Sie sind auf Seite 1von 1

Saudi Aramco 2616-ENG (03/99)

PMT OPRNS
AAB SAUDI ARABIAN OIL COMPANY

THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL OR IN PART SHALL BE OBTAINED FROM THIS DOCUMENT WITHOUT THE WRITTEN CONSENT OF ITS OWNER.
clearly marked as "Spare Parts" and shipped with the equipment in accordance with the
WAB

instructions from Purchaser. Packing lists shall be furnished complete and in detail so
that parts can be handled without uncrating, if desired.
ENGG CERT

CIB

Recommended spares should take into account related factors of equipment reliability,
NSA

effect of equipment downtime upon production and safety, cost of parts and availability
of equipment service facilities.

21.0 PRE-COMMISSIONING AND COMMISSIONING

Vendor shall carry out Pre-Commissioning and Commissioning for all equipment.
DESCRIPTION

Vendor shall provide to SAUDI ARAMCO Representative a schedule of Pre-


ISSUED FOR CONSTRUCTION

Commissioning activities for approval prior to commencement to enable SAUDI


ARAMCO to witness tests/checks as required.

Vendor shall provide a suitably qualified and experienced representative in the field
during the installation of the Corrosion Inhibitor Injection Skid.

Vendor shall provide suitably qualified and experienced commissioning and control
systems engineers in the field during pre-commissioning and commissioning of the
19000-9284
JO/EWO
CER 11-

Corrosion Inhibitor Injection Skid. Vendor shall submit the daily rates for this activity
with their offer.
07/16/19
DATE

Vendor shall supply all tools and equipment necessary to complete the Pre-
Commissioning and Commissioning.
NO.
REV

00

DISCIPLINE
ENGINEER
Valid calibration certificates for all test equipment must be submitted to SAUDI
NSA ARAMCO Representative and approval gained for the use, before commencement.
07/16/19
04/14/13
DATE:
PROJECT
ENGINEER 22.0 NON MATERIAL REQUIREMENTS
HMA

DATE:
04/14/13
07/16/19 Vendor shall meet requirements of various NMR’s listed in section 2.6 of this
CERTIFIED specification in addition to the requirements specified in Saudi Aramco material
CIB
04/14/13
standards (SAMSS).
07/16/19
DATE:
CONSTRUCTION
AGENCY In addition to the NMRs referred in Section 2.6, all documents listed out under Clause
WAB
14 of 32-SAMSS-038 shall be provided by Skid Manufacturer.
07/16/19
DATE:
OPERATIONS 23.0 EXCEPTIONS, CLARIFICATIONS AND ALTERNATIVES
ABB

07/16/19 Vendor shall be responsible for submitting the exceptions and/or clarifications to this
DATE:
CONTROL NUMBER

Specification, Data sheets and standard requirements. The exceptions and/or


VERIFICATION

clarifications shall be clearly and specifically stated in the quotation under a separate
EDSD

heading of “Exceptions and clarifications” with the comprehensive reasons and


supporting information. No implied or hidden exceptions shall be acceptable. No
DATE:
BY:

exceptions that sacrifice the safety or reliability of the equipment shall be acceptable.
REVISIONCERTIFICATION

APPROVAL/CERTIFICATION REQUIREMENTS,
THIS INDICATES THAT REV. NO.__________
CERTIFICATE

OF THIS DRAWING IS COVERED, FOR ALL

BY DRAWING COMPLETION CERTIFICATE

If the Vendor fails to submit “Exceptions and Clarifications” to the Buyer with his
00 A

11-19000-9284-001

proposal, the Vendor’s proposal shall be regarded as “No exceptions or clarifications to


(DCC) NO. _____________________

this Specification”.

TECHNICAL SPECIFICATIONS FOR CORROSION INHIBITOR INJECTION DWG.TYPE PLANT NO. INDEX DRAWING NO. SHT.NO. REV.NO.
REVISION

SKID TIE-IN HRML-824 WS WELL TO HRML PWI DOC


434 TE- 126923 30
GOSP A OF 00
HARMALIYAH SAUDI ARABIA JO / EWO:
11-19000-9284 31
EDSD/2616-0399.doc

Das könnte Ihnen auch gefallen