Beruflich Dokumente
Kultur Dokumente
This document lists the configurations that have been tested for the Primavera P6 version 6.2.1 release.
Notes:
• The P6 product suite is supported on VMware.
• In general, the P6 product suite is compatible with configurations supported by third party vendors.
• For information on tested configurations for Contract Manager, see the Contract Manager Tested Configurations document (testedcfg.htm
in the root folder of the Contract Manager physical media or download).
• For information on tested configurations for the Primavera Integration API, see the Primavera Integration API Administrator’s Guide
(\Integration\API\docs\setup.pdf of the P6 physical media or download).
• Except where noted, all configurations were tested with English as the operating system locale and input language.
Contents
• Databases
• Database Client Software
• Java Application Servers
• Web Servers
• Client Operating Systems
• Browsers
• Client JREs
• Workflow Repository Software
• LDAP Software
• Single Sign-On Environments
• Citrix Software
• Other Primavera Applications
Databases
Database Server
Generic Platform Platform Database Collation Page/Locale Primavera Applications
• Group Server
• Western European
• Project Management
module
• Group Server
Databases
Database Server
Generic Platform Platform Database Collation Page/Locale Primavera Applications
• Project Management
module
• UTF8 • Methodology
IBM AIX 5.3 Oracle 11.1.0.6.0
Management module
• Western European
• P6 Web Access server
IBM AIX Based • Group Server
Systems:
(64-bit) • Project Management
module
• UTF8 • Methodology
IBM AIX 6.1 Oracle 11.1.0.6.0
Management module
• Western European
• P6 Web Access server
• Group Server
Oracle Enterprise
Linux x86-64 Oracle HTTP Server P6 Web Access
Linux 5
Oracle Enterprise
Oracle HTTP Server P6 Web Access
Linux 5
Linux x86
Apache Web Server • P6 Web Access server
Red Hat Enterprise v. 2.2.6**
Linux AS 5 • Timesheets website
Microsoft Windows x64 (64-bit) • Microsoft Windows Vista • Methodology Management module
sp2*
• Standalone version of Project Management and
• Microsoft Windows 7* Methodology Management modules
Browsers
Generic Platform Client Operating Browser Primavera Applications
System
LDAP Software
Generic Platform LDAP Platform LDAP Software Primavera Applications
Oracle Internet
Oracle Enterprise P6 Web Access server
Linux x86 Directory 10gR3
Linux 4
(10.1.4) P6 Web Access client
Windows 2003
Server R2 sp2 Windows Server 2003 • Project Management module
Primary Domain Active Directory **
Microsoft Windows • Methodology Management module
Controller
(32-bit)
• P6 Web Access server
Windows 2003 Sun One 5.2 LDAP
Server R2 sp2 directory server • Group Server
Single Sign-On (SS0) Environments
Generic Platform SSO Platform SSO Software LDAP Directory Server Primavera
Applications
Windows 2003 CA Netegrity Sun One 5.2 LDAP directory • Group Server
Microsoft Windows Server R2 sp2 SiteMinder 12 sp1 server
(32-bit) with SiteMinder Web • P6 Web Access
Agent QMR5 server
Citrix Software
Generic Platform Platform Citrix Software Citrix Client Primavera Applications
Copyright © 1999, 2009, Oracle and/or its affiliates. All rights reserved.