Beruflich Dokumente
Kultur Dokumente
DESIGN
RURAL WORKS DEPARTMENT (GOVT. OF BIHAR)
District: Darbhanga
Name of River Kosi River
Location of Bridge:
Span Arrangement: 8 x 24.75m
Length of Bridge: 202.88 m
Design Discharge: 4517.00 cumec.
Design Velocity: 1.931 m/s
Design HFL: 101.890 m
Design FRL: 106.000 m
Top of Abutment/Pier cap: 103.22 m
Lowest Bed level at Pier: 99.630 m
Lowest Bed level at Abutment: 100.006 m
Lowest Bed level at Bank: 100.069 m
Page 14
Bed Level
104.000
102.000
100.000
98.000
96.000
94.000
92.000
90.000
88.000
86.000
0.000
20.000
40.000
60.000
80.000
100.000
120.000
140.000
160.000
180.000
200.000
220.000
240.000
260.000
280.000
300.000
320.000
340.000
360.000
380.000
400.000
420.000
C/S of Chainage 150.0m D/S H.F.L
Page 16
Page 17
PART 2 HYD. DESIGN CALC.
Hydrological Calculation of Bridges RWD, Bihar
Bed Level
104.000
102.000
100.000
98.000
96.000
94.000
92.000
90.000
88.000
20.000
40.000
60.000
80.000
100.000
120.000
140.000
160.000
180.000
200.000
220.000
240.000
260.000
280.000
300.000
320.000
340.000
360.000
380.000
400.000
420.000
0.000
Page 18
Page 19
Bed Level
104.000
102.000
100.000
98.000
96.000
94.000
92.000
90.000
88.000
0.000
20.000
40.000
60.000
80.000
100.000
120.000
140.000
160.000
180.000
200.000
220.000
240.000
260.000
280.000
300.000
320.000
340.000
360.000
380.000
400.000
420.000
C/S of Chainage 150.0m U/S H.F.L
Page 20
Long Slope
93.800
93.600
Bead Level, m
93.400
93.200
93.000
92.800
92.600
92.400
150 m 0m 150 m
Summary:
Dischar
Chainag Velocity (V, Long
S# Loaction ge (Q, Bed level
e m/s) Slope
cu.m)
1 U/S 150 m 2.457 6024.3 93.590 0.000000
2 B/S 0m 2.151 4083.2 93.092 0.003320
3 D/S 150 m 1.931 3441.7 92.850 0.001613
Dickens Formula:
Page 22
Summary of discharge
Page 23
HFL = 101.890 m
Q = 4517.00 cumec
Le = 186.48 m
Db = 24.22 cumec/m
Ksf = 1.0
S = 0.0016
dsm = 1.34*(Db2/Ksf)^1/3
8.601 m
For abutment, 1.27*dsm = 10.92 m
For Pier, 2*dsm = 17.20 m
II
II 2 1 A layer Df
Hs Medium
sandy
dense
silt layer
silty
Deepest
sand Scour Level at RL
2000
Hs27.228m
AFFLUX HEIGHT c soil
Average velocity of flow = V = 1.931 m/sec.
Un-obstructed area of flow = A1 = 202.88 m (Area of flow at bridge site)
Obstructed area of flow = A = 186.88 m 2.25