Sl No Hazard Mitigation
1. Maintain proper housekeeping at work area.
2. Follow designated pathway and staircase while going to and from Control Room for work permit issuance.
1 Slip trip and fall at the work area 3. Always maintain 3 Point contact while using any staircase.
4. Remain mindful of the debris accumulated in the staircase.
5. Keep all required spares at a designated place at job site and barricade the working area.
1. Use of Dust Mask is Mandatory
2 Dust Hazard
2. Work to be started only after emptying the belt.
3 Dos and don’ts at working site Do's Don’t
Enter area with mandatory PPE . Do not start job until Proper isolation if required.
For pulling old or new belt use good quality manila rope. Don’t stand near the belt stand.
Use hand gloves before start jobs. Don’t touch any electric cable.
SOP MADE BY: INDRANIL GHOSH SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 017 Revision No. 00 Effective Date 15/06/2020
SOP Description: Pump changing job 10/8 Section WASHERY 3
Department :CB Page Page 2 of 11
1. Safety Induction SAFETY: Safety Briefing of the hazards to regarding the area Trained people
Requirement: Awareness of safety Supervisor and about the job. should be involved
rules, Job hazards, work knowledge, & supervisor Use of safety appliances during the work such as in Job
use of safety appliance, rules about (Safety shoes, Safety Jacket Hand Gloves, safety
working at height, rules about working Helmet, safety Goggles, Dust Masks).
at dusty area, rules about firefighting. Refer safety
standard SS/ENGG-
Hazard: Unawareness about the area, 58 for use of PPE
Slip trip & fall hazard, dusty
environment.
ENVIRONMENT:
Flying fine dust.
QUALITY:
Ensure proper Positive Isolation.
Safety Safety Safety Florescent Safety Ear Plug Co Detector Dust Mask Positive Isolation
Helmet Shoe Goggles Jacket Gloves Lock
Mention] Mention]
During On Job √ √ √ ×
SOP MADE BY: INDRANIL GHOSH SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 017 Revision No. 00 Effective Date 15/06/2020
SOP Description: Pump changing job 10/8 Section WASHERY 3
Department :CB Page Page 4 of 11
SOP MADE BY: INDRANIL GHOSH SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 017 Revision No. 00 Effective Date 15/06/2020
SOP Description: Pump changing job 10/8 Section WASHERY 3
Department :CB Page Page 5 of 11
2 Engagement of Requirements: 1. Job should be carried out under the supervision of expert Supervisor. 1. Follow standard:
Manpower Trained People Officer 2. All persons must have Six days training and PME Certificate. EHSMSM/
Forman WORKS/446/4007
Contractor 3. Work Permit should be obtained in prescribed format
Supervisor 4. 6-directional hazard must be identified and fill-up in work permit.
ENVIRONMENT: NA
QUALITY: NA
SOP MADE BY: INDRANIL GHOSH SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 017 Revision No. 00 Effective Date 15/06/2020
SOP Description: Pump changing job 10/8 Section WASHERY 3
Department :CB Page Page 6 of 11
3 Pre Start - Up SAFETY: Supervisor 1. Safety induction training by safety supervisor and site in
Job Activities Injury during the charge must be given to workers before starting the job. 1. Trained
handling of Tools & people should
tackles be involved in
2. Following tools and tackles which is require to executing job. Follow
the job must be accumulated in the working zone area. the SS/GEN –
58 for
ENVIRONMENT: personal
SL. Tools & Tackles Capacity/ Size Nos.
Dusty Area protective
No. equipment’s
QUALITY: 1 Spanner M36,M30 As standard.
Condition of Tools and requ
Tackles ired
2 Hammer 1 Kg/2 Kg As
requ
ired
3 Allen key As
requ
ired
SOP MADE BY: INDRANIL GHOSH SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 017 Revision No. 00 Effective Date 15/06/2020
SOP Description: Pump changing job 10/8 Section WASHERY 3
Department :CB Page Page 7 of 11
SOP MADE BY: INDRANIL GHOSH SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 017 Revision No. 00 Effective Date 15/06/2020
SOP Description: Pump changing job 10/8 Section WASHERY 3
Department :CB Page Page 8 of 11
ENVIRONMENT:
Fine dust.
QUALITY:
Without damaging
equipment and
without violating
material handling
standard job
should be done.
SOP MADE BY: INDRANIL GHOSH SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 017 Revision No. 00 Effective Date 15/06/2020
SOP Description: Pump changing job 10/8 Section WASHERY 3
Department :CB Page Page 9 of 11
ENVIRONMENT:
Spatter of metal flowing
away from job.
QUALITY: NA.
SOP MADE BY: INDRANIL GHOSH SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 017 Revision No. 00 Effective Date 15/06/2020
SOP Description: Pump changing job 10/8 Section WASHERY 3
Department :CB Page Page 10 of 11
SOP MADE BY: INDRANIL GHOSH SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :
STANDARD OPERATING PROCEDURE
Form No.: EHSMSM/446/4013 Form Rev. No.: 00 Effective date: 01-Nov-2009
SOP No.: WBD/CBN/4.1-01/CB MAINT/ 017 Revision No. 00 Effective Date 15/06/2020
SOP Description: Pump changing job 10/8 Section WASHERY 3
Department :CB Page Page 11 of 11
8 Return work SAFETY: Contractor 1. Ensure all the jobs are completed and no man with tools / Close work permit by
permit NA Supervisor/ Dept tackles are near the work area.. concern department.
representative/ 2. Any scrap should be removed and put that in designated
ENVIRONMENT: Contractor employee scrap yard.
NA
QUALITY:
NA
QUALITY:
NA
SOP MADE BY: INDRANIL GHOSH SOP CHECKED BY: AK ROUT(Sr. MGR) SOP APPROVED BY: MANISH KUMAR (HEAD W-3)
Date: Date: Date:
Sign. : Sign. : Sign. :