4. Clearance diagrams Submit on 05.02.19 Pending from client approval. Submit on
05.02,19
Fire detection and alarm system for CRP Pending for approval from client. Submit on
16 Room 7.2.19
Civil/Structure Drawings
Fire detection and alarm system for CRP Submitted on 07.02.19. Pending form client
16 Room approval
19 Cable schedule submit on 18.03.19 After SAS approaval. Pending from client
from 22.01.19 submit on 18.03.19
Civil/Structure Drawings
22 Equipment Fabrication-132kV
Civil/Structure Drawings
20 Tower Foundation - 132kV
21 Equipment Fabrication-132kV
22 Equipment Foundation - 132kV
23 CRB, Transit Camp etc.
Civil/Structure Drawings
18 Tower Foundation - 132kV
19 Equipment Fabrication-132kV
20 Equipment Foundation - 132kV
.
EQUIPMENT STATUS UP TO ON DATED 13.02.19
Common 132kV & 33kV Equipment Status on 13.2.19
drawings
Sr. No. EQUIPMENT DESCRIPTION
145KV 1250A 31.5KA, DOUBLE BREAK
1
ISOLATOR WITH ONE E/S
145KV 1250A 31.5KA, DOUBLE BREAK
2
ISOLATOR WITHOUT E/S(TANDEM) Substation wiise spare list and TTR report
145KV 1250A 31.5KA, DOUBLE BREAK submission pending from Vendor end (12.02.19)
3
ISOLATOR WITHOUT E/S
36KV,1250A 25KA,3-PHASE DOUBLE
8
BREAK ISOLATOR WITH ONE E/S
31 String hardware
vendor to finalize in this week