BSRP-OD-L&T-2020-821 14-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Submission of company profile for design dawing, supply & Erection of toll plaza no

3474 RITES-OD RITES-BSRP-OD-L&T-2020-822 16-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Observation on design drawign of canopy for both toll plaza yes

3475 RITES-OD RITES-BSRP-OD-L&T-2020-823 18-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Comments on GT investigation report of PUP 288+750 yes

3476 L&T LT/BSRP/OUT/20-21/060 19-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites COVID-19 Outbreak of COVID-19 and subsequent lockdown across the country in reply to AE letter no. 815 dated 12-05-2020 mayank
3477 L&T LT/BSRP/OUT/20-21/061 19-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Payments submission of SPS-25 for main works (April'2020) RITES-BSRP-OD-L&T-2020-815 kausal
Outbreak of COVID-19 and subsequent lockdown across the Country- Further extension of two
3478 L&T LT/BSRP/OUT/20-21/062 19-May-20 M/s. L&T Ltd, Bangriposi The project Director COVID-19 mayank
weeks w.e.f. 18.05.2020
3479 L&T LT/BSRP/OUT/20-21/063 20-May-20 M/s. L&T Ltd, Bangriposi The project Director Claims Introduction of provisions of Dispute Review Board (DRB) in ongoing EPC projects in reply to NHAI letter dated 01-05-2020 mayank
3480 L&T LT/BSRP/OUT/20-21/064 20-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of Design of Footpath cum Drain arrangement at service road /structure location Gairick

Resistance from local populace from 212 to 212.250 RHS for demanding the construction of
3481 RITES-OD RITES-BSRP-OD-L&t-2020-824 18-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi COS, land issues yes LT/BSRP/OUT/20-21/065
drain demand

3482 RITES-OD RITES-BSRP-OD-L&t-2020-825 19-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings submission of company profile for Toll management System of Toll Plaza no

COS, Other Resistance from local populace from Km 212+000 to 212+250 RHS for demanding the
3483 L&T LT/BSRP/OUT/20-21/065 21-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites reply to AE letter no. 824 dated 18-05-2020 Mayank
obstruction construction of road side drain

Sarpanch, Ghosada , Karanjia, Intimation for rejoning of Workmen who were unable to join Due to lockdown Because of
3484 L&T LT/BSRP/OUT/20-21/066 22-May-20 M/s. L&T Ltd, Bangriposi COVID-19 VNC
Mayurabhanj, Odisha COVID-19

3485 RITES-OD RITES-BSRP-OD-L&t-2020-826 19-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Submission of Revised median Opening Drawing Along with Safety Certificate

Mr.Kapil prasad, Team leader, Sr. Design &


3486 RITES-OD RITES-BSRP-OD-L&t-2020-827 21-May-20 Highway Engg. M/s. L&T Ltd, Bangriposi Drawings, Request for construction of Bus stop at 257 in Asana
Miscellaneuos
Design &
3487 RITES-OD RITES-BSRP-OD-L&t-2020-828 22-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Drawings, Request for median opening at 238+560 near bus stand deopata Khadambeda Chawk no
Miscellaneuos
Workable stretch unencumbered length for the month of Feb'20, Mar'20, Apr'20 to carry out
3488 RITES-OD RITES-BSRP-OD-L&t-2020-829 22-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Hindrance list yes LT/BSRP/OUT/20-21/073
construction activities on project highway
LT-BSRP-OUT-19-20-684
LT-BSRP-OUT-19-20-697
LT-BSRP-OUT-20-21-007
3489 L&T LT/BSRP/OUT/20-21/067 25-May-20 M/s. L&T Ltd, Bangriposi The project Director COVID-19 Outbreak of COVID-19 & Relief Measures by MoRTH mayank
LT-BSRP-OUT-20-21-016
LT-BSRP-OUT-20-21-048
LT-BSRP-OUT-20-21-062
Construction of additional structures (VIP REFERENCE) at singhara chawk Km 310+630 VUP
3490 RITES-NHAI RITES-BSRP-OD-NHAI-2020-366 5-May-20 The Team Leader, AE - RITES The project Director COS no
under COS
3491 RITES-NHAI RITES-BSRP-OD-NHAI-2020-367 16-May-20 The Team Leader, AE - RITES The project Director Payments Interim Payment Certificate No 24 no
3492 RITES-NHAI RITES-BSRP-OD-NHAI-2020-368 23-May-20 The Team Leader, AE - RITES The project Director Payments, COS RA Bill-01 for Strengthening of Incident Management Services (SIMS) under COS no
CGM (Tech.), & RO, NHAI,
3493 NHAI NHAI/NHDP-IV/OR/01/2010/152654 26-May-20 GM (T)-Odisha, NHAI-HQ, Delhi Bhubaneswar COS Change of Scope submission of Cost, Quantity, and completion Programme yes

Payments, Submission of RA Bill-08 ,07 and 06 for Elrc. utillity Shifting works as per Approved Estimate
3494 L&T LT/BSRP/OUT/20-21/068 26-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Kausal
Utilities under jashipur bisoi and jpk Elec. Section
LT-BSRP-OUT-20-21-045
3495 L&T LT/BSRP/OUT/20-21/069 26-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Release of 10% hold Amount Kausal
RITES-BSRP-OD-NHAI-2020-369
Reimbursement of tax liability incurred due to implementation of GST Act as per circular 3.3.15
3496 L&T LT/BSRP/OUT/20-21/070 26-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites CIL, Payments dated 04-02-2017 and NHAI/F&A/GST-2017-18/SM dated 01.-08.2018 against main works (GST Kausal
CIL)
LT-BSRP-OUT-20-21-06
Outbreak of pandemic COVID-19 and corresponding Government Orders for Nationwide
Claims, COVID- LT-BSRP-OUT-20-21-16
3497 L&T LT/BSRP/OUT/20-21/071 28-May-20 M/s. L&T Ltd, Bangriposi The project Director lockdown - Statement showing additional costs incurred by the Contractor during the period from mayank
19 LT-BSRP-OUT-20-21-48
22nd March 2020 up to 19th April 2020
LT-BSRP-OUT-20-21-62

mailed to cluster and HQ Contracts team for


3498 RITES-OD RITES-BSRP-OD-L&t-2020-830 23-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Claims Compensation towards losses suffered- cost incurred due to delay in the works
consent.

3499 RITES-OD RITES-BSRP-OD-L&T-2020-831 28-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Submission of Drawing of Minor Junction

3500 RITES-NHAI RITES-BSRP-OD-NHAI-2020-369 23-May-20 The Team Leader, AE - RITES The project Director Payments Submission of SPS-25 for main works as per Sch-H no
Miscellaneous,
3501 RITES-NHAI RITES-BSRP-OD-NHAI-2020-370 23-May-20 The Team Leader, AE - RITES The project Director Modifications in Schedule-H stage payment for Jashipur Bypass no
Payment
Extension of time for Project milestone-III and Schedule completion date (for delays acrued upto
3502 RITES-NHAI RITES-BSRP-OD-NHAI-2020-371 26-May-20 The Team Leader, AE - RITES The project Director Time Extension no
29 Feb 2020)
LT-BSRP-OUT-20-21-057
LT-BSRP-OUT-20-21-034
3503 L&T LT/BSRP/OUT/20-21/072 28-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Design & Drawings Submission of compliance report against observation of drawing of FOB Gairick
LT-BSRP-OUT-19-20-618
RITES-BSRP-OD-LT-2020-809
LT-BSRP-OUT-20-21-025
Workable Stretch/Unencumbered length for the month of Feb’20, March 20 and April’20 to carry
3504 L&T LT/BSRP/OUT/20-21/073 30-May-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Hindrance list LT-BSRP-OUT-20-21-050 Mayank
out construction activities on Project Highway
RITES-BSRP-OD-LT-2020-829
LT-BSRP-OUT-19-20-183
Payments,
3505 L&T LT/BSRP/OUT/20-21/074 1-Jun-20 M/s. L&T Ltd, Bangriposi The Project Director Electrical utility shifting under NESCO – Dismantling charges & Salvage value LT-BSRP-OUT-19-20-310 mayank
Utilities
RITES-BSRP-OD-LT-2019-392
Request for providing revised approved copy of estimates for Tree felling works in Odisha
3506 L&T LT/BSRP/OUT/20-21/075 1-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, RITES, AE Utilities mayank
Section

The Block Development Officer, Time Extension,


3507 L&T LT/BSRP/OUT/20-21/076 2-Jun-20 M/s. L&T Ltd, Bangriposi Request for providing rainfall data on monthly basis from May’20 onwards mayank
Bijatala Block, Mayurbhanj Force Majeure

3508 RITES-OD RITES-BSRP-OD-L&T-2020-832 28-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi COS Submission of details for Change of Scope work
3509 RITES-OD RITES-BSRP-OD-L&T-2020-833 29-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi COS Submission of COS Cast Estimate for Toll management System
Submission of raft Drawing for Footpath cum Drain arrangement at Service Road/ Structure
3510 RITES-OD RITES-BSRP-OD-L&T-2020-834 30-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings
Location
CIL, GST
3511 RITES-OD RITES-BSRP-OD-L&T-2020-835 1-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Reimbursement of Tax liability incurred Due to Implementation of GST against Main Works yes
Payments
Not relevant to
3512 RITES-NHAI RITES-BSRP-OD-NHAI-2020-372 Not relevant to L&T Not relevant to L&T Not relevant to L&T no Not relevant to L&T
L&T
Payments,
3513 RITES-NHAI RITES-BSRP-OD-NHAI-2020-373 30-May-20 The Team Leader, AE - RITES The project Director Submission of RA Bill-08 for Electrical utility Shifting under Jashipur And Sukruli Electrical Section
Utilities
3514 RITES-NHAI RITES-BSRP-OD-NHAI-2020-374 30-May-20 The Team Leader, AE - RITES The project Director COS, land issues Construction of PUP at 243+290 and FOB 243+660 under COS
LT-BSRP-OUT-20-21-049
Time Extension, Notification for Unprecedented Rainfall and AMPHAN Cyclone in May’2020 under Clause 10.5.2 of
3515 L&T LT/BSRP/OUT/20-21/077 2-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, RITES, AE LT-BSRP-OUT-20-21-026 mayank
Force Majeure the Contract Agreement
RITES-BSRP-OD-LT-2020-795
LT-BSRP-OUT-20-21-042
3516 L&T LT/BSRP/OUT/20-21/078 2-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, RITES, AE Design & Drawings Submission of PC Approved RE Wall Drawing For PUP at 288+750 LT-BSRP-OUT-19-20-651 Gairick
RITES-BSRP-OD-LT-2020-706
3517 L&T LT/BSRP/OUT/20-21/079 2-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, RITES, AE Design & Drawings Submission of Draft Drawing for PUP 295+470 LT-BSRP-OUT-20-21-057 Gairick
LT-BSRP-OUT-19-20-038
LT-BSRP-OUT-19-20-378-A
3518 L&T LT/BSRP/OUT/20-21/080 2-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, RITES, AE Design & Drawings Submission of Typical Details of Bus Shelter Gairick
RITES-BSRP-OD-LT-2019-506
RITES-BSRP-OD-LT-2019-659
3519 L&T LT/BSRP/OUT/20-21/081 2-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, RITES, AE Design & Drawings Submission of Pc Drawing for COS LT-BSRP-OUT-20-21-038 Gairick
LT-BSRP-OUT-20-21-057
3520 L&T LT/BSRP/OUT/20-21/082 2-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, RITES, AE Design & Drawings Submission of Draft Plan and Profile for 242v to 245 of COS Gairick
LT-BSRP-OUT-20-21-072
RITES-BSRP-OD-LT-2020-581
3521 L&T LT/BSRP/OUT/20-21/083 2-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, RITES, AE Design & Drawings Submission of Highway miscellaneous Drawing Approval Gairick
LT-BSRP-OUT-20-21-213
3522 L&T LT/BSRP/OUT/20-21/084 3-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, RITES, AE Quality Submission of NDT test Report RITES-BSRP-QC-OD-LT-2020-806 Pankaj Kumar
3523 L&T LT/BSRP/OUT/20-21/085 4-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, RITES, AE Quality ndependent Laboratory Test of Construction materials Pankaj Kumar
in reply to RITES/BSRP/OD/L&T/2020/837 dated
3524 L&T LT/BSRP/OUT/20-21/086 5-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, RITES, AE Quality of Works Submission of proposal for corrective action for Poor Quality work of concreting at MJB 287+951 RKP
03-06-2020
Resistance from local populace from 212.000 to 212.250 RHS for demanding the construction of
3525 RITES-NHAI RITES-BSRP-OD-NHAI-2020-375 1-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi COS
road side drain
Design &
3526 RITES-OD RITES-BSRP-OD-L&T-2020-836 2-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Drawings, COS Submission of compliance report along with P&P from 242 to 244 yes

3527 RITES-OD RITES-BSRP-OD-L&T-2020-837 3-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Poor Quality work of concreting at MJB 287+951 Yes LT/BSRP/OUT/20-21/086
3528 RITES-OD RITES-BSRP-OD-L&T-2020-838 3-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Time Extension Submission of EOT Revised Work Programme Yes
Land Issues,
3529 RITES-OD RITES-BSRP-OD-L&T-2020-839 4-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Submission of De-scoping proposal for Jashipur Bypass yes
Descoping
construction of additional structure VIP reference at Singhada Chawk at Km 310+530 of project
3530 RITES-OD RITES-BSRP-OD-L&T-2020-840 4-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi COS yes
highway under COS
Time Extension, Notification for unprecedented rainfall and AMPHAN cyclone in May'2020 under clause 10.5.2 of
3531 RITES-OD RITES-BSRP-OD-L&T-2020-841 4-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi yes
Force Majeure the Contract Agreement
construction of additional structure VIP reference at Singhada Chawk at Km 310+530 of project
3532 NHAI NHAI-11011-15-RITES-2020-PIU-BLS-394 2-Jun-20 The project Director The Team Leader, RITES, AE COS no
highway under COS
Land Issues,
3533 NHAI NHAI-11011-15-RITES-2020-PIU-BLS-397 2-Jun-20 The project Director The Team Leader, RITES, AE Submission of De-scoping proposal for Jashipur Bypass no
Descoping
3534 L&T LT/BSRP/OUT/20-21/087 6-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Quality Submission of Cost for Construction of Additional underpass near km 226+840 to 296+730 QA
Submission of SPS-26 for main works for the month of May'2020 (considering relaxation as per
3535 L&T LT/BSRP/OUT/20-21/088 6-Jun-20 M/s. L&T Ltd, Bangriposi The Team Leader, Rites Payments kausal
MoRTH Order)
3536 L&T LT/BSRP/OUT/20-21/089 8-Jun-20 M/s. L&T Ltd, Bangriposi The Tahsildar,Saraskana Payments Issue Money Receipt VNC
The Team Leader, RITES, AE - Time Extension,
3537 L&T LT/BSRP/OUT/20-21/090 9-Jun-20 M/s. L&T Ltd, Bangriposi Submission of IMD rainfall data for the month of may'2020 collected from Bijatala Block,Bisoi Mayank
RITES Force Majeure

The project Director, NHAI, Regarding Providing information to Shri Akshaya kumar Pattanayak/ Right to information LT/BSRP/OUT/19-20635
3538 L&T LT/BSRP/OUT/20-21/091 9-Jun-20 M/s. L&T Ltd, Bangriposi RTI VNC
PIU-Balasore Act.2005 RITES/BSRP/OD/LT/2020/800
3539 RITES-QC RITES-BSRP-QC-OD-LT-2020-362 18-Mar-20 The Team Leader, AE - RITES M/s.L&T Ltd, Bangriposi Quality of Works Third party test reports
3540 RITES-QC RITES-BSRP-QC-OD-LT-2020-366 12-May-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Independent laboratory test of Construction materials LT-BSRP-OUT-20-21-52
LT/BSRP/OUT/20-21/045
RITES/BSRP/OD/LT/2020/818
The Team Leader, RITES, AE - The project Director, NHAI,
3541 RITES-NHAI RITES-BSRP-OD-NHAI-2020-376 5-Jun-20 RITES PIU-Balasore Payments IPC-25 LT/BSRP/OUT/20-21/061
RITES/BSRP/OD/LT/2020/369
LT/BSRP/OUT/20-21/69
The Team Leader, RITES, AE -
3542 L&T LT/BSRP/OUT/20-21/092 9-Jun-20 M/s. L&T Ltd, Bangriposi RITES Claims Compensation towards losses suffered / costs incurred due to delay in the Works mayank

The Team Leader, RITES, AE - Claims, Interest Reimbursement of tax liability incurred on account of GST – Change in Law pursuant to Sub-
3543 L&T LT/BSRP/OUT/20-21/093 9-Jun-20 M/s. L&T Ltd, Bangriposi mayank
RITES on GST CIL Clause 19.17 of the Agreement

The Team Leader, RITES, AE - Claims, CIL Min. Increase in minimum wages of workmen - Change in Law pursuant to Sub-Clause 19.17 of the
3544 L&T LT/BSRP/OUT/20-21/094 9-Jun-20 M/s. L&T Ltd, Bangriposi mayank
RITES wages Agreement
The Team Leader, RITES, AE -
3545 L&T LT/BSRP/OUT/20-21/095 9-Jun-20 M/s. L&T Ltd, Bangriposi RITES Claims Interest on delayed payments mayank

The Team Leader, RITES, AE -


3546 L&T LT/BSRP/OUT/20-21/096 9-Jun-20 M/s. L&T Ltd, Bangriposi RITES MPR Submission of MPR for the month of May'2020 mayank

The Team Leader, RITES, AE - LT/BSRP/OUT/20-21/088


3547 L&T LT/BSRP/OUT/20-21/097 10-Jun-20 M/s. L&T Ltd, Bangriposi RITES COVID-19 Outbreak of COVID-19 & Relief Measures by MoRTH mayank
LT/BSRP/OUT/20-21/067
LT/BSRP/OUT/20-21/082 02.06.20
LT/BSRP/OUT/20-21/072 28.05.20
LT/BSRP/OUT/20-21/034 27.04.20
3548 RITES-OD RITES-BSRP-OD-L&T-2020-842 8-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Submission of draft Plan & Profile for Km 242 to 245 for COS
LT/BSRP/OUT/19-20/618 15.02.20
RITES-BSRP-OD-LT-2020-809 07-05-20
RITES-BSRP-OD-LT-2020-836 02.06.20
The Team Leader, RITES, AE -
3549 L&T LT/BSRP/OUT/20-21/098 10-Jun-20 M/s. L&T Ltd, Bangriposi RITES COS Construction of Additional Structure at various locations of project highway under COS mayank

The Team Leader, RITES, AE - Construction of Additional Structures (VIP reference) at Shinghara Chowk at Km 310+530 of
3550 L&T LT/BSRP/OUT/20-21/099 10-Jun-20 M/s. L&T Ltd, Bangriposi RITES COS RITES/BSRP/OD/LT/2020/840 04.06.20 mayank
Project highway under COS
3551 NHAI NHAI/11011/15/RITES/2020/PIU/BLS/425 9-Jun-20 The project Director The Team Leader, RITES, AE Descoping Construction of Diversion road near EUP Locations
3552 RITES-QC RITES-BSRP-QC-OD-LT-2020-367 6-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Independent laboratory test of Construction materials LT-BSRP-OUT-20-21-085
RITES/BSRP/OD/NHAI/2020/343 12.02.20
RITES/BSRP/OD/NHAI/2020/366 05.05.20
The Team Leader, RITES, AE - The project Director, NHAI,
3553 RITES-NHAI RITES-BSRP-OD-NHAI-2020-377 9-Jun-20 RITES PIU-Balasore COS Construction of Additional Structures ( VIP Reference) at Singhara Chowk of COS LT/BSRP/OUT/20-21/031 25-04-20
NHAI/11011/15/RITES/2020/PIU/BLS/394
04.06.20
LT/BSRP/OUT/20-21/007 Dt.11-04-20
LT/BSRP/OUT/20-21/016 Dt.17-0420
The Team Leader, RITES, AE - Outbreak of COVID-19 Corresponding Government Orders for Nationwide lockdown- fourth LT/BSRP/OUT/20-21/048 Dt.05-05-20
3554 L&T LT/BSRP/OUT/20-21/100 10-Jun-20 M/s. L&T Ltd, Bangriposi COVID-19 Mayank
RITES Extension of lockdown up to 30th JUN'20 LT/BSRP/OUT/20-21/060 Dt.19-05-20
LT/BSRP/OUT/20-21/062 Dt.19-05-20
RITES/BSRP/OD/LT/2020/815 Dt.12-05-20
The Team Leader, RITES, AE - Submission of PC approved Drawing for footpath Cum Drain arrangement at Service RITES/BSRP/OD/LT/2020/834 30-05-20
3555 L&T LT/BSRP/OUT/20-21/101 11-Jun-20 M/s. L&T Ltd, Bangriposi Design & Drawings GD
RITES road/Structure locations LT/BSRP/OUT/20-21/064 20.05.20
The Team Leader, RITES, AE - The project Director, NHAI, LT/BSRP/OUT/20-21/097 10.06.20
3556 RITES-NHAI RITES-BSRP-OD-NHAI-2020-378 10-Jun-20 COVID-19 Outbreak of Covid-19 and Relief measures by MoRTH for Retention Money
RITES PIU-Balasore LT/BSRP/OUT/20-21/088 06.06.20
LT/BSRP/OUT/20-21/038 25.4.20
3557 RITES-OD RITES-BSRP-OD-L&T-2020-843 10-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Submission of PC Approved drawing for change of scope
LT/BSRP/OUT/20-21/081 02.06.20
The Team Leader, RITES, AE - LT/BSRP/OUT/20-21/070 Dt.26-05-20
3558 L&T LT/BSRP/OUT/20-21/102 11-Jun-20 M/s. L&T Ltd, Bangriposi Claims, GST CIL Request for interim relief against hold amount of GST CIL for main works mayank
RITES RITES/BSRP/OD/LT/2020/835 Dt.01-06-20
The Team Leader, RITES, AE - Design & LT/BSRP/OUT/20-21/082 Dt.02-06-20
3559 L&T LT/BSRP/OUT/20-21/103 11-Jun-20 M/s. L&T Ltd, Bangriposi Submission of Draft plan and Profile for 242 to 245 for COS GD
RITES Drawings RITES/BSRP/OD/LT/2020/ 842 Dt.8-06-20
The Team Leader, RITES, AE - Design & Submission of Drawing of Drawing of Drain plan and Profile from 288+190 to 289+100 adjacent
3560 L&T LT/BSRP/OUT/20-21/104 11-Jun-20 M/s. L&T Ltd, Bangriposi LT/BSRP/OUT/19-20/605 Dt-11-02-20 GD
RITES Drawings to PUP 288+750
The Team Leader, RITES, AE - Claims, CIL Reimbursement of Royalty and Related Claims CL prusuant to Sub-clause 19.17 of the
3561 L&T LT/BSRP/OUT/20-21/105 12-Jun-20 M/s. L&T Ltd, Bangriposi mayank
RITES Royalty Agreement LT/BSRP/OUT/17-18/075 29.11.17
3562 L&T LT/BSRP/OUT/20-21/106 13-Jun-20 M/s. L&T Ltd, Bangriposi The Tahsildar, Saraskana Statutory River Sand of Royalty Payments VNC
LT/BSRP/OUT/20-21/067 Dt-25-05-20
The Team Leader, RITES, AE - COVID-19,
3563 L&T LT/BSRP/OUT/20-21/107 13-Jun-20 M/s. L&T Ltd, Bangriposi Outbreak of Covid-19 Request for Modification of Schedule-H LT/BSRP/OUT/20-21/088 Dt-6-06-20 Mayank
RITES Payments
NHAI-11011-15-RITES-2020-PIU-BLS-439
The Team Leader, RITES, AE -
3564 L&T LT/BSRP/OUT/20-21/108 13-Jun-20 M/s. L&T Ltd, Bangriposi RITES Quality Proposal for Using blended mix material for RE fill at Flyover At Flyover at 215+268 QA/QC

LT/BSRP/OUT/19-20/603 10.02.2019
3565 RITES-OD RITES-BSRP-OD-L&T-2020-844 12-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Miscellaneous Deployment of Ambulances
RITES/BSRP/OD/LT/2020/740 12.02.20
LT/BSRP/OUT/19-20/084 03.06.20
3566 RITES-OD RITES-BSRP-OD-L&T-2020-845 12-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Comments on NDT Test Report for Slab of MNB 265+754
RITES/BSRP/OD/LT/2020/ 05.05.20
LT/BSRP/OUT/20-21/083 Dt-02.06.20
3567 RITES-OD RITES-BSRP-OD-L&T-2020-846 12-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Submission of Highway miscellaneous Drawing approval LT/BSRP/OUT/19-20/213 Dt-8.07.2019
RITES/BSRP/OD/LT/2020/581 Dt-05.08.2019
LT/BSRP/OUT/20-21/049 Dt-05.05.20
Time Extension, LT/BSRP/OUT/20-21/077 Dt-02.06.20
3568 RITES-OD RITES-BSRP-OD-L&T-2020-847 12-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Submission of IMD rainfall data for the month of May 2020 collected from Bijatala block, Bisoi
Force Majeure LT/BSRP/OUT/20-21/090 Dt-08.06.20
RITES/BSRP/OD/LT/2020/841 Dt-04-06-20
NHAI-11011-15-RITES-2020-PIU-BLS-425
3569 RITES-OD RITES-BSRP-OD-L&T-2020-848 12-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Descoping Construction of Diversion Road near EUP Locations
Dt.12.06.20
The Team Leader, RITES, AE - Application-v for Interim Time Extension ( For the delays up to 31st May'2020) pursuant to Sub-
3570 L&T LT/BSRP/OUT/20-21/109 16-Jun-20 M/s. L&T Ltd, Bangriposi Time Extension mayank
RITES clause 10.5 of the Agreement
The Team Leader, RITES, AE -
3571 L&T LT/BSRP/OUT/20-21/110 16-Jun-20 M/s. L&T Ltd, Bangriposi
RITES Quality of Works Regarding Comments on NDT Test Report for slab of MNB 265+754 QA/QC

3572 RITES-OD RITES-BSRP-OD-L&T-2020-849 12-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Miscellaneous Request from local Populance of Begunia village Demanding bus Stop and Median Opening
Design &
3573 RITES-OD RITES-BSRP-OD-L&T-2020-850 12-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Submission of Typical Details of Bus Shelter-Observation
Drawings
Outbreak of pandemic Covid-19 and corresponding Government Orders for nationwide lockdown-
3574 RITES-OD RITES-BSRP-OD-L&T-2020-851 14-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi COVID-19 yes LT/BSRP/OUT/20-21/158
Statement
3575 RITES-OD RITES-BSRP-OD-L&T-2020-852 14-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Approval of RE Wall Drawings of PUP @ch.288+750

3576 RITES-OD RITES-BSRP-OD-L&T-2020-853 15-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Submission of PC Approved Drawing

3577 RITES-OD RITES-BSRP-OD-L&T-2020-854 15-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Submission of Proposal for Corrective Action for Poor Quality work of Concreting at MJB yes RITES-BSRP-OD-NHAI-2020-372
3578 RITES-QC RITES-BSRP-QC-OD-LT-2020-368 15-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Third party Test reports
The Team Leader, RITES, AE - The project Director, NHAI,
3579 RITES-NHAI RITES-BSRP-OD-NHAI-2020-380 9-Jun-20 RITES PIU-Balasore COVID-19 Outbreak of pandemic Covid-19 and Modification of Schedule-H

The Team Leader, RITES, AE -


3580 L&T LT/BSRP/OUT/20-21/111 17-Jun-20 M/s. L&T Ltd, Bangriposi
RITES Quality of Works Regarding Request for Permission for Lifting Soil/ Filling sand vnc

The Team Leader, RITES, AE -


3581 L&T LT/BSRP/OUT/20-21/111-A 19-Jun-20 M/s. L&T Ltd, Bangriposi
RITES
1 KR

3582 L&T LT/BSRP/OUT/20-21/112 20-Jun-20 M/s. L&T Ltd, Bangriposi File Note Surajit sir
The Team Leader, RITES, AE -
3583 L&T LT/BSRP/OUT/20-21/113 20-Jun-20 M/s. L&T Ltd, Bangriposi
RITES
1 QA/QC P-2

The Team Leader, RITES, AE -


3584 L&T LT/BSRP/OUT/20-21/113-A M/s. L&T Ltd, Bangriposi RITES Quality of Works Submission of Test result of natural sand proposed to use for earth fill for RE wall

Delivery dept Bhubeneshwar


3585 L&T LT/BSRP/OUT/20-21/114 22-Jun-20 M/s. L&T Ltd, Bangriposi Air 1 vasant

M/s Shri Sai Traders


3586 L&T LT/BSRP/OUT/20-21/115 22-Jun-20 M/s. L&T Ltd, Bangriposi BHUBANESHWAR 1 vasant

3587 RITES-QC RITES-BSRP-QC-OD-LT-2020-369 19-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Proposal for Using blended mix material for RE fill At Flyover at 215+268
3588 RITES-QC RITES-BSRP-QC-OD-LT-2020-370 19-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Quality of Works Third party Test reports
The Team Leader, RITES, AE - The project Director, NHAI,
3589 RITES-NHAI RITES-BSRP-OD-NHAI-2020-382 9-Jun-20 RITES PIU-Balasore Maintenance/DLP Maintenance /plantation Activities Durung Monsoon Period

3590 RITES-OD RITES-BSRP-OD-L&T-2020-855 15-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings Submission of Drawing for Pedestrian Underpass At km 295+470

3591 RITES-OD RITES-BSRP-OD-L&T-2020-856 18-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Claims Non Submission of Required Document for SPS-26 for the Month of may'20
3592 RITES-OD RITES-BSRP-OD-L&T-2020-857 19-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Descoping Submission of Revised De-scoping Proposal
3593 RITES-OD RITES-BSRP-OD-L&T-2020-858 20-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Miscellaneous Construction Earthen Shoulder median Filling
3594 RITES-OD RITES-BSRP-OD-L&T-2020-859 20-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi COS Construction of additional Structures (VIP reference) at Sinhgara Chowk 310+530 COS
The Team Leader, RITES, AE - Design & Submission of Revised PC Approved Design and Drawing of Toilet Building for Both the
3595 L&T LT/BSRP/OUT/20-21/116 22-Jun-20 M/s. L&T Ltd, Bangriposi Gairick
RITES Drawings Tollpalzas
The Team Leader, RITES, AE - Design &
3596 L&T LT/BSRP/OUT/20-21/117 22-Jun-20 M/s. L&T Ltd, Bangriposi Submission of Design and Drawing for RCC Retaining Wall at RE wall Approaches Gairick
RITES Drawings
The Team Leader, RITES, AE - Design &
3597 L&T LT/BSRP/OUT/20-21/118 22-Jun-20 M/s. L&T Ltd, Bangriposi Resubmission of Highway miscellaneous Road Sign Drawing Gairick
RITES Drawings
The Team Leader, RITES, AE -
3598 L&T LT/BSRP/OUT/20-21/119 23-Jun-20 M/s. L&T Ltd, Bangriposi
RITES Quality of Works Submission of PIT and Dynamic test at MJB 205+710 Gairick

The Team Leader, RITES, AE - Design &


3599 L&T LT/BSRP/OUT/20-21/120 23-Jun-20 M/s. L&T Ltd, Bangriposi Submission of Recised PC approved RE wall Drawing for VUP at Ch.227+229 Gairick
RITES Drawings
The Team Leader, RITES, AE - Design &
3600 L&T LT/BSRP/OUT/20-21/121 23-Jun-20 M/s. L&T Ltd, Bangriposi Submission of Revised PC Approved RE Wall DRawing for VUP at DT .296+144 Gairick
RITES Drawings
The Team Leader, RITES, AE -
3601 L&T LT/BSRP/OUT/20-21/122 23-Jun-20 M/s. L&T Ltd, Bangriposi
RITES Quality of Works Submission of Company Profile of Bajaj Electricals Limited Gairick

The Team Leader, RITES, AE -


3602 L&T LT/BSRP/OUT/20-21/123 23-Jun-20 M/s. L&T Ltd, Bangriposi
RITES Quality of Works Source Approval of vendor for Road Sing, stud, Gantry ETC Gairick

The Team Leader, RITES, AE -


3603 L&T LT/BSRP/OUT/20-21/124 23-Jun-20 M/s. L&T Ltd, Bangriposi
RITES Land Issues Additional ROW requirement for Major Junction Development Gairick

The Team Leader, RITES, AE -


3604 L&T LT/BSRP/OUT/20-21/125 23-Jun-20 M/s. L&T Ltd, Bangriposi
RITES Quality of Works Resubmission of Geotechnical Investigation Report of PUP@288+750 Gairick

The Team Leader, RITES, AE - Design &


3605 L&T LT/BSRP/OUT/20-21/126 23-Jun-20 M/s. L&T Ltd, Bangriposi Resubmission of Final Design and Drawing of Canopy for Both tollplazas 216+360 and 277000 Gairick
RITES Drawings
The Team Leader, RITES, AE - Design &
3606 L&T LT/BSRP/OUT/20-21/127 23-Jun-20 M/s. L&T Ltd, Bangriposi Submission of Design and Drawing of Highway lighting Gairick
RITES Drawings
The Team Leader, RITES, AE -
3607 L&T LT/BSRP/OUT/20-21/128 23-Jun-20 M/s. L&T Ltd, Bangriposi
RITES Quality of Works Resubmission of Geotechnical Investigation Report of VUP@285+706 Gairick

The Team Leader, RITES, AE -


3608 L&T LT/BSRP/OUT/20-21/128 A 23-Jun-20 M/s. L&T Ltd, Bangriposi
RITES Quality of Works Request for certification of invoice for the month of May'2020 mayank

3609 RITES-OD RITES-BSRP-OD-L&T-2020-860 20-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Payments Interest on Delayed payments
Reimbursement of tax liability incurred on account of GST CIL pursuant to Sub-clause 19.17 the
3610 RITES-OD RITES-BSRP-OD-L&T-2020-861 20-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Claims, GST CIL
Agreement
3611 RITES-OD RITES-BSRP-OD-L&T-2020-862 22-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi CIL Increase in minimum wages of labours-CIL pursuant to CL.19.17 the Agreement
Submission of Drawing of Drain plan and Profile from 288+190 to 289+100 Adjacent to PUP
3612 RITES-OD RITES-BSRP-OD-L&T-2020-863 22-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Design & Drawings
288+750
Workable Stretch/Unencumbered length for the Month of Carry out Construction activities on
3613 RITES-OD RITES-BSRP-OD-L&T-2020-864 22-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Hindrance list
Project Highway
3614 RITES-OD RITES-BSRP-OD-L&T-2020-865 22-Jun-20 The Team Leader, AE - RITES M/s. L&T Ltd, Bangriposi Claims, GST CIL Request for Interim relief against hold Amount of GST CIL for Main works
Remarks
received on 12-05-2020, mail from PIU office, letter is addressed to L&T HQ

Non submission of documents and incomplete stretch

approval intimation

approval intimation

Lockdown 4 notification

confirmation for PC approved dwg submission

approval of company credentials

relocation of bus stop at 257

median opening proposal not accepted

Received on 23-05-2020

certification
Received from AE office on 05-06-2020 soft copy

Received from AE office on 05-06-2020 soft copy

COVID claim upto 19-04 reply

Das könnte Ihnen auch gefallen