Sie sind auf Seite 1von 1

BILL OF QUANTITIES

XII. Painting Works

XIII. Electrical Works

XIV. Plumbing / Sanitary Works

Finishing Works

IX.

XV. Mechanical Works


Carpentry Works
X.

XI. Roof and Framing Works

REVIEWED AS TO
PREPARED BY: SUBMITTED: DESIGN CONCEPT: RECOMMENDING APPROVAL APPROVED:(FOR ISSUANCE) PROJECT & LOCATION / BARANGAY: SHEET CONTENTS: SET NO. SHEET NO.

VARIOUS DPWH
PROPOSED PROJECTS
ARMAN U. CUEVAS PABLO G. RACINES (SEE COVER SHEET) (SEE COVER SHEET) BOD 2
STANDARD TWO-STOREY
ARCHITECTURAL DESIGN MANAGING PARTNER JOSEPHINE P. ISTURIS DANTE B. POTANTE RAUL C. ASIS SCHOOL BUILDING
BILL OF QUANTITIES G-2
POSITION: ARCHITECT 52
PRC No.: 0018676 TIN No.: 907-359-364 CHIEF, DIRECTOR IV, BOD UNDERSECRETARY ( 4-CLASSROOMS )
PTR No.: 8941423 BUILDINGS DIVISION, BOD (REVISED 3-24-17)

Das könnte Ihnen auch gefallen