Sie sind auf Seite 1von 3

SERVICE REPORT

General Information
ASSET NO.: HDR - 025 PROJECT: QYTS LOCATION: TERESA DATE AND TIME: 10/7/2018 SMR:

MAKE / BRAND MACHINE MODEL MACHINE SERIAL NO. ENGINE MODEL ENGINE SERIAL NO. REPORTED BY:

FURUKAWA HCR - 900 C7 JTF09255 MC KEVIN F. TALAVERA

WORK ORDER NO.: JOB DESCRIPTION: REPLACE ENGINE OF FURUKAWA DRILL

Type of Repair

GENERAL SERVICES PREVENTIVE MAINTENANCE BACKLOG RUNNING REPAIR MAJOR REPAIR WARRANTY REWORK OTHERS ______________________

1. Problem Statement
1.1 Repoted Problem / What is the problem of the unit?
REPLACE OVERHEAT ENGINE BY A BRAND NEW C7 ENGINE.

2. Findings and Analysis


2.1 What are the findings?
NEW C7 INDUSTRIAL ENGINE STRUCTURAL DESIGN IS NOT THE SAME OR MATCH ON THE OLD C7 ENGINE ATTACHED IN THE MACHINE.

3. Scope of Work
3.1 Work Done
»REPLACE / INTERCHANGE PARTS OF THE ENGINE: »CONNECT ALL ATTACHEMENTS AND ACCESSORIES

● FRONT BRACKETS »CONNECT ALL OIL, FUEL, HYD. CONNECTIONS

● PULLEYS & TENSIONER »DOWNLOAD / REPROGRAM NEW ECM INSTALLED BECAUSE ENGINE

● WATER PUMP CONFIGURATIONS ARE NOT THE SAME COMPARED TO THE OLD ONE

● SUCTION PIPE OF OIL PUMP »ENGINE TESTING

● OIL PAN »MACHINE TESTING

● FUEL LINES AND PRIMING PUMP »DOWNLOAD ALL PARAMETERS SEEN ON THE CAT ET.

»INSTALL NEW ENGINE NOTE : CHECK ATTACHED PSR

4. Conclusion
4.1 What caused the problem based on above findings?
Problem Code:
STRUCTURAL SURFACE LEAK SYSTEM MALFUNCTION TRANSFORT DAMAGE ADJUSMENT WRONG FLUID LEVEL WRONG FLUID FACTORY ASSEMBLY

LOOSE/LOST FASTENERS UNSATISFACTORY WELD WRONG / LOST PART OPERATIONAL PROBLEM ACCIDENT SCHEDULED PMS SCHEDULED REPAIR OTHERS

ENGINE STRUCTURAL DESIGN DOESN’T FIT ON THE MACHINE ITSELF. NEED TO INTERCHANGE USEFUL PARTS SO THAT ALL ATTACHMENTS WILL BE A GOOD

FIT ON THE MACHINE.

5. Recommendation and Overall Assessment


5.1 What parts to be replaced and why, practices to be maintained/stop? | Status of the unit
NEED TO HAVE SPARE NEW OR REMAN WATER PUMP BECAUSE THE WATER PUMP INSTALLED ALREADY RUN 8000 + HRS.

SEALS OF THE WATER PUMP ALMOST REACHED ITS LIMIT OR LIFE CYCLE, TO REDUCE DOWN TIME NEED TO HAVE A PREPARE WATER PUMP OR SEAL KIT.

Component

MACHINE ENGINE POWER TRAIN / TRANSMISSION / TORQUE CONVERTER ELECTRICAL HYDRAULIC CAB / OPERATOR COMPARTMENT

STEERING FRAME / BODY BRAKE SYSTEM AIR CONDITIONING UNDERCARRIAGE UNDERCHASSIS TIRE G.E.T.

WORK EQUIPMENT (BUCKET, BLADE, RIPPER, BOOM, ATTACHMENT) ROCKDRILL (DRIFTER) / FEED MOTOR / ROD CHANGER PNEUMATIC COMPONENTS (COMPRESSOR)

JOB PERFORMED BY: (NAME) EMPLOYEE NO. SIGNATURE DATE START TIME END TIME MAN HOUR WORK STATUS

MC KEVIN F. TALAVERA 6075 COMPLETED

AURELIO PINTOR III 6079 TO BE CONTINUED

WAITING FOR PARTS


COMPLETED W/
NEW REQUIREMENT
OTHERS

PREPARED BY: NOTED & APPROVED BY: CONFORME:

MC KEVIN F. TALAVERA
MECHANIC / TECHNICIAN MAINTENANCE SUPERVISOR / MAINTENANCE SUPERINTENDENT OPERATION REPRESENTATIVE
PRINT NAME & SIGNATURE PRINT NAME & SIGNATURE PRINT NAME & SIGNATURE
DATE: DATE: DATE & TIME:
SERVICE REPORT
PHOTOS EVIDENCE AND FINDINGS
PHOTO 1 FINDINGS

» ALL ENCIRCLED PARTS ARE PARTS / ATTACHMENTS THAT

DOESN’T FIT ON THE MACHINE

PHOTO 2 FINDINGS

» ALL ENCIRCLED PARTS ARE TRANSFERRED TO THE NEW ENGINE

PHOTO 3 FINDINGS

» WATER PUMP THAT ALREADY RUN 8000 + HRS

» NEED TO MONITOR BECAUSE SEALS MIGHT BE WORN BECAUSE

SEALS ALREADY REACHED ITS LIMIT / LIFE CYCLE

STANDARD LIFE CYCLE OF WATER PUMP 6000 HRS

PHOTO 4 FINDINGS

» TRANSFERRED SUCTION PIPE OF OIL PUMP BECAUSE THE PREVIOUS SUCTION PIPE

IS LONG ENOUGH HITTING THE BASE OF THE OIL PAN


BACKLOG RECORD FORM
General Information
ASSET NO.: HDR - 025 PROJECT: QYTS LOCATION: TERESA DATE AND TIME: 10/7/2018 SMR:

MAKE / BRAND MACHINE MODEL MACHINE SERIAL NO. ENGINE MODEL ENGINE SERIAL NO. REPORTED BY:

FURUKAWA HCR - 900 C7 JTF09225 MC KEVIN F. TALAVERA

Type of Inspection

DRIVER/OPERATOR MAINTENANCE INSPECTION PREVENTIVE MAINTENANCE RUNNING REPAIR OTHERS ____________________________________

Symptom/Findings:

WATER PUMP ALREADY RUN 8000 + HRS, SEALS MIGHT WORN BECAUSE IT WILL ALMOST REACH IT END LIFE CYCLE

Recommendation and Overall Assessment:

REPLACE WATER PUMP ASSEMEBLY OR RESEAL WATER PUMP

Priority ESTIMATED DURATION OF REPAIR

URGENT NEXT PM WHEN POSSIBLE MONITOR

Parts Needed

ITEM QUANTITY PART NUMBER DESCRIPTION REMARKS

1 1 193-9237 PUMP GP-WATER

10

11

12

13

14

15

WORK ORDER NO.

REQUISITION NO.

ESTIMATED PARTS ARRIVAL

PARTS ARRIVAL DATE

Toolings, Consumables and Support Equipment

CRANE FORKLIFT BOOM TRUCK TIRE HANDLER WASHING OTHERS _________________________

NOTED & APPROVED BY:

MC KEVIN F. TALAVERA

MAINTENANCE SUPERVISOR / MAINTENANCE SUPERINTENDENT


PRINT NAME & SIGNATURE
DATE:

Das könnte Ihnen auch gefallen