Sie sind auf Seite 1von 8

DESIGN REFERENCE FOR

ELEVATOR INSTALLATIONS
BASIC SPECIFICATIONS
BASIC SPECIFICATIONS OF THE NexWay OF THE NexWay

● Capacity and Speed ●: Applicable ● Control, Door and Operation Systems ●: Applicable −: Not applicable

Rated speed (m/sec) Operation system


Rated Number
Code number capacity of Number of
elevators Contlol system Door system 1-car selective 2-car selective Σ AI-22 group Σ AI-2200C group
(kg) persons 2.0 2.5 3.0 3.5 4.0 collective collective control system control system
in a bank
(Standard) (option) (option) (option)

1 car ●(1C-2BC) ― ― ―
P 10 750 10 ● ● ●# ●# ●#

2 cars ― ●(2C-2BC)* 1   ― * 2 ―


P 12 900 12 ● ● ● ● ●#
VVVF control with
3 cars ― ― ●(3C-ΣAI-22) ●(3C-ΣAI-2200C)
microprocessor,
VVVF control and 2-panel center
P 14 1050 14 ● ● ● ● ● Data Network opening〈CO〉
4 cars ― ― ●(4C-ΣAI-22) ●(4C-ΣAI-2200C)
System (Standard),
with multiple 2-panel side
microprocessor opening〈2S〉
P 16 1200 16 ● ● ● ● ● 5 cars modules (option), ― ― ― ●(5C-ΣAI-2200C)
(VFGH) 4-panel center
opening〈2CO〉
6 cars (option) ― ― ― ●(6C-ΣAI-2200C)
P 18 1350 18 ● ● ● ● ●
7 cars ― ― ― ●(7C-ΣAI-2200C)

P 21 1600 21 ● ● ● ● ●
8 cars ― ― ― ●(8C-ΣAI-2200C)

Notes: 1. Capacity and number of persons are based on EN81-1 (1998). Notes: * 1. When the capacity and speed exceed the range shown in the left page, the operation system 2C-2BC should be 2C-ΣAI-22.
2. Please consult our local subcontractor in the following cases: * 2. Please consult our local subcontractor, when 2C-ΣAI-22 system is required instead of 2C-2BC system.
① When the specifications are out of the above table.
② When the combination of capacity and speed with mark # is required.

Selective collective (2BC) ΣAI-22&ΣAI-2200C Group Control Systems


The system consists of call buttons in the car, and a The systems, which employ an intelligent expert
● Specifications
riser of up and down destination floor buttons installed system and fuzzy logic, are specially designed for
Rated speed 2.0 m/sec 2.5 m/sec 3.0 m/sec 3.5 m/sec 4.0 m/sec at each elevator hall (single button at terminal floors), group control of 3 to 8 elevators (as described above).
which connect electrically with microprocessors Practical information required for group control is
Maximum number of stops 48
supervising floor selection and direction of travel. A car stored in the system's memory as a "Knowledge
Maximum travel (m) 150 will respond to those car and hall calls that comply with Database". Drawing from this database, various traffic
Minimum floor height (mm) 2,500 *
its direction of service. conditions are monitored and analyzed applying IF-
When there are no more calls registered for the car's THEN decision rules to maximize the effectiveness of
Notes: 1. Please consult our local subcontractor for specifications outside these ranges.
2. * The minimum floor height 2500mm is for steel structure only. It may become more than 2500mm when car arrival chime is   direction of travel, the car's service direction is each elevator operation.
     required at each hall (AECH),or depending on sill support height. However, the minimum floor height for RCC is 2800mm reversed. The systems perform assignments to the most-used
     with standard type of sill support. locations, and thereby provide superb efficiency and
service.
In addition to the above, ΣAI-2200C system performs
optimal car allocation using Dynamic Rule-set
Optimizer.

1 2
STANDARD
STANDARD INSTALLATION INSTALLATION

● Notes on Installation Planning ● Some Examples of Bank Arrangements


Elevator Points Relating to the Points Relating to the Desirable Plans
Arrangement Hoistway Machine Room
● Elevator installations should be ● In steel-reinforced concrete ● Provide the recommended width
properly planned according to buildings, design the hoistways and height to assure that there
such factors as the size and so that concrete walls are at will be sufficient room for
nature or kind of the building, the least 120mm thick. inspection and maintenance.
traffic flow and peak traffic ● Hoistways must be no more than ● Since the elevator drive

demand or conditions, the 30mm out of plumb. equipment generates


location of public transportation ● No wiring or distribution panels considerable heat, sufficient
facilities and stores. should be built into or mounted ventilation and or air-
● Dispersing elevators in different on hoistway walls. conditioning capacity must be
areas of a building adversely ● It is forbidden under most provided to assure that the
affects their passenger-carrying building codes to install any machine-room temperature does
efficiency. Therefore, elevators conduit work or piping in not exceed 40℃.
should, as far as possible, be hoistways except as required for ● When occupied areas of the

concentrated in the center of the the elevator itself. building are in close proximity to
building. ● Pit-depth and overhead-height the machine room, such as in
● When two groups of elevators dimensions must always be at the case of elevators for the low
face each other, ample space least the minimum shown in the and middle floors of a high-rise
should be left between the drawings. building, it may be desirable to
groups. ● If it proves necessary to make provide additional soundproofing
● The number of elevators in each use of space below the pit, or intervening walls. Undesirable Plans
group should be decided on the contact our local subcontractor.
basis of the physical ● When the building is to be of

arrangement of the elevators and steel construction, our local


the floors served. subcontractor should be brought
● As much as possible, all the into the discussion at the earliest
floors served by one group of possible moment.
elevators should be functionally
and structurally similar.
Dissimilarity among the floors
served will result in a drop in
service level.
● In residential buildings, hotels,

and the like, it is not desirable for


the elevator hall to be located
farther than 50 meters from any
apartment or room.

3 4
RATED SPEED OF
RATED SPEED OF 2.0∼3.0 m/sec 2.0∼3.0 m/sec

● Car frame height (HB) according to car design and car depth
100-125 AM (min)
R1 Car frame Car designs
height (HB)
(mm) S10 S20 S30 N10 N20 N30 N40 N50 N60 N70 N80

(by owner)
Vent. fan

3450 ○ ○ ○ ○ BB≧1400 ○ ○ ○ ○

BH

BM (min)
3650 ○ ○

BB
BB<1400
Note: The dimensions HB are calculated when the ceiling height (HL) is 2300mm and without the emergency exit on ceiling.

Access door : (by owner)


Please consult our local subcontractor if required the emergency exit.

Vent. window
(by owner)
Top clearance (TC) Machine-room height (HM)

Height: 2000
JJ
● ●

Width: 1000
R2
AA
(Unit: mm) (Unit: mm)
AH

Attachment Control Control Rated speed Travel (TR) (m) Rated speed Regulation
panel panel panel
(m/sec) TR≦100 100<TR≦150 (m/sec)
EN81-1
Hoistway Wall socket
(by owner)
Intercom (option) 2.0 1760 1910
Power receiving box Lighting outlet 2.0
(by owner) (by owner)
2.5 1840 1990 2.5 2500
Machine room 3.0 2190 2340
3.0

● Reaction loads in machine room and pit (Unit: kN) ● Pit-depth (PD) *2 (Unit: mm) ● Overhead-height (OH) *2 (Unit: mm)
Hoisting hook or trolley beam (by owner)
Rated Rated capacity (kg) Rated Travel Rated capacity (kg) Rated Travel Rated capacity (kg)
speed speed TR speed TR
(m/sec) 750 900 1050 1200 1350 1600 (m/sec) (m) 750 900 1050 1200 1350 1600 (m/sec) (m) 750 900 1050 1200 1350 1600
TR≦100 2080 Cinder-concrete finish

HM (min.)
R1 91 104 108 112 118 123 TR≦100 5210 (by owner)
2.0 100<TR≦120 2800
R2 59 67 68 73 74 82 2.0 100<TR≦120 5360
2.0
120<TR≦150 − 3000 3020
2.5 P1 106 116 122 130 140 154 120<TR≦150 − 5360
TR≦100 2080
P2 96 103 107 113 119 128 TR≦100 5290
2.5 100<TR≦120 2840

TC
R1 104 108 112 118 123 2.5 100<TR≦120 5440
120<TR≦150 − 3040 3060
R2 67 68 73 74 82 TR≦100 2650
120<TR≦150 − 5440
3.0 −
P1 120 125 134 144 159 TR≦100 5640

OH (min.)
3.0 100<TR≦120 − 3130
3.0 −

Entrance height:
P2 107 111 117 123 132 120<TR≦150 3330 3350 100<TR≦150 5790

HB
HH=2100
Note: The dimensions OH are calculated when the car frame height (HB) is 3450mm.

HL
● Dimension table of car, hoistway and machine room Highest
floor

Car Internal dimensions of hoistway (mm) *2 Internal dimensions of machine room (mm)
internal

Total height
In-line arrangement In-line arrangement Facing arrangement *3
Rated Rated Number Entrance dimensions

Travel(TR)
Code (mm) 1-unit 2-unit 3-unit 4-unit 1-unit 2-unit 3-unit 4-unit
speed capacity of width
number installation installation installation installation installation installation installation installation 4 units 6 units 8 units
(m/sec) (kg) persons JJ (mm)
Width x Depth Width x Depth Width x Depth Width x Depth Width x Depth Width x Depth Width x Depth Width x Depth Width x Depth Width Width Width
AA x BB AH x BH AH x BH AH x BH AH x BH AM x BM AM x BM AM x BM AM x BM AM AM AM
2.0
2.5 P 10 750 10 800 1400 x 1300 2000 x 2050 3900 x 2050 5900 x 2050 7900 x 2050 2350 x 3455 4200 x 3455 6200 x 3455 8200 x 3455 4200 6200 8200

P 12 900 12 900 1600 x 1300 2300 x 2050 4300 x 2050 6500 x 2050 8700 x 2050 2350 x 3455 4400 x 3455 6600 x 3455 8800 x 3455 4400 6600 8800 Lowest
floor
P 14 1050 14 900 1600 x 1500 2300 x 2250 4300 x 2250 6500 x 2250 8700 x 2250 2350 x 3655 4400 x 3655 6600 x 3655 8800 x 3655 4400 6600 8800
2.0

PD (min.)
2.5 P 16 1200 16 1000 1800 x 1500 2500 x 2250 4700 x 2250 7100 x 2250 9500 x 2250 2500 x 3655 4750 x 3655 7150 x 3655 9550 x 3655 4750 7150 9550
3.0
P 18 1350 18 1100 2000 x 1500 2700 x 2250 5100 x 2250 7700 x 2250 10300 x 2250 2700 x 3655 5150 x 3655 7750 x 3655 10350 x 3655 5150 7750 10350

P 21 1600 21 1100 2000 x 1700 2700 x 2450 5100 x 2450 7700 x 2450 10300 x 2450 2700 x 3855 5150 x 3855 7750 x 3855 10350 x 3855 5150 7750 10350
Notes: * 1. All the above dimensions are calculated based on EN81-1 (1998).
* 2. The dimensions PD, OH and BH are calculated when the counterweight without safety gear is located in back of the car. P1 P2
* 3. These machine room depth BM with a facing arrangement should be (2BH+3500) mm when lobby width is 3.5m.
* 4. Refer to page 7 and 8 for hoistway and machine room layouts with a facing arrangement. Hoistway section
* 5. The dimensions shown are minimum requirements, particularly in the figures of TC, OH and PD.
     Necessary tolerance should be separately considered for the building construction errors.
* 6. The dimensions TC, OH, PD and reaction load are calculated according to car and hoistway dimensions on the above table and conditions.
5 6
RATED SPEED OF
RATED SPEED OF 3.5, 4.0 m/sec 3.5, 4.0 m/sec

Vent. fan
AM (min) ● Car frame height (HB) according to car design and car depth
100-125
R1 (by owner)
Car frame Car designs
height (HB)
(mm) S10 S20 S30 N10 N20 N30 N40 N50 N60 N70 N80

Vent. window
BH

(by owner)

BB
3450 ○ ○ ○ ○ BB≧1400 ○ ○ ○ ○

3650 BB<1400 ○ ○

BM (min) = lobby width + 2BH


JJ
AA R2
AH
Note: The dimensions HB are calculated when the ceiling height (HL) is 2300mm and without the emergency exit on ceiling.

(by owner)
Please consult our local subcontractor if required the emergency exit.

Lobby width:
Attach-

3500-4500
Control Control Control Attachment ment
panel panel panel panel panel

Access door :
Elevator lobby control
Group
panel
Control
panel
Control
panel
Control
panel
Attachment
panel
Attach-
ment
panel Intercom

Height: 2000
Width: 1000
(option)

Wall socket
● Top clearance (TC) (Unit: mm) ● Machine-room height (HM) (Unit: mm)
(by owner)

Rated speed Travel (TR) (m) Rated speed Regulation


Power receiving box
(by owner) (m/sec) (m/sec)
BH

TR≦100 100<TR≦120 120<TR≦150 EN81-1


Lighting outlet
(by owner)
3.5 2520 2670 3.5 2500
4.0 4.0
3070
Hoistway Machine room

● Reaction loads in machine room and pit (Unit: kN) ● Pit-depth (PD) *2 (Unit: mm) ● Overhead-height (OH) *2 (Unit: mm)
Rated Rated capacity (kg) Rated Travel Rated capacity (kg) Rated Travel Rated capacity (kg) Hoisting hook or trolly beam (by owner)
speed speed TR speed TR
(m/sec) 750 900 1050 1200 1350 1600 (m/sec) (m) 750 900 1050 1200 1350 1600 (m/sec) (m) 750 900 1050 1200 1350 1600

HM (min.)
R1 123 127 132 133 141 TR≦100 3020 TR≦100 5970 Cinder-concrete finish
3.5 − (by owner)
R2 80 79 82 90 94 3.5 100<TR≦120 − 3370 100<TR≦150 6120
3.5 −
P1 125 131 140 151 165 120<TR≦150 3570 3590 4.0 TR≦150 − 6520

P2 115 119 125 131 140 4.0 TR≦150 − 3920 Note: The dimensions OH are calculated when the car frame   
   height (HB) is 3450mm.

TC
OH (min.)
R1 127 132 133 141

R2 79 82 90 94
4.0 −
P1 128 140 151 165

HB
Entrance height:
P2 119 125 131 140

HH=2100

HL
● Dimension table of car, hoistway and machine room Highest
floor
Car Internal dimensions of hoistway (mm) *2 Internal dimensions of machine room (mm)
internal
In-line arrangement In-line arrangement Facing arrangement *3
dimensions

Total height
Rated Rated Number Entrance
Code (mm) 2-unit 3-unit 4-unit 2-unit 3-unit 4-unit
speed capacity of width 4 units 6 units 8 units

Travel (TR)
number installation installation installation installation installation installation
(m/sec) (kg) persons JJ (mm)
Width x Depth Width x Depth Width x Depth Width x Depth Width x Depth Width x Depth Width x Depth Width Width Width
AA x BB AH x BH AH x BH AH x BH AM x BM AM x BM AM x BM AM AM AM

3.5 P 12 900 12 900 1600 x 1300 4400 x 2100 6650 x 2100 8900 x 2100 4500 x 3455 6750 x 3455 9000 x 3455 4500 6750 9000 Lowest
floor
P 14 1050 14 900 1600 x 1500 4400 x 2300 6650 x 2300 8900 x 2300 4500 x 3655 6750 x 3655 9000 x 3655 4500 6750 9000

PD (min.)
3.5 P 16 1200 16 1000 1800 x 1500 4800 x 2300 7250 x 2300 9700 x 2300 4800 x 3655 7250 x 3655 9700 x 3655 4800 7250 9700
4.0
P 18 1350 18 1100 2000 x 1500 5200 x 2300 7850 x 2300 10500 x 2300 5200 x 3655 7850 x 3655 10500 x 3655 5200 7850 10500

P 21 1600 21 1100 2000 x 1700 5200 x 2500 7850 x 2500 10500 x 2500 5200 x 3855 7850 x 3855 10500 x 3855 5200 7850 10500
P2 P1 P1 P2
Notes: * 1. All the above dimensions are calculated based on EN81-1 (1998).
* 2. The dimensions PD, OH and BH are calculated when the counterweight without safety gear is located in back of the car.
* 3. These machine room depth BM with a facing arrangement should be (2BH+3500) mm when lobby width is 3.5m.
* 4. Refer to page 5 and 6 for hoistway and machine room layouts with an in-line arrangement. Hoistway section
* 5. The dimensions shown are minimum requirements, particularly in the figures of TC, OH and PD.
     Necessary tolerance should be separately considered for the building construction errors.
* 6. The dimensions TC, OH, PD and reaction load are calculated according to car and hoistway dimensions on the above table and conditions.

7 8
ENTRANCE LAYOUT
ENTRANCE LAYOUT DRAWINGS DRAWINGS

Type E-102 (standard) Type E-302, E-312 (option)

Door plan (section B-B)

Hoistway entrance

Door elevation
(section A-A)
Building structure Building structure
(by owner) (by owner)

Note: 1. Triangular key-hole is required under EN81-1. Note: 1. Triangular key-hole is required under EN81-1.
Wall and floor finishing 2. Details in sections A-A and B-B are not for Wall and floor finishing 2. Details in sections A-A and B-B are not for
(by owner) BS-476 fire rated doors. (by owner) BS-476 fire rated doors.

9 10
ELECTRICAL
ELECTRICAL INSTALLATION INSTALLATION

● Electrical Equipment Required for Elevator Operation ● Power Feeder Data Roping(2:1)

Speed Rated Traction Current at 400V *1 Capacity of NF in M/R Heat


(m/min) load motor power supply emission
at 200V at 400V
(kg) (kW) FLU (A) FLAcc (A) (kVA) system (A) system (A) (W)
NF breaker *2 750 15 27 52 16 125 75 2330
900 15 31 56 18 125 75 2800
1050 15 33 61 19 125 75 3260
1150 15 37 64 21 125 75 3570
120 1200 20 37 67 21 125 75 3730
Ground wire *1
1350 20 41 72 23 125 75 4190
1500 20 45 78 25 150 75 4660
1600 20 47 82 26 150 75 4970
750 18 31 64 18 125 75 2910
900 18 36 69 20 125 75 3490
1050 18 39 75 21 150 75 4070
1150 18 43 79 23 150 75 4460
150 1200 25 44 82 23 150 75 4660
1350 25 48 88 25 150 75 5240
1500 25 53 96 28 175 100 5820
1600 25 56 100 29 175 100 6210
750 22 34 74 19 125 75 3490
900 22 39 81 21 125 75 4190
1050 22 45 90 23 150 75 4890
1150 22 48 94 25 150 75 5350
180 1200 30 50 98 25 175 100 5590
1350 30 56 105 28 175 100 6280
1500 30 61 114 30 200 100 6980
Notes: *1. The minimum size of ground wire is determined according to the ampere
1600 30 65 119 32 200 100 7450
rating of the NF breaker installed at the power source side.
750 25 40 97 21 125 75 4070
*2. The ampere rating of the power-source NF breaker should be of one step 900 25 44 99 23 150 75 4890
larger than of the receiving-box NF breaker installed in the elevator 1050 25 51 113 27 175 100 5700
machine room. 1150 25 55 117 29 175 100 6240
210 1200 35 57 124 30 200 100 6520
1350 35 63 131 33 200 100 7330
1500 35 70 139 35 200 125 8140

Traction-Machinery Power Supply Intercom (where necessary) 1600


750
35
29
74
44
144
110
37
23
250
125
125
75
8690
4660
900 29 49 112 26 150 100 5590
It is necessary to install power-supply equipment of This is essential to establish the communication 1050 29 57 123 30 200 100 6520
sufficient capacity to ensure the elevators accelerating between elevator passengers and outside in case of 1150 29 61 128 31 200 100 7140
240 1200 40 64 135 33 200 125 7450
smoothly and landing accurately. emergency.
1350 40 71 143 36 250 125 8380
The power supply should be kept within a voltage- The master station transceiver is usually in a location 1500 40 78 159 39 300 150 9310
fluctuation range of +5 ~ -10%, and a voltage- readily accessible to the supervisor, in the central 1600 40 83 165 41 300 150 9930

imbalance factor of 5%. supervisor's room or elevator lobby. The wiring work Notes: * 1. If the power supply voltage is other than 400V, the FLU and FLAcc current vary inversely with power supply voltage as follows.
(Current at E volts) = (Current at 400 volts) x (400 / E) where, E: power supply voltage
When selecting protective breakers on the power- between the master station and the elevator machine
supply side, be guided by voltage ratings of the no- room is not included in the elevator contract.
fuse breakers supplied with the elevators. To facilitate piping and wiring, it is desirable to decide Feeder Size Calculation Table 1
on the position of the master station at the earliest ● The feeder size must be selected to withstand Feeder size Coefficient Feeder size Coefficient
Power Supply for Lighting stage of building design. continuous flow of the following current at an (mm2) K (mm2) K
Lighting for the elevator cars and indicators, where 3.5 5.1 60 87.3
ambient temperature of 40°C.
possible, should be supplied via a separate circuit that Lighting Equipment 1.25 x FLU(A)……………In case of FLU ≦ 50 (A)
5.5
8
8.0
11.6
80
100
115
148
will not be affected by power failures elsewhere. The machine room should be fitted with good lighting 14 20.6 125 184
1.10 x FLU(A)……………In case of FLU > 50 (A)
22 32.1 150 225
for maintenance work. The light switch should be The wire length per feeder size must be calculated 30 42.5 200 287
Ventilation Equipment positioned close to the machine-room entrance. with the following formula. 38 54.3 250 371
50 70.7 325 473
A machine-room ventilation device having a sufficient L ≦ K x E/FLAcc
capacity to keep the room temperature below 40°C is Inspection Power Outlets Where, FLU: Full load up current (A) at E volts
FLAcc: Full load accelerating current (A) at E volts
Table 2
required. These should be installed in the machine room and pit
No. of Diversity factor
A ventilation window should also be installed at the for use during inspection and maintenance. L: Wire length (m) elevators
on common For FLU For FLAcc
opposite side of ventilation fan. K: Coefficient (Please see Table 1.)
feeder Without express zone With express zone
E: Power supply voltage (V) 2 2.0 1.7 1.85
● In case of feeding power to a group of elevators 3 2.7 2.4 2.7
4 3.1 2.95 3.4
through a common feeder, the capacity of the power 5 3.25 3.6 4.2
supply transformer, the feeder size, and the ampere 6 3.3 4.1 4.9
7 3.71 4.6 5.6
rating of the no-fuse (NF) breaker are determined 8 4.08 5.1 6.3
through multiplying by the following diversity factor. 9 4.45 5.6 6.9
10 4.8 6.0 7.6
(Refer to Table 2.)

11 12
REFERENCE DATA FOR ELEVATOR PLANNING NOTES ON INSTALLATION PLANNING

Elevator traffic reaches a peak when people employed Selecting the Elevator Speed Elevator Site Requirements ● All other work related to building construction.
in the building arrive for work in the morning, when The maximum number of floors served in a building
● The machine-room power-receiving panel and the
● The temperature of the machine room shall be below
they break for lunch at midday, and when they leave serves as the criterion for selecting the speed at which electrical wiring for illumination, plus the power from
40°C.
for home in the evening. Obviously, the elevators must the elevators should travel. To select elevators using ● The following conditions are required for maintaining
it to the electrical room.
be capable of handling the increased traffic during the chart below, if the building has 23 floors, select
● The laying of conduit and wiring between the elevator
elevators performance:
these peaks. And during actual business hours, the elevators with a speed of 3.5m/sec or 4.0m/sec. pit and the terminating point for the emergency bell,
a. The relative humidity shall be below 90% on a
elevators must be able to respond promptly to serve intercom, etc.
monthly average and below 95% on a daily
the people who are on the move inside the building as ● The power consumed in installation work and test
average.
well as those who arrive at or leave the building. So operation.
b. The machine room and the elevator hoistway
that the elevators best suited to the conditions and ● All the necessary building materials for grouting in of
shall be free of dust or harmful gas.
environment at hand can be selected, Mitsubishi ● The walls, floors and ceiling of the machine room
brackets, bolts, etc.
Electric applies computer simulation, traffic ● The provision and subsequent alteration as required,
shall be finished with mortar or other materials so as
computation, and other techniques based on its wealth and eventual removal of the scaffolding as required
to prevent concrete dust.
of experience in this field to offer a wide range of by the elevator contractor, and any protection of the
elevator consulting services. Given below are reference work as may be required during progress.
data useful for general planning.
Work Not Included in Elevator Contract ● The provision of a suitable locked space for the

The following items are not a part of elevator storage of elevator equipment and tools during
Max. no. of floors served Recommended elevator speed installation work, and are the responsibility of the elevator installation.
building owner or general contractor.
● Construction of the elevator machine room with
Ordering Information
proper beams and slabs, equipped with a lock,

5.0 m/sec
30 floors Please include the following information when ordering
complete with illumination, ventilation and
or requesting estimates.
waterproofing.
● The desired number of units, speed, and loading
● Access to the elevator machine room sufficient to

4.0 m/sec
25 floors capacity.
allow passage of the control panel and traction
● The number of stops or number of floors to be

3.5 m/sec
machine.
served.
20 floors Suspension hook facilities and ladders in the
● The total elevator travel and floor-to-floor height.
3.0 m/sec

machine room.
● Operation system.
● Finishing of the machine-room floor and the walls
2.5 m/sec

● Selected car design and size.


15 floors and floors in the vicinity of the entrance hall after
● Entrance design.
completion of the installation.
m/sec

● Signal equipment.
2.0

● Construction of an illuminated, ventilated and water-


m/sec
1.75

10 floors ● A sketch of part of the building where the elevators


proofed elevator hoistway.
m/sec

are to be installed.
1.5

● A ladder to the elevator pit.


● The voltage, phase and frequency of power source
● Provision for the cutting of the necessary holes and
1.0 m/sec

5 floors for the motor and lighting.


joists and for making good thereafter as required.
● Separate beams, when the hoistway dimensions

markedly exceed the specifications, and intermediate


beams when two or more elevators are installed.

● Selecting the Operation System


Scale of building Large-scale office building
Numb Saving energy and space
er of

eleva Medium-scale office building ● High-efficiency transport mechanism


tors ● Environment-conscious industrial
waste treatment ● Comfortable, quiet ride
Operation system 1 2 3 4 5 6 7 8 ● Smooth door operation
● Welfare-awareness / Universal design

1-car selective collective (2BC) ◎ ● Riding and boarding safety


● Safety in emergencies
● High reliability
2-car selective collective (2BC) ◎ ● Safe service spots

ΣAI-22 group control system ◎

ΣAI-2200C group control system ◎ ◎ ◎ ◎ ◎

Applicable system ◎ Recommended system


Mitsubishi Electric Inazawa Works has acquired ISO 9001 certification
by the International Standards Organization(ISO)based on a review of
quality management for the System.
The plant has also acquired the environmental management system standard
ISO 14001 certification.

13 14

Das könnte Ihnen auch gefallen