Monorail - How to Build - Design - US Monorail http://www.ac-h.com/monobuild.php
factors, these include: the weight of your load (P), the length of the lift required (L), the speed(s) required of the hoist, whether a
chain or wire rope is desired, and the method used to power the hoist (manual, electric, hydraulic, air).
Electric Wire Rope Hoist
Electric Chain Hoist
Manual Chain Hoist
Air Chain and Wire Rope Hoists
2 of 7 2/17/2011 9:36 AM
Monorail - How to Build - Design - US Monorail http://www.ac-h.com/monobuild.php
One important thing to remember is that you can not have a motorized trolley if you are planning on having any switches in your system. If switches are required and you
still want motorized movement you will have to use a tractor to pull the trolley, see step 9.
3 of 7 2/17/2011 9:36 AM
Monorail - How to Build - Design - US Monorail http://www.ac-h.com/monobuild.php
4 of 7 2/17/2011 9:36 AM
Monorail - How to Build - Design - US Monorail http://www.ac-h.com/monobuild.php
This step is centered around what you need for your facility. Based on how your facility is laid out, and how you intend to use the system you must decided where the
5 of 7 2/17/2011 9:36 AM
Monorail - How to Build - Design - US Monorail http://www.ac-h.com/monobuild.php
Any place that you need to have the trolley turn from one section of track on to another section you will need a switch, the switch must be placed 4 feet before the
section of track you are turning onto in order to complete the switch. Also when planning any curves or turns in the track, plan on starting the curve 4 feet before you
want to finish it.