• U P JAL NIGAM
DETAILED PROJECT REPORT
FOR
WATER SUPPLY COMPONENT(PRIORITY-I, PHASE-I)
UNDER
VARANASI CITY
Volume-I (Report & Technical Statement)
Estimate No.
Estimated Cost : 111.021/124.899 Crore Year : 2007-2008
PROJECT MANAGER
G.P.P. UNIT, U.P. JAL NIGAM,
VARANASI.
INDEX
Salient Feature
1. Name of Project : Water Supply component (Priority-I) Under JNNURM.
2. Name of Town : Varanasi
3. Population & Water Requirement in MLD
4. Work Proposed.
Major Sub-Component
Component
Source (i)Type of Source – River/ Ground water
Development (ii) Intake Structure– Repair/ renovation of 3 Nos. raw water pumping
Station (civil work)
(iii) Plant & Machinery-
(a) Supply replacement and commissioning, etc. of 5 Nos. 80kl/min,
40 m head, Raw water pumps in dry / wet sump.
(b) Installation & commissioning of 4000KVA sub station 33/11 KV
complete.
(iv) Other Structures- Repair of staff Quarter, Bituminous road 175m.
Raw water New Rising main of 1600mm dia PSC in a length of 1.8km from Bhadaini
Transmission Pumping Station to Bhelupur Water Works.
system Existing Rising Main
(i) 1200mm dia PSC Rising main L = 1.8km
(ii)1050mm dia CI Rising Main L = 1.8km
Water (i) Inlet Work-Repair of inlet chamber & inlet channel to settling tank.
Treatment (ii) Primary Treatment-
(a) Repair of 3 Nos. flocculation channel & settling tank of each
100mld capacity.
(b) New construction of 1number settling tank of 100mld capacity.
(iii) Chemical House and Dosing System–Repair of alum dosing plant.
(iv) Filter House and Associated Plant & Building-
Rehabilitation of filter plant building, change of filter media,
arrangement for pumping back wash water upto inlet of settling tank.
(v) Clear water reservoir pumping plant-
Construction of Pump House- 2Nos.
(vi) Control room and Laboratory–
New construction of Control room and repair of Laboratory room
Clear Water (i) Laying of feeder main from Bhelupur WTP to Lanka zone and
Transmission Rajghat zone of size 200mm DI to 750mm dia. of length- 20.83 km.
Line (ii) Replacement of 600mm dia. old steel Hume pipe rising main (40
years old) from Bhelupur to Benia by 600mm dia. DP pipe- length
2.2km.
(iii) Supply, installation and commissioning of clear water pump
capacity varying from 1.6 KL/min. to 40 KL/min.- 18 Nos.
(iv) Existing pumping plant 40 KL/m-5Nos.
(v) Installation & commissioning of 5000 KVA sub-station 33/3.3
KV and 1500 KVA sub-station 33/0.4KV complete.
Service Ground service Reservoir–
Reservoir (i) Construction of 8 Nos. CWR at different existing OHT site.
(ii) Construction of 17 nos. CWR at proposed OHT site and two
nos. CWR proposed for direct pumping
Over Head Reservoir
Construction of 17 nos. over head tank in different zone of Cis-Varuna
area capacity 2000 KL to 3000 KL staging 20m.
Booster Station/ Control Room –
(i) Construction of 8Nos Booster pumping station & Control room
at existing OHT site.
(ii) Construction of 19 nos. Booster Pumping Station at proposed
OHT site.
(iii) Supply, installation, commissioning of clear water booster pump
for different zonal OHT/Reservoir of capacity varying from 1.2 KL/min
to 4.20 KL/Min.- 84 Nos.
Others (i) Supply of Portable leak detection equipment- 4Nos.
(ii) New assets required for proper water supply and its
maintenance such as non clog submersible pump, Magnetic flow
metre, Diesel Generating Set (trolley mounted, “S C A D A”
System for controlling supply of water in Varanasi City.
5. ECONOMICS
PROJECT REPORT
1. AUTHORITY:
This estimate for Water Supply Component of Varanasi city under “Jawaharlal
Nehru National Urban Renewal Mission (JNNURM)” has been prepared in pursuance to
the instruction of Managing Director, U.P. Jal Nigam, Lucknow vide his letter no.
210/JNNURM/1005/034-2001/2006 conveyed by Chief Engineer, U.P. Jal Nigam,
Allahabad vide his letter no. 3385/JNURM/90 dated 5.7.06(Annexure-1). The proposals
of this DPR has been discussed with the officials of the Varanasi Jal Sansthan and their
suggestions have been duly incorporated in this DPR (Annexure-II & III). Resolution of
Varanasi Jal Sansthan for implementation of this project is at Annexure-IV. Necessary
amendments have also been made keeping in view the circulated TOOL-KITs and
observations raised by CPHEEO, MoUD, New Delhi conveyed vide letter no.
10245/13/NURM/2007-CPHEEO dated 11.5.07.
3. INTRODUCTION:
Varanasi city is located along the western bank of the river Ganga. Its name has
been derived from the two existing streams flowing in the North and South of the old city
namely Varuna and Assi rivers. It is said to be the most ancient city in the world. Its
name is traceable in the ancient books like Vedas and Upanishads. Since time
immemorial, it is a famous pilgrim centre and a seat of learning. At present it is one of
the most important tourist centre in the world. Thousands of foreigners visit the city
every year specially to see beautiful scene of the crescent shape Ghats along the river
Ganga. Besides, old narrow lanes, ancient Budha Stupa at Sarnath and the Golden
Temple of Lord Vishwanath also attracts the tourists & devotees.
Varanasi is one of the five big cities of Uttar Pradesh. It is the District head
quarter of Varanasi district and also head quarter of Varanasi Commissioner’s office. It
is also an important commercial centre and is mainly famous for Jari works on silk
fabrics, woolen carpets, wooden toys and brass utencils etc. The city is gradually being
industrialized with the establishment of big industries like Diesel Locomotive workshop,
BHEL, Cinni Fan Factory, Sahu Chemical Fertilizer, Gas bottling plant etc. This has led
to rapid urbanization of other areas of the city where provision of civic amenities like
Water Supply arrangement is very essential.
3.1 Location:
Varanasi town lies between the 25°15’ to 25°22’ North latitude and 82° 57’ to
83°01’ East longitude. The river Ganga flows from South to North having the world
famous ghats on its left bank. A ridge runs almost 200m to 400m away from the
western bank of Ganga and the area between the river and the ridge slopes towards
the river Ganga. Most of the area beyond the ridge, slopes towards the river Assi in
the South and towards river Varuna in the North. The highest flood level of river
Ganga is 73.90 meters (1978), and lowest river water level is approximately 58.00
meters. The general ground level varies from R.L. 71.0m to 80.0m.
3.2 Approach:
Varanasi city is approachable by rail, air and also by water ways. The most
important railway station within the city is Varanasi itself. The airport is located at
about 18 kms towards the North-West of the city near Babatpur village. Introduction
of water transport through Ganga from Patna to Allahabad via Varanasi is under
active consideration of the Govt. of India and is expected to be materialized very
soon.
3.3 Climate:
The climate of the town is of tropical nature with temperature varying from 5°C
in winter to 45°C in summer. The annual rainfall varies from 680mm to 1500mm
with large proportion of its occurring during the months of July to September.
3.4 Geology:
Geologically it is situated in the alluvial Gangetic plains and is under laid with
sediments deposited in successive stages. Layers of clay, fine sand, clay mixed with
kankar and stone bazari are met with during drilling operations.
6. SCOPE OF WORK:
An integrated approach has been adopted to develop a water supply system that
can fulfill the water requirement for next 30 years after 2010 base year. The following
works have been proposed in phased manner on priority basis as tabulated below:
Sl. Year Population Water Water Deficit Storage Capacity (mld) Remarks
Total Existing Deficit
No. Cis-Varuna Requirement availability (mld)
Required
in mld Cis (mld)
Varuna
1 2 3 4 5 6 7 8 9
1. 2010 1188700 191.13 125.00 66.13 63.75 52.20 11.55 Available water at present 125 mld and
storage capacity 52.20 mld
2. 2025 1525000 243.77 125.00 118.77 81.20 52.20 29.00 -
3. 2040 1847500 295.30 125.00 170.30 98.45 52.20 46.45 -
Water demand has been calculated keeping in view the surface source as main source of water supply. The existing TWs shall be
treated as defunct after completion of their useful life.
jnu-r-1
WATER STORAGE REQUIREMENT IN CIS-VARUNA AREA OF VARANASI CITY
Sl. Zone Name of Zone Water requirement in Storage required in ML Storage Deficit No. of OHT Remarks
No. No. 2010 2025 2040 2010 2025 2040 available ML
ML
1 2 3 4 5 6 7 8 9 10 11 12 13
1. 6 London Misson 15.88 22.11 28.40 5.30 7.40 9.50 2.05 7.50 3-2500KL
Zone
2. 7 Cotton Mill Zone 17.96 21.29 24.60 6.00 7.00 8.20 1.25 7.00 2-2500KL+
1-2000KL
3. 8 Rajghat Zone 24.03 30.08 35.89 8.00 10.00 12.00 1.50(CWR) 10.50 4-2500KL Partly thr-
4. 9 Jaitpura Zone 10.11 12.20 14.45 3.40 4.00 4.80 1.25(CWR) 3.50 2-2000KL ough OHT
5. 10 Maidagin 14.70 15.88 18.27 5.00 5.30 6.00 3.00(CWR) 3.00 1-3000KL & partly DP
6. 11 Chauk Zone 16.59 18.65 20.90 5.50 6.20 7.00 7.00 - - Direct pu-
mping thr-
ough Bhe-
lupur WTP
7. 12 Benia Zone 20.51 22.76 25.09 6.80 7.60 8.40 8.40 - -
8. 13 Sigra Zone 18.74 25.33 31.51 6.25 8.50 10.50 2.50 8.00 4-2000KL
9. 15 Bhelupur Zone 42.18 58.15 72.71 14.00 19.40 24.25 24.25 - Direct pu-
mping thr-
ough Bhe-
lupur WTP
10. 16 Lanka Zone 10.43 17.32 23.48 3.50 5.80 7.80 1.00 6.80 2-2500KL +
1-2000KL
Total: 191.13 243.77 295.30 63.75 81.20 98.45 52.20 46.30 46.50KL
DP – Direct Pumping
jnu-r-1
8. PROPOSALS:
Proposals for Phase-I priority-I works are framed for the improvement of water
supply in Cis-Varuna area of Varanasi city. For which two meetings were held with Jal
Sansthan officers in Varanasi Jal Sansthan office on 5.8.06 and 6.8.06 and works to be
proposed in JNNURM were discussed in detail and minutes of meeting were circulated,
which is annexed as Annexure-II & III. Accordingly the following proposals were made
in the estimate.
(a) Renovation/Rehabilitation of Raw Water Intake Works at Bhadaini:
For pumping river water, there are three numbers of pumping stations at
Bhadaini. All of them are of circular shape. One of them is dry sump pumping
station and other two are wet sump pumping stations. Out of the three one wet
sump pumping station was constructed in the year 1994 and in sound condition
but it needs minor repair like repairing of floor, repair of plaster work,
replacement of window panes, colour washing, painting etc.
The other two pumping stations and their switch gear room are very old and
are in bad condition which require major repair like reconstruction of old brick
wall, dismantling of damaged floor and construction of new floor, replacement of
doors, windows, rolling shutter, construction of new RCC ramp, making suitable
arrangement for installation of gantry girder with crane in the pump house and
other miscellaneous works.
In order to enhance the pumping capacity of raw water so as to increase water
intake from perennial source, the old pumps which have completed their useful
life(year of commissioning before 1986) are proposed to be replaced by 80
KL/min pumps. The details of existing & proposed pumps are given below:
Data shows that current revenue receipt is sufficient for the O&M expenditure.
RECURRING EXPENDITURE:
The annual recurring expenditure of the scheme in the year 2010 and 2030 is Rs.
3034.00 lakh and Rs. 12911.00 lakh respectively. While working out the annual
recurring expenditure, cost of electricity, oil &lubricant required to run the pumping
plants, cost of the chemicals , repair cost of the works, expenditure on maintenance
staff has been taken into account. The maintenance cost per capita per year and the
cost of production of water per kilo litre worked out to Rs. 177.00 and Rs. 3.03
respectively in the year 2010 and Rs. 460.00 and Rs. 7.89 respectively after 20 years
completion of the said projects i.e. in the year 2030.
ANNUAL INCOME
Annual income at different stages of the scheme has been calculated on the basis of
Tariff approved by Government of Uttar Pradesh vide Gazette Notification No.
541/9-2-2000/25.7.2000 (Annexure-IX) According to the provisions under this
notification, the consumer is charged on the basis of volumetric consumption. Details
of annual income has been worked out in the enclosed financial statement. The total
annual income in the year 2010 and 2030 work out to Rs. 4729.00 lakh
and Rs. 15426.00 lakh respectively. The income thus generated is sufficient to
meet the maintenance cost and thus the executed/proposed projects under water
supply component in Varanasi is self sustainable.
(Amount in Rs. lacs)
Years Annual Exp. Annual income Profit/loss (+)/(-)
2010 4260.00 4729.00 (+) 469.00
2030 14137.00 15426.00 (+)1289.00
14. FINANCING:
The total cost of the project is Rs. 111.021 crores.
The proposed funding pattern will be:
(i) 50% work cost of this project shall be made available by the Govt.
of India as grant-in-aid i.e Rs 55.511 crore.
(ii) 20% work cost of this project shall be made available by the State
Govt. as grant-in-aid i.e Rs 22.204 crore.
(iii) 30% work cost of this project i.e. Rs. 33.306 crores shall be made
available by Nagar Nigam, Varanasi (Annexure-X)
In addition to the above project cost, 12.5% centage charge of U.P. Jal Nigam
over cost of project which includes project preparation and supervision shall be
borne by State Govt. & ULB. This amount works out to Rs. 13.878 crores.
15. UNDERTAKING:
No project component submitted for funding under JNNURM has been funded/is
proposed to be funded under any other scheme of the Central/State Government.
16. CONCLUSION:
With the implementation of this project, the Cis-Varuna area of Varanasi city will
get safe drinking water. The project will have socio-economic impacts in terms of
improvement in living standard & public health in the region with allied benefits like
employment opportunities particularly during the construction stages.
With the above remarks the “Detailed Project Report (DPR) of Water Supply
Component PriorityI, Phase-I under Jawahar Lal Nehru National Urban Renewal
Mission” amounting to Rs 111.021/124.899 (with 12.5% centage) Crore is hereby
submitted for approval and allotment of funds.
(M.P. Jain)
GENERAL MANAGER
COUNTERSIGNED
(R.K. Sharma)
CHIEF ENGINEER
DETAILED PROJECT REPORT
FOR
DEVELOPMENT INFRA-STRUCTURE FACILITIES IN VARANASI CITY
(WATER SUPPLY COMPONENT-PRIORITY-I PHASE-I)
UNDER
JAWAHARLAL NEHRU NATIONAL URBAN RENEWAL MISSION (JNNURM)
FORM-J1
Checked by Prepared by
Recommended by Approved
Varanasi Varanasi
(Rs. in lacs)
Sl.No. Particulars Amount
1 2 3
1. Preparation of Detailed Project Report @ 1.5% of Govt. of
India Share (Rs. 5551.06 lacs) 83.27
2. Capacity Building IEC @ 1.5% of Govt. of India Share (Rs.
5551.06 lacs) 83.27
3. Efficiency @ 1% of Govt. of India share (Rs. 5551.06) 55.51
4. Innovative Approach @ 1% of Govt. of India Share (Rs.
5551.06 lacs) 55.51
5. Incentives (1+2+3+4) 277.56
6. Third party project monitoring and evaluation @ 5% of
Govt. of India share (Rs. 5551.06 lacs) 277.56
FORM-J2
Checked by Prepared by
Recommended by Approved
Varanasi Varanasi
Project Engineer
DETAILED PROJECT REPORT
FOR
DEVELOPMENT INFRA-STRUCTURE FACILITIES IN VARANASI CITY
(WATER SUPPLY COMPONENT-PRIORITY-I PHASE-I)
UNDER
JAWAHARLAL NEHRU NATIONAL URBAN RENEWAL MISSION (JNNURM)
FORM-J(CIVIL)
FORM–‘J’(E/M)
Prepared by Recommended by
Checked by
J.E.(T)
Office of the Executive Engineer, Jal Nigam Yantrik Khand (II) , U.P.Jal Nigam,
Varanasi
J.E.(T)
DETAIL PROJECT REPORT FOR WATER SUPPLY COMPONENT
(PRIORITY-I) PHASE-I UNDER JNNURM IN VARANASI CITY.
6. Other Item
(i) Portable leak detection equipment-4Nos. 48.25
(ii) “SCADA” system for controlling supply of water in
Varanasi city. 671.70
Project Engineer
ECONOMICS
(R.K. Tripathi)
General Manager
Varanasi Jal Sansthan, Varanasi.
BUILDING WORK
1. Bhadaini Intake Works
Present Value of Bhadaini Intake well. 650.00 Lacs
Present Value of Existing Pumping Plant & Chlorinating Plant of 122 Nos.
Tube well = 122x1.50=183.00 Lacs
Cost of existing 5 no. pumps of 40 KL/min. = 500.00 lacs
Present cost of pumps installed at
Zonal Pumping Station = 1410HPx3000/HP = 42.30
Total cost = 500+183+42.30
= 725.30 lacs
ABSTRACT OF ANNUAL EXPENDITURE ON ELECTRICITY FOR EXISTING &
PROPOSED WORK IN PRIORITY-I
Assistant Engineer
Assistant Engineer
A. HSD Oil
Average running of Generator = 6 hours
No. of Generator =4
Average Consumption = 22 litre/hour
Total Running of days = 365 days
Total HSD required 365x6x22 = 192720 litre
Cost of HSD @ Rs. 34.76/litre = 6698947.00
Say Rs. 66.99 lacs
B. Mobil Oil
Total Running hours of Generator for 365 days = 4x6x365
= 8760 hours
(i) Average consumption of Mobil oil due
to operation @ 3 litre 50 hour will be = 525 litre
(ii) Changing of Mobil oil on each 250 hours
Nos. of time changing. = 8760/250
= 35.04
= 35 times
Total Mobil Oil required @ 25 litre/change = 25x35
= 875 litre
Total Mobil Oil required = (525+875) litre
= 1400 litres
Cost of Mobil Lil @ 120/- per litre(20W/40 multigrade) =168000.00
Say: 1.68 lacs
Total A+B = 66.99+1.68
= 68.67
Say: 68.67 lacs
Assistant Engineer
ANNUAL EXPENDITURE ON
CHEMICALS ON W.T.P. TO BE PROPOSED IN PRIORITY-II
Assuming 10% linear increase in the expenditure on chemicals per annum on the present
works out expenditure.
The expenditure on chemical in the year 2030 works out to Rs. 252 + 252x10x20
100
= Rs. 756.00 lacs
OFFICE OF THE EXECUTIVE ENGINEER, JAL NIGAM YANTRIK KHAND (II) ,
U.P.JAL NIGAM, VARANASI.
1. Assuming the turbidity (3000 ppm to 5000 ppm.) during rainy season.
For 3 months ( 16 June to 15 September) i.e. = 92 days
The Alum consumption will be 34.00 Tone/ day for 250 MLD of
Raw Water = 34 x 92 days = 3128 Tones
2. Turbidity after rainy season of Raw Water will be below 3000 ppm.
For 9 months ( 16 September to 15 June) i.e. = 273 days
The Alum consumption 1.25 Tone/day for 250 MLD of
Raw Water will be = 1.25 x 273 days = 341.25
Tones
= 3469.25 x 2600/-
= Rs. 9020050.00
= Say Rs. 90.20 Lacs
Assistant Engineer
OFFICE OF THE EXECUTIVE ENGINEER, JAL NIGAM YANTRIK KHAND (II) ,
U.P.JAL NIGAM, VARANASI.
Total Cost of Bleaching Powder @ 20/- per Kg. = 182500x 20 = Rs. 3650000/-
Say Rs. 36.50 Lacs
Assistant Engineer
COST OF STAFF OF VARANASI JALSANSTHAN
Anticipated expenditure on staff in the year 2030 assuming 10% linear increase
the salary & DA of staff works out to Rs. 915 + 915x10x20
100
= 2745.00 lacs
TECHNICAL STATEMENT
The models for across-river developments are numerous, such as the Delhi-
Noida growth, where the demographic shifts are influenced by the proximity to the
parent city, and catalyzed by efficient connectivity. For this considering business as
usual, in the absence of any major road network enhancement scenarios, the growth
projections are similar to those in the master plan documents prepared by the Varanasi
Development Authority.
The detailed analysis of the Varanasi region is focused on the municipal
extents of Varanasi in the municipal limit.
The base data used for population projection is the data obtained from the
Census of India, with detailed urban area population and municipal ward for 2001 and
the 1991 census data summaries. This data provides the numeric basis for
benchmarking the actual population and its decadal growth for the past decade.
The ward-wise population data for the municipal wards provides the base for
the population distribution across the landscape of the city. Comparison of the data
available from the 1991 census and the 2001 provisional census reflects a change in the
urban extent and the number of municipal wards. Increasing from 40 wards in 1991,
the current municipal area is now divided into 91 administrative wards.
Varanasi town shows a constant increase in the population with varying rate of
increase from decade to decade. Assuming that the scheme of water supply will
commence to function from 2010, it is required to estimate the population after 30 years
that is in the year 2040 and also the intermediate population after 15 years that is in the
year 2025.
Population forecast of the city in different design stages of the project i.e. initial stage,
mid-stage and ultimate stage have been worked out by different methyods are a under.
1931 207650 - -
1941 266002 58352 -
1951 355771 89769 + 31417
1961 489864 134093 + 44324
1971 671934 182070 + 47977
1981 773865 101931 - 80139
1991 1030863 256998 + 155067
2001 1202443 171580 - 85418
Total: 994793 113228
Average = 1/7 994793 = 1/6 x 113228
= 142113 = 18871
Pn = P1 + nx + n(n+1)Y
2
The population projections have been worked out for the base year, mid year and
design year by different conventional methods as tabulated above.
From the above table it is clear that population projection by Arithmetical
progression, Geometrical Progression & Incremental increase methods are on lower side.
The projected population in the year 2010 by Geometrical Progression method is 14.93
lacs where as assessed present population (year 2007) of Varanasi city is more than 15.00
lacs.
The projected population by semi-log graph method & Area Density method are
almost similar and seems to be the most reasonable according to the trend of present
population growth of the city.
Therefore, base year, mid year and design population of Varanasi city calculated
by Area Density method has been adopted for design purposes.
Population projections by Area Density Method works out to 1666100, 2473700
and 3317900 in the year 2010, 2025 & 2040 respectively. Floating population in the
Varanasi city has been considered and equivalent population 50000 has been taken in
calculation of water demand in the various stages. Thus the population considered in
various stages in this project comes to 1716100, 2523700 and 3367900.
(3). POPULATION DISTRIBUTION PROJECTIONS
(3).1 Defining Urban Character of Municipal Wards and Peri-Urban Areas
The urban character of Varanasi is complex, extended between the old city of
Varanasi and the more contemporary growths that are happening now in more
peripheral limits of the municipal areas. The high-density of built form in the old city
precludes much growth of population in this area which is adjacent to the ghats along
the west-bank of the Ganga River.
Adjacent to the ghats and the old-city are the densely packed developments that
by their proximity to the ghats and their longevity of existence have become the
cultural fabric of the city. Much of the structures and infrastructure in these areas are in
poor physical condition, however the complexity of development and ownership
patterns makes it difficult to imagine a radical change in the future years in these areas.
For purposes of growth analysis and population increase, these areas have been
collectively categorized as the city core. In this area the expectation is to see almost no
additional growth and the master plan projects policies that are actually aimed at
decongesting these areas possibly resulting in negative growth.
The municipal areas adjacent to the city core are constantly under greater
development pressure due to the proximity to the city core and all the services and
cultural attraction. This area reflects a plotted development pattern with individual land
ownership and development providing the maximum potential for growth directed
through individual investment.
Major catalysts for growth are the plans for development of the new ring road to
the North of the city which will over the next decades come in to developed form,
spawning a Greater urban development density in the northern parts of Varanasi. Also,
the development of Major road systems connecting to the National Highways on the
southern extent of the city is already causing a spurt in development in this area.
Combined with plans for a transport nagar in the waste", extremity of Varanasi and the
connectivity across the Ganga to the eastern bank (To Ramnagar and Mughalsarai) the
growth of urban areas and the population of Varanasi Outside of the municipal wards are
likely to continue to accelerate. .
For the purposes of assigning growth rates by municipal wards, the following
ward characteristics were defined and growth rates allocated. Based on an analysis of
the growth. Characteristics of each ward, depending on its current density, road
network, master-plan designation, and adjacent ward characteristics, the individual ward
growth rates were redefined.
Table -5 Growth characteristics defined
General Rangel Pop. Density as per
Ward Character
Growth Rate* 2001 Census
Ghats 0.10% 842.00
Core Area 0.2% to 1% 601.00
Proximal to City Core 1 % to 5% 210.00
Developed areas adjacent to Varuna 5% to 7.5% 115.00
Open areas adjacent to Varuna 7.5% to 10% 40.00
Near BHU 3% to 10% 162.00
Peripheral Areas 3% to 5% 148.00
* Outliers to these growth rates exist and are a result of localized characteristics which
in instances have a lower or higher growth rate than that for the defined ward
characteristics
The infrastructure is evidently one of the most important catalysts for growth
and its presence, and the.. Condition of the same, shapes the urban growth of the city.
The city of Varanasi is divided by the Varuna river, running west to east, through the
city, in to the Cis-Varuna and the Trans-Varuna regions. The Cis-Varuna area is the
older city area with spiritual and tourist attractions including the river ghats, the
temples, and the old shopping by lanes of the city that attract the tourists. These
attractions remain concentrated in the city core, surrounding which are the older
residential neighborhoods of the city. South of the city core is the Bananas Hindu
University Campus that provides a relief to the expanding high-urban density of
Varanasi, giving way to more rapidly growing areas of the city, in part due to the
availability of open space, and to a large extent due to the connectivity to the central
city by the road networks, as well as the links to the regional highway at the southern
extent of the city.
Directed by the Varuna on the north and the boundary formed by the highway
connectivity on the south, the growth patterns in this part of Varanasi are expected to
be an. infill of available developable space, pushing further out to the west, along and
beyond the railway colony development.
The development patterns evident from the satellite imagery clearly reflect the
influence of the road networks across the urban landscape of Varanasi. As one follows
the urbanization radiating outward from the highly congested city core, the growth
across the Varuna River is funnelled through the limited connectivity cross the river.
This growth extends outward following the traces of the roads leading to Sarnath (north)
and Jaunpur (north-west). On the southern side of the city, the growth rapidly moves
across the network of road reaching south past the BHU campus, towards the highway.
On the west, the growth extends out from the central parts of the city to the railway
colony and other large clusters of development that have emerged outside of the current
municipal extents. On the east side, the Ganga River forms the natural boundary, with
bridges across to Ramnagar and Mughalsarai encouraging growth of these townships,
positioning them as complementary development areas, should the road connections be
enhanced.
Floating population in the Cis-Varuna area has been considered and equivalent
population load has been taken in deriving the water demand in various years.
Wardwise Population Projection for Varanasi city
Ward Area
ID Ward Name Ward Location POP2001 PD2001 POP 2010 PD 2010 POP 2025 PD 2025 POP 2030 PD 2040 POP 2040 PD 2040
in Ha
1 Lahar Tara PROX 29 12,384 427 15,292 527 17,445 602 18,067 623 19191 662
2 Indra Pur Open/ Varuna 235 15,694 67 38,529 164 68,873 293 79,136 337 99507 423
3 Chhittanpura CORE 9 13,135 1,459 15,475 1,719 17,496 1,944 18,269 2,030 19573 2175
4 Narayan Open/ Varuna 186 14,313 77 38,534 207 79,004 425 88,011 473 120450 648
5 Tarna Open/ Varuna 438 13,027 30 43,934 100 106,014 242 129,944 297 177616 406
6 Nadeshar PERIP 78 12,877 165 23,450 301 40,611 521 46,754 559 59138 758
7 Pahadiya Devloped/ Varuna 160 20,506 128 42,623 266 67,467 422 75,939 475 92894 581
8 Kamal Garha CORE 30 15,874 529 17,815 594 19,207 640 19,842 661 20465 682
9 Quazi SaidullapuraCORE 32 14,561 455 16,752 524 18,552 580 19,168 599 20307 635
10 Jalalipura PROX 61 14,608 239 18,336 301 22,587 370 24,311 399 26571 436
11 Rasulpura CORE 17 15,758 927 18,040 1,061 19,836 1,167 20,452 1,203 21575 1269
12 Nawapura CORE 40 13,989 350 16,118 403 18,341 459 19,415 485 20587 515
13 Saraiyan PERIP 107 15,854 148 22,422 210 32,682 305 36,915 345 43730 409
14 Alai Pur PROX 78 12,823 164 18,418 236 24,496 314 26,275 337 29858 383
15 Sarai Surjan PROX 95 13,669 144 30,739 324 51,965 547 58,388 615 71080 748
16 Madan Pura GHAT 6 11,945 1,991 13,770 2,295 15,524 2,587 16,176 2,696 17472 2912
17 Rajghat PERIP 88 22,373 254 31,731 361 44,323 504 49,214 559 56888 646
18 Katehar CORE 8 12,678 1,585 15,605 1,951 18,555 2,319 19,614 2,452 21497 2687
19 Ghausabad PERIP 25 3,150 126 5,793 232 10,383 338 12,094 484 15676 627
20 Ramrepur Open/ Varuna 331 16,228 49 46,547 141 101,823 357 122,825 371 164584 497
21 Sikraul Devloped/ Varuna 147 13,826 94 31,104 212 54,388 370 62,171 423 77,609 528
22 Dara Nagar CORE 26 11,052 425 14,251 548 17,177 661 18,256 702 20337 782
23 Taktakpur Devloped/ Varuna 113 11,881 105 26,285 233 43,720 387 49,639 439 61342 543
24 Senpura CORE 11 7,193 654 8,880 807 10,398 945 10,958 996 12037 1094
25 Mavaiya Open/ Varuna 481 13,169 27 36,433 76 94,147 196 117,681 245 164469 342
26 Jaitpura CORE 23 16,067 699 18,449 802 19,902 865 20,539 893 21473 934
27 Sarnath Open/ Varuna 764 12,049 16 33,364 44 86,136 113 107,765 141 150761 197
28 Shivpurwa PERIP 105 11,757 112 19,659 187 28,337 270 31,549 300 36940 352
29 Baluwabeer CORE 9 10,105 1,123 11,634 1,293 12,875 1,431 13,406 1,490 14114 1568
30 Salem Pura CORE 26 14,312 550 16,675 641 19,375 745 19,437 748 20536 790
31 Khojwan PROX 47 10,684 227 15,546 331 23,034 490 25,619 545 30701 653
32 Loco Hitpura PERIP 81 11,847 146 19,838 245 29,063 359 31,766 392 37136 458
33 Dhup Chandi PROX 60 13,490 225 17,676 295 22,166 369 23,619 394 26481 441
34 Jagat Ganj PROX 53 15,920 300 21,535 406 27,163 513 28,957 546 32487 613
35 Dashaswamedh GHAT 11 9,441 858 10,878 989 12,272 1,116 12,793 1,163 13827 1257
36 Kamalpur CORE 14 14,588 1,042 16,696 1,193 18,363 1,312 18,935 1,353 19982 1427
37 Bag Hada GHAT 20 11,206 560 11,873 994 12,242 612 12,391 620 12606 630
38 Sarsauli Open/ Varuna 148 19,675 133 41,508 280 61,917 418 68,723 464 81924 554
39 Shivala GHAT 22 11,719 533 12,421 565 12,807 582 12,965 589 13195 600
40 Piyari Kala CORE 16 12,275 767 14,012 876 15,578 974 16,143 1,009 17235 1077
Ward Area
ID Ward Name Ward Location POP2001 PD2001 POP 2010 PD 2010 POP 2025 PD 2025 POP 2030 PD 2040 POP 2040 PD 2040
in Ha
41 Ramapura CORE 21 9,700 462 11,038 526 12,093 573 12,381 590 13010 620
42 Raj Mandir GHAT 6 10,749 1,792 12,288 2,048 13,971 2,328 14,558 2,426 15,726 2,621
43 Prahalad Ghat GHAT 6 11,476 1,913 13,673 2,279 15,695 2,616 16,448 2,741 17,894 2,982
44 Garhvasi Tola GHAT 7 9,640 1,377 11,114 1,588 12,528 1,790 13,053 1,865 14,095 2,014
45 Quazi Pura PROX 46 12,576 273 16,182 352 20,224 440 21,431 466 23,978 521
46 Beniya CORE 26 12,781 492 14,543 559 16,164 622 16,754 644 17,907 689
47 Eshwargangi CORE 27 8,177 303 10,656 395 12,871 477 13,615 504 15,046 557
48 Hadha CORE 20 11,621 581 13,212 661 14,206 710 15,196 760 16,223 811
49 Madhyameshwar CORE 20 9,433 472 11,523 576 13,382 669 14,062 703 15,360 768
50 Kameshwar Mahadev
GHAT 7 9,401 1,343 11,164 1,595 12,791 1,827 13,398 1,914 14,564 2,081
51 Raja Bazar Devloped/ Varuna 95 9,273 98 19,049 201 32,524 342 37,193 392 46,456 489
52 Sapta Sagar CORE 13 9,841 757 11,995 923 13,958 1,074 14,659 1,128 16,080 1,237
53 Braham Nal GHAT 16 5,339 334 6,151 384 6,937 434 7,231 452 7,819 489
54 Gola Dina Nath CORE 10 9,284 928 10,448 1,045 11,513 1,151 11,898 1,190 12,642 1,264
55 Pan Dareeba CORE 20 8,269 413 9,365 468 10,387 519 10,748 537 11,451 573
56 Nariya F / BHU 65 17,068 263 24,992 385 33,780 520 36,341 559 41,300 633
57 Pande Haweli CORE 13 7,601 585 8,699 669 9,687 745 10,048 773 10,747 827
58 Lallupura Kalan CORE 17 12,286 723 13,829 813 15,234 896 15,744 926 16,730 984
59 Basniyan CORE 20 13,327 666 14,782 739 15,755 788 16,542 827 16,588 829
60 Lallupura Khurd PROX 63 12,289 195 16,225 258 18,907 300 21,344 339 23,682 376
61 Hukul Ganj Devloped/ Varuna 94 13,781 147 28,311 301 48,414 515 55,387 589 69,221 736
62 Lahang Pura CORE 10 11,634 1,163 13,095 1,309 14,430 1,443 14,910 1,491 15,841 1,584
63 Luxa CORE 33 12,788 388 14,979 454 16,540 501 16,994 515 17,821 540
64 Durga Kund PROX 80 11,142 139 23,187 290 37,838 473 42,052 526 50,337 629
65 Tulsipur PERIP 103 18,082 176 26,093 253 38,599 375 43,083 418 51,998 505
66 Tilbhandeshwar CORE 9 13,397 1,489 14,963 1,663 15,950 1,772 16,283 1,809 16,857 1,873
67 Bangali Tola GHAT 9 6,039 671 6,958 773 7,850 872 8,183 909 8,847 983
68 Sunderpur F / BHU 55 14,414 262 22,635 412 31,000 564 33,464 608 38,262 696
69 Kaal Bhairav CORE 18 8,281 460 9,643 536 10,935 607 11,659 648 12,309 684
70 Revadi Talab CORE 13 9,187 707 9,947 765 10,329 795 10,458 804 10,647 819
71 Karaundi F / BHU 160 13,862 87 42,875 268 75,916 474 85,738 536 105,231 658
72 Sigra PROX 68 9,303 137 16,065 236 25,446 374 28,434 418 34,802 512
73 Shivpur Devloped/ Varuna 121 13,076 108 27,346 226 44,929 371 50,895 421 62,324 515
74 Binayaka PROX 54 14,865 275 17,933 332 21,361 396 22,440 416 24,477 453
75 Bajardiha PERIP 118 19,864 168 27,756 235 40,448 343 44,851 380 53,830 456
76 Sarai Gowardhan CORE 14 7,319 523 8,237 588 9,075 648 9,379 670 9,968 712
77 Bhelupur PROX 46 10,598 230 12,791 266 15,226 317 15,987 348 17,423 363
78 Katuapura CORE 12 9,193 766 10,997 916 12,598 1,050 13,175 1,098 14,273 1,189
79 Nai Basti Devloped/ Varuna 52 10,183 196 16,377 315 22,184 427 24,162 465 28,025 539
80 Om Kaleshwar PROX 24 8,319 347 10,208 425 12,254 511 13,056 544 14,402 600
81 Jangamwadi CORE 21 8,594 409 9,862 470 11,052 526 11,475 546 12,310 586
82 Pandeypur Devloped/ Varuna 76 7,907 104 17,001 224 29,526 388 33,971 447 42,784 563
Water Supply Zone wise Population (Trans Varuna)
P = Part
F.P. = Floating Population
P = Part
F.P. = Floating Population
WATER SUPPLY ZONE-WISE POPULATION, WATER DEMAND AND STORAGE IN
CIS-VARUNA AREA OF VARANASI CITY
Sl. Zone Name of Zone Water requirement in Storage required in ML Storage Deficit No. of OHT Remarks
No. No. 2010 2025 2040 2010 2025 2040 available ML
ML
1 2 3 4 5 6 7 8 9 10 11 12 13
1. 6 London Misson 15.88 22.11 28.40 5.30 7.40 9.50 2.05 7.50 3-2500KL
Zone
2. 7 Cotton Mill Zone 17.96 21.29 24.60 6.00 7.00 8.20 1.25 7.00 2-2500KL+
1-2000KL
3. 8 Rajghat Zone 24.03 30.08 35.89 8.00 10.00 12.00 1.50(CWR) 10.50 4-2500KL Partly thr-
4. 9 Jaitpura Zone 10.11 12.20 14.45 3.40 4.00 4.80 1.25(CWR) 3.50 2-2000KL ough OHT
5. 10 Maidagin 14.70 15.88 18.27 5.00 5.30 6.00 3.00(CWR) 3.00 1-3000KL & partly DP
6. 11 Chauk Zone 16.59 18.65 20.90 5.50 6.20 7.00 7.00 - - Direct pu-
mping thr-
ough Bhe-
lupur WTP
7. 12 Benia Zone 20.51 22.76 25.09 6.80 7.60 8.40 8.40 - -
8. 13 Sigra Zone 18.74 25.33 31.51 6.25 8.50 10.50 2.50 8.00 4-2000KL
9. 15 Bhelupur Zone 42.18 58.15 72.71 14.00 19.40 24.25 24.25 - Direct pu-
mping thr-
ough Bhe-
lupur WTP
10. 16 Lanka Zone 10.43 17.32 23.48 3.50 5.80 7.80 1.00 6.80 2-2500KL +
1-2000KL
Total: 191.13 243.77 295.30 63.75 81.20 98.45 52.20 46.30 46.50KL
DP – Direct Pumping
Water and Storage Requirement in Cis-Varuna area of Varanasi City in different years.
Sl. Year Population Water Water Deficit Storage Capacity (mld) Remarks
Total Existing Deficit
No. Cis-Varuna Requirement availability (mld)
Required
in mld Cis (mld)
Varuna
1 2 3 4 5 6 7 8 9
1. 2010 1188700 191.13 125.00 66.13 63.75 52.20 11.55 Available water at present 125 mld and
storage capacity 52.20 mld
2. 2025 1525000 243.77 125.00 118.77 81.20 52.20 29.00 -
3. 2040 1847500 295.30 125.00 170.30 98.45 52.20 46.45 -
Water demand has been calculated keeping in view the surface source as main source of water supply. The existing TWs shall
be treated as defunct after completion of their useful life.
jnu-r-1
Sl. Name of Projected population Total Requirement Required Discharge Discharge Discharge to be Remarks
No. Zone in 2040 population of water in discharge to be pumped pumped through
Col. (3+4) 2040 in 18 hrs. pumped directly to existing/proposed
(Taking pumping through distributio feeder main (mld)
For For 172.50x existing n system for 18 hrs. Design
general Slum lpcd for RM in 18 from pumping discharge
population general hrs. (mld) central
population water
and 46 lpcd works
for slum (mld) (18
population) hrs.
(mld) pumping)
1 2 3 4 5 6 7 8 9 10(a) 10(b) 11
1. Bhelupura 409400 45500 454900 72.71 96.95 12.56 84.39 - - Direct pumping
2. Sigra 177400 19700 197100 31.51 42.01 10.00 - 32.01 32.00 Balance pumping
through existing
feeder main
3. Chowk 117700 13100 130800 20.90 27.87 18.56 9.31 - Existing R/M from
Bhelupur to Chowk is
sufficient to carry the
required discharge
upto 2025 for which
the pumping
arrangement have
been proposed
4. Benia 141300 15700 157000 25.09 33.45 10.83 - 22.62 23.00 Balance pumping
through proposed
R/M for Benia CWR
5. London 159900 17800 177700 28.40 37.86 - - 37.87 37.90 Pumping through
Mission existing feeder main.
6. Cotton 138500 15400 153900 24.60 32.80 - - 32.80 32.80 -do-
Mill
1 2 3 4 5 6 7 8 9 10(a) 10(b) 11
7. Rajghat 202100 22400 224500 35.89 47.85 - - 47.85 47.85 Pumping through
proposed feeder main
8. Jaitpura 81400 9000 90400 14.45 19.27 - - 19.27 19.30 -do-
9. Maidagin 102900 11400 114300 18.27 24.36 - - 24.36 24.40 -do-
10. Lahartara Outside the municipal limit. -
11. Lanka 132200 14700 146900 23.48 31.31 - - 31.31 31.30 Pumping through
proposed feeder main
1662800 184700 1847500 295.30 393.73 51.95 93.70 248.09 248.55
CALCULATION OF CARRYING CAPACITIES OF EXISTING FEEDER MAIN
(i) 1200mm dia. PSC Rising Main which is nearly 20 years old. The value of C is taken as 109
(ii) 1050mm dia. CI Rising main which is 53 years old. The value of C is taken as 60.
Annual Electric Power Consumption per m head in pumping design discharge= Rs. 11.759 lacs
Sl. Size of pipe in mm Head Actual Head loss Total Cost of Discharge in Kld
No. loss due value due to Head electric In 1200mm In In
to pipe of head friction in loss consumption PSC pipe 1050mm proposed
laid m/ loss pipe in m in lacs Col. (Existing) CI PSC
thousand fittings 6x12.18 existing Rising
m assuming pipe main
10% of
Col.4
1 2 3 4 5 6 7 8(a) 8(b) 8(c)
1. 1200PSC+1050CI+1200PSC 1.97 3.55 0.36 3.91 45.92 147879 57294 188577
2. 1200PSC+1050CI+1400PSC 1.32 2.38 0.24 2.62 30.85 119314 46227 228189
3 1200PSC+1050CI+1500PSC 1.08 1.95 0.20 2.15 25.20 106978 41448 245304
4 1200PSC+1050CI+1600PSC 0.88 1.59 0.16 1.75 20.59 95923 37164 260643
5 1200PSC+1050CI+1800PSC 0.59 1.06 0.10 1.17 13.82 77334 29962 286434
6 1200PSC+1050CI+2000PSC 0.40 0.763 0.07 0.80 9.39 62756 24315 306659
Sl. Length Rete/m length of pipe Cost ofMaintenance Annual Capitalised Total cost Remarks
No. of pipe including cost of pipe in charges maintenance value of Col.
in m excavation, laying & Rs. lacs towards Expenditure annual 11+Col.
jointing etc. rising main Col.7+12 expenditure 14 Rs. lacs
@ ½% lf Rs. lacs factor as
Col.11 Rs. 9.42 Rs.
lacs lacs
9 10 11 12 13 14 15 16
1. 1800 11922+27830+11922.00 930.01 4.65 50.57 476.37 1406.38
2 1800 11922+27830+13531.48 959.09 4.80 35.65 335.82 1294.91
3 1800 11922+27830+15180.06 988.77 4.94 30.14 283.96 1272.73
4 1800 11922+27830+16623.01 1014.75 5.07 25.66 241.75 1256.50 Economical
5 1800 11922+27830+20081.49 1077.00 5.39 19.21 180.96 1257.97
6 1800 11922+27830+25622.43 1176.74 5.88 15.27 143.80 1320.054
From the above 1200mm PSC (existing) + 1050 mm dia. CI (existing) + 1600 mm dia. proposed rising main will be
economical.
Hence provide additional 1600mm dia. PSC Rising main parallel to existing Rising main.
Line Flow in KL/H Actual equivalent population Remarks
No. ( KL/Hx18 )
0.16
1 2 3 4
1 8112 912600 Rate of water supply 150
2 7779 875138
lpcd+15% (UFW) for
3 7446 837675
4 7113 800212 90% population and 40
5 6780 762750 lpcd+15% (UFW) for
6 6363 715838
7 6155 692438 10% population keeping
8 5188 583650 in view the Slum area.
9 2621 294863
10 2413 271350
11 1996 224550
12 1579 177638
13 1162 130725
14 417 46912
15 2567 288788
16 2234 251325
17 1817 204412
18 1015 114188
19 500 56250
20 802 90225
21 333 37463
22 469 52763
23 333 37463
24 417 46912
25 333 37463
26 967 108788
27 550 61875
28 133 14963
29 417 46912
30 417 46912
31 417 46912
32 417 46912
33 417 46912
34 333 37463
35 333 37463
36 333 37463
37 333 37463
38 417 46912
39 1334 150075
40 584 65700
41 417 46912
42 167 18788
43 750 84375
44 333 37463
45 417 46912
(i) CAPACITY OF OVER HEAD TANK
As per design criteria capacity of Over Head Tank will be decided from draw of
pattern:
= 65.41 kld
(c) Hourly rate of pumping(with 18 hrs. of pumping)= 24/18
= 1.3333
(d) From the pumping schedule = Maxm (excess + deficit)
0 hr. to 10 hr. and
14 hr. to 22 hr. = (5.50+1.167)a
= 6.667 ‘a’
Calculation of Balancing Reservoir
18 hrs pumping with peak factor 2.0
Qu Allowable = 77.76/2.5
= 31.10
No. of piles to be used= 184.80/31.10 = 5.94
Say: 6 piles at 120 cm c/c.
Similarly for
Deviation angle, L = 45°
Horizontal thrust, F = 21.64 tonnes
No. of piles =21.64/6.69 = 3.23
Say 4 piles are used 60 cm. Pile cap at spacing c/c
90cm length 2.00m.
For Deviation angle, L = 90°
Horizontal thrust, F = 39.98 tonnes
assuming a pile of 400m dia. and length 3.0m
Qu = 9x0.4x40 (300-1.5x40)
= 34560 kg = 34.56 tonnes
Qa = 34.56/2.5 = 13.82 tonnes
No. of pile = 39.98/13.82
= 2.89, Say 3 piles are used 70 cm pile cap.
6. Diameter of pipe – 500mm.
Deviation angle L= 22½°
Cross sectional area A = π/4 x 502 = 1963.75
Horizontal thrust = 2 PA Sin L/2
= 2 x 10 x 1963.75x 0.195 x 10-3
= 7.66 tonnes.
Assuming a pile of 30cm diameter and 2.0m length
Ultimate lateral load carrying capacity is given by
Qu = 9 CU D (L-1.5D)
Where CU= .4 kg/cm2
D= 30cm
L= 200cm
Qu = 9x0.4x30(200-1.5x30)
= 16740 kg = 16.74 tonnes
Taking a factor of safety of 2.5
Allowable load = 16.74/2.5
= 6.70 tonnes
No. of pile = 7.66/6.70
= 1.14, Say 2 Nos.
Two piles are used 30cm dia. & length 2.0m with a cap of 60cm. thick should be
provided at a spacing of 3D = 3x30= 90 cm c/c Similarly,
‘Technical Calculations’
2 Pumps of 80 Kl. per minute will be installed one will be working and another
as stand by at a time.
2. Duty Calculation
(ii) 33 KV grade XLPE cable = Outgoing panel to starter & starter to motor)
( 1x3x70 sq. mm. )
(iii) 11 KV grade XLPE cable = Outgoing panel to starter & starter to motor)
( 1x3x70 sq. mm. )
1. Data provided / furnished by Jal Sansthan vide letter No. 2465/Karya –4/85 dated 27.06.07
Assistant Engineer
Calculation for duties of Pumping Plants to be installed in different C.W.R. for
filling different capacity of Over HeadTanks
(i) For 3000 Kl. Over Head Tank
Duty and Technical data of Pumping Plants for filling the 3000 Kl. capacity CWR
for Over Head Tank – 1 No.
Duty and Technical data of Pumping Plants for filling the 2000 Kl. capacity CWR
for Over Head Tank – 8 No.
i. Discharge of Pump = 2800 lpm
ii. Head = 32 m.
iii. Sp. grav. of water = 1.0
iv. W.H.P. = 19.91
v. Efficiency of Pump = 80%
vi. H.P. input to Pump = 24.89
vii. Efficiency of Motor = 90%
viii. H.P. input to Motor =27.65
ix. KWI to Motor = 20.63
x. considering 15% margin of power in motor as per water supply manual
rating of motor required= 28.62 H.P.
xi. Next commercial rating of motor = 30 H.P = 22.38 K.W.
xii. Working voltage = 3 phase 415 ± 6%. A.C.
xiii. Size of pipes, S.V. & NRV in suction side = 200 mm. dia
xiv. Size of pipes, S.V. & NRV in delivery side = 200 mm. dia
xv. Size of common header line and NVR when
2 pumps will be in parallel = 300 mm. dia
Duty and Technical data of Pumping Plants for filling the 1250 Kl. capacity CWR
for Over Head Tank – 2 No.
Duty and Technical data of Pumping Plants for filling the 800 Kl. capacity CWR
for Over Head Tank – 1 No.
i. Discharge of Pump = 1200 lpm
ii. Head = 32 m.
iii. Sp. grav. of water = 1.0
iv. W.H.P. = 8.53
v. Efficiency of Pump = 80%
vi. H.P. input to Pump = 10.66
vii. Efficiency of Motor = 90%
viii. H.P. input to Motor = 11.85
ix. KWI to Motor = 8.84
x. considering 20% margin of power in motor as per water supply manual
rating of motor required = 12.79 H.P.
xi. Next commercial rating of motor = 15 H.P
xii. Working voltage = 3 phase 415 ± 6%. A.C.
xiii. Size of pipes, S.V. & NRV in suction side = 150 mm. dia
xiv. Size of pipes, S.V. & NRV in delivery side = 150 mm. dia
xv. Size of common header line and NVR when
2 pumps will be in parallel = 200 mm. dia
Transformer Rating
ASSISTANT ENGINEER