Sie sind auf Seite 1von 3

FREMAROBI SKILLS DEVELOPMENT CENTRE, INC.

ROOT CAUSE ANALYSIS REPORT


Date: 29-Nov-10

ID ISSUE
NO. The following
ROOT CAUSE PREVENTIVE ACTIONS
DESCRIPTION
issues are results DEPT. SEC.FOCAL PERSON
of recently conducted
surveillance audit by Global
Group

Minutes of last 2 management The last two management review Members of the management
reviews indicate that not all meeting were conducted to review were given overview of
agenda items were formally address specific issues and failed the importance of taking-up all
addressed and no documented to look into other subjects which subjects matter on every
output are integral part of every review. meeting of the group. Specific
isssues should be taken
separetely and if it affects the
quality management system ,
the Risk Analysis Team shall be
Nestor convene to address the isssues.
1 QA
Miranda Also, to oversee the day-to-
day implementation of quality
man agemen t system and
oversee the full documentation
of all related activities,
Ms.Michelle Sotto was apointed
to assist Mr. Miranda and shall
act as the Management
Representative .

Register of quality records All documents are in possesion of All QA files shall be handed to
incomplete, all records of the Mr. Miranda and were not all the new Management
quality deparment missing. Nestor presented during audit Representative for safekeeping
2 QA
Miranda and including generations of
reports and minutes of QA
related meetings.
No recent measurement of of set It become customary that The QAM prepared and
quality objectivs operations were completed daily submitted to the President
Nestor as per TESDA operation company quality objectives
3 QA
Miranda procedures that other details andwas subsequently
relating to quality objectives were approved. Copies were
not given proper attentions. distributed to all concerns.
Poor standard of cleanliness in Michelle The noted area is the company The President immediately
the kitchen used for stewarding Sotto kitchen use for preparing staff ordered the repair and
course. Also chipped tiles in meals and use only for reprimanded the kichen staff to
several areas. assessment In the event of spill- adhere to good housekeeping
over of assessement schedules. practice.
4 Admin. (more than the regular batch.)
The defects cited is schedule for
repair on the last month of the
year as part of the year end
correcive measures of company
infrastructures.
No maintenance logs or records Michelle There was a log-book but the New forms was designed and
available to indicate that this Sotto mainenance personnel failed to will be implemented by Admin.
5 activity is carried out on course Admin. update and maintain. The
equipment or general building responsibilities were tied-up
fixtures and fittings between Operations and Admin.
Cans of paint and thinners are Michelle The said hazardous and As ordered by the President, a
not adequately segregated and Sotto flammable materials were stored new steel enclosures was
secured in an open areas as suggested by constructed at Engine Section
6 Admin. previous TESDA's compliance to accommodate both Deck and
audit. Previous fire inspection did Engine hazardous materials.
not cite the inadequacy of the Ventilated and properly
storage. marked.
Inspection tags on fire Michelle The Admin was given the task
extinguisher are not being utised Sotto to checked reqularly and
7 Admin. delegated the checking and
recording of inspection to the
Property Custodian
At time of audit, checklist and Th e Audit Team failed to submit The QAM immediately advised
summaries of internal audit Nestor checklist and summary of the the Audit to complete and
8 completed 19th April were not QA audit submit the checklist and
Miranda
available summary audit report
Team Leader: Nestor M. Miranda

Member: Michelle Sotto

Eric Alcanzo

Abigail Gubot

Das könnte Ihnen auch gefallen