CLIENT

OWNERS ENGINEER

EPC CONTRACTOR

SITE / PROJECT

NEW STEEL COMPLEX IN BELLARA

- 25-11-2016 FIRST EDITION CGD RNF RNF


REV DATE DESCRIPTION DONE CHECKED APPROVED
FOR INFORMATION ISSUE OWNER SIGN DATE
FOR APPROVAL
STATUS

VALID FOR DESIGN


VALID FOR CONSTRUCTION
AS BUILT

CONTRACTOR REFERENCE DOCUMENT NAME REVISION

TUNNEL DU CONVOYEUR C11A. A


DOCUMENT NUMBER STANDARD FONDATION. NOTE DE CALCUL. PAGES

P1-MHS-DFM-C-C11A-CR-0010 25
TABLE DE MATIÈRES
1.  OBJET 3 
2.  CODES ET RÈGLEMENTS 5 
3.  DONNÉES D’ENTRÉE 6 
3.1.  DOCUMENTATION DE REFERENCE 6 
3.2.  CARACTERISTIQUES DES MATERIAUX 6 
3.2.1.  Béton 6 
3.2.2.  Armature 6 
3.3.  CONSIDERATIONS GEOTECHNIQUES 6 
4.  CHARGES ET COMBINAISONS 8 
4.1.  DESSIN DE CHARGES 8 
4.2.  CHARGES DES STRUCTURE 8 
4.3.  ACTIONS À CONSIDÉRER 9 
4.4.  COMBINAISONS D’ACTIONS. 11 
5.  CALCUL DE LE FONDATION 14 
5.1.  DESCRIPTION GENERALE 14 
5.2.  MODELISATION 15 
5.3.  CHARGES INTRODUITES AU MODEL DU CALCUL 15 
5.4.  LA STABILITE DE FLOTTAISON 17 
5.5.  ARMATURES DES SEMELLES 18 
6.  DESSIN DU CADRE. 19 
6.1.  ELU CONTRAINTES NORMALES. 19 
6.2.  ELU EFFORTS TANGENTIELS. 20 
6.4.  ELS FISSURATION. 21 
7.  CONCLUSIONS 22 

P1-MHS-DFM-C-C11A-CR-0010 Page 2 of 25
1. OBJET

L’objet de ce rapport de calcul est de présenter les calculs et les résultats de l’analyse et la
conception du le tunnel du convoyeur C11A correspondant à les nouvelles installations de
traitement des minerais à Bellara, (république algérienne), y compris la description générale des
données d’entrée considérées, les procédures de conception et les résultats.
Le complexe sidérurgique est situé à Bellara, province de JIJEL, nord-est de l’Algérie et ce
projet comprend le part des systèmes de manutention des matériaux (site et port).

Trains dècharge station

Tunnel convoyeur C11A

Figure 1. Trains dècharge station et tunnel du convoyeur C11A.

Figure 2. Trains dècharge station

P1-MHS-DFM-C-C11A-CR-0010 Page 3 of 25
Figure 3. Convoyeur C11A. Tunnel d'accès indiquée par l'ellipse rouge.

Figure 4. Section du tunnel d'accès.

Il s’agit d’un ouvrage type pont cadre en béton armé.

PARAMÈTRES DIMENSIONS

Largeur intérieure 3.8 m

Hauteur intérieure 2.86 m

Longueur utile 2 m

Épaisseur radier 35 cm

Épaisseur traverse 35 cm

Épaisseur piédroits 35 cm

Enrobage des aciers 30 mm

P1-MHS-DFM-C-C11A-CR-0010 Page 4 of 25
2. CODES ET RÈGLEMENTS

Les codes et normes utilisés pour la conception sont conformes au Règlement Algérien CBA 93,
envisageant les conditions de conception les plus sévères. Toutefois, dans des circonstances où
aucune Norme Algérienne ne comprend un élément particulier, alors on prendra en considération
d’autres codes et normes, comme ceux indiqués ci-dessous.
Comme référence, la liste suivante présente les normes de conception principales qui sont
considérés pour la conception :
 DTR BC 2.41: Règles de conception et de calcul des structures en béton armé CBA 93.

 DTR C 2.48: Règles parasismiques algériennes RPA 99 version 2003.

 DTR C 2.47: Règlement neige et vent RNV 2013.

 DTR-BC 2.2: Charges permanentes et charges d’exploitation

 Eurocode 0: Bases de calcul des structures

 Eurocode 1 « Actions sur les structures »

 Eurocode 2: Calcul des structures en béton

• Eurocode 8 « Calcul sismique »

• Document d’Application Nationale : Dossier-pilote PICF-EL du SETRA

• Document d’Application Nationale : Règles BAEL 91 révisées 99

P1-MHS-DFM-C-C11A-CR-0010 Page 5 of 25
3. DONNÉES D’ENTRÉE

3.1. DOCUMENTATION DE REFERENCE

Les documents suivants ont été considérés pour la conception et le calcul de la fondation:
«Civil Design Criteria»

3.2. CARACTERISTIQUES DES MATERIAUX

Les caractéristiques des matériaux considérés sont les suivantes :

3.2.1. Béton

 Classe de résistance du béton C30/37

 Résistance caractéristique en compression du béton (fck) (MPa) 30.00 MPa

 Résistance caractéristique en traction directe du béton (fck) (MPa) 2.89 MPa

 Coefficient partiel relatif du matériau [c] 1.5 / 1.2 (accid.)

 Module d’élasticité (Ec) (MPa) 27,576.79

3.2.2. Armature

 Type d’acier Fe500

 Résistance caractéristique d’acier fy (MPa) 500

 Coefficient partiel relatif du matériau [s] 1.15 /1 (accid.)

 Module d’élasticité (Es) (MPa) 200,000

 Enrobage nominal 50 mm

3.3. CONSIDERATIONS GEOTECHNIQUES

Il est indispensable de connaitre les caractéristiques géotechniques pour la détermination des


nécessités structurales. Ces données ont été déterminées avec les résultats des sondages et
essais contenu dans le document “Étude Géotechnique du Project Bellara”
Les données géotechniques pris comme valables sont:

 Densité relative du sol (T/m3) 2.00

 Angle de friction interne (Ф) 30°

P1-MHS-DFM-C-C11A-CR-0010 Page 6 of 25
 Coefficient pour pression active (Ka) 0.333

 Coefficient pour pression passive (Kp) 3

 Contrainte admissible minimale (kg/cm2) 2.28

P1-MHS-DFM-C-C11A-CR-0010 Page 7 of 25
4. CHARGES ET COMBINAISONS

4.1. DESSIN DE CHARGES

POIDS MORT

 Poids mort de la structure

 Poids mort du béton armé /m3 = 25 kN/m3

 Poids mort d’acier /m3 = 78,5 kN/m3

4.2. CHARGES DES STRUCTURE

Dans la figure suivant il est montré lescharges transmises par la structure métallique du
Convoyeur C11A:

Figure 5

P1-MHS-DFM-C-C11A-CR-0010 Page 8 of 25
Figure 6

4.3. ACTIONS À CONSIDÉRER

CARACTÉRISTIQUES DES MATÉRIAUX


Poids volumique du béton 25 KN/m³
Résistance caractéristique à 28
30 MPa
jours
Consistance du béton Autoplaçant

Nuance de l’acier B-500SD

Limite d’élasticité 500 MPa


CONDITIONS DU MILIEU AMBIANT
Classe d’exposition extérieure XC2

Classe d’exposition intérieure XC2

Critère de fissuration Fissuration très préjudiciable


CARACTÉRISTIQUES DU REMBLAI
Hauteur maximale 4m

Hauteur minimale 1.5 m

Poids volumique hors nappe 20 KN/m³

Poids volumique déjaugé 10 KN/m³

Cohésion -

P1-MHS-DFM-C-C11A-CR-0010 Page 9 of 25
HYPOTHÈSES GÉOTECHNIQUES
Angle de frottement interne 30º
Tension admissible 200 kN/m²
Module de réaction élastique 20000 kN/m²
verticale
Coefficient de Marston Cd oui
NAPPE PHRÉATIQUE
Hauteur de la nappe 2 m (variable du 5m au 2 m)

Poids volumique 10 KN/m³


CHARGES PERMANENTES
Poids propre de la structure 25 KN/m³

Remblai 20 KN/m³

Equipements des superstructures 22 KN/m³


CHARGES D’EXPLOITATION
Classe de chaussée Route (catégories 1-2-3)

Charges routières Non prévu

Charges militaires Non prévu

Charges de chantier Non prévu


Extraviel du 35 T du charge
Charges exceptionnelles
maximale.
CARACTÉRISTIQUES SISMIQUES
Accélération sismique 0.2g

Prise en compte de l’effet de Marston

L’effet de Marston est dans certain cas requis pour le calcul des terres.

Ce coefficient de Marston Cd a été calculé comme suit :

(voir article de référence joint à l’annexe 7)

Avec ; sachant que φ = 30º, KR = 0.33

Et μ’ = μ = tang φ = 0.58

Dans ce cas H = 4 m

Et Bd = 0.35+3.8+0.35 = 4.5 m

→ Cd = 0.75

La hauteur des terres H est ensuite multipliée par ce coefficient Cd pour obtenir la hauteur
fictive à prendre en compte dans le calcul.

P1-MHS-DFM-C-C11A-CR-0010 Page 10 of 25
→ HMarston = 4 m * 0.75 = 3.00 m

Dans ce cas, la quantité d’acier est donc plus importante, comme observé dans les tableaux et
les plans montrés en annexe.

Action seismic

Le calcul de la charge sismique est réalisé à l´aide d´une analyse de la structure sismique selon
l´Eurocode 8.

Nous déterminons le coefficient K à partir de la formule de MONONOBE et OKABE selon l’Annexe


E de l’EN 1998-5.: Kad = 0.41.

4.4. COMBINAISONS D’ACTIONS.

Les combinaisons d’actions ont été faites d’accord CBA, annexe C et RPA99 (chapitre V).

 Combinaisons no sismiques

ÉTATS LIMITES ULTIMES DE RÉSISTANCE:

ÉTATS LIMITES DE SERVICE:

ÉTATS LIMITES ACCIDENTELS

P1-MHS-DFM-C-C11A-CR-0010 Page 11 of 25
 Combinaisons sismiques

1: G + Q + E (4 combinaisons ±Ex; ±Ey)


2: 0.8G +/- E (4 combinaisons ±Ex; ±Ey)
3 :G+Q+1.3E

Nous prenons

    

P1-MHS-DFM-C-C11A-CR-0010 Page 12 of 25
Figure 7 

P1-MHS-DFM-C-C11A-CR-0010 Page 13 of 25
5. CALCUL DE LE FONDATION

5.1. DESCRIPTION GENERALE

Les structures en béton sont conçues selon la norme algérienne DTR BC 2.41. En outre, les
exigences du code sismique algérien DTR C 2.48 (RPA 99 version 2003) ont été prises en compte
dans la conception.
La fondation est une une cuve enterrée de manière irrégulière, avec une profondeur variable
entre 5 et 8 mètres environ. C11a tunnel est de section rectangulaire avec des dimensions
intérieures de 3800x2860m² et una longuer du 46 m
La figure suivante montre une vue de la fondation.

Figure 8

P1-MHS-DFM-C-C11A-CR-0010 Page 14 of 25
5.2. MODELISATION

Le modèle est effectué dans le programme d´éléments finis SAP2000 (calcul matriciel par
noeuds/barres) afin d´obtenir les efforts des différentes sections de la structure. L’élément est
calculé sur une longueur unitaire de 1.00 mètre. Le modèle de calcul se compose de 52 éléments
de type ‘barre’.

Les supports du modèle s’appliquent sur les noeuds du radier à travers des ressorts verticaux
qui ont un comportement élastique linéaire, dont le coefficient est calculé à partir du module de
réaction élastique vertical de la terre.

Le calcul du cadre est effectué sur un tronçon d´une longueur d´1 mètre. De ce fait, les
caractéristiques mécaniques des sections des barres sont calculées en conséquence. Les supports
du modèle s’appliquent sur les noeuds du radier à travers des ressorts verticaux qui ont un
comportement élastique linéaire, dont le coefficient est calculé à partir du module de réaction
élastique vertical de la terre.

Le calcul du cadre est effectué sur un tronçon d´une longueur d´1 mètre. De ce fait, les
caractéristiques mécaniques des sections des barres sont calculées en conséquence.

Les supports du modèle s’appliquent sur les noeuds du radier à travers des ressorts verticaux
qui ont un comportement élastique linéaire, dont le coefficient est calculé à partir du module de
réaction élastique vertical de la terre.
Le calcul du cadre est effectué sur un tronçon d´une longueur d´1 mètre. De ce fait, les
caractéristiques mécaniques des sections des barres sont calculées en conséquence.

5.3. CHARGES INTRODUITES AU MODEL DU CALCUL

Dans la figure suivant il est montré les charges introduites dans le model du calcul:

P1-MHS-DFM-C-C11A-CR-0010 Page 15 of 25
Figure 9. Surcharge appuis (gauche) et empente du terrain au repòs(droite)

Figure 10.Empente du terrain actif (gauche) empente du terrain avec seisme (droite).

Figure 11. Nappe phreatic (gauche) et surcharge dalle superieur (droite)

P1-MHS-DFM-C-C11A-CR-0010 Page 16 of 25
5.4. LA STABILITE DE FLOTTAISON

Les contrôles de stabilité sont faits en tenant compte des combinaisons États limites de service
(ELS). En raison de l’extension des valeurs de combinaison de charge, seuls les résultats sont
indiqués. En la figure suivant le facteur de sécurité vers la flottation du la Trains dècharge station
Trains dècharge station por un eppaisiuer constante du 0.80 m es representer vers la profondeur
du nappe hydrostatique.

STABILITE DE FLOTTATION
6

5
facteur de sécurité

0
0 1 2 3 4 5 6 7
PROFONDEUR DU NAPPE HYDROSTATIQUE(m)

Dans la figure suivant il est montrè les forces pour le tunnel.


B 3.8 B 3.8
H 2.86 H 2.86
Eppaisieur dalles 0.35 Eppaisieur dalles 0.35
HT 4 HT 0
NPh 1 NPh 1
Eppaissieur murs 0.35 Eppaissieur murs 0.35
Dalle inferieur cantilever 0.2 Dalle inferieur cantilever 0.2
B P  W B P  W
m m kN/m³ kN/m m m kN/m³ kN/m
Poids tunnel - - - 126.30 Poids tunnel - - - 126.30
Poids terrain 4.5 1 20 90.00 Poids terrain 4.5 0 20 0.00
Poids terrain 4.5 3 30 405.00 Poids terrain 4.5 0 30 0.00
Poids terrain 0.4 1 20 8.00 Poids terrain 0.4 0 20 0.00
Poids terrain 0.4 6.21 30 74.52 Poids terrain 0.4 3.21 30 38.52
Eau 4.9 6.56 10 -321.44 Eau 4.9 2.56 10 -125.44
Somme 382.38 Somme 39.38
FS 2.19 FS 1.31

P1-MHS-DFM-C-C11A-CR-0010 Page 17 of 25
5.5. ARMATURES DES SEMELLES

Le calcul d’armature est conçu pour assurer la résistance de la section de la semelle aux
moments de flexion, de tensions et de forces de cisaillement est ELS et les combinaisons de charge
sismique.
Le calcul est effectué par l’utilisation de feuilles de calcul.
Armature longitudinal

Dans tous les cas une quantité minimum d’armature est fournie. Dans ce cas, le code algérien
ne fournit pas de quantité minimale pour les fondations, les règles de l’Eurocode sont considérées.
Selon ces critères, les quantités minimum d’armature sont comme suit :

Armature transversal

La section transversale est vérifiée considérant l’armature minimum selon les règles de CBA 93
(A.5.2.).
Vérification de fissure

En outre, la limite de la largeur de fissure des ELS est également prise en compte pour
déterminer l’armature nécessaire. La vérification de la largeur de fissure est effectuée en tenant
compte les règles 1-1 de l’Eurocode EN 1992-, limitant la largeur de la fissure à 0,2 mm pour les
combinaisons de charge SLS au façons exterieurs.

P1-MHS-DFM-C-C11A-CR-0010 Page 18 of 25
6. DESSIN DU CADRE.

Dans les pages qui suivent, ils sont inclus les calculs de stabilité de la semelle et les armés de
la semelle et les poteaux.

6.1. ELU CONTRAINTES NORMALES.

La figure suivant montre l’armature necessaire (bleu l’envelope,vert tendre hauteur minimal,
cyan hauteur maximale, rouge l’armature base, armature du renfort vert foncé)

P1-MHS-DFM-C-C11A-CR-0010 Page 19 of 25
6.2. ELU EFFORTS TANGENTIELS.

Dans les figures suivants il est montre les efforts tranchants minimales vs l’effort tranchant du
calcul (figure superieur), et l’effort tranchant Vsu necessaire vs Vsu disposeè:

Figure 12.Dalles superieur et inferieur (gauche et droite).

Figure 13. Murs

P1-MHS-DFM-C-C11A-CR-0010 Page 20 of 25
6.4. ELS FISSURATION.

Dans les figures suivants, les abertures du fissure sont montre :

P1-MHS-DFM-C-C11A-CR-0010 Page 21 of 25
7. CONCLUSIONS
Dans les pages qui suivent, ils sont inclus les calculs de stabilité de la semelle et les armés du
tunnel. Il est considéré comme prouvé sa conformité à la réglementation applicable en matière
de sécurité structurelle

P1-MHS-DFM-C-C11A-CR-0010 Page 22 of 25
ANNEXE DU CALCUL

P1-MHS-DFM-C-C11A-CR-0010 Page 25 of 25
Cadre 3.8x2.86 HT 1.5-4 Combinaisons
Service Technique

Actions jugées

Actions permanentes

P.P Poids propre du structure

T Poids du remblai

Actions variables

S.T. Surcharge extérieure

S.U. Surcharge intérieure

C.C. Convoi

Actions accidentelles

Séisme Pression de la Terre en cas de tremblement de terre

ELS

- 1·P.P

- 1·P.P + 1·T

- 1·P.P + 1·T + 1·S.T.

- 1·P.P + 1·T + 1·S.U.

- 1·P.P + 1·T + 1·C.C.

- 1·P.P + 1·T + 1·S.T. + 1·S.U.

- 1·P.P + 1·T + 1·S.T. + 1·0.6·C.C.

- 1·P.P + 1·T + 1·0.6·S.T. + 1·C.C.

- 1·P.P + 1·T + 1·S.U. + 1·C.C.

- 1·P.P + 1·T + 1·S.T. + 1·S.U. + 1·0.6·C.C.

- 1·P.P + 1·T + 1·0.6·S.T. + 1·S.U. + 1·C.C.

ELS fissuration

- 1·P.P

- 1·P.P + 1·T

- 1·P.P + 1·T + 0.2·S.T.

- 1·P.P + 1·T + 0.2·S.U.

- 1·P.P + 1·T + 0.2·C.C.

- 1·P.P + 1·T + 0.2·S.T. + 0.2·S.U.

- 1·P.P + 1·T + 0.2·S.T. + 0.2·C.C.

- 1·P.P + 1·T + 0.2·S.U. + 0.2·C.C.

- 1·P.P + 1·T + 0.2·S.T. + 0.2·S.U. + 0.2·C.C.


Cadre 3.8x2.86 HT 1.5-4 Combinaisons
Service Technique

ELU

- 1.35·P.P

- 1.35·P.P + 1.5·T

- 1.35·P.P + 1.5·T + 1.5·S.T.

- 1.35·P.P + 1.5·T + 1.5·S.U.

- 1.35·P.P + 1.5·T + 1.5·C.C.

- 1.35·P.P + 1.5·T + 1.5·S.T. + 1.5·S.U.

- 1.35·P.P + 1.5·T + 1.5·S.T. + 1.5·0.6·C.C.

- 1.35·P.P + 1.5·T + 1.5·0.6·S.T. + 1.5·C.C.

- 1.35·P.P + 1.5·T + 1.5·S.U. + 1.5·C.C.

- 1.35·P.P + 1.5·T + 1.5·S.T. + 1.5·S.U. + 1.5·0.6·C.C.

- 1.35·P.P + 1.5·T + 1.5·0.6·S.T. + 1.5·S.U. + 1.5·C.C.

- 0.9·P.P

- 0.9·P.P + 0.9·T

- 0.9·P.P + 0.9·T + 1.5·S.T.

- 0.9·P.P + 0.9·T + 1.5·S.U.

- 0.9·P.P + 0.9·T + 1.5·C.C.

- 0.9·P.P + 0.9·T + 1.5·S.T. + 1.5·S.U.

- 0.9·P.P + 0.9·T + 1.5·S.T. + 1.5·0.6·C.C.

- 0.9·P.P + 0.9·T + 1.5·0.6·S.T. + 1.5·C.C.

- 0.9·P.P + 0.9·T + 1.5·S.U. + 1.5·C.C.

- 0.9·P.P + 0.9·T + 1.5·S.T. + 1.5·S.U. + 1.5·0.6·C.C.

- 0.9·P.P + 0.9·T + 1.5·0.6·S.T. + 1.5·S.U. + 1.5·C.C.

- 1·P.P + 1·Sismo + 1·S.U.

- 1·P.P + 1·Sismo + 1·S.T. + 1·S.U.

- 1·P.P + 1·Sismo + 1·C.C.

- 1·P.P + 1·Sismo + 1·C.C. + 1·0.6·S.T.

- 1·P.P + 1·Sismo + 1·S.T. + 1·0.6·C.C.

- 1·P.P + 1·Sismo + 1·C.C. + 1·0.6·S.T. + 1·S.U.

- 1·P.P + 1·Sismo + 1·S.T. + 1·0.6·C.C. + 1·S.U.


ANNEXE 3

RÉSULTATS DU PROGRAMME DE CALCUL


Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

Modèle de calcul - Bars:

Modèle de calcul - Noeuds:

Les efforts obtenus dans chaque section sont les suivants:


Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

MODÈLE DE LA HAUTEUR MAXIMALE DU TERRAIN

Traverse

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmax Vmax Nmax Mmax Vmax Nmax Mmax Vmax Nmax
kN·m kN kN kN·m kN kN kN·m kN kN
1 0 0.000 0.000 7.276 0.000 0.000 5.389 0.000 0.000 5.389
1 0.19 1.954 0.000 7.276 1.447 0.000 5.389 1.447 0.000 5.389
1 0.38 9.784 0.000 7.276 9.089 0.000 5.389 6.950 0.000 5.389
2 0.57 49.443 0.000 7.276 42.123 0.000 5.389 37.602 0.000 5.389
2 0.76 92.376 0.000 7.276 70.966 0.000 5.389 64.245 0.000 5.389
3 0.95 128.635 0.000 7.276 95.326 0.000 5.389 86.779 0.000 5.389
3 1.14 158.219 0.000 7.276 115.202 0.000 5.389 105.205 0.000 5.389
4 1.33 181.129 0.000 7.276 130.594 0.000 5.389 119.523 0.000 5.389
4 1.52 197.365 0.000 7.276 141.503 0.000 5.389 129.733 0.000 5.389
5 1.71 206.927 0.000 7.276 147.928 0.000 5.389 135.835 0.000 5.389
5 1.9 209.929 10.382 7.276 149.947 1.579 5.389 137.844 0.316 5.389
6 2.09 206.927 38.464 7.276 147.928 25.176 5.389 135.835 21.937 5.389
6 2.28 197.365 72.624 7.276 141.503 48.774 5.389 129.733 43.558 5.389
7 2.47 181.129 107.752 7.276 130.594 72.372 5.389 119.523 65.179 5.389
7 2.66 158.219 142.880 7.276 115.202 95.969 5.389 105.205 86.800 5.389
8 2.85 128.635 178.007 7.276 95.326 119.567 5.389 86.779 108.421 5.389
8 3.04 92.376 213.135 7.276 70.966 143.165 5.389 64.245 130.043 5.389
9 3.23 49.443 248.263 7.276 42.123 166.762 5.389 37.602 151.664 5.389
9 3.42 9.784 283.391 7.276 9.089 190.360 5.389 6.950 173.285 5.389
10 3.61 1.954 318.455 7.276 1.447 213.915 5.389 1.447 194.898 5.389
10 3.8 0.000 352.500 7.276 0.000 236.791 5.389 0.000 216.357 5.389

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmin Vmin Nmin Mmin Vmin Nmin Mmin Vmin Nmin
kN·m kN kN kN·m kN kN kN·m kN kN
1 0 -144.345 -352.500 -192.749 -96.408 -236.791 -127.960 -87.241 -216.357 -119.526
1 0.19 -80.616 -318.455 -192.749 -53.599 -213.915 -127.960 -48.172 -194.898 -119.526
1 0.38 -24.581 -283.391 -192.749 -15.885 -190.360 -127.960 -13.333 -173.285 -119.526
2 0.57 0.000 -248.263 -192.749 0.000 -166.762 -127.960 0.000 -151.664 -119.526
2 0.76 0.000 -213.135 -192.749 0.000 -143.165 -127.960 0.000 -130.043 -119.526
3 0.95 0.000 -178.007 -192.749 0.000 -119.567 -127.960 0.000 -108.421 -119.526
3 1.14 0.000 -142.880 -192.749 0.000 -95.969 -127.960 0.000 -86.800 -119.526
4 1.33 0.000 -107.752 -192.749 0.000 -72.372 -127.960 0.000 -65.179 -119.526
4 1.52 0.000 -72.624 -192.749 0.000 -48.774 -127.960 0.000 -43.558 -119.526
5 1.71 0.000 -38.464 -192.749 0.000 -25.176 -127.960 0.000 -21.937 -119.526
5 1.9 0.000 -10.382 -192.749 0.000 -1.579 -127.960 0.000 -0.316 -119.526
6 2.09 0.000 0.000 -192.749 0.000 0.000 -127.960 0.000 0.000 -119.526
6 2.28 0.000 0.000 -192.749 0.000 0.000 -127.960 0.000 0.000 -119.526
7 2.47 0.000 0.000 -192.749 0.000 0.000 -127.960 0.000 0.000 -119.526
7 2.66 0.000 0.000 -192.749 0.000 0.000 -127.960 0.000 0.000 -119.526
8 2.85 0.000 0.000 -192.749 0.000 0.000 -127.960 0.000 0.000 -119.526
8 3.04 0.000 0.000 -192.749 0.000 0.000 -127.960 0.000 0.000 -119.526
9 3.23 0.000 0.000 -192.749 0.000 0.000 -127.960 0.000 0.000 -119.526
9 3.42 -24.581 0.000 -192.749 -15.885 0.000 -127.960 -13.333 0.000 -119.526
10 3.61 -80.616 0.000 -192.749 -53.599 0.000 -127.960 -48.172 0.000 -119.526
10 3.8 -144.345 0.000 -192.749 -96.408 0.000 -127.960 -87.241 0.000 -119.526
Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

Radier

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmax Vmax Nmax Mmax Vmax Nmax Mmax Vmax Nmax
kN·m kN kN kN·m kN kN kN·m kN kN
11 0 161.185 357.798 0.000 109.000 242.739 0.000 99.099 225.090 0.000
11 0.19 94.826 346.365 0.000 63.944 235.296 0.000 57.102 217.647 0.000
11 0.38 44.430 334.931 0.000 21.853 227.853 0.000 16.829 210.204 0.000
12 0.57 6.379 264.835 0.000 0.000 179.874 0.000 0.000 165.604 0.000
12 0.76 0.000 253.402 0.000 0.000 172.430 0.000 0.000 158.161 0.000
13 0.95 0.000 194.284 0.000 0.000 131.836 0.000 0.000 117.108 0.000
13 1.14 0.000 183.991 0.000 0.000 125.153 0.000 0.000 109.817 0.000
14 1.33 0.000 117.468 0.000 0.000 79.676 0.000 0.000 69.583 0.000
14 1.52 0.000 107.175 0.000 0.000 72.993 0.000 0.000 62.292 0.000
15 1.71 0.000 55.801 0.000 0.000 28.918 0.000 0.000 23.528 0.000
15 1.9 0.000 49.117 0.000 0.000 22.235 0.000 0.000 16.237 0.000
16 2.09 0.000 1.513 0.000 0.000 0.000 0.000 0.000 0.000 0.000
16 2.28 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
17 2.47 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
17 2.66 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
18 2.85 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
18 3.04 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
19 3.23 6.379 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
19 3.42 44.430 0.000 0.000 21.853 0.000 0.000 16.829 0.000 0.000
20 3.61 94.826 0.000 0.000 63.944 0.000 0.000 57.102 0.000 0.000
20 3.8 161.185 0.000 0.000 109.000 0.000 0.000 99.099 0.000 0.000

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmin Vmin Nmin Mmin Vmin Nmin Mmin Vmin Nmin
kN·m kN kN kN·m kN kN kN·m kN kN
11 0 0.000 0.000 -244.295 0.000 0.000 -163.402 0.000 0.000 -153.288
11 0.19 0.000 0.000 -244.295 0.000 0.000 -163.402 0.000 0.000 -153.288
11 0.38 -22.808 0.000 -244.295 -9.961 0.000 -163.402 -5.698 0.000 -153.288
12 0.57 -59.913 0.000 -244.295 -43.493 0.000 -163.402 -37.283 0.000 -153.288
12 0.76 -98.642 0.000 -244.295 -75.787 0.000 -163.402 -67.512 0.000 -153.288
13 0.95 -133.404 0.000 -244.295 -99.235 0.000 -163.402 -89.741 0.000 -153.288
13 1.14 -165.993 0.000 -244.295 -121.269 0.000 -163.402 -110.555 0.000 -153.288
14 1.33 -186.738 0.000 -244.295 -135.239 0.000 -163.402 -123.925 0.000 -153.288
14 1.52 -205.921 0.000 -244.295 -148.202 0.000 -163.402 -135.961 0.000 -153.288
15 1.71 -212.834 -1.513 -244.295 -152.843 0.000 -163.402 -140.761 0.000 -153.288
15 1.9 -218.622 -8.956 -244.295 -156.768 0.000 -163.402 -144.287 0.000 -153.288
16 2.09 -212.834 -55.801 -244.295 -152.843 -28.918 -163.402 -140.761 -23.528 -153.288
16 2.28 -205.921 -62.484 -244.295 -148.202 -35.601 -163.402 -135.961 -30.819 -153.288
17 2.47 -186.738 -117.468 -244.295 -135.239 -79.676 -163.402 -123.925 -69.583 -153.288
17 2.66 -165.993 -127.761 -244.295 -121.269 -86.359 -163.402 -110.555 -76.875 -153.288
18 2.85 -133.404 -194.284 -244.295 -99.235 -131.836 -163.402 -89.741 -117.108 -153.288
18 3.04 -98.642 -204.577 -244.295 -75.787 -138.519 -163.402 -67.512 -124.400 -153.288
19 3.23 -59.913 -264.835 -244.295 -43.493 -179.874 -163.402 -37.283 -165.604 -153.288
19 3.42 -22.808 -276.269 -244.295 -9.961 -187.317 -163.402 -5.698 -173.047 -153.288
20 3.61 0.000 -346.365 -244.295 0.000 -235.296 -163.402 0.000 -217.647 -153.288
20 3.8 0.000 -357.798 -244.295 0.000 -242.739 -163.402 0.000 -225.090 -153.288
Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

Piédroit gauche

ENVELOPPE DES EFFORTSS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmax Vmax Nmax Mmax Vmax Nmax Mmax Vmax Nmax
kN·m kN kN kN·m kN kN kN·m kN kN
21 0 188.573 211.209 0.000 127.947 141.345 0.000 116.158 132.270 0.000
21 0.143 163.667 187.783 0.000 113.046 125.727 0.000 102.353 117.397 0.000
21 0.286 145.807 164.816 0.000 104.871 110.417 0.000 95.210 102.830 0.000
22 0.429 130.224 142.310 0.000 97.731 95.412 0.000 89.029 88.569 0.000
22 0.572 116.865 120.264 0.000 91.596 80.715 0.000 83.781 74.616 0.000
23 0.715 105.677 98.866 0.000 86.436 66.450 0.000 79.437 60.994 0.000
23 0.858 96.911 77.953 0.000 82.427 52.507 0.000 76.009 47.682 0.000
24 1.001 90.698 57.287 0.000 79.660 38.730 0.000 73.491 34.649 0.000
24 1.144 86.429 39.974 0.000 77.737 25.260 0.000 71.781 21.922 0.000
25 1.287 84.808 25.674 0.000 77.135 12.096 0.000 70.950 9.502 0.000
25 1.43 85.129 12.054 0.000 77.388 5.389 0.000 70.882 5.389 0.000
26 1.573 87.233 7.276 0.000 78.397 5.389 0.000 71.534 5.389 0.000
26 1.716 91.067 7.276 0.000 80.134 5.389 0.000 72.877 5.389 0.000
27 1.859 96.578 7.276 0.000 82.569 5.389 0.000 74.881 5.389 0.000
27 2.002 103.711 7.276 0.000 85.673 5.389 0.000 77.516 5.389 0.000
28 2.145 112.414 7.276 0.000 89.417 5.389 0.000 80.755 5.389 0.000
28 2.288 122.632 7.276 0.000 93.771 5.389 0.000 84.568 5.389 0.000
29 2.431 134.347 7.276 0.000 98.729 5.389 0.000 88.929 5.389 0.000
29 2.574 147.538 7.276 0.000 104.284 5.389 0.000 93.814 5.389 0.000
30 2.717 162.201 7.276 0.000 110.441 5.389 0.000 99.201 5.389 0.000
30 2.86 182.687 7.276 0.000 122.481 5.389 0.000 110.401 5.389 0.000

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmin Vmin Nmin Mmin Vmin Nmin Mmin Vmin Nmin
kN·m kN kN kN·m kN kN kN·m kN kN
21 0 0.000 0.000 -431.416 0.000 0.000 -292.741 0.000 0.000 -270.478
21 0.143 0.000 0.000 -429.596 0.000 0.000 -291.393 0.000 0.000 -269.130
21 0.286 0.000 0.000 -427.777 0.000 0.000 -290.045 0.000 0.000 -267.782
22 0.429 0.000 0.000 -425.957 0.000 0.000 -288.697 0.000 0.000 -266.434
22 0.572 0.000 0.000 -424.138 0.000 0.000 -287.349 0.000 0.000 -265.086
23 0.715 0.000 0.000 -422.318 0.000 0.000 -286.001 0.000 0.000 -263.739
23 0.858 0.000 0.000 -420.498 0.000 0.000 -284.654 0.000 0.000 -262.391
24 1.001 0.000 0.000 -418.679 0.000 0.000 -283.306 0.000 0.000 -261.043
24 1.144 0.000 -1.781 -416.859 0.000 0.000 -281.958 0.000 0.000 -259.695
25 1.287 0.000 -11.907 -415.040 0.000 0.000 -280.610 0.000 0.000 -258.347
25 1.43 0.000 -22.032 -413.220 0.000 -6.294 -279.262 0.000 -3.718 -257.000
26 1.573 0.000 -32.183 -411.401 0.000 -18.236 -277.915 0.000 -15.403 -255.652
26 1.716 0.000 -45.616 -409.581 0.000 -29.872 -276.567 0.000 -26.781 -254.304
27 1.859 0.000 -62.609 -407.762 0.000 -41.200 -275.219 0.000 -37.852 -252.956
27 2.002 0.000 -79.184 -405.942 0.000 -52.251 -273.871 0.000 -48.617 -251.608
28 2.145 0.000 -95.644 -404.123 0.000 -63.223 -272.523 0.000 -59.075 -250.261
28 2.288 0.000 -111.653 -402.303 0.000 -73.896 -271.176 0.000 -69.228 -248.913
29 2.431 0.000 -127.465 -400.484 0.000 -84.438 -269.828 0.000 -79.133 -247.565
29 2.574 0.000 -142.818 -398.664 0.000 -94.673 -268.480 0.000 -88.732 -246.217
30 2.717 0.000 -157.797 -396.844 0.000 -104.659 -267.132 0.000 -98.043 -244.869
30 2.86 0.000 -172.503 -395.025 0.000 -114.463 -265.784 0.000 -107.089 -243.521
Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

Piédroit droit

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmax Vmax Nmax Mmax Vmax Nmax Mmax Vmax Nmax
kN·m kN kN kN·m kN kN kN·m kN kN
31 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
31 0.143 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
31 0.286 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
32 0.429 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
32 0.572 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
33 0.715 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
33 0.858 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
34 1.001 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
34 1.144 0.000 1.781 0.000 0.000 0.000 0.000 0.000 0.000 0.000
35 1.287 0.000 11.907 0.000 0.000 0.000 0.000 0.000 0.000 0.000
35 1.43 0.000 22.032 0.000 0.000 6.294 0.000 0.000 3.718 0.000
36 1.573 0.000 32.183 0.000 0.000 18.236 0.000 0.000 15.403 0.000
36 1.716 0.000 45.616 0.000 0.000 29.872 0.000 0.000 26.781 0.000
37 1.859 0.000 62.609 0.000 0.000 41.200 0.000 0.000 37.852 0.000
37 2.002 0.000 79.184 0.000 0.000 52.251 0.000 0.000 48.617 0.000
38 2.145 0.000 95.644 0.000 0.000 63.223 0.000 0.000 59.075 0.000
38 2.288 0.000 111.653 0.000 0.000 73.896 0.000 0.000 69.228 0.000
39 2.431 0.000 127.465 0.000 0.000 84.438 0.000 0.000 79.133 0.000
39 2.574 0.000 142.818 0.000 0.000 94.673 0.000 0.000 88.732 0.000
40 2.717 0.000 157.797 0.000 0.000 104.659 0.000 0.000 98.043 0.000
40 2.86 0.000 172.503 0.000 0.000 114.463 0.000 0.000 107.089 0.000

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmin Vmin Nmin Mmin Vmin Nmin Mmin Vmin Nmin
kN·m kN kN kN·m kN kN kN·m kN kN
31 0 -188.573 -211.209 -431.416 -127.947 -141.345 -292.741 -116.158 -132.270 -270.478
31 0.143 -163.667 -187.783 -429.596 -113.046 -125.727 -291.393 -102.353 -117.397 -269.130
31 0.286 -145.807 -164.816 -427.777 -104.871 -110.417 -290.045 -95.210 -102.830 -267.782
32 0.429 -130.224 -142.310 -425.957 -97.731 -95.412 -288.697 -89.029 -88.569 -266.434
32 0.572 -116.865 -120.264 -424.138 -91.596 -80.715 -287.349 -83.781 -74.616 -265.086
33 0.715 -105.677 -98.866 -422.318 -86.436 -66.450 -286.001 -79.437 -60.994 -263.739
33 0.858 -96.911 -77.953 -420.498 -82.427 -52.507 -284.654 -76.009 -47.682 -262.391
34 1.001 -90.698 -57.287 -418.679 -79.660 -38.730 -283.306 -73.491 -34.649 -261.043
34 1.144 -86.429 -39.974 -416.859 -77.737 -25.260 -281.958 -71.781 -21.922 -259.695
35 1.287 -84.808 -25.674 -415.040 -77.135 -12.096 -280.610 -70.950 -9.502 -258.347
35 1.43 -85.129 -12.054 -413.220 -77.388 -5.389 -279.262 -70.882 -5.389 -257.000
36 1.573 -87.233 -7.276 -411.401 -78.397 -5.389 -277.915 -71.534 -5.389 -255.652
36 1.716 -91.067 -7.276 -409.581 -80.134 -5.389 -276.567 -72.877 -5.389 -254.304
37 1.859 -96.578 -7.276 -407.762 -82.569 -5.389 -275.219 -74.881 -5.389 -252.956
37 2.002 -103.711 -7.276 -405.942 -85.673 -5.389 -273.871 -77.516 -5.389 -251.608
38 2.145 -112.414 -7.276 -404.123 -89.417 -5.389 -272.523 -80.755 -5.389 -250.261
38 2.288 -122.632 -7.276 -402.303 -93.771 -5.389 -271.176 -84.568 -5.389 -248.913
39 2.431 -134.347 -7.276 -400.484 -98.729 -5.389 -269.828 -88.929 -5.389 -247.565
39 2.574 -147.538 -7.276 -398.664 -104.284 -5.389 -268.480 -93.814 -5.389 -246.217
40 2.717 -162.201 -7.276 -396.844 -110.441 -5.389 -267.132 -99.201 -5.389 -244.869
40 2.86 -182.687 -7.276 -395.025 -122.481 -5.389 -265.784 -110.401 -5.389 -243.521
Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

MODÈLE DE LA HAUTEUR MINIMUM DU TERRAIN

Traverse

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmax Vmax Nmax Mmax Vmax Nmax Mmax Vmax Nmax
kN·m kN kN kN·m kN kN kN·m kN kN
1 0 0.000 0.000 7.276 0.000 0.000 5.389 0.000 0.000 5.389
1 0.19 13.114 0.000 7.276 5.976 0.000 5.389 1.447 0.000 5.389
1 0.38 34.913 0.000 7.276 25.708 0.000 5.389 10.007 0.000 5.389
2 0.57 57.363 0.000 7.276 43.487 0.000 5.389 22.894 0.000 5.389
2 0.76 79.164 0.000 7.276 58.242 0.000 5.389 33.965 0.000 5.389
3 0.95 97.540 0.000 7.276 70.680 0.000 5.389 43.324 0.000 5.389
3 1.14 119.698 0.000 7.276 85.605 0.000 5.389 51.932 0.000 5.389
4 1.33 136.933 0.000 7.276 97.214 0.000 5.389 58.626 0.000 5.389
4 1.52 149.243 0.185 7.276 105.506 0.000 5.389 63.408 0.000 5.389
5 1.71 156.630 13.715 7.276 110.481 5.924 5.389 66.277 0.000 5.389
5 1.9 159.092 27.246 7.276 112.140 18.164 5.389 67.233 3.633 5.389
6 2.09 156.630 46.875 7.276 110.481 31.429 5.389 66.277 12.861 5.389
6 2.28 149.243 66.505 7.276 105.506 44.695 5.389 63.408 22.090 5.389
7 2.47 136.933 80.510 7.276 97.214 54.210 5.389 58.626 30.569 5.389
7 2.66 119.698 103.666 7.276 85.605 69.827 5.389 51.932 40.268 5.389
8 2.85 97.540 129.583 7.276 70.680 87.284 5.389 43.324 50.334 5.389
8 3.04 79.164 154.176 7.276 58.242 103.858 5.389 33.965 60.225 5.389
9 3.23 57.363 173.805 7.276 43.487 117.124 5.389 22.894 69.453 5.389
9 3.42 34.913 193.435 7.276 25.708 130.389 5.389 10.007 78.682 5.389
10 3.61 13.114 213.065 7.276 5.976 143.655 5.389 1.447 87.911 5.389
10 3.8 0.000 232.695 7.276 0.000 156.921 5.389 0.000 97.139 5.389

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmin Vmin Nmin Mmin Vmin Nmin Mmin Vmin Nmin
kN·m kN kN kN·m kN kN kN·m kN kN
1 0 -1.607 -16.117 0.000 -1.785 -17.908 0.000 -1.785 -17.908 0.000
1 0.19 -60.829 -213.065 -85.919 -40.408 -143.655 -56.740 -22.075 -87.911 -44.309
1 0.38 -31.588 -193.435 -85.919 -20.625 -130.389 -56.740 -7.499 -78.682 -44.309
2 0.57 -12.025 -173.805 -85.919 -5.097 -117.124 -56.740 0.000 -69.453 -44.309
2 0.76 -1.183 -154.176 -85.919 0.000 -103.858 -56.740 0.000 -60.225 -44.309
3 0.95 0.000 -129.583 -85.919 0.000 -87.284 -56.740 0.000 -50.334 -44.309
3 1.14 0.000 -103.666 -85.919 0.000 -69.827 -56.740 0.000 -40.268 -44.309
4 1.33 0.000 -80.510 -85.919 0.000 -54.210 -56.740 0.000 -30.569 -44.309
4 1.52 0.000 -66.505 -85.919 0.000 -44.695 -56.740 0.000 -22.090 -44.309
5 1.71 0.000 -46.875 -85.919 0.000 -31.429 -56.740 0.000 -12.861 -44.309
5 1.9 0.000 -27.246 -85.919 0.000 -18.164 -56.740 0.000 -3.633 -44.309
6 2.09 0.000 -13.715 -85.919 0.000 -5.924 -56.740 0.000 0.000 -44.309
6 2.28 0.000 -0.185 -85.919 0.000 0.000 -56.740 0.000 0.000 -44.309
7 2.47 0.000 0.000 -85.919 0.000 0.000 -56.740 0.000 0.000 -44.309
7 2.66 0.000 0.000 -85.919 0.000 0.000 -56.740 0.000 0.000 -44.309
8 2.85 0.000 0.000 -85.919 0.000 0.000 -56.740 0.000 0.000 -44.309
8 3.04 -1.183 0.000 -85.919 0.000 0.000 -56.740 0.000 0.000 -44.309
9 3.23 -12.025 0.000 -85.919 -5.097 0.000 -56.740 0.000 0.000 -44.309
9 3.42 -31.588 0.000 -85.919 -20.625 0.000 -56.740 -7.499 0.000 -44.309
10 3.61 -60.829 0.000 -85.919 -40.408 0.000 -56.740 -22.075 0.000 -44.309
10 3.8 -92.604 0.000 -85.919 -61.915 0.000 -56.740 -38.245 0.000 -44.309
Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

Radier

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmax Vmax Nmax Mmax Vmax Nmax Mmax Vmax Nmax
kN·m kN kN kN·m kN kN kN·m kN kN
11 0 115.484 242.209 0.000 78.532 165.680 0.000 53.018 115.692 0.000
11 0.19 81.439 237.901 0.000 55.019 162.987 0.000 32.834 112.999 0.000
11 0.38 51.850 233.592 0.000 34.443 160.294 0.000 13.648 110.305 0.000
12 0.57 31.693 180.214 0.000 18.674 123.459 0.000 0.000 85.807 0.000
12 0.76 17.281 175.906 0.000 3.448 120.766 0.000 0.000 83.114 0.000
13 0.95 2.871 132.649 0.000 0.000 90.745 0.000 0.000 60.949 0.000
13 1.14 0.000 129.480 0.000 0.000 88.812 0.000 0.000 58.408 0.000
14 1.33 0.000 80.756 0.000 0.000 55.202 0.000 0.000 36.352 0.000
14 1.52 0.000 77.588 0.000 0.000 53.268 0.000 0.000 33.811 0.000
15 1.71 0.000 44.702 0.000 0.000 30.252 0.000 0.000 14.424 0.000
15 1.9 0.000 41.533 0.000 0.000 28.318 0.000 0.000 11.882 0.000
16 2.09 0.000 17.888 0.000 0.000 7.895 0.000 0.000 0.000 0.000
16 2.28 0.000 15.464 0.000 0.000 5.202 0.000 0.000 0.000 0.000
17 2.47 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
17 2.66 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
18 2.85 2.871 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
18 3.04 17.281 0.000 0.000 3.448 0.000 0.000 0.000 0.000 0.000
19 3.23 31.693 0.000 0.000 18.674 0.000 0.000 0.000 0.000 0.000
19 3.42 51.850 0.000 0.000 34.443 0.000 0.000 13.648 0.000 0.000
20 3.61 81.439 0.000 0.000 55.019 0.000 0.000 32.834 0.000 0.000
20 3.8 115.484 0.000 0.000 78.532 0.000 0.000 53.018 0.000 0.000

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmin Vmin Nmin Mmin Vmin Nmin Mmin Vmin Nmin
kN·m kN kN kN·m kN kN kN·m kN kN
11 0 0.000 0.000 -167.555 0.000 0.000 -112.242 0.000 0.000 -83.961
11 0.19 -14.340 0.000 -167.555 -3.300 0.000 -112.242 0.000 0.000 -83.961
11 0.38 -30.144 0.000 -167.555 -21.193 0.000 -112.242 -6.433 0.000 -83.961
12 0.57 -47.028 0.000 -167.555 -36.959 0.000 -112.242 -21.217 0.000 -83.961
12 0.76 -74.255 0.000 -167.555 -55.668 0.000 -112.242 -36.203 0.000 -83.961
13 0.95 -98.425 0.000 -167.555 -72.121 0.000 -112.242 -47.683 0.000 -83.961
13 1.14 -121.776 0.000 -167.555 -88.063 0.000 -112.242 -58.650 0.000 -83.961
14 1.33 -136.465 0.000 -167.555 -98.041 0.000 -112.242 -65.558 0.000 -83.961
14 1.52 -150.946 0.000 -167.555 -107.915 0.000 -112.242 -72.036 0.000 -83.961
15 1.71 -156.132 -17.888 -167.555 -111.421 -7.895 -112.242 -74.497 0.000 -83.961
15 1.9 -160.716 -20.384 -167.555 -114.559 -10.588 -112.242 -76.475 0.000 -83.961
16 2.09 -156.132 -44.702 -167.555 -111.421 -30.252 -112.242 -74.497 -14.424 -83.961
16 2.28 -150.946 -47.870 -167.555 -107.915 -32.185 -112.242 -72.036 -16.965 -83.961
17 2.47 -136.465 -80.756 -167.555 -98.041 -55.202 -112.242 -65.558 -36.352 -83.961
17 2.66 -121.776 -83.925 -167.555 -88.063 -57.135 -112.242 -58.650 -38.893 -83.961
18 2.85 -98.425 -132.649 -167.555 -72.121 -90.745 -112.242 -47.683 -60.949 -83.961
18 3.04 -74.255 -135.817 -167.555 -55.668 -92.679 -112.242 -36.203 -63.490 -83.961
19 3.23 -47.028 -180.214 -167.555 -36.959 -123.459 -112.242 -21.217 -85.807 -83.961
19 3.42 -30.144 -184.522 -167.555 -21.193 -126.152 -112.242 -6.433 -88.500 -83.961
20 3.61 -14.340 -237.901 -167.555 -3.300 -162.987 -112.242 0.000 -112.999 -83.961
20 3.8 0.000 -242.209 -167.555 0.000 -165.680 -112.242 0.000 -115.692 -83.961
Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

Piédroit gauche

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmax Vmax Nmax Mmax Vmax Nmax Mmax Vmax Nmax
kN·m kN kN kN·m kN kN kN·m kN kN
21 0 134.496 149.685 0.000 91.895 100.329 0.000 60.830 72.407 0.000
21 0.143 119.767 137.138 0.000 83.149 91.964 0.000 54.129 64.300 0.000
21 0.286 108.644 123.697 0.000 77.790 83.004 0.000 50.779 56.319 0.000
22 0.429 98.674 109.704 0.000 72.911 73.675 0.000 47.871 48.509 0.000
22 0.572 91.208 96.172 0.000 69.418 64.653 0.000 45.564 41.007 0.000
23 0.715 87.169 83.099 0.000 67.934 55.938 0.000 43.958 33.811 0.000
23 0.858 84.122 70.487 0.000 66.841 47.530 0.000 42.707 26.922 0.000
24 1.001 82.014 56.614 0.000 66.110 38.281 0.000 41.782 20.110 0.000
24 1.144 80.791 42.556 0.000 65.713 28.909 0.000 41.153 13.519 0.000
25 1.287 80.399 28.958 0.000 65.619 19.844 0.000 40.791 7.234 0.000
25 1.43 80.785 23.094 0.000 65.800 15.676 0.000 40.667 5.389 0.000
26 1.573 81.895 21.312 0.000 66.227 13.997 0.000 40.752 5.389 0.000
26 1.716 83.675 18.026 0.000 66.869 11.397 0.000 41.016 5.389 0.000
27 1.859 86.073 14.923 0.000 67.699 9.001 0.000 41.430 5.389 0.000
27 2.002 89.033 12.004 0.000 68.686 6.810 0.000 41.964 5.389 0.000
28 2.145 92.504 9.270 0.000 69.802 5.389 0.000 42.591 5.389 0.000
28 2.288 96.430 7.276 0.000 71.016 5.389 0.000 43.279 5.389 0.000
29 2.431 100.764 7.276 0.000 72.305 5.389 0.000 44.005 5.389 0.000
29 2.574 105.473 7.276 0.000 73.657 5.389 0.000 44.757 5.389 0.000
30 2.717 110.647 7.276 0.000 75.143 5.389 0.000 45.543 5.389 0.000
30 2.86 119.155 7.276 0.000 80.126 5.389 0.000 49.623 5.389 0.000

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmin Vmin Nmin Mmin Vmin Nmin Mmin Vmin Nmin
kN·m kN kN kN·m kN kN kN·m kN kN
21 0 0.000 0.000 -295.892 0.000 0.000 -202.391 0.000 0.000 -138.361
21 0.143 0.000 0.000 -294.073 0.000 0.000 -201.044 0.000 0.000 -137.013
21 0.286 0.000 -1.482 -292.253 0.000 0.000 -199.696 0.000 0.000 -135.665
22 0.429 0.000 -4.059 -290.433 0.000 0.000 -198.348 0.000 0.000 -134.317
22 0.572 0.000 -6.452 -288.614 0.000 0.000 -197.000 0.000 0.000 -132.970
23 0.715 0.000 -8.661 -286.794 0.000 -1.812 -195.652 0.000 0.000 -131.622
23 0.858 0.000 -10.686 -284.975 0.000 -4.062 -194.305 0.000 0.000 -130.274
24 1.001 0.000 -12.527 -283.155 0.000 -6.107 -192.957 0.000 0.000 -128.926
24 1.144 -5.833 -14.184 -281.336 0.000 -7.948 -191.609 0.000 0.000 -127.578
25 1.287 -10.335 -15.657 -279.516 -2.629 -9.585 -190.261 0.000 -0.211 -126.231
25 1.43 -13.469 -20.417 -277.697 -4.799 -13.072 -188.913 0.000 -3.575 -124.883
26 1.573 -15.274 -28.363 -275.877 -5.793 -18.370 -187.566 0.000 -8.615 -123.535
26 1.716 -15.791 -35.849 -274.058 -5.657 -23.360 -186.218 0.000 -13.348 -122.187
27 1.859 -15.058 -42.875 -272.238 -4.433 -28.044 -184.870 0.000 -17.775 -120.839
27 2.002 -13.115 -49.441 -270.418 -2.165 -32.422 -183.522 0.000 -21.894 -119.491
28 2.145 -10.001 -55.546 -268.599 0.000 -36.492 -182.174 0.000 -25.707 -118.144
28 2.288 -5.877 -61.192 -266.779 0.000 -40.256 -180.826 0.000 -29.214 -116.796
29 2.431 -0.994 -66.435 -264.960 0.000 -43.751 -179.479 0.000 -32.452 -115.448
29 2.574 0.000 -71.332 -263.140 0.000 -47.016 -178.131 0.000 -35.459 -114.100
30 2.717 0.000 -75.904 -261.321 0.000 -50.064 -176.783 0.000 -38.250 -112.752
30 2.86 0.000 -80.169 -259.501 0.000 -52.907 -175.435 0.000 -40.835 -111.405
Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

Piédroit droit

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmax Vmax Nmax Mmax Vmax Nmax Mmax Vmax Nmax
kN·m kN kN kN·m kN kN kN·m kN kN
31 0 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
31 0.143 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000 0.000
31 0.286 0.000 1.482 0.000 0.000 0.000 0.000 0.000 0.000 0.000
32 0.429 0.000 4.059 0.000 0.000 0.000 0.000 0.000 0.000 0.000
32 0.572 0.000 6.452 0.000 0.000 0.000 0.000 0.000 0.000 0.000
33 0.715 0.000 8.661 0.000 0.000 1.812 0.000 0.000 0.000 0.000
33 0.858 0.000 10.686 0.000 0.000 4.062 0.000 0.000 0.000 0.000
34 1.001 0.000 12.527 0.000 0.000 6.107 0.000 0.000 0.000 0.000
34 1.144 5.833 14.184 0.000 0.000 7.948 0.000 0.000 0.000 0.000
35 1.287 10.335 15.657 0.000 2.629 9.585 0.000 0.000 0.211 0.000
35 1.43 13.469 20.417 0.000 4.799 13.072 0.000 0.000 3.575 0.000
36 1.573 15.274 28.363 0.000 5.793 18.370 0.000 0.000 8.615 0.000
36 1.716 15.791 35.849 0.000 5.657 23.360 0.000 0.000 13.348 0.000
37 1.859 15.058 42.875 0.000 4.433 28.044 0.000 0.000 17.775 0.000
37 2.002 13.115 49.441 0.000 2.165 32.422 0.000 0.000 21.894 0.000
38 2.145 10.001 55.546 0.000 0.000 36.492 0.000 0.000 25.707 0.000
38 2.288 5.877 61.192 0.000 0.000 40.256 0.000 0.000 29.214 0.000
39 2.431 0.994 66.435 0.000 0.000 43.751 0.000 0.000 32.452 0.000
39 2.574 0.000 71.332 0.000 0.000 47.016 0.000 0.000 35.459 0.000
40 2.717 0.000 75.904 0.000 0.000 50.064 0.000 0.000 38.250 0.000
40 2.86 0.000 80.169 0.000 0.000 52.907 0.000 0.000 40.835 0.000

ENVELOPPE DES EFFORTS


ENV_ELU ENV_ELS ENV_ELSFIS
SECC. X Mmin Vmin Nmin Mmin Vmin Nmin Mmin Vmin Nmin
kN·m kN kN kN·m kN kN kN·m kN kN
31 0 -134.496 -149.685 -295.892 -91.895 -100.329 -202.391 -60.830 -72.407 -138.361
31 0.143 -119.767 -137.138 -294.073 -83.149 -91.964 -201.044 -54.129 -64.300 -137.013
31 0.286 -108.644 -123.697 -292.253 -77.790 -83.004 -199.696 -50.779 -56.319 -135.665
32 0.429 -98.674 -109.704 -290.433 -72.911 -73.675 -198.348 -47.871 -48.509 -134.317
32 0.572 -91.208 -96.172 -288.614 -69.418 -64.653 -197.000 -45.564 -41.007 -132.970
33 0.715 -87.169 -83.099 -286.794 -67.934 -55.938 -195.652 -43.958 -33.811 -131.622
33 0.858 -84.122 -70.487 -284.975 -66.841 -47.530 -194.305 -42.707 -26.922 -130.274
34 1.001 -82.014 -56.614 -283.155 -66.110 -38.281 -192.957 -41.782 -20.110 -128.926
34 1.144 -80.791 -42.556 -281.336 -65.713 -28.909 -191.609 -41.153 -13.519 -127.578
35 1.287 -80.399 -28.958 -279.516 -65.619 -19.844 -190.261 -40.791 -7.234 -126.231
35 1.43 -80.785 -23.094 -277.697 -65.800 -15.676 -188.913 -40.667 -5.389 -124.883
36 1.573 -81.895 -21.312 -275.877 -66.227 -13.997 -187.566 -40.752 -5.389 -123.535
36 1.716 -83.675 -18.026 -274.058 -66.869 -11.397 -186.218 -41.016 -5.389 -122.187
37 1.859 -86.073 -14.923 -272.238 -67.699 -9.001 -184.870 -41.430 -5.389 -120.839
37 2.002 -89.033 -12.004 -270.418 -68.686 -6.810 -183.522 -41.964 -5.389 -119.491
38 2.145 -92.504 -9.270 -268.599 -69.802 -5.389 -182.174 -42.591 -5.389 -118.144
38 2.288 -96.430 -7.276 -266.779 -71.016 -5.389 -180.826 -43.279 -5.389 -116.796
39 2.431 -100.764 -7.276 -264.960 -72.305 -5.389 -179.479 -44.005 -5.389 -115.448
39 2.574 -105.473 -7.276 -263.140 -73.657 -5.389 -178.131 -44.757 -5.389 -114.100
40 2.717 -110.647 -7.276 -261.321 -75.143 -5.389 -176.783 -45.543 -5.389 -112.752
40 2.86 -119.155 -7.276 -259.501 -80.126 -5.389 -175.435 -49.623 -5.389 -111.405
Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

Traverse

Enveloppe des moments de flexion ELU

-200.0

-150.0

-100.0
Hmax+
-50.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
Hmax-
0.0
kN·m

50.0 Hmin+

100.0
Hmin-
150.0

200.0

250.0

Enveloppe des efforts tranchants ELU

-400.0

-300.0

-200.0 Hmax+

-100.0
Hmax-
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
0.0
kN

Hmin+
100.0

200.0 Hmin-

300.0

400.0

Enveloppe des efforts normaux ELU

-250.0

-200.0

Hmax+
-150.0
Hmax-
-100.0
kN

Hmin+

-50.0
Hmin-
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0
0.0

50.0
Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

Radier

Enveloppe des moments de flexion ELU

-250.0

-200.0

-150.0
Hmax+
-100.0
Hmax-
-50.0
kN·m

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0


0.0 Hmin+

50.0
Hmin-
100.0

150.0

200.0

Enveloppe des efforts tranchants ELU

-400.0

-300.0

-200.0 Hmax+

-100.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0 Hmax-
0.0
kN

Hmin+
100.0

200.0 Hmin-

300.0

400.0

Enveloppe des efforts normaux ELU

-300.0

-250.0

Hmax+
-200.0
Hmax-
-150.0
kN

Hmin+

-100.0
Hmin-

-50.0

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 4.0


0.0
Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

Piédroit gauche

Enveloppe des moments de flexion ELU

-50.0

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5


0.0
Hmax+

50.0 Hmax-
kN·m

Hmin+
100.0

Hmin-
150.0

200.0

Enveloppe des efforts tranchants ELU

-200.0

-150.0

-100.0
Hmax+
-50.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
Hmax-
0.0
kN

50.0 Hmin+

100.0
Hmin-
150.0

200.0

250.0

Enveloppe des efforts normaux ELU

-500.0

-450.0

-400.0
Hmax+
-350.0

-300.0 Hmax-
-250.0
kN

Hmin+
-200.0

-150.0
Hmin-
-100.0

-50.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
0.0
Cadre 3.8x2.86 HT 1.5-4 Résultats du programme de calcul
Service Technique

Piédroit droit

Enveloppe des moments de flexion ELU

-200.0

-150.0
Hmax+

-100.0 Hmax-
kN·m

Hmin+
-50.0

0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5 Hmin-


0.0

50.0

Enveloppe des efforts tranchants ELU

-250.0

-200.0

-150.0
Hmax+
-100.0
Hmax-
-50.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
kN

0.0 Hmin+

50.0
Hmin-
100.0

150.0

200.0

Enveloppe des efforts normaux ELU

-500.0

-450.0

-400.0
Hmax+
-350.0

-300.0 Hmax-
-250.0
kN

Hmin+
-200.0

-150.0
Hmin-
-100.0

-50.0
0.0 0.5 1.0 1.5 2.0 2.5 3.0 3.5
0.0
ÉTAT LIMITE D'ÉPUISEMENT
FLEXION SIMPLE
Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Traverse

Section et matériaux

b 0.35 m
h 1.00 m
re 5.8 cm
ri 7.0 cm
L 3.80 m

Béton HA-30
fck = 30.00 N/mm²
c = 1.5
Acier B-500S,SD
fyk = 500.00 N/mm²
s = 1.15

Dimensionnement

Efforts A. Nécessaire A. réelle


Mmax Mmin Intérieure Extérieure Intérieure Extérieure
SECC. X kN·m kN·m cm²/m cm²/m cm²/m cm²/m
1 0.00 0.000 -144.345 0.000 12.000 7.917 21.991
1 0.19 13.114 -80.616 1.083 6.537 7.917 21.991
2 0.38 34.913 -31.588 2.906 2.516 14.551 16.025
2 0.57 57.363 -12.025 4.818 0.951 21.554 9.023
3 0.76 92.376 -1.183 7.871 0.093 21.991 7.917
3 0.95 128.635 0.000 11.132 0.000 21.991 7.917
4 1.14 158.219 0.000 13.876 0.000 21.991 7.917
4 1.33 181.129 0.000 16.056 0.000 21.991 7.917
5 1.52 197.365 0.000 17.632 0.000 21.991 7.917
5 1.71 206.927 0.000 18.573 0.000 21.991 7.917
6 1.90 209.929 0.000 18.870 0.000 21.991 7.917
6 2.09 206.927 0.000 18.573 0.000 21.991 7.917
7 2.28 197.365 0.000 17.632 0.000 21.991 7.917
7 2.47 181.129 0.000 16.056 0.000 21.991 7.917
8 2.66 158.219 0.000 13.876 0.000 21.991 7.917
8 2.85 128.635 0.000 11.132 0.000 21.991 7.917
9 3.04 92.376 -1.183 7.871 0.093 21.991 7.917
9 3.23 57.363 -12.025 4.818 0.951 21.554 9.023
10 3.42 34.913 -31.588 2.906 2.516 14.551 16.025
10 3.61 13.114 -80.616 1.083 6.537 7.917 21.991
10 3.80 0.000 -144.345 0.000 12.000 7.917 21.991
Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Radier

Section et matériaux

b 0.35 m
h 1.00 m
re 5.8 cm
ri 7.0 cm
L 3.80 m

Béton HA-30
fck = 30.00 N/mm²
c = 1.5
Acier B-500S,SD
fyk = 500.00 N/mm²
s = 1.15

Dimensionnement

Efforts A. Nécessaire A. réelle


Mmax Mmin Intérieure Extérieure Intérieure Extérieure
SECC. X kN·m kN·m cm²/m cm²/m cm²/m cm²/m
11 0.00 161.185 0.000 13.493 0.000 21.991 7.917
11 0.19 94.826 -14.340 7.731 1.184 21.991 7.917
12 0.38 51.850 -30.144 4.160 2.505 16.025 14.551
12 0.57 31.693 -59.913 2.524 5.037 9.023 21.554
13 0.76 17.281 -98.642 1.369 8.427 7.917 21.991
13 0.95 2.871 -133.404 0.226 11.569 7.917 21.991
14 1.14 0.000 -165.993 0.000 14.610 7.917 21.991
14 1.33 0.000 -186.738 0.000 16.597 7.917 21.991
15 1.52 0.000 -205.921 0.000 18.474 7.917 21.991
15 1.71 0.000 -212.834 0.000 19.159 7.917 21.991
16 1.90 0.000 -218.622 0.000 19.737 7.917 21.991
16 2.09 0.000 -212.834 0.000 19.159 7.917 21.991
17 2.28 0.000 -205.921 0.000 18.474 7.917 21.991
17 2.47 0.000 -186.738 0.000 16.597 7.917 21.991
18 2.66 0.000 -165.993 0.000 14.610 7.917 21.991
18 2.85 2.871 -133.404 0.226 11.569 7.917 21.991
19 3.04 17.281 -98.642 1.369 8.427 7.917 21.991
19 3.23 31.693 -59.913 2.524 5.037 9.023 21.554
20 3.42 51.850 -30.144 4.160 2.505 16.025 14.551
20 3.61 94.826 -14.340 7.731 1.184 21.991 7.917
20 3.80 161.185 0.000 13.493 0.000 21.991 7.917
Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Piédroit gauche

Section et matériaux

b 0.35 m
h 1.00 m
re 5.8 cm
ri 6.8 cm
L 2.86 m

Béton HA-30
fck = 30.00 N/mm²
c = 1.5
Acier B-500S,SD
fyk = 500.00 N/mm²
s = 1.15

Dimensionnement

Efforts A. Nécessaire A. réelle


Mmax Mmin Intérieure Extérieure Intérieure Extérieure
SECC. X kN·m kN·m cm²/m cm²/m cm²/m cm²/m
21 0.00 0.000 -20.082 0.000 15.970 7.917 32.188
21 0.14 0.000 -19.389 0.000 13.715 7.917 30.263
22 0.29 0.000 -18.695 0.000 12.129 7.917 28.337
22 0.43 0.000 -18.001 0.000 10.765 7.917 28.149
23 0.57 0.000 -17.308 0.000 9.610 7.917 28.149
23 0.72 0.000 -16.614 0.000 8.652 7.917 28.149
24 0.86 0.000 -15.920 0.000 7.907 7.917 28.149
24 1.00 0.000 -15.227 0.000 7.383 7.917 28.149
25 1.14 0.000 -14.533 0.477 7.024 7.917 28.149
25 1.29 0.000 -13.840 0.846 6.888 7.917 15.354
26 1.43 0.000 -13.146 1.104 6.915 7.917 14.074
26 1.57 0.000 -12.452 1.253 7.091 7.917 18.239
27 1.72 0.000 -11.759 1.296 7.414 7.917 23.510
27 1.86 0.000 -11.065 1.235 7.879 7.917 28.149
28 2.00 0.000 -10.371 1.075 8.484 7.917 28.149
28 2.15 0.000 -9.678 0.819 9.227 7.917 28.149
29 2.29 0.000 -8.984 0.480 10.107 7.917 28.149
29 2.43 0.000 -8.291 0.081 11.124 7.917 28.149
30 2.57 0.000 -7.597 0.000 12.282 7.917 28.149
30 2.72 0.000 -6.903 0.000 13.584 7.917 28.149
30 2.86 0.000 -6.210 0.000 15.433 7.917 28.149
Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Piédroit droit

Section et matériaux

b 0.35 m
h 1.00 m
re 5.8 cm
ri 6.8 cm
L 2.86 m

Béton HA-30
fck = 30.00 N/mm²
c = 1.5
Acier B-500S,SD
fyk = 500.00 N/mm²
s = 1.15

Dimensionnement

Efforts A. Nécessaire A. réelle


Mmax Mmin Intérieure Extérieure Intérieure Extérieure
SECC. X kN·m kN·m cm²/m cm²/m cm²/m cm²/m
31 0.00 20.082 0.000 15.970 0.000 32.188 7.917
31 0.14 19.389 0.000 13.715 0.000 30.263 7.917
32 0.29 18.695 0.000 12.129 0.000 28.337 7.917
32 0.43 18.001 0.000 10.765 0.000 28.149 7.917
33 0.57 17.308 0.000 9.610 0.000 28.149 7.917
33 0.72 16.614 0.000 8.652 0.000 28.149 7.917
34 0.86 15.920 0.000 7.907 0.000 28.149 7.917
34 1.00 15.227 0.000 7.383 0.000 28.149 7.917
35 1.14 14.533 0.000 7.024 0.477 28.149 7.917
35 1.29 13.840 0.000 6.888 0.846 15.354 7.917
36 1.43 13.146 0.000 6.915 1.104 14.074 7.917
36 1.57 12.452 0.000 7.091 1.253 18.239 7.917
37 1.72 11.759 0.000 7.414 1.296 23.510 7.917
37 1.86 11.065 0.000 7.879 1.235 28.149 7.917
38 2.00 10.371 0.000 8.484 1.075 28.149 7.917
38 2.15 9.678 0.000 9.227 0.819 28.149 7.917
39 2.29 8.984 0.000 10.107 0.480 28.149 7.917
39 2.43 8.291 0.000 11.124 0.081 28.149 7.917
40 2.57 7.597 0.000 12.282 0.000 28.149 7.917
40 2.72 6.903 0.000 13.584 0.000 28.149 7.917
40 2.86 6.210 0.000 15.433 0.000 28.149 7.917
ÉTAT LIMITE D'ÉPUISEMENT
CONTRE LE CISAILLEMENT
Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Traverse

Section et matériaux

b 0.35 m
h 1.00 m
re 5.0 cm
ri 5.0 cm
L 3.80 m

Béton HA-30
fck = 30.00 N/mm²
c = 1.5
Acier B-500S,SD
fyk = 500.00 N/mm²
s = 1.15

Dimensionnement

1ª Vérification. Épuisement de compression oblique dans l'âme

Vrd = 352.500 kN

Vu1 = 1,752.000 kN

2ª Vérification. Épuisement de traction dans l'âme

Vrd = 298.155 kN

Vu2 = 197.577 kN

Vcuc = 142.515 kN

Vsu = 155.640 kN

A90,min = 14.806 cm²/m

A90 = 9.655 cm²/m


Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Radier

Section et matériaux

b 0.35 m
h 1.00 m
re 5.0 cm
ri 5.0 cm
L 3.80 m

Béton HA-30
fck = 30.00 N/mm²
c = 1.5
Acier B-500S,SD
fyk = 500.00 N/mm²
s = 1.15

Dimensionnement

1ª Vérification. Épuisement de compression oblique dans l'âme

Vrd = 357.798 kN

Vu1 = 1,752.000 kN

2ª Vérification. Épuisement de traction dans l'âme

Vrd = 339.745 kN

Vu2 = 197.577 kN

Vcuc = 142.515 kN

Vsu = 197.231 kN

A90,min = 18.762 cm²/m

A90 = 9.655 cm²/m


Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Piédroit gauche

Section et matériaux

b 0.35 m
h 1.00 m
re 5.0 cm
ri 5.0 cm
L 2.86 m

Béton HA-30
fck = 30.00 N/mm²
c = 1.5
Acier B-500S,SD
fyk = 500.00 N/mm²
s = 1.15

Dimensionnement

1ª Vérification. Épuisement de compression oblique dans l'âme

Vrd = 211.209 kN

Vu1 = 1,752.000 kN

2ª Vérification. Épuisement de traction dans l'âme

Vrd = 162.613 kN

Vu2 = 192.193 kN

Vcuc = - kN

Vsu = - kN

A90,min = - cm²/m

A90 = - cm²/m
Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Piédroit droit

Section et matériaux

b 0.35 m
h 1.00 m
re 5.0 cm
ri 5.0 cm
L 2.86 m

Béton HA-30
fck = 30.00 N/mm²
c = 1.5
Acier B-500S,SD
fyk = 500.00 N/mm²
s = 1.15

Dimensionnement

1ª Vérification. Épuisement de compression oblique dans l'âme

Vrd = 211.209 kN

Vu1 = 1,752.000 kN

2ª Vérification. Épuisement de traction dans l'âme

Vrd = 162.613 kN

Vu2 = 192.193 kN

Vcuc = - kN

Vsu = - kN

A90,min = - cm²/m

A90 = - cm²/m
ÉTAT LIMITE DE FISSURATION
Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Traverse

Fissuration préjudiciable
σlim = 250.000 N/mm²

Md = 137.844 kN·m
σ= 248.468 N/mm²
σ < σlim

σHmax σHmin σlim


SECC. X N/mm² N/mm² N/mm²
1 0.00 150.590 66.017 250.000
1 0.19 83.151 38.105 250.000
2 0.38 35.581 26.705 250.000
2 0.57 69.108 42.075 250.000
3 0.76 115.802 61.224 250.000
3 0.95 156.421 78.093 250.000
4 1.14 189.634 93.608 250.000
4 1.33 215.443 105.675 250.000
5 1.52 233.847 114.294 250.000
5 1.71 244.846 119.466 250.000
6 1.90 248.468 121.190 250.000
6 2.09 244.846 119.466 250.000
7 2.28 233.847 114.294 250.000
7 2.47 215.443 105.675 250.000
8 2.66 189.634 93.608 250.000
8 2.85 156.421 78.093 250.000
9 3.04 115.802 61.224 250.000
9 3.23 69.108 42.075 250.000
10 3.42 35.581 26.705 250.000
10 3.61 83.151 38.105 250.000
10 3.80 150.590 66.017 250.000
Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Radier

Fissuration peu préjudiciable


σlim = 320.000 N/mm²

Md = 144.287 kN·m
σ= 260.082 N/mm²
σ < σlim

σHmax σHmin σlim


SECC. X N/mm² N/mm² N/mm²
11 0.00 171.058 91.516 320.000
11 0.19 98.566 56.677 320.000
12 0.38 44.911 36.421 320.000
12 0.57 68.521 38.994 320.000
13 0.76 121.692 65.257 320.000
13 0.95 161.760 85.949 320.000
14 1.14 199.278 105.719 320.000
14 1.33 223.377 118.171 320.000
15 1.52 245.073 129.847 320.000
15 1.71 253.726 134.283 320.000
16 1.90 260.082 137.848 320.000
16 2.09 253.726 134.283 320.000
17 2.28 245.073 129.847 320.000
17 2.47 223.377 118.171 320.000
18 2.66 199.278 105.719 320.000
18 2.85 161.760 85.949 320.000
19 3.04 121.692 65.257 320.000
19 3.23 68.521 38.994 320.000
20 3.42 44.911 36.421 320.000
20 3.61 98.566 56.677 320.000
20 3.80 171.058 91.516 320.000
Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Piédroit gauche

Fissuration très préjudiciable


σlim = 200.000 N/mm²

Md = 70.882 kN·m
σ= 187.662 N/mm²
σ < σlim

σHmax σHmin σlim


SECC. X N/mm² N/mm² N/mm²
21 0.00 139.375 72.988 200.000
21 0.14 130.243 68.879 200.000
22 0.29 128.991 68.795 200.000
22 0.43 121.387 65.270 200.000
23 0.57 114.232 62.125 200.000
23 0.72 108.310 59.935 200.000
24 0.86 103.635 58.230 200.000
24 1.00 100.202 56.968 200.000
25 1.14 97.871 56.111 200.000
25 1.29 172.797 99.346 200.000
26 1.43 187.662 107.667 200.000
26 1.57 147.702 84.143 200.000
27 1.72 118.013 66.419 200.000
27 1.86 102.097 56.488 200.000
28 2.00 105.691 57.217 200.000
28 2.15 110.107 58.071 200.000
29 2.29 115.304 59.010 200.000
29 2.43 121.251 59.999 200.000
30 2.57 127.912 61.024 200.000
30 2.72 135.257 62.096 200.000
30 2.86 150.527 67.659 200.000
Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

Piédroit droit

Fissuration très préjudiciable


σlim = 200.000 N/mm²

Md = 70.882 kN·m
σ= 187.662 N/mm²
σ < σlim

σHmax σHmin σlim


SECC. X N/mm² N/mm² N/mm²
31 0.00 139.375 72.988 200.000
31 0.14 130.243 68.879 200.000
32 0.29 128.991 68.795 200.000
32 0.43 121.387 65.270 200.000
33 0.57 114.232 62.125 200.000
33 0.72 108.310 59.935 200.000
34 0.86 103.635 58.230 200.000
34 1.00 100.202 56.968 200.000
35 1.14 97.871 56.111 200.000
35 1.29 172.797 99.346 200.000
36 1.43 187.662 107.667 200.000
36 1.57 147.702 84.143 200.000
37 1.72 118.013 66.419 200.000
37 1.86 102.097 56.488 200.000
38 2.00 105.691 57.217 200.000
38 2.15 110.107 58.071 200.000
39 2.29 115.304 59.010 200.000
39 2.43 121.251 59.999 200.000
40 2.57 127.912 61.024 200.000
40 2.72 135.257 62.096 200.000
40 2.86 150.527 67.659 200.000
CONTRAINTE DU TERRAIN
Cadre 3.8x2.86 HT 1.5-4 Annexe de calcul
Service Technique

La réaction du sol se calcule à partir de la réaction maximale de l'enveloppe des États Limites de Service
et des ressorts verticaux employés pour modéliser l´appui et la superficie du sol qui soutient cette réaction.

Ci-dessous sont présentées les réactions et les résultats des tensions qui se produisent:

Hauteur maximale du remblai


Point Réaction Tension Max Tension Min
kN kN/m² kN/m²
12 53.366 140.437 82.439
13 46.268 121.757 37.578
14 42.628 112.179 35.835
15 39.829 104.813 34.399
16 37.936 99.832 33.463
17 37.282 98.109 33.139
18 37.936 99.832 33.463
19 39.829 104.813 34.399
20 42.628 112.179 35.835
21 46.268 121.757 37.578
22 53.366 140.437 82.439
Moyenne 43.394 114.195 43.688

Hauteur minimale du remblai


Point Réaction Tension Max Tension Min
kN kN/m² kN/m²
12 42.689 224.679 56.147
13 37.682 99.163 31.636
14 35.193 92.614 33.104
15 33.277 87.571 34.251
16 32.015 84.249 33.463
17 31.575 83.093 33.139
18 32.015 84.249 33.463
19 33.277 87.571 34.251
20 35.193 92.614 33.104
21 37.682 99.163 31.636
22 42.689 224.679 56.147
Moyenne 35.753 114.513 37.304

Dans ce cas, la tension de référence q'ref = 3/4 qmax + 1/4 qmin = 176.42 kN/m² est inférieure à la tension
admissible du sol de 200 kN/m². Le sol est donc considéré comme valable.