MM
SNO Date Module
1 11/5/2020 MM
2 11/5/2020 MM
3 11/7/2020 MM
4 11/7/2020 MM
5 11/7/2020 MM
6 11/7/2020 MM
7 11/7/2020 MM
8 11/7/2020 FI
9 11/7/2020 MM
10 11/7/2020 MM
11 11/7/2020 MM
12 11/7/2020 MM
13 11/11/2020 MM
14 11/14/2020 MM
15 11/15/2020 MM
MM
16 11/17/2020
17 11/19/2020 MM
18 11/19/2020 MM
19 11/20/2020 MM
20 11/23/2020 MM
21 11/23/2020 MM
22 11/25/2020 MM
23 11/28/2020 MM
24 12/1/2020 MM
Description User
Prince/trilok/A
Authorization issue store/purchase/Gate Entry man
PO Item Text character is very less( At least 2-3 lines are must to
mention Make & specifications)
Prince
Additional One page is required (discussion done with Nikhil done &
1 page will be added)
Prince
CRD /TUBE requirement can’t be clubbed in Single PO (release
strategy is not present for this Po) Prince
Bug in Releae strategy. Release startegy not triggered in
Consumable PO Prince
In case of Subcon PO, wrong receipt quantity is showing in Gate
entry report. Trilok
In some cases gate entry number is incorrect. Trilok
Width thickness mismatch error. Trilok
User wants to transfer material from CRCA to tube plant of Finished Gaurav/
stage. Shashikant
Discussion
Change
done, Release
in PR
MM Arvind strategy
release
explained to
strategy
arvind sir. Confirmation pending at
16 11/16/2020 HSL end
Nikhil