Beruflich Dokumente
Kultur Dokumente
chow
kit
interim 2 | 12.nov.2020
chow kit
1. a fast paced community.
proposal.
community music centre how does this proposal effect the community? programs.
shops in the site. But the abandonment of the individual premises are caused by their
non-strategic positions, the capitalist incarnation of malls that houses maximum individu-
alistic convenience of essentials, and a competitive financial survivalist environment, Jamming
Studios
dissolving the local unification.
conclusion
lack of innovation and creativity
a divided community, a result from creating a constant unchanged the “left behinds” have no dull day to day routine sparks no
a lifelong survivalistic approach + separation between people + opportunity to get back on track + push for better lives
and negative perception
entrances green stretch
vehicular
DN
users DN
UP UP
UP UP
daily DN DN
transit users
(bus) daily
transit users
(monorail)
+
locals from Jalan
Chow Kit
solid/void views
UP UP
UP UP
soundwave
DN
soundwave pattern to emphasize DN
N
SITE PLANS 1:400
B
1
A102
0
UP
Soup Kitchen
22 m²
A A’
Auditorium
UP 209 m² Storage
Office 18 m² -
14 m²
Meeting Space ---
10 m² Walkway
19 m²
Sitting Area
Changing Room
8 m²
UP
M&E
Water
Backstage
Riser Rehearsal 15 m²
Corner RAMP UP
FROM
BASEMENT
RAMP DOWN
TO BASEMENT
1:8
UP
1:8
Jamming Studio Open Stage
31 m² UP
Room
3 m²
Rehearsal
Corner
Jamming Studio
19 m²
Jamming Studio
17 m²
UP
Open
Stage
UP
UP
Rehearsal
Corner
DROP OFF
Storage
9 m²
Sitting Area
Storage
10 m²
Restaurant
46 m²
UP
UP
UP
Bus Stop
Sitting Area
Stair +
Sitting Area
UP
B’
Outdoor Sitting Area
Outdoor Sitting Area
N
LEVEL G 1:200
A102
1
DN
Control Room
26 m²
Storage
Not Enc losed
A A’
DN
Waiting Lounge
M&E
5 m²
DN
Teacher's Room
26 m² DN
Water Riser
5 m²
Stage Management
Office
17 m²
DN
UP
Discussion
Music Training Room
Corner 27 m²
Room
7 m² Music Training Room
26 m²
UP
Waiting Area
Viewing Deck
Mastering Studio
26 m²
-
---
DN
DN
Viewing
Deck
UP
Storage
6 m²
Exhibition Space
93 m²
DN
B’
N
LEVEL 1 1:200
1
A102
A A’
Water
Tank Room
UP
Lobby
38 m² Accomodation
17 m²
Accomodation
26 m²
Music Listening
Area
Music
Reading Library
Area
Not Enclosed
B’
N
LEVEL 2 1:200
B
1
A102
A -
---
A’
Lift Room
15 m²
B’
N
LEVEL 3 1:200
1
A102
Pump Room
Not Enc losed
Fan Room
16 m²
M&E
Not Enc losed
Storage
11 m²
Security Room
24 m²
UP
- DN
---
UP
RA
M PU
P1
:8
:8
N1
OWD
MP
UP
RA
N
BASEMENT PARKING 1:200
Digital Signboard
Waiting
Lounge Auditorium Music & Theatre Fire
Training Studio Escape
Sitting Area
Drop-Off
Storage Walkway Soup
Kitchen
Concrete Wall
Teacher's Room
26 m² Music Library
Viewing Entrance
Deck 38 m²
Basement Parking
materiality
pattern hardwood (chengal) as louvre that
five main strips that occupies 5 smaller strips mimicks the five horizontal lines in a staff
inside to exaggerate the importance of music
and to create a sense of movement
advertising
digital billboard as an advertising device to notify
incoming and outgoing monorail of events that happen
on the music centre
final goal
the five strips that wraps around the music centre
ends at the digital billboard, indicating the goal of the
centre, to promote the rise of a musical entity in
chow kit
MONORAIL
TRACK
from inside the park looking towards northwest audience perspective of the auditorium
from east (people who comes from the monorail station) from the jamming studios from the music library