Beruflich Dokumente
Kultur Dokumente
On “B” Recycle valve on WREP, FV-61-NO2AO2 A,B,C the valve plugs are to be changed out for
new design. Valve body to be left in place, bonnet removed & plug changed. Suction valve
XV 61NO2AO1 ABC and discharge XV 612NO2A02A02 ABC to be hand jacked shut, power
removed & vent valves open.
1. Valve’s hand jacked shut, Actuator power removed ( Suction & Discharge).
2. Vent at suction pressure gauge to be open.
3. Line’s & pump drained
4. Operator to stand by to check for leakage
Isolation requirement is for single isolation & blind, time and risk exposure for installation of blinds
is estimated to be 4 hrs. Requires opening pipe work numerous times. Recycle line is high point of
system, Crude is stabilized, associated gas is minimal.